INFORME DE PRODUCCION SEMANA 09 - COSTO DIRECTO POR PRTIDA - COMPARADO CON EL PRESUPUESTO INTERNO (SETIEMBRE 2014) PRESUPUESTO DESCRIPCION Unidad 15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 21-Sep 28-Sep 5-Oct 12-Oct 19-Oct 26-Oct 2-Nov 9-Nov SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SF-4.02 EXCAVACION EN ROCA Costo Directo S/. 56,847.83 58,928.41 7,144.75 4,097.50 4,867.38 2,341.00 0.00 0.00 0.00 0.00 Cantidad m3 1,176.73 1,106.73 128.00 90.40 94.80 15.00 0.00 0.00 0.00 0.00 Costo Unitario S/./m3 48.31 53.25 55.82 45.33 51.34 156.07 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 53,466.13 6,183.68 4,367.22 4,579.79 724.65 0.00 0.00 0.00 0.00 Margen Costo Directo S/. (5,462.28) (961.07) 269.72 (287.59) (1,616.35) 0.00 0.00 0.00 0.00 SF-4.03 PERFORACION EN ROCA PARA ANCLAJES Costo Directo S/. 13,270.50 1,543.62 0.00 1,543.62 0.00 0.00 0.00 0.00 0.00 0.00 Cantidad Und 270.00 36.00 0.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 Costo Unitario S/./Und 48.31 42.88 0.00 42.88 0.00 0.00 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 1,739.16 0.00 1,739.16 0.00 0.00 0.00 0.00 0.00 0.00 Margen Costo Directo S/. 195.54 0.00 195.54 0.00 0.00 0.00 0.00 0.00 0.00 SF-4.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. <1KM Costo Directo S/. 27,889.36 20,499.82 2,160.00 1,620.00 2,160.00 0.00 0.00 0.00 0.00 0.00 Cantidad m2 3,220.48 1,738.33 128.00 90.40 47.40 0.00 0.00 0.00 0.00 0.00 Costo Unitario S/./m3 8.66 11.79 16.88 17.92 45.57 0.00 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 15,053.94 1,108.48 782.86 410.48 0.00 0.00 0.00 0.00 0.00 Margen Costo Directo S/. (5,445.88) (1,051.52) (837.14) (1,749.52) 0.00 0.00 0.00 0.00 0.00 SF-5.01 SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4" Costo Directo S/. 7,466.15 2,258.96 0.00 2,258.96 0.00 0.00 0.00 0.00 0.00 0.00 Cantidad m2 278.38 80.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00 Costo Unitario S/./m2 26.82 28.24 0.00 28.24 0.00 0.00 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 2,145.60 0.00 2,145.60 0.00 0.00 0.00 0.00 0.00 0.00 Margen Costo Directo S/. (113.36) 0.00 (113.36) 0.00 0.00 0.00 0.00 0.00 0.00 SF-6.02 HABILT. Y COLOCACIÓN DE ACERO DE REFUERZO Fy=4200 Kg/cm2 Costo Directo S/. 195,354.96 47,560.81 456.00 20,710.09 21,406.27 4,988.45 0.00 0.00 0.00 0.00 Cantidad m2 56,954.80 15,779.20 196.85 6,895.28 7,215.27 1,471.80 0.00 0.00 0.00 0.00 Costo Unitario S/./kg 3.43 3.01 2.32 3.00 2.97 3.39 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 54,122.66 675.21 23,650.81 24,748.39 5,048.26 0.00 0.00 0.00 0.00 Margen Costo Directo S/. 6,561.85 219.21 2,940.73 3,342.11 59.81 0.00 0.00 0.00 0.00 SF-7.01.01 CONCRETO PARA ZAPATAS f'c = 280 kg/cm2 Costo Directo S/. 74,365.37 27,286.20 0.00 0.00 27,286.20 0.00 0.00 0.00 0.00 0.00 Cantidad m2 184.80 68.91 0.00 0.00 68.91 0.00 0.00 0.00 0.00 0.00 Costo Unitario S/./m3 402.41 395.97 0.00 0.00 395.97 0.00 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 27,729.71 0.00 0.00 27,729.71 0.00 0.00 0.00 0.00 0.00 Margen Costo Directo S/. 443.51 0.00 0.00 443.51 0.00 0.00 0.00 0.00 0.00 SF-7.02.02 ENC. Y DESENC. NORMAL Y CARAVISTA EN ESTRIBOS Y ALETAS Costo Directo S/. 39,238.89 3,549.37 0.00 0.00 459.00 3,090.37 0.00 0.00 0.00 0.00 Cantidad m2 718.16 48.28 0.00 0.00 0.00 48.28 0.00 0.00 0.00 0.00 Costo Unitario S/./m2 54.64 73.52 0.00 0.00 0.00 64.01 0.00 0.00 0.00 0.00 Costo Directo Operativo S/. 2,637.93 0.00 0.00 0.00 2,637.93 0.00 0.00 0.00 0.00 Margen Costo Directo S/. (911.44) 0.00 0.00 (459.00) (452.44) 0.00 0.00 0.00 0.00 ACUMULADO TOTAL COSTO REAL 161,627.18 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! TOTAL COSTO INTERNO 156,895.12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! MARGEN SOBRE COSTO INTERNO -4,732.06 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! -3.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -4,732.06 UM. SOBRE COSTO INTERNO -3.02% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! COSTO INTERNO COSTO REAL ACUMULADO

Upload: wilfredo-neyra-cisneros

Post on 05-Dec-2015

9 views

Category:

Documents


2 download

DESCRIPTION

hoja de planificacion y control de obras

TRANSCRIPT

Page 1: programacion 1

INFORME DE PRODUCCION SEMANA 09 - COSTO DIRECTO POR PRTIDA - COMPARADO CON EL PRESUPUESTO INTERNO (SETIEMBRE 2014)

PRESUPUESTO

DESCRIPCION Unidad15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov

21-Sep 28-Sep 5-Oct 12-Oct 19-Oct 26-Oct 2-Nov 9-Nov

SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13

SF-4.02 EXCAVACION EN ROCA

Costo Directo S/. 56,847.83 58,928.41 7,144.75 4,097.50 4,867.38 2,341.00 0.00 0.00 0.00 0.00Cantidad m3 1,176.73 1,106.73 128.00 90.40 94.80 15.00 0.00 0.00 0.00 0.00

Costo Unitario S/./m3 48.31 53.25 55.82 45.33 51.34 156.07 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 53,466.13 6,183.68 4,367.22 4,579.79 724.65 0.00 0.00 0.00 0.00

Margen Costo Directo S/. (5,462.28) (961.07) 269.72 (287.59) (1,616.35) 0.00 0.00 0.00 0.00

SF-4.03 PERFORACION EN ROCA PARA ANCLAJES

Costo Directo S/. 13,270.50 1,543.62 0.00 1,543.62 0.00 0.00 0.00 0.00 0.00 0.00Cantidad Und 270.00 36.00 0.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo Unitario S/./Und 48.31 42.88 0.00 42.88 0.00 0.00 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 1,739.16 0.00 1,739.16 0.00 0.00 0.00 0.00 0.00 0.00

