project awirs 4 - energie facteur 4
TRANSCRIPT
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 1
11ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
PROJECT AWIRS 4
WOOD PELLETSLiège
22ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
NEW WAY : IMPORT OF (WOOD) PELLETSNEW WAY : IMPORT OF (WOOD) PELLETS
��Wood «Wood « pelletspellets »»
��Already testedAlready tested
��Peanuts huskPeanuts husk
��SunflowerSunflower
��Later onLater onother «other « pelletspellets »»
��cerealscereals
��coffee huskcoffee husk
��……
• controlled energy balance(energy consumption for production and transportation)
• controlled sustainability( « FSC » certification of woods)
• great excess of wood residues in the world = large potential on the long run
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 2
33ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Wood pellets production
• compress up from 200 kg/m 3 up to 650 kg/m 3
Grinding
• grind with hammer mills
� Produced in pellet mills
• dry up to moisture content < 17%
44ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
�� Swedish norm ASAE 269.4 (Dec96) or European TCSwedish norm ASAE 269.4 (Dec96) or European TC--335335
DURABILITYDURABILITY
Already test other possibilitiesAlready test other possibilities•• Expansion under water (CRAGx, Gembloux)Expansion under water (CRAGx, Gembloux)
EXPANSIONEXPANSION•• DensityDensity
BULKBULK = 650 kg/m= 650 kg/m33, INTRINSIC = 1280 kg/m, INTRINSIC = 1280 kg/m33
Test performed Test performed by Electrabelby Electrabel
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 3
55ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
10 – 40 mm4 – 10 mm
Quality norms pellets sept-04
Parameters Units ElectrabelDiameter mm 4-10Length 10-40 mmVolatile matterWater content % DM < 10 %Bulk (apparent) density kg/m3 > 600Low heating value GJ/ton ar > 17Ash content % DM < 1%Bark content < 5%Initial melting temperature (red cond) °C > 1200°CCl % DM < 0,03 %S % DM < 0,2%F ppm < 30Additives (past, vegetal oil) % FORBIDDENWaste wood Qualitative FORBIDDENHeavy metalsAs mg/kg DM < 2Cd mg/kg DM < 1Cr mg/kg DM < 15Cu mg/kg DM < 20Hg mg/kg DM < 1Pb mg/kg DM < 20Zn mg/kg DMBenzo-a-pyrene mg/kg DM < 0,5Pentachlorphenol mg/kg DM < 3Particle size distribution minimum% < 3.0 mm (Durability) 100,0%% < 2.0 mm 95,0%% < 1.5 mm 75,0%% < 1.0 mm 50,0%
Wood pellets spec’s
66ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
�� Boiler manufactured Boiler manufactured by Cockerill Metallurgical Industries :by Cockerill Metallurgical Industries :-- natural circulationnatural circulation-- license license Combustion EngineeringCombustion Engineering
�� OilOil––gas unit commissioned in 1967 gas unit commissioned in 1967
�� Converted in 1982 to coal Converted in 1982 to coal –– gasgas
�� Power level :125 MWPower level :125 MW
�� Steam : 390 ton/h, 145 bar, 545Steam : 390 ton/h, 145 bar, 545°°CC
Awirs Unit 4 power plantAwirs Unit 4 power plant
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 4
77ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Project diagramProject diagram
wood pellets hammer mills boiler electricity
pellet silo’s
natural gas fan
wood dust silo
unloading
boiler
electricitygenerator
steam
flue gas
network
88ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Facts and figuresFacts and figures
plant 34% efficiency80,3 MWe
wood pellets 17 GJ/ton4,7 MWhp/ton1,6 MWhe/ton
350.097 tons/year50 tons/h
generation 7000 hours562.100 MWh
green certificates 0,70 tau(CO2) min.393.470 certificates/y
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 5
99ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
�� ExistingExisting old power plant old power plant
�� Short delayShort delay : 7 months for realisation: 7 months for realisation
�� CommissioningCommissioning : August 2005: August 2005
�� Full substitutionFull substitution of coal : «of coal : « World PremiereWorld Premiere »»
�� Must be Must be fully reversiblefully reversible to coal in 3 weeks timeto coal in 3 weeks time
�� Safety issueSafety issue: fire and explosion with wood dust: fire and explosion with wood dust
�� Delivery wood pellet : Delivery wood pellet : justjust--inin--timetime 1200 tons/day1200 tons/day
�� SteamSteam : 510: 510°°C instead of 545C instead of 545°°CC
�� Power levelPower level : 80 MW instead of 120 MW with coal: 80 MW instead of 120 MW with coal
Major Project ConstraintsMajor Project Constraints
1010ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
UnloadingUnloading
unloading with unloading with mobile cranemobile crane
flatboat flatboat
500500--2000 ton2000 ton
screening, filtering screening, filtering
Just-in-time deliveryWith unloading 200 t/h
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 6
1111ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
HOPPER
TDB0TDB1
new
TDB2
new
TDB3old coal conveyor (350 m)
TR5
CENTREX 2
CENTREX 1
Conveying belts
FILTER 3
FILTER 2
FILTER 1
all conveyors fully covered
1212ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Handling Handling
weight balance
metal detector
hopper, sieve 5 cm and filter
Over band
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 7
1313ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
•• safetysafety : : -- sparkling detection sparkling detection -- water µwater µ--pulverisation pulverisation -- water deluge water deluge -- Fike explosion extinguish deviseFike explosion extinguish devise
Hammer millsHammer mills
