presentasi 93
DESCRIPTION
DCPTRANSCRIPT
PRESENTASI PRESENTASI
LAPORAN PENGUJIAN NILAI CBR LAPANGAN DENGAN LAPORAN PENGUJIAN NILAI CBR LAPANGAN DENGAN
DCP DCP
(DYNAMIC CONE PENETROMETER) (DYNAMIC CONE PENETROMETER)
JALANJALAN BRIGJEND. SUDIHARTO BARAT SEMARANG BRIGJEND. SUDIHARTO BARAT SEMARANG
ANGGOTA KELOMPOKANGGOTA KELOMPOK
• Budi sasmita ajiBudi sasmita aji 51134130875113413087
• Anienthio Prananda FAnienthio Prananda F 51134130605113413060
• Ari Shiyam PAri Shiyam P 51134130615113413061
• Yusita DykaYusita Dyka 51134130755113413075
• Roki RegeanRoki Regean 51134130895113413089
• Evi KristianingrumEvi Kristianingrum 51134130535113413053
• Ifan Owel VedroIfan Owel Vedro 51134130625113413062
• Wafin S TuladaWafin S Tulada 51134130575113413057
DYNAMIC CONE PENETROMETERDYNAMIC CONE PENETROMETERJALANJALAN BRIGJEND. SUDIHARTO BARAT SEMARANG BRIGJEND. SUDIHARTO BARAT SEMARANG
Waktu dan Tempat Pelaksanaan
Instrumen Pelaksanaan
Hasil dan Pembahasan
Kesimpulan
WAKTU DAN TEMPAT PELAKSANAANWAKTU DAN TEMPAT PELAKSANAAN
TempatTempat :: Jalan Jalan Brigjen Sudiarto Brigjen Sudiarto
“Barat” “Barat” KecamatanKecamatan Pedurungan Pedurungan, , Kota Kota
SemarangSemarang
Hari dan tanggalHari dan tanggal :: SabtuSabtu, , 3030 MeiMei 201 20155
INTRUMEN PELAKSANAANINTRUMEN PELAKSANAAN
Alat
Prosedur Cara uji CBR dengan Dynamic Cone Penetrometer (DCP). Departemen
Pekerjaan Umum`
Alat tulis Data tabel
Langkah Kerja1.Pilih titik pengujian yang akan dilakukan pengujian. Biasanya dilakukan secara zig zag pada arah dan jarak tertentu.2.Letakkan alat pada posisi titik pengujian secara vertikal tegak lurus terhadap permukaan tanah. Bila terjadi penyimpangan sedikit saja akan menyebabkan kesalahan pengukuran yang relatif besar.3.Atur batang berskala sehingga menunjukkan angka 0 dan catat dalam centimeter.4.Naikkan palu geser sampai menyentuh bagian bawah pegangan,lalu lepaskan sehingga palu jatuh secara bebas menumbuk anvil atau landasan penumbuk sambil menjaga agar posisi alat tidak menjadi miring. Tumbukan ini akan menyebabkan konus menembus lapisan yang akan diuji.5.Catat jumlah pukulan dan kedalaman penetrasinya ke dalam formulir/blanko percobaan.6.Hentikan pengujian jika jumlah pukulan telah mencapai 40 kali atau kedalaman penetrasi antara 70 s/d 90 cm.7.Cabut batang dan konus yang telah masuk ke dalam tanah dengancara menumbukkan palu geser ke atas hingga menyentuh plat alas pemegang alat.