Margen Costo Directo S/. 195.54 0.00 195.54 0.00 0.00 0.00 0.00 0.00 0.00

SF-4.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. <1KM

Costo Directo S/. 27,889.36 20,499.82 2,160.00 1,620.00 2,160.00 0.00 0.00 0.00 0.00 0.00Cantidad m2 3,220.48 1,738.33 128.00 90.40 47.40 0.00 0.00 0.00 0.00 0.00

Costo Unitario S/./m3 8.66 11.79 16.88 17.92 45.57 0.00 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 15,053.94 1,108.48 782.86 410.48 0.00 0.00 0.00 0.00 0.00

Margen Costo Directo S/. (5,445.88) (1,051.52) (837.14) (1,749.52) 0.00 0.00 0.00 0.00 0.00

SF-5.01 SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4"

Costo Directo S/. 7,466.15 2,258.96 0.00 2,258.96 0.00 0.00 0.00 0.00 0.00 0.00Cantidad m2 278.38 80.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo Unitario S/./m2 26.82 28.24 0.00 28.24 0.00 0.00 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 2,145.60 0.00 2,145.60 0.00 0.00 0.00 0.00 0.00 0.00

Margen Costo Directo S/. (113.36) 0.00 (113.36) 0.00 0.00 0.00 0.00 0.00 0.00

SF-6.02 HABILT. Y COLOCACIÓN DE ACERO DE REFUERZO Fy=4200 Kg/cm2

Costo Directo S/. 195,354.96 47,560.81 456.00 20,710.09 21,406.27 4,988.45 0.00 0.00 0.00 0.00Cantidad m2 56,954.80 15,779.20 196.85 6,895.28 7,215.27 1,471.80 0.00 0.00 0.00 0.00

Costo Unitario S/./kg 3.43 3.01 2.32 3.00 2.97 3.39 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 54,122.66 675.21 23,650.81 24,748.39 5,048.26 0.00 0.00 0.00 0.00

Margen Costo Directo S/. 6,561.85 219.21 2,940.73 3,342.11 59.81 0.00 0.00 0.00 0.00

SF-7.01.01 CONCRETO PARA ZAPATAS f'c = 280 kg/cm2

Costo Directo S/. 74,365.37 27,286.20 0.00 0.00 27,286.20 0.00 0.00 0.00 0.00 0.00Cantidad m2 184.80 68.91 0.00 0.00 68.91 0.00 0.00 0.00 0.00 0.00

Costo Unitario S/./m3 402.41 395.97 0.00 0.00 395.97 0.00 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 27,729.71 0.00 0.00 27,729.71 0.00 0.00 0.00 0.00 0.00

Margen Costo Directo S/. 443.51 0.00 0.00 443.51 0.00 0.00 0.00 0.00 0.00

SF-7.02.02 ENC. Y DESENC. NORMAL Y CARAVISTA EN ESTRIBOS Y ALETAS

Costo Directo S/. 39,238.89 3,549.37 0.00 0.00 459.00 3,090.37 0.00 0.00 0.00 0.00Cantidad m2 718.16 48.28 0.00 0.00 0.00 48.28 0.00 0.00 0.00 0.00

Costo Unitario S/./m2 54.64 73.52 0.00 0.00 0.00 64.01 0.00 0.00 0.00 0.00

Costo Directo Operativo S/. 2,637.93 0.00 0.00 0.00 2,637.93 0.00 0.00 0.00 0.00

Margen Costo Directo S/. (911.44) 0.00 0.00 (459.00) (452.44) 0.00 0.00 0.00 0.00

ACUMULADO

TOTAL COSTO REAL 161,627.18 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

TOTAL COSTO INTERNO 156,895.12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

MARGEN SOBRE COSTO INTERNO -4,732.06 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

-3.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

-4,732.06MARGEN ACUM. SOBRE COSTO INTERNO -3.02% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

COSTOINTERNO

COSTO REAL ACUMULADO

E11
COINSO: COLOCAR METRADO DE PRESUPUESTO.
E19
COINSO: COLOCAR METRADO DE PRESUPUESTO.
E43
COINSO: COLOCAR METRADO DE PRESUPUESTO.
E51
COINSO: COLOCAR METRADO DE PRESUPUESTO.
E67
TRANSLEI: COLOCAR METRADO DE PRESUPUESTO.
E76
TRANSLEI: COLOCAR METRADO DE PRESUPUESTO.
E103
TRANSLEI: COLOCAR METRADO DE PRESUPUESTO.
Page 2: programacion 1

SF-4.02 EXCAVACION EN ROCA m3

28800

RECURSOS UND ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

MaterialesPETROLEO DIESEL 2 gln 13.52 428.82 5,795.73 35.10 474.40 26.33 355.80 35.10 474.40 525.34 7,100.33DINAMITA und 13.00 337.00 4,381.00 25.00 325.00 25.00 325.00 25.00 325.00 25.00 325.00 437.00 5,681.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 10,176.73 799.40 680.80 799.40 325.00 0.00 0.00 0.00 0.00 0.00 12,781.33

EquiposRETROEXCVADORA 420E hm 103.64 185.17 19,192.06 18.00 1,865.60 13.50 1,399.20 18.00 1,865.60 0.00 0.00TALADRO MANUAL BOSH PROFESSIONAL dia 80.00 27.00 2,160.00 6.00 480.00 6.00 480.00 6.00 480.00 6.00 480.00BROCA DE PERFORACIÓN Und 600.00 1.00 600.00 0.25 150.00 0.25 150.00 0.25 150.00 0.25 150.00

Total Equipos 21,952.06 2,495.60 2,029.20 2,495.60 630.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ (planilla) hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR (planilla) hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO (planilla) hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL (planilla) hh 5.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON (planilla) hh 4.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO PERFORISTA (fuera de planilla) día 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON (fuera de planilla) día 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CANTIDAD TOTAL DE HH hh 6.375 1,208.00 7,701.00 498.00 3,174.75 188.00 1,198.50 217.00 1,383.38 192.00 1,224.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.375 192.00 648.00 200.00 675.00 56.00 189.00 56.00 189.00 48.00 162.00 0.00 0.00 0.00 0.00 0.00 552.00 1,863.00Total Mano de Obra 8,349.00 3,849.75 1,387.50 1,572.38 1,386.00 0.00 0.00 0.00 0.00 0.00 1,863.00

Costo TotalSemanal S/. 40,477.78 7,144.75 4,097.50 4,867.38 2,341.00 - - - - - Acumulado S/. 40,477.78 47,622.53 51,720.03 56,587.41 58,928.41 58,928.41 58,928.41 58,928.41 58,928.41 58,928.41 58,928.41

ProducciónSemanal m3 778.53 128.00 90.40 94.80 15.00Acumulado m3 778.53 906.53 996.93 1,091.73 1,106.73 1,106.73 1,106.73 1,106.73 1,106.73 1,106.73 1,106.73% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 51.99 55.82 45.33 51.34 156.07 0.00 0.00 0.00 0.00 0.00 53.25Acumulado S/./m3 51.99 52.53 51.88 51.83 53.25 53.25 53.25 53.25 53.25 53.25 53.25Diferencia de Margen Semanal S/. -7,144.75 -4,097.50 -4,867.38 -2,341.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. -40,477.78 -47,622.53 -51,720.03 -56,587.41 -58,928.41 -58,928.41 -58,928.41 -58,928.41 -58,928.41 -58,928.41 -58,928.41

TARIFA EN S/.

