presentasi tor (term of references) manajemen proyek
DESCRIPTION
menjelaskan tentang kerangka kerja proyek sistem informasi english describes the framework for information systems projectTRANSCRIPT
![Page 1: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/1.jpg)
Kerangka Acuan Kerja (Term Of References)Sistem Pakar Determinasi Batuan
Beku
![Page 2: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/2.jpg)
AHMAD RUDINI 09.12.4121
DANANG REZKIHI ADIYOGA 10.12.5259
EMILIYANA YESINTA 10.12.5270
TS. MUTIARA FATWA INDHA HANA 10.12.5274
VENI NUR ROFIQOH ZEN 10.12.5296
ARIF CAHYA BASKARA 10.12.5303
ANDI SAPUTRA 10.12.5305
SEPTIA KHOLID WIBISONO 10.12.5307
ANSELMUS DIMAS PRASETYO 10.12.5316
AHMAD TAFTAZANI 10.12.5320
DIAZ ARTA GUMILAR 10.12.5331
TIM
DIVISI
TOR
![Page 3: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/3.jpg)
Tempat penelitian Sdr. Anas Ubanan
![Page 4: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/4.jpg)
Apa sih keinginannya ??
Jenis Batuan Jenis Batuan Ciri – ciri
Ciri – ciri
Spesifik batuanSpesifik batuan
Kandungan Mineral
Kandungan Mineral
Informasi Determinasi Batuan Beku
Derajat KeasamanDerajat Keasaman
Warna Warna
Tekstur Tekstur
![Page 5: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/5.jpg)
Kerangka acuan kerja adalah landasan atau rujukan kerja yang digunakan sebagai dasar tata kelola dan tata laksana suatu pekerjaan.
![Page 6: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/6.jpg)
Aktivitas Pokok
SRA (System Requirement Analysis)
Modeling / Designing System
TOR (Term Of References)
Dasar Teori
Analisa Pengembangan Sistem
![Page 7: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/7.jpg)
Penanggung JawabPimpro
Anggota Proyek
Project Manager
Notulen
![Page 8: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/8.jpg)
Sumber Daya
Kebutuhan SDM
Kebutuhan non-SDM
Kriteria batuanKriteria batuan Tools penunjangTools penunjang
Tim pimproTim pimpro Tim managerTim manager
![Page 9: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/9.jpg)
Pelaksanaan Pengumpulan DataSurvei Pendahuluan
Survei Inventarisasi Batuan Beku
![Page 10: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/10.jpg)
Pengolahan Data
Penataan dan penomoran
Inventarisasi
Pengkodean
Pemasukan
Editing dan validasi
Verifikasi dan penggabungan
![Page 11: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/11.jpg)
Kebutuhan Tenaga Ahli
Database Engineer => 1 org
Team Leader => 1 orgAhli Geologi => 1 org
System analis => 2 orgProgrammer Android => 2 org
![Page 12: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/12.jpg)
Diagram Time Line
Analisis kebutuhan
Desian
SistemCoding Program
Testing
Implementasi System
Minggu ke 1 2 3 4 5 6 7 8
![Page 13: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/13.jpg)
Hasil yang diharapkan
Dokumen hasil survey dan analisis
Dokumen manual sistem
Dokumen spesifikasi dan desain
Dokumen implementasi
![Page 14: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/14.jpg)
![Page 15: Presentasi tor (term of references) manajemen proyek](https://reader033.vdocuments.pub/reader033/viewer/2022061214/549d01f7b47959a0318b48ec/html5/thumbnails/15.jpg)
Terima Kasih....