HASIL DAN PEMBAHASANHASIL DAN PEMBAHASANHasil Pengujian DCP Jalan Brigjen Sudiarto “Barat”
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
2.22 9.19
1 1 2 2
1 2 1.2 3.2
1 3 1.1 4.3
1 4 1.6 5.9
1 5 5.1 11
1 6 2.3 13.3
1 7 5.3 18.6
5.10 3.601 8 5.9 24.5
1 9 4.3 28.8
1 10 1.9 30.7
1.67 12.661 11 1.3 32
1 12 1.6 33.6
1 13 2.1 35.7
1 14 5.4 41.1
3.69 5.18
1 15 4.8 45.9
1 16 2.1 48
1 17 3.5 51.5
1 18 3.2 54.7
1 19 2.9 57.6
1 20 4.4 62
1 21 5 67
1 22 3.9 70.9
1 23 4.1 75
1 24 3 78
Titik 1
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
2.87 6.88
1 1 4.5 4.5
1 2 2.5 7
1 3 2.9 9.9
1 4 3.6 13.5
1 5 4.1 17.6
1 6 2.3 19.9
1 7 2.3 22.2
1 8 2.8 25
1 9 3.2 28.2
1 10 2.6 30.8
1 11 2.5 33.3
1 12 2 35.3
1 13 2.8 38.1
1 14 2 40.1
1 15 2.1 42.2
1 16 1.9 44.1
1 17 2.4 46.5
1 18 2.7 49.2
1 19 3.9 53.1
1 20 4.2 57.3
1 21 4.3 61.6
9.20 1.851 22 5.2 66.8
1 23 13.2 80
Titik 2
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
1.48 14.44
1 1 2 2
1 2 1.4 3.4
1 3 1 4.4
5 8 5.7 10.1
1 9 1.3 11.4
5 14 8.5 19.9
1 15 2 21.9
1 16 2.4 24.3
1 17 2.1 26.4
1 18 1.4 27.8
1 19 1.3 29.1
1 20 1 30.1
1 21 1.2 31.3
1 22 1.3 32.6
1 23 1.5 34.1
1 24 2.7 36.8
3.96 4.78
1 25 5.9 42.7
1 26 3 45.7
1 27 3.5 49.2
1 28 4.1 53.3
1 29 3.3 56.6
1 30 4.2 60.8
7.75 2.251 31 8 68.8
1 32 7.5 76.3
Titik 3
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
0.85 27.00
1 1 1.7 1.7
1 2 1.1 2.8
1 3 1 3.8
1 4 1 4.8
5 9 4 8.8
5 14 3.1 11.9
5 19 3.5 15.4
5 24 5 20.4
1 25 1.6 22
1.50 14.25
5 30 6.6 28.6
1 31 1.6 30.2
5 36 8.3 38.5
5 41 7.5 46
1 42 2.6 48.6
2.51 7.98
1 43 2.8 51.4
1 44 2.7 54.1
1 45 2.6 56.7
1 46 2.7 59.4
1 47 3 62.4
1 48 3.2 65.6
1 49 2.7 68.3
1 50 1.9 70.2
1 51 1 71.2
Titik 4
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 00
2.66 7.50
1 1 3.13.1
1 2 1.95
1 3 2.1 7.1
1 4 1.78.8
1 5 19.8
1 6 6.516.3
1 7 2.618.9
1 8 2.121
1 9 2.923.9
1 10 225.9
1.30 16.741 11 1.6
27.5
1 12 1.228.7
1 13 1.129.8
1 14 1.731.5
2.10 9.74
1 15 1.833.3
1 16 235.3
1 17 3.538.8
1 18 1.240
1 19 2.142.1
1 20 2.244.3
1 21 1.645.9
1 22 1.847.7
1 23 2.249.9
1 24 1.851.7
1 25 1.853.5
1 26 2.355.8
1 27 2.858.6
1 28 2.360.9
1 29 2.963.8
1 30 1.164.9
1 31 1.166
1 32 1.867.8
1 33 1.469.2
1 34 5.274.4
1 35 1.375.7
Titik 5
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 00
3.66 5.22
1 1 2.82.8
1 2 2.55.3
1 3 3.79
1 4 5.414.4
1 5 3.918.3
1 6 2.120.4
1.72 12.25
1 7 1.622
1 8 1.823.8
1 9 1.225
1 10 1.626.6
1 11 1.628.2
1 12 1.629.8
1 13 1.731.5
1 14 1.733.2
1 15 1.835
1 16 2.337.3
1 17 1.839.1
1 18 1.941
1 19 243
2.53 7.90
1 20 2.345.3
1 21 2.347.6
1 22 2.450
1 23 2.352.3
1 24 2.654.9
1 25 2.457.3
1 26 2.259.5
1 27 362.5
1 28 3.365.8
1 29 3.469.2
1.28 17.04
1 30 1.670.8
1 31 1.272
1 32 173
1 33 1.374.3
1 34 1.375.6
Titik 6
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
1.52 14.09
1 1 2.4 2.4
1 2 1.6 4