C12
Usuario: precio estimado según información de almacén
A22
Usuario: INCLUYE BROCA Y ENERGIA
Page 3: programacion 1

SF-4.03 PERFORACION EN ROCA PARA ANCLAJES m3

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

MaterialesCOMBUSTIBLE Gln 13.52 0.00 0.00 0.00 0.00 0.00ACERO CORRUGADO 1" kg 2.30 0.00 0.00 536.36 1,233.62 536.36 1,233.62DINAMITA 0.00 0.00RESINA EPOXICA Gln 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 1,233.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,233.62

EquiposTALADRO MANUAL BOSH PROFESSIONAL dia 80.00 0.00 0.00 2.00 160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 160.00RETROEXCVADORA 420E hm 103.64BROCA DE PERFORACIÓN Und 600.00 0.25 150.00

Total Equipos 0.00 0.00 310.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ (planilla) hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR (planilla) hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO (planilla) hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL (planilla) hh 5.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON (planilla) hh 4.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO PERFORISTA (fuera de planilla) hh 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON (fuera de planilla) hh 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.375 0.00 0.00 0.00 31.50 106.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.50 106.31CANTIDAD TOTAL DE HH hh 6.375 0.00 0.00 0.00 63.00 401.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.00 401.63

Total Mano de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - 1,543.62 - - - - - - - Acumulado S/. - - 1,543.62 1,543.62 1,543.62 1,543.62 1,543.62 1,543.62 1,543.62 1,543.62 1,543.62

ProducciónSemanal m3 36.00Acumulado m3 - 0.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 - 42.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.88Acumulado S/./m3 - 42.88 42.88 42.88 42.88 42.88 42.88 42.88 42.88 42.88Diferencia de Margen Semanal S/. - -1,543.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - -1,543.62 -1,543.62 -1,543.62 -1,543.62 -1,543.62 -1,543.62 -1,543.62 -1,543.62 -1,543.62

Page 4: programacion 1

SF-4.05 RELLENO DETRAS DE ESTRIBOS CON MATERIAL DE PRESTAMO m3

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 SEMANA Nº 16 SEMANA Nº 17 SEMANA Nº 18 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 AL 30/11/14 AL 07/12/14 AL 14/12/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

MaterialesCOMBUSTIBLE Gln 13.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00MATERIAL SELECCIONADO DE CANTERA m3 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EquiposRETROEXCVADORA 420E hmCOMPACTADOR VIBRATORIO TIPO PLANCHA 7HP hmRODILLO VIBRATORIO DE 3 TN hm

0.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total Mano de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - - - - - - - - - - - - - Acumulado S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ProducciónSemanal m3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,045.00 0.00 0.00 0.00 0.00Acumulado m3 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,045.00 1,045.00 1,045.00 1,045.00 1,045.00 1,045.00% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Acumulado S/./m3 - #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Semanal S/. - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

V28
TRANSLEI: falta el parte del dia 14 se esta asumiento 17.4 en dos turnos por verificar
Page 5: programacion 1

SF-4.06 ELIMINACION DE MATERIAL EXCEDENTE DIST. <1KM m3

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales

PETROLEO DIESEL 2 Gln 13.52 76.99 1,040.55 11.70 158.13 8.78 118.60 11.70 158.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 109.16 1,475.410.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 1,040.55 158.13 118.60 158.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,475.41

EquiposRETROEXCVADORA 420E hm 93.64 40.52 3,794.47 6.00 561.87 4.50 421.40 6.00 561.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.02 5,339.61CAMION VOLQUETE 15m3 hm 120.00 81.04 9,724.80 12.00 1,440.00 9.00 1,080.00 12.00 1,440.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.04 13,684.80

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 13,519.27 2,001.87 1,501.40 2,001.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,024.41

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total Mano de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. 14,559.82 2,160.00 1,620.00 2,160.00 - - - - - - - Acumulado S/. 14,559.82 16,719.82 18,339.82 20,499.82 20,499.82 20,499.82 20,499.82 20,499.82 20,499.82 20,499.82 20,499.82 20,499.82

ProducciónSemanal m3 1,472.53 128.00 90.40 47.40 0.00Acumulado m3 1,472.53 1600.53 1,690.93 1,738.33 1,738.33 1,738.33 1,738.33 1,738.33 1,738.33 1,738.33 1,738.33 1,738.33% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta 16.88 17.92 45.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.79Acumulado S/./m3 3.47 9.89 10.45 10.85 11.79 11.79 11.79 11.79 11.79 11.79 11.79 11.79 11.79Diferencia de Margen Semanal S/. -1,715.84 -1,306.31 -1,995.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. -14,559.82 -16,275.66 -17,581.97 -19,577.49 -19,577.49 -19,577.49 -19,577.49 -19,577.49 -19,577.49 -19,577.49 -19,577.49 -19,577.49

Page 6: programacion 1

SF-5.01 SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4" m2

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales

PETROLEO DIESEL 2 Gln 13.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CEMENTO PORTLAND TIPO MS Bls 20.53 32.00 656.96 32.00 656.96HORMIGON m3 60.00 12.00 720.00 12.00 720.00AGUA m3 0.00 0.00GASOLINA 90 OCT Gln 14.5 2.00 29.00 2.00 29.00

0.00 0.000.00 0.00

Total Materiales 0.00 0.00 1,405.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,405.96

EquiposMEZCLADOR DE CONCRETO DE 11p3 dia 80.00 0.00 0.00 2.00 160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 160.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 0.00 0.00 24.00 81.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 81.00CANTIDAD TOTAL DE HH hh 6.38 0.00 0.00 96.00 612.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 612.00Total Mano de Obra 0.00 0.00 693.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - 2,258.96 - - - - - - - - Acumulado S/. - - 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96 2,258.96

ProducciónSemanal m3 80.00Acumulado m3 - 0.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 28.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.24Acumulado S/./m3 0.50 - 28.24 28.24 28.24 28.24 28.24 28.24 28.24 28.24 28.24 28.24Diferencia de Margen Semanal S/. - -2,219.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31 -2,219.31

Page 7: programacion 1

SF-6.01 HABILITACIÓN DE ACERO DE REFUERZO Fy=4200 Kg/cm2 KG

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales ACERO CORRUGADO FY=4200 kg/cm2 Kg 2.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PETROLEO DIESEL 2 Gln 13.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EquiposTRONZADORA ELECTRICA DE ACERO dia 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Mano de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - - - - - - - - - - Acumulado S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ProducciónSemanal m3Acumulado m3 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Acumulado S/./m3 0.50 - #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Semanal S/. - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Gl/m2 #DIV/0! Tasa Prom #DIV/0!DOSIS CEMENTO PORTLAND (Meta 0.0682 BL / M2 )

Page 8: programacion 1

SF-6.02 COLOCACIÓN DE ACERO DE REFUERZO Fy=4200 Kg/cm2 KG

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 SEMANA Nº 16 SEMANA Nº 17 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 AL 30/11/14 AL 07/12/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales0.00 0.00

PETROLEO DIESEL 2 gal 13.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00ACERO CORRUGADO 3/4" kg 2.30 0.00 6,895.28 15,859.14 7,215.27 16,595.13 1,471.80 3,385.13 15,582.35 35,839.40ALAMBRE N°16 kg 3.65 413.72 1,510.07 432.92 1,580.14 88.31 322.32 934.94 3,412.53

