process improvement of housing in washing machine · 2014. 4. 22. · prasert sriboonchandr * wirot...

7
. . 2556 16-18 2556 Process Improvement of Housing in Washing Machine * E-mail: [email protected] * Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, Faculty of Industrial Technology and Management King Mongkuts University of Technology North Bangkok E-mail: [email protected] * 36 39.1 2 64.3 Abstract This research project aims to improve the manufacturing process of the washing machine. Operation step consist of the study of production processes. After analyzing the current problems we found the production capacity is not sufficient to support the project in the next process or bottlenecks in process. After analysis using flow charts, we found the process steps are not necessary, have been waiting, how to work hard, transportation distance is too far, are often the work piece and the main equipment in the production of high value. Proposed a technique to improve the engineering and production line balancing. The result of the update found around the bottleneck positions, reduced 36 second or 39.1 percent, the number of employees in the production reduced 2 people and improve the capacity increase of 64.3 percent. Keywords: Washing Machine, IE Technique, Line Balancing

Upload: others

Post on 10-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

Process Improvement of Housing in Washing Machine

*

E-mail: [email protected]*

Prasert Sriboonchandr * Wirot Sae-ho

Department of Industrial Management, Faculty of Industrial Technology and Management King Mongkut�s University of Technology North Bangkok

E-mail: [email protected] *

36 39.1 2

64.3

Abstract

This research project aims to improve the manufacturing process of the washing machine. Operation step

consist of the study of production processes. After analyzing the current problems we found the

production capacity is not sufficient to support the project in the next process or bottlenecks in process. After analysis using flow charts, we found the process steps are not necessary, have been waiting, how

to work hard, transportation distance is too far, are often the work piece and the main equipment in the production of high value. Proposed a technique to improve the engineering and production line balancing.

The result of the update found around the bottleneck positions, reduced 36 second or 39.1 percent, the number of employees in the production reduced 2 people and improve the capacity increase of 64.3

percent.

Keywords: Washing Machine, IE Technique, Line Balancing

Page 2: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

1.

[1]

1

1

2.

3.

4.

2

2

2

5.

1 2

1

Page 3: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

2

1 2

8

2

2

5

#1 #2 3

3

3

62.79

6.

ECRS

[2]

1

440412 419 433

456

273

0

100

200

300

400

500

8

127

Page 4: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

1

1) -> 2) -> 3) -> 4) #1 -> 5) #2 1) -> 2)

-> 3) -> 4) ( ) -> 5) ( ) -> 6)#1 -> 7) #2 -> 8) ( )

2

2

3

3 ( / )

6

Page 5: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

4

4

5 Conveyor 1 ST#2 ST#1, ST #2 Turn table 50

5 2

ST#1 ST#2 ( )

6 1 � �

Page 6: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

6

7

7

( )

8

8

Page 7: Process Improvement of Housing in Washing Machine · 2014. 4. 22. · Prasert Sriboonchandr * Wirot Sae-ho Department of Industrial Management, ... production capacity is not sufficient

. . 2556 16-18 2556

9

7.

4 5

4

5

8.

36 39.1 2

64.3

[1] . 2554.

. 2554, 20-

21 2554. [2] . . :

( - ), 2547