1 3 1.5 5.5
1 4 1.6 7.1
1 5 1.1 8.2
1 6 1.3 9.5
1 7 1.3 10.8
1 8 1.2 12
1 9 1.4 13.4
1 10 1.6 15
1 11 1.8 16.8
1 12 1.5 18.3
1 13 1.6 19.9
1 14 1.6 21.5
1 15 1.6 23.1
1 16 1.9 25
1 17 2.6 27.6
1 18 1.8 29.4
1 19 1.2 30.6
5 24 6.5 37.1
1 25 1.2 38.3
1 26 2.3 40.6
1 27 1.3 41.9
5 32 6.6 48.5
1 33 1.9 50.4
3.00 6.531 34 2.6 53
1 35 3.3 56.3
1 36 3.1 59.4
1 37 2.6 62
0.54 44.985 42 2.4 64.4
5 47 3 67.4
5 52 5.3 72.7
1.50 14.251 53 1.4 74.1
1 54 1.675.7
Titik 7
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 00
2.30 8.811 1 2.7
2.7
1 2 1.8 4.5
1 3 2.46.9
5 8 4.911.8
1.33 16.271 9 1.2
13
1 10 1.414.4
1 11 1.415.8
1 12 1.517.3
1.79 11.66
1 13 1.719
1 14 1.2 20.2
1 15 2.2 22.4
1 16 1.924.3
1 17 1.826.1
1 18 1.5 27.6
1 19 1.328.9
1 20 1.430.3
1 21 1.5 31.8
1 22 233.8
1 23 1.8 35.6
1 24 1.8 37.4
1 25 2.1 39.5
1 26 2.141.6
1 27 3.3 44.9
1 28 1.1 46
1 29 2.648.6
2.27 8.96
1 30 1.8 50.4
1 31 2 52.4
1 32 2.454.8
1 33 2.156.9
1 34 2.2 59.1
1 35 2.4 61.5
1 36 2.363.8
1 37 2.366.1
1 38 2.568.6
1 39 2.471
1 40 2.373.3
1 41 2.575.8
Titik 8
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)
PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK
LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :
STA/KM :1 TANGGAL :30-05-2015
UKURAN KONUS :30°
BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR
TUMBUKAN TUMBUKAN PENETRASI
(cm) (cm) (cm/tumbukan) (%)
0 0 0 0
2.58 7.76
1 1 2.8 2.8
1 2 2.2 5
1 3 2.8 7.8
1 4 3 10.8
1 5 2.4 13.2
1 6 1.8 15
1 7 4.1 19.1
1 8 2.7 21.8
1 9 2.3 24.1
1 10 2.3 26.4
1 11 1.9 28.3
1 12 2.8 31.1
1 13 1.9 33
1 14 2.4 35.4
1 15 2.5 37.9
1 16 2.8 40.7
1 17 3.1 43.8
1 18 3.8 47.6
5.03 3.65
1 19 4.4 52
1 20 5.4 57.4
1 21 5.7 63.1
1 22 4.5 67.6
1 23 4.4 72
1 24 5.8 77.8
Titik 9
Cara Perhitungan
Menghitung DCPDCP = (Penetrasi Awal-Penetrasi Akhir)/Kum. Tum.
= (77.8-0)/24= 3.24 cm/tumbukan
Menghitung CBRUkuran konus 30o
Log10 (CBR) = 1.352-1.125 Log10(cm/tumbukan)Log10 (CBR) = 1.352- 1.125 Log10 x 3.24
= 5.99 %
Nilai CBR = -3.9516x + 9.48470.9 = -3.9516x + 9.48470.9 – 9.4847 = -3.9516x-8.5847 = -3.9516x0 = -3.9516x+8.5847X = 8.5847Jadi, nilai CBR 90% adalah 8.5847%
KESIMPULANKESIMPULANDari percobaan di atas dapat ditarik kesimpulan:Dari percobaan di atas dapat ditarik kesimpulan:
•Dynamic Cone Penetrometer merupakan alat yang sederhana Dynamic Cone Penetrometer merupakan alat yang sederhana
dalam pengoprasiannya untuk mendapatkan harga CBR.dalam pengoprasiannya untuk mendapatkan harga CBR.
•Dari Dynamic Cone Penetrometer ini dapat diketahui nilai CBR Dari Dynamic Cone Penetrometer ini dapat diketahui nilai CBR
langsung lapangan melalui grafik standar yang ada.langsung lapangan melalui grafik standar yang ada.
•Dari hasil praktikum didapatkan bahwa nilai CBR 90% adalah %Dari hasil praktikum didapatkan bahwa nilai CBR 90% adalah %