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 17,369.21 18,175.27 3,707.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39,251.94

Equipos

RETROEXCVADORA 420E (para traslado acero) hm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CIZALLA ELECTRICA DE FIERRO dÍa 32.00 6.00 192.00 6.00 192.00 6.00 192.00

Total Equipos 0.00 0.00 192.00 192.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 0.00 18.00 60.75 168.00 567.00 160.00 540.00 96.00 324.00CANTIDAD TOTAL DE HH hh 6.38 0.00 62.00 395.25 405.00 2,581.88 392.00 2,499.00 120.00 765.00Total Mano de Obra 0.00 456.00 3,148.88 3,039.00 1,089.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - 456.00 20,710.09 21,406.27 4,988.45 - - - - - - - Acumulado S/. - 456.00 21,166.09 42,572.36 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81 47,560.81

ProducciónSemanal m3 196.85 6,895.28 7,215.27 1,471.80Acumulado m3 - 196.85 7,092.13 14,307.41 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20 15,779.20% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta 2.32 3.00 2.97 3.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.01Acumulado S/./m3 0.21 - 2.32 2.98 2.98 3.01 3.01 3.01 3.01 3.01 3.01 3.01 3.01 3.01 3.01Diferencia de Margen Semanal S/. -414.66 -19,262.08 -19,891.06 -4,679.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - -414.66 -19,676.74 -39,567.80 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18 -44,247.18

Page 9: programacion 1

SF-7.01.01 CONCRETO PARA ZAPATAS f'c = 280 kg/cm2 m3

RECURSOS UND TARIFA EN S/. ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales CEMENTO PORTLAND TIPO MS Bls 20.53 0.00 0.00 758.00 15,561.74 0.00 0.00 0.00 0.00 0.00 758.00 15,561.74GASOLINA DE 84 OCT Gln 14.50 0.00 0.00 0.00 25.00 362.50 0.00 0.00 0.00 0.00 0.00 25.00 362.50PIEDRA CHANCADA DE 1/2" m3 78.00 53.06 4,138.68 53.06 4,138.68PIEDRA CHANCADA DE 3/4" m3 0.00 45.48 0.00ARENA CHANCADA m3 61.00 45.48 2,774.28 #REF! 2,774.28

0.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 22,837.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,837.20

EquiposRETROEXCVADORA 420E hm 120.00 0.00 0.00 0.00 6.00 720.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 720.00MEZCLADOR DE CONCRETO DE 11 p3 día 80.00 18.00 1,440.00 18.00 1,440.00VIBRADOR DE CONCRETO 2.5" día 60.00 12.00 720.00 12.00 720.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 2,880.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,880.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ hh 16.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 14.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 11.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 72.00 243.00CANTIDAD TOTAL DE HH hh 6.38 208.00 1,326.00

Total Mano de Obra 0.00 0.00 0.00 1,569.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - - 27,286.20 - - - - - - - Acumulado S/. - - 0.00 27,286.20 27,286.20 27,286.20 27,286.20 27,286.20 27,286.20 27,286.20 27,286.20 27,286.20

ProducciónSemanal m3 68.91Acumulado m3 - 0.00 0.00 68.91 68.91 68.91 68.91 68.91 68.91 68.91 68.91 68.91% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 395.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 395.97Acumulado S/./m3 0.50 - #DIV/0! 0.00 395.97 395.97 395.97 395.97 395.97 395.97 395.97 395.97 395.97Diferencia de Margen Semanal S/. - 0.00 -27,252.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 -27,252.05 -27,252.05 -27,252.05 -27,252.05 -27,252.05 -27,252.05 -27,252.05 -27,252.05 -27,252.05

J23
Usuario: se considera costo de una semana
J24
Usuario: se considera costo de una semana
Page 10: programacion 1

SF-7.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS

RECURSOS UND TARIFA EN US$ ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales CEMENTO PORTLAND TIPO MS BOL 5.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PETROLEO DIESEL 2 gal 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EquiposCAMABAJA dia 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ-A hh 5.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CAPATAZ-B hh 4.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 125.30 0.00 0.00 35.00 125.30OFICIAL hh 3.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 2.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 715.00 2,059.20 0.00 0.00 715.00 2,059.20AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CANTIDAD TOTAL DE HH hh 6.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Mano de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,184.50 0.00 0.00 2,184.50

Costo TotalSemanal S/. - - - - - - - - 2,184.50 - - Acumulado S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 2,184.50 2,184.50 2,184.50 2,184.50

ProducciónSemanal m3 PREVISTO 48.28 65,558.32 58,279.05 64,882.64Acumulado m3 - 0.00 0.00 0.00 48.28 48.28 48.28 48.28 65,606.60 123,885.65 188,768.29 188,768.29% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.00 0.01Acumulado S/./m3 - #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.02 0.01 0.01Diferencia de Margen Semanal S/. - 0.00 0.00 0.00 0.00 0.00 0.00 -2,184.50 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 -2,184.50 -2,184.50 -2,184.50 -2,184.50

Page 11: programacion 1

SF-7.02.01 CONCRETO PARA ESTRIBOS Y ALETAS f'c = 280 kg/cm2

RECURSOS UND TARIFA EN US$ ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales CEMENTO BOL 5.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00COMBUSTIBLE gal 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EquiposCAMABAJA dia 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ-A hh 5.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CAPATAZ-B hh 4.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 3.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 2.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 0 0.00 0.00 0.00 48.00 162.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CANTIDAD TOTAL DE HH hh 6.38 0 0.00 0.00 0.00 80.00 510.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total Mano de Obra 0.00 0.00 0.00 0.00 672.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - - - 672.00 - - - - - - Acumulado S/. - - 0.00 0.00 672.00 672.00 672.00 672.00 672.00 672.00 672.00 672.00

ProducciónSemanal m3 PREVISTOAcumulado m3 428,220.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% Acumulado % m3 esponjados 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Acumulado S/./m3 0.50 - #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Semanal S/. - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 12: programacion 1

SF-7.02.02 ENC. Y DESENC. NORMAL Y CARAVISTA EN ESTRIBOS Y ALETAS

RECURSOS UND TARIFA EN US$ ACUM ANT SEMANA Nº 6 SEMANA Nº 7 SEMANA Nº 8 SEMANA Nº 9 SEMANA Nº 10 SEMANA Nº 11 SEMANA Nº 12 SEMANA Nº 13 SEMANA Nº 14 SEMANA Nº 15 ACUM. TOTAL

AL 14/09/14 AL 21/09/14 AL 28/09/14 AL 05/10/14 AL 12/10/14 AL 19/10/14 AL 26/10/14 AL 02/11/14 AL 09/11/14 AL 16/11/14 AL 23/11/14 DEL: 15/07/07 AL 30/09/07

CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO CANT. COSTO

Materiales MADERA TORNILLO p2 4.50 0.00 0.00 0.00 0.00 101.90 458.56 0.00 0.00 0.00 0.00 101.90 458.56CHEMALAC gal 78.80 0.00 0.00 0.00 0.00 2.41 190.22 0.00 0.00 0.00 0.00 2.41 190.22DISOLVENTE gal 41.19 1.45 59.66 1.45 59.66ALAMBRE N°8 kg 3.50 14.48 50.69 14.48 50.69TRIPLEY DE 18mm PARA ENCOFRADOS Pln 83.00 7.34 101.51 7.34 101.51CLAVOS PARA MADERA kg 2.97 14.48 43.02 14.48 43.02

0.00 0.000.00 0.00

Total Materiales 0.00 0.00 0.00 0.00 903.67 0.00 0.00 0.00 0.00 0.00 0.00 903.67

EquiposCAMABAJA dia 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.000.00 0.00

Total Equipos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stand ByTotal de Equipos S/. 0.00Total Stand By 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mano de obraCAPATAZ-A hh 5.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00CAPATAZ-B hh 4.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERADOR hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OPERARIO hh 3.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00OFICIAL hh 3.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PEON hh 2.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AOJAMIENTO, ALIMENTACIÓN, TRANSPORTE hh 3.38 0 0.00 0.00 0.00 88.80 299.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00CANTIDAD TOTAL DE HH hh 6.38 0 0.00 0.00 72.00 459.00 296.00 1,887.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total Mano de Obra 0.00 0.00 0.00 459.00 2,186.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Costo TotalSemanal S/. - - - 459.00 3,090.37 - - - - - - Acumulado S/. - - 0.00 459.00 3,549.37 3,549.37 3,549.37 3,549.37 3,549.37 3,549.37 3,549.37 3,549.37

ProducciónSemanal m3 PREVISTO 48.28Acumulado m3 - 0.00 0.00 0.00 48.28 48.28 48.28 48.28 48.28 48.28 48.28 48.28% Acumulado % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Costo UnitarioSemanal S/./m3 C.U. Meta - 0.00 0.00 64.01 0.00 0.00 0.00 0.00 0.00 0.00 73.52Acumulado S/./m3 - #DIV/0! 0.00 0.00 73.52 73.52 73.52 73.52 73.52 73.52 73.52 73.52Diferencia de Margen Semanal S/. - 0.00 0.00 -3,090.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00Diferencia de Margen Acumulada S/. - - 0.00 0.00 -3,090.37 -3,090.37 -3,090.37 -3,090.37 -3,090.37 -3,090.37 -3,090.37 -3,090.37

Page 13: programacion 1

Item

01

01.01

01.02

01.03

02

02.01

02.02

02.03

02.04

03

03.01

03.02

03.03

03.04A

03.04B

03.05

03.06

03.07

04

04.01

04.01

05

05.01

05.01.01A

05.01.01.03

05.01.01.02

05.01.01.01

05.01.01B

05.01.01.03

05.01.01.02

05.01.01.01

05.01.02A

05.01.02.04A

05.01.02.02A

05.01.02.03A

05.01.02.01 A

Page 14: programacion 1

05.01.02.04B

05.01.02.02B

05.01.02.03B

05.01.02.01 B

05.01.02B

05.01.02.04A

05.01.02.02A

05.01.02.03A

05.01.02.01 D

05.01.02.04B

05.01.02.02B

05.01.02.03B

05.01.02.01 E

05.02

05.02.01

05.02.01.01

05.02.01.02

05.02.01.03

05.02.02

05.02.02.01

05.02.02.02

05.02.02.03

05.02.03

05.02.03.01

05.02.03.02

05.02.03.03

05.02.04

05.02.04.01

05.02.04.02

05.02.04.03

05.02.05

05.02.05.01

05.02.05.02

05.02.05.03

06

06.01

06.02

06.03

06.04

06.05

06.06

07

07.01

Page 15: programacion 1

07.02

08

08.01

08.02

09

09.01

09.02

09.03

09.04

09.05

09.06

09.07

09.08

10

10.01

11

11.01

11.02

11.03

11.04

11.05

12

12.01

ELABORADO POR:NOMBRE : CARGO : FECHA:

Page 16: programacion 1

Descripción de la Actividad

OBRAS PROVISIONALES

CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40 m.

ALMACEN, OFICINA Y CASETA DE GUARDIANIA

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

OBRAS PRELIMINARES

TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA

ACCESO PROVISIONAL PEATONAL

DESMONTAJE DE PUENTE EXISTENTE

DEMOLICION DE MUROS DE MAMPOSTERIA DE PIEDRA

MOVIMIENTO DE TIERRAS

EXCAVACION PARA CIMENTACION CON MAQUINARIA EN ESTRIBOS

EXCAVACION PARA CIMENTACION EN ROCA CON PRE-CORTE EN ESTRIBOS

CORTE EN ROCA EN ACCESO MARGEN IZQUIERDA CON EQUIPOS

PERFORACION EN ROCA PARA ANCLAJES DE F°C° D = 1", PROF. = 0.90 m EN ZAPATA IZQUIERDA

PERFORACION EN ROCA PARA ANCLAJES DE F°C° D = 1", PROF. = 0.90 m EN ZAPATA DERECHA

RELLENO DETRAS DE ESTRIBOS MATERIAL FILTRANTE P.CH D=1"

RELLENO DETRAS DE ESTRIBOS CON MATERIAL DE PRESTAMO

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

CONCRETO SIMPLE

SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4" - ESTRIBO DERECHO

SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4" - ESTRIBO IZQUIERDO

CONCRETO ARMADO

SUB ESTRUCTURA

ZAPATAS ESTRIBO DERECHO

ACERO DE REFUERZO Fy=4200 kG/cm2 - ANACLAJES E.D

ACERO DE REFUERZO Fy=4200 kG/cm2 - ESTRIBO DERECHO

ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS - ESTRIBO DERECHO

CONCRETO PARA ZAPATAS f'c = 280 kg/cm2 - ESTRIBO DERECHO

ZAPATAS ESTRIBO IZQUIERDO

ACERO DE REFUERZO Fy=4200 kG/cm2 - ANCLAJES E.I

ACERO DE REFUERZO Fy=4200 kG/cm2 - ESTRIBO IZQUIERDO

ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS - ESTRIBO IZQUIERDO

CONCRETO PARA ZAPATAS f'c = 280 kg/cm2 - ESTRIBO IZQUIERDO

ESTRIBOS DERECHO

ACERO DE REFUERZO Fy=4200 Kg/cm2 EN ESTRIBOS - E. DERECHO

ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS - DERECHO

ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS - DERECHO

CONCRETO PARA ESTRIBOS f'c = 280 kg/cm2 - DERECHO

ALETAS - L. DERECHO

Page 17: programacion 1

ACERO DE REFUERZO Fy=4200 Kg/cm2 EN ALETAS - E. DERECHO

ENCOFRADO Y DESENCOFRADO CARAVISTA EN ALETAS - E. DERECHO

ENCOFRADO Y DESENCOFRADO NORMAL EN ALETAS - E. DERECHO

CONCRETO PARA ALETAS f'c = 280 kg/cm2 - DERECHO

ESTRIBOS IZQUIERDO

ACERO DE REFUERZO Fy=4200 Kg/cm2 EN ESTRIBOS - E. IZQUIERDO

ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS - IZQUIERDO

ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS - IZQUIERDO

CONCRETO PARA ESTRIBOS f'c = 280 kg/cm2 - IZQUIERDO

ALETAS - L. IZQUIERDO

ACERO DE REFUERZO Fy=4200 Kg/cm2 EN ALETAS - E. IZQUIERDO

ENCOFRADO Y DESENCOFRADO CARAVISTA EN ALETAS - E. IZQUIERDO

ENCOFRADO Y DESENCOFRADO NORMAL EN ALETAS - E. IZQUIERDO

CONCRETO PARA ALETAS f'c = 280 kg/cm2 - IZQUIERDO

SUPER ESTRUCTURA

VIGAS

CONCRETO F'c=280 Kg/cm2 PARA VIGAS

ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS

ACERO DE REFUERZO Fy=4200 Kg/cm2

PLATAFORMA

CONCRETO F'c=280 Kg/cm2 PARA PLATAFORMA

ENCOFRADO Y DESENCOFRADO CARAVISTA EN PLATAFORMA

ACERO DE REFUERZO Fy=4200 Kg/cm2

PARAPETOS

CONCRETO EN PARAPETOS f'c = 210 kg/cm2

ENCOFRADO Y DESENCOFRADO CARAVISTA EN PARAPETOS

ACERO DE REFUERZO Fy=4200 Kg/cm2

BANCAS DE CONCRETO

CONCRETO EN BANCAS f'c = 210 kg/cm2

ENCOFRADO Y DESENCOFRADO CARAVISTA EN BANCAS

ACERO DE REFUERZO Fy=4200 Kg/cm2

LOSA DE APROXIMACION

CONCRETO F'c=210 Kg/cm2 PARA LOSA E APROXIMACION

ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA DE APROXIMACION

ACERO DE REFUERZO Fy=4200 Kg/cm2

FALSO PUENTE

FALSO PUENTE PARA ENCOFRADO DE VIGAS Y PLATAFORMA

DESMONTAJE DE FALSO PUENTE

EXCAVACION DE ZANJA PARA DADOS DE CONCRETO

ENCOFRADO Y DESENCOFRADO NORMAL PARA DADOS DE CONCRETO

CONCRETO SIMPLE F'c=175 Kg/cm2 PARA DADOS DE CONCRETO

DEMOLICION DE DADOS DE CONCRETO

OBRAS DE DRENAJE

TUBERIA DE DRENAJE SUBTERRANEO TUB PVC SAL NARANJA 6"

Page 18: programacion 1

TUBERIA DE DRENAJE SUPERFICIAL TUB PVC SAL GRIS 3"

PAVIMENTOS

PAVIMENTO DE ADOQUIN E EN PLATAFORMA DE e = 6 cm

PAVIMENTO DE ADOQUIN EN VEREDAS DE e = 4 cm

INSTALACIONES ELECTRICAS

CORTE EN PAVIMENTO PARA EMPOTRAR TUBERIA, PROF.=0.20

REPOSICION DE PAVIMENTO CON CONCRETO f'c=210 kg/cm2

TUBERIA PVC SAP 25mm EMPOTRADA EN PISO

SALIDA DE ALUMBRADO CON POSTE DE FIERRO CON FAROLA

LUMINARIA FAROLA E-44 150 WATT JOSFEL

TABLERO DE DISTRIBUCION METALICO D-01, 04 POLOS RIEL DIN

CONEXION A RED EXTERNA Y MEDIDOR

POZO PUESTA A TIERRA

SEÑALIZACION

SEÑALIZACION INFORMATIVA

VARIOS

BARANDA METALICA

JUNTA DE DILATACION METALICA

APOYO DE NEOPRENE SH 60/65 DE 0.60 X 0.60 X 1"

COBERTURA METALICA CON POLICARBONATO CELULAR e=8mm

PLACA RECORDATORIA

FLETE TERRESTRE

FLETE TERRESTRE DE TRUJILLO A OBRA

ELABORADO POR:

Page 19: programacion 1

SEPTIEMBRE 2014

Und SEMANA 6

Duración L14

und 1.00 1.00 0.00 1.00

m2 50.00 20.00 0.00 3.00

glb 1.00 0.00

m2 715.35 120.00 0.00 6.00

glb 1.00 0.00

glb 1.00 0.00

m3 119.00 100.00 0.00 2.00

m3 1,388.00 80.00 0.00 18.00

m3 1,176.73 45.00 341.00 27.00 25.60

m3 76.30 45.00 0.00 2.00

und 138.00 80.00 36.00 2.00

und 132.00 80.00 0.00 2.00

m3 357.14 130.00 0.00 3.00

m3 470.95 70.00 0.00 7.00

m3 3,220.48 150.00 270.60 22.00

m2 141.67 80.00 0.00 2.00

m2 136.71 80.00 80.00 2.00

kg 1,036.95 0.00

kg 9,404.65 300.00 0.00 32.00

m2 54.13 14.00 0.00 4.00

m3 136.71 20.00 0.00 7.00

kg 1,036.95 300.00 328.96

kg 9,745.87 300.00 7,764.06 33.00

m2 58.10 14.00 0.00 5.00

m3 141.67 20.00 68.91 8.00

kg 6,181.55 300.00 0.00 21.00

m2 71.00 10.00 0.00 8.00

m2 76.29 12.00 0.00 7.00

m3 60.46 12.00 0.00 6.00

Metrado Total

Rend. Referencial

Metrado Ejecutado al

11.10

Metrado Saldo

Page 20: programacion 1

kg 7,382.09 300.00 0.00 25.00

m2 98.22 10.00 0.00 10.00

m2 87.76 12.00 0.00 8.00

m3 77.28 12.00 0.00 7.00

kg 6,181.55 300.00 3,708.93 21.00

m2 71.00 10.00 21.65 8.00

m2 86.59 12.00 26.63 8.00

m3 60.46 12.00 0.00 6.00

kg 7,382.09 300.00 4,306.22 25.00

m2 100.45 10.00 0.00 11.00

m2 126.84 12.00 0.00 11.00

m3 88.83 12.00 0.00 8.00

m2 16.64 12.00 0.00 2.00

m2 111.61 8.00 0.00 14.00

kg 5,250.84 300.00 0.00 18.00

m3 25.53 10.00 0.00 3.00

m2 84.36 8.00 0.00 11.00

kg 2,336.46 300.00 0.00 8.00

m3 2.83 12.00 0.00 1.00

m2 38.25 12.00 0.00 4.00

kg 246.04 300.00 0.00 1.00

m3 0.98 12.00 0.00 1.00

m2 11.12 12.00 0.00 1.00

kg 160.78 300.00 0.00 1.00

m3 24.48 12.00 0.00 3.00

m2 12.52 16.00 0.00 1.00

kg 2,682.89 300.00 0.00 9.00

m2 99.90 10.00 0.00 10.00

m2 99.90 60.00 0.00 2.00

m3 12.96 3.00 0.00 5.00

m2 46.08 16.00 0.00 3.00

m3 12.96 15.00 0.00 1.00

m3 12.96 40.00 0.00 1.00

m 44.80 160.00 0.00 1.00

Page 21: programacion 1

und 70.00 120.00 0.00 1.00

m2 39.96 20.00 0.00 2.00

m2 45.51 20.00 0.00 3.00

m 43.20 120.00 0.00 1.00

m3 0.86 12.00 0.00 1.00

m 105.00 140.00 0.00 1.00

pto 9.00 1.50 0.00 6.00

und 9.00 6.00 0.00 2.00

und 1.00 1.00 0.00 1.00

und 1.00 1.00 0.00 1.00

und 1.00 1.00 0.00 1.00

und 2.00 1.00 0.00 2.00

m 22.20 18.00 0.00 2.00

m 32.00 20.00 0.00 2.00

und 4.00 2.00 0.00 2.00

m2 43.66 20.00 0.00 3.00

und 1.00 1.00 0.00 1.00

t 451.48 70.00

Page 22: programacion 1

SEPTIEMBRE 2014 SEMANA 6

M M J V S D Metrado15 16 17 18 19 20 Semanal

25.60 25.60 25.60 25.60 12.80 140.80

0.00

51.2 51.2 38.4 140.80

0.00

0.00

0.00

0.00

0.00

0.00

Page 23: programacion 1
Page 24: programacion 1

10 10

Page 25: programacion 1

SEPTIEMBRE 2014 SEMANA 7

L M M J V S D21 22 23 24 25 26 27

12.80 12.80 12.80 12.80 12.80 6.40

18.0 18.0

80.0

329.0

600 900 1,400 1,400 1,400 900

Page 26: programacion 1

492.13

Page 27: programacion 1

20

Page 28: programacion 1

SEPTIEMBRE 2014 OCTUBRE 2014 SEMANA 7 SEMANA 8

Metrado L M M J V SSemanal 28 29 31 01 02 03

70.40 21.60 21.60 21.60 21.60 21.60 6.80

36.00

0.00

0.00 114.8

0.00

80.00

329.0

6,600.0 900.0 264.1

0.0 68.91

Page 29: programacion 1

492.1 581.4 581.4 535.8 535.8 535.8

738.2 738.2 738.2 738.2 328.1

Page 30: programacion 1

20.0 20

FIRMA:

Page 31: programacion 1

OCTUBRE 2014 SEMANA 8 SEMANA 9

D Metrado L M M J V04 Semanal 05 06 07 08 09

114.80 3.00 3.00 3.00 3.00 3.00

0.00

114.80

1,164.06

68.91

Page 32: programacion 1

2,770.3 446.5

5.41 5.41 5.41 5.41

6.66 6.66 6.66 6.66

3,280.9 205.1 205.1 205.1 205.1 205.1

Page 33: programacion 1

20 20

FIRMA:

Page 34: programacion 1

OCTUBRE 2014 SEMANA 9 SEMANA 10

S D Metrado L M M10 11 Semanal 12 13 14

15.00 17.23 17.23 17.23

0.00

0.00 18.0

15.0 15.00 114.8 51.7

0.00

Page 35: programacion 1

446.51

21.65

26.63

23.73

1,025.29

0

0

Page 36: programacion 1

20 20

Page 37: programacion 1

OCTUBRE 2014 SEMANA 10 SEMANA 11

J V S D Metrado L15 16 17 18 Semanal 19

51.68

25.33 25.33 25.33 76.00

18.0 36.00

76.0 242.48

80.00 80.00

0.00

Page 38: programacion 1

26.99 50.72 9.74

0

0

Page 39: programacion 1

20

Page 40: programacion 1

OCTUBRE 2014 SEMANA 11

M M J V S D20 21 22 23 24 25

Page 41: programacion 1
Page 42: programacion 1
Page 43: programacion 1

OCTUBRE 2014 SEMANA 11 RESTRICCIONES

MetradoDiseño Interfer Cliente/Sup Materiales M.O. Equipos

Semanal

0.00

0.00

0.00

0.00

0.00

BE4
Microsoft: PLANOS
Page 44: programacion 1

9.74

0

0

Page 45: programacion 1

0

Page 46: programacion 1

RESTRICCIONES

Otras Restr Liberada Ejecutada

BL4
Microsoft: SIN RESTRICCIONES
Page 47: programacion 1
Page 48: programacion 1
Page 49: programacion 1

CONSTRUCTORA E INVERSIONES SOTO SACRUC: 20482289500

Nº APELLIDOS Y NOMBRES DNI CATEGORÍA

EMPR

ESA

1 BENITES CORONEL BEATO GONZALO 19692638 MAESTRO 71.40

2 ABURTO CADILLO PAULINO 42483251 OFICIAL 45.00

3 BERMUDEZ MARTINEZ OBIDIO LEODAN 48191768 PEON 35.00

4 CARRANZA ORBEGOZO ERASMO AMERICO 40435046 PEON 35.00

5 GUTIERREZ SAUL 42842668 PERFORISTA 80.00

6 GAMBOA JUNIOR 70399087 PEON 30.00

7 OTINIANO RAMOS LEODAN 44126313 OPERARIO 50.00

8 ALVITES OTINIANO MARTIN 80144595 OPERARIO 55.00

9 MUÑOZ VENTURO MANFREDO 19431981 OPERARIO 50.00

COM

UN

IDAD

10 CARRANZA OSMAR GERMAN 40800817 OFICIAL 45.0011 CARBAJAL ERASMO PEON 35.0012 VALDIVIEZO LUJAN JEINER 76538191 PEON 35.0013 ALVARADO FRANCISCO 19028831 PEON 35.0014 AGUILAR CARLOS PEON 35.0015 VALDIVIEZO SEGUNDO 19081064 PEON 35.0016 SOTO DAVID PEON 30.0017 ALVARADO SANTOS 44863534 PEON 35.0018 ALVARADO CARLOS 41791736 PEON 35.0019 SALINAS REYES MAXIMO 19024279 PEON 35.0020 VALDIVIEZO BACILIO HEINER 76625892 PEON 35.0021 ALVARADO RODRIGUEZ JHONATAN PEON 35.0022 OTILIO JUAREZ BACILIO OFICIAL 45.00

MAESTROOPERARIOOFICIALPEONPERFORISTA

OBRAS PRELIMINARESEXCAVACION EN MAT. SUELTO

EXCAVACION EN ROCA PERFORACION EN ROCA PARA ANCLAJES

OBRA: "CREACIÓN DEL PUENTE CARROZABLE ALLACDAY EN EL BARRIO RAMON CASTILLA, DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO - LA LIBERTAD"

JORNADA DIARIA (S/.)

F11
Brenda: Valor por confirmar.
F30
Brenda: Valor por confirmar.
Page 50: programacion 1

HABILITACIÓN DE ACERO DE REFUERZO Fy=4200 Kg/cm2SOLADO DE CONCRETO f'c = 100kg/cm2, E = 4"

CONCRETO PARA ZAPATAS f'c = 280 kg/cm2ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS

Page 51: programacion 1

Dom

inic

al

Dom

inic

al

6/30/2014 6.0 1.0 1.0 8.0 6.0 1.0 1.0 8.0 6.0

6/30/2014 6.0 1.0 - 7.0 6.0 1.0 - 7.0 6.0

9/16/2013 6.0 1.0 1.0 8.0 6.0 1.0 1.0 8.0 3.0

8/12/2014 5.0 - - 5.0 6.0 1.0 - 7.0 3.0

8/21/2014 - - - - 3.0 - - 3.0 6.0

9/1/2014 - - - - - - - - -

11/1/2013 - - - - - - - - -

8/4/2014 - - - - - - - - -

9/26/20148/11/2014 4.0 - - 4.0 - - - - - 8/11/2014 1.0 - - 1.0 - - - - - 8/30/2014 - - - - - - - - 1.0

9/8/2014 - - - - - - - - - 9/8/2014 - - - - - - - - - 9/9/2014 - - - - - - - - -

9/25/2014 - - - - - - - - - 9/26/2014 - - - - - - - - - 9/26/2014 - - - - - 9/26/2014 - - - - - 9/25/2014 - - - - - 9/25/2014 - - - - - 9/29/2010

7.0 7.0

10.0 6.0 13.0 13.0

3.0 30.0 29.0

HH 240.0 232.03,544.0

240.0

232.0

OBRA: "CREACIÓN DEL PUENTE CARROZABLE ALLACDAY EN EL BARRIO RAMON CASTILLA, DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO - LA LIBERTAD"

FECHA DE INGRESO

SEMANA Nº 1 (11/08/2014-17/08/2014)

SEMANA Nº 2 (18/08/2014-24/08/2014)

SEMANA Nº 3 (25/08/2014-31/08/2014)

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

G9
Brenda: Ha estado trabajando en la obra de Usquil.
G10
Brenda: Has estado trabajando en la obra de Usquil.
G11
Brenda: Ha estado laborando en la obra de Usquil.
G15
Brenda: Ha estado laborando anteriormente en la obra de Usquil.
G16
Brenda: Ha estado trabajando enla obra de Usquil.
Page 52: programacion 1
Page 53: programacion 1

Dom

inic

al

Dom

inic

al

Dom

inic

al

1.0 1.0 8.0 6.0 1.0 - 7.0 6.0 1.0 1.0 8.0

1.0 1.0 8.0 6.0 1.0 - 7.0 5.0 - 1.0 6.0

- - 3.0 CESADO - CESADO -

- - 3.0 - - - - 5.0 - - 5.0

1.0 - 7.0 6.0 1.0 - 7.0 6.0 1.0 - 7.0

- - - 5.5 - - 5.5 5.5 - 1.0 6.5

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - - 6.0 1.0 - 7.0 6.0 1.0 - 7.0 - - - - - - - - - - - - - 1.0 6.0 1.0 - 7.0 6.0 1.0 - 7.0 - - - - - - - 6.0 1.0 - 7.0 - - - - - - - 6.0 1.0 - 7.0 - - - - - - - 5.0 - - 5.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

7.0 6.0 7.0

7.0 12.0 12.0 7.0 11.50 34.50 6.0 6.0 6.0 27.0 35.5 59.5

216.0 284.0 476.0

216.0 284.0 476.0

SEMANA Nº 3 (25/08/2014-31/08/2014)

SEMANA Nº 4 (01/09/2014-07/09/2014)

SEMANA Nº 5 08/09/2014-14/09/2014)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Page 54: programacion 1
Page 55: programacion 1

Dom

inic

al

Hor

as E

xtra

s

Dom

inic

al

Hor

as E

xtra

s

6.0 1.0 1.0 2.0 8.0 6.0 1.0 1.0 2.0 8.0 6.0

6.0 1.0 1.0 4.0 8.0 6.0 1.0 - 4.0 7.0

CESADO - - CESADO - - CESADO

6.0 1.0 1.0 4.0 8.0 6.0 1.0 - - 7.0 6.0

6.0 1.0 1.0 1.0 8.0 6.0 1.0 - - 7.0 6.0

5.0 - - 4.0 5.0 6.0 1.0 - - 7.0 6.0

4.0 - - - 4.0 6.0 1.0 1.0 3.0 8.0 6.0

- - - - 6.0 1.0 1.0 3.0 8.0 3.0

- - - - - 1.0 - - 4.0 1.0 5.0 6.0 1.0 1.0 2.0 8.0 6.0 1.0 - - 7.0 6.0 - - - - - - - - - - 6.0 1.0 - 2.0 7.0 6.0 - - - 6.0 6.0 6.0 1.0 - 2.0 7.0 6.0 1.0 - 4.0 7.0 6.0 6.0 1.0 1.0 2.0 8.0 6.0 1.0 1.0 - 8.0 6.0 6.0 1.0 1.0 2.0 8.0 6.0 1.0 1.0 - 8.0 6.0 - - - - - 3.0 - - - 3.0 5.0 - - - - - 2.0 - - - 2.0 3.0 - - - - - 2.0 - - - 2.0 3.0 - - - - - 2.0 - - - 2.0 6.0 - - - - - 4.0 - - - 4.0 6.0 - - - - - 3.0 - - - 3.0 5.0

6.0

7.0 7.0 4.0 15.0 14.0 12.0 38.00 54.00 7.0 6.0 70.0 94.0

560.0 752.0

498.0 188.0 63.00

SEMANA Nº 6 (15/09/2014-21/09/2014)

SEMANA Nº 7 (22/09/2014-28/09/2014)

SEMANA Nº 8 (29/09/2014-05/10/2014)

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Día

s Tr

abaj

ados

(L-S

)

Page 56: programacion 1

62.0 405.0 96.0

14.02 406.01 246.02 56

7.2.17.2.2 16

MAESTRO 8TOTAL DE HH 144

TOTAL DE PERSONAS 18

Page 57: programacion 1

Dom

inic

al

1.0 7.0

CESADO

1.0 1.0 8.0

1.0 7.0

1.0 7.0

1.0 7.0

3.0

5.01.0 7.0

1.0 7.01.0 7.01.0 7.01.0 1.0 8.0

5.03.03.0

1.0 7.01.0 7.0

5.01.0 1.0 8.0

6.0 14.0 6.0 66.00 6.0 98.0

784.0

217.0

SEMANA Nº 8 (29/09/2014-05/10/2014)

Dom

ingo

Tr

abaj

ado

Tota

l Día

s Re

mun

erad

os

Page 58: programacion 1

392.0

175.0

2 3 4 5 6 7 8 9 10 11 12 SEM 940 40 32 24 36 36 24 32 15224 24 56 16 24 24 16 8048 48 40 40

40 40 8016 16 24 48 68 76 56 48 296

8 8 8 8 8 8 8 8 40136 136 120 0 136 136 144 128 144 688

17 17 15 0 17 17 18 16 18

Page 59: programacion 1

VALE INGRESO FECHA DESCSRIPCIÓN UND. CANT.

0000015 30.09.14 CHOCOLATE Und. 500000009 22.09.14 PITOS Und. 1100000009 22.09.14 MECHA m 500000008 19.09.14 PITOS Und. 1000000008 19.09.14 CHOCOLATE Und. 1500000008 19.09.14 MECHA m 1500000008 19.09.14 BROCA DE CORTE Und. 40000007 15.09.14 CHOCOLATE Und. 500000007 15.09.14 PITOS Und. 500000007 15.09.14 MECHA m 500000006 13.09.14 CHOCOLATE Und. 200000005 02.09.14 CHOCOLATE Und. 700000005 02.09.14 PITOS Und. 1000000005 02.09.14 MECHA m 700000005 02.09.14 NITRATO KG 40000002 25.08.14 CHOCOLATE Und. 900000002 25.08.14 PITOS Und. 900000002 25.08.14 MECHA m 900000001 22.08.14 CHOCOLATE Und. 70000001 22.08.14 PITOS Und. 70000001 22.08.14 MECHA m 7