•• silo’s of silo’s of 20 m20 m33 per mill per mill (density of wood dust about 0,4)(density of wood dust about 0,4)
•• two millstwo mills
•• supplier : supplier : Brabant van OpstalBrabant van Opstal
•• capacity each : capacity each : 25 ton/h25 ton/h
1414ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
2 BVO hammer mills2 BVO hammer mills
25 ton/h25 ton/houtlet coal hopperoutlet coal hopper
inlet millinlet mill
stones sieve and stones sieve and magnetic metal separatormagnetic metal separator
sieve grid sieve grid 2,5mm2,5mm
hammershammers
selector at inletselector at inlet
Mill selection criteriaMill selection criteria–– Electricity consumptionElectricity consumption–– Required particle sizeRequired particle size
distribution : distribution : 90% < 1 mm, 90% < 1 mm, 100% < 1,5mm100% < 1,5mm
–– Cost : Cost : investment + investment + maintenancemaintenance
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 8
1515ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
2 BVO hammer mills 25 ton/h2 BVO hammer mills 25 ton/h
stones sieve and stones sieve and magnetic metal separatormagnetic metal separator
sieve grid sieve grid 2,5mm2,5mm
hammershammers
Mill sieve gridMill sieve grid–– Opening holes Opening holes –– Required particle sizeRequired particle size
distribution : distribution : 90% < 1 mm, 90% < 1 mm, 100% < 1,5mm100% < 1,5mm
–– permeability : permeability : 30 to 50%30 to 50%
Mill hammersMill hammers–– Number of hammersNumber of hammers–– Size and length of the Size and length of the
hammershammers–– Material to withstand Material to withstand
wearing (Crosabro, Nihard)wearing (Crosabro, Nihard)–– Cost : Cost :
unavaibility+ maintenanceunavaibility+ maintenance
Mill powder level Mill powder level indicatorindicator
–– Ultrasonic LTUltrasonic LT–– Capacitive LTCapacitive LT–– Capacitive LT withCapacitive LT with
–– 2 of 3 function2 of 3 function–– Cleaning systemCleaning system
1616ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
BurnersBurners
Primary air
woodPre mixing
room
Turbulence devise
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 9
1717ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Safety measuresSafety measures
�� Fire & explosionFire & explosion (Atex 137)(Atex 137)−− Inside the bins : explosive mixtures Inside the bins : explosive mixtures −− Training of personnel about dust explosion safety, Training of personnel about dust explosion safety,
�� Prevention equipmentsPrevention equipments−− Electrical installation (zone 20) Electrical installation (zone 20) −− static electricity linksstatic electricity links−− Spark detectionSpark detection−− Water µWater µ--pulverisationpulverisation−− Water delugeWater deluge−− metal detection metal detection −− CO detection in the buildingCO detection in the building−− Special safety design of fuel binsSpecial safety design of fuel bins
1818ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Overview safety systemsOverview safety systems
infra-red spark detector
FIKE bottle
sprinkler systemWater deluge
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 10
1919ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
�� ActiveActive systemsystem
�� Explosion Explosion detectiondetection via pressure sensorsvia pressure sensors
�� InjectionInjection of extinction agent (sodium bicarbonate) of extinction agent (sodium bicarbonate)
�� NN22 is is propulsionpropulsion agentagent
Fire explosion suppression system
extinctionextinction bottlebottleexplosionexplosion sensorssensors
resistance limitresistance limit
pressure (bar)pressure (bar)
time (msec)time (msec)Operation of the explosion Operation of the explosion
insulation insulation
Container of Container of explosionexplosion
Control panelControl panel
Explosion Explosion DetectorDetector
2020ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
•• Temperature detection and water deluge systemTemperature detection and water deluge system
••FikeFike bumbbumb
Fuel bins
Arrival of Arrival of the TDB3the TDB3
CENTREX CENTREX 11
CENTREX CENTREX 22
Extractor Extractor TR5TR5
R2R2
••Limited residence timeLimited residence time : 10 hours: 10 hours
••ReRe--usedused �� avoid 6 months delay for permittingavoid 6 months delay for permitting
�� Two existing coal binsTwo existing coal bins••VolumeVolume of 600 m3of 600 m3
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 11
2121ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Gaseous emissionsGaseous emissions
Awirs4Awirs4 DustDust SOxSOx NOxNOx
mg/Nmmg/Nm33 @6%O@6%O22
resultsresults 55 00 140140
limits before limits before 1/1/20081/1/2008
350350 17001700 11001100
limits after limits after 1/1/20081/1/2008
100100 12001200 600600
2222ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Growth of pellet market in the EUGrowth of pellet market in the EUSource Peter W. Heller 09/04, PerEnergy gmbh
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 12
2323ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Wood pellets Electrabel in 2006Wood pellets Electrabel in 2006Requirements : 350.000 (Awirs4)
Pellets Feedstock Electrabel Pellets Feedstock Electrabel
British ColumbiaBritish Columbia Main supplierMain supplier
GermanyGermany
RussiaRussia
LethonieLethonie
FinlandFinland
SwedenSweden
2424ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
ELECTRABEL BELUXELECTRABEL BELUXAwirs 4 Wood PelletsAwirs 4 Wood Pellets
Conférence Innovation et Technologie de la
Transformation des Déchets en Energie
24 mai 2007 - Liège
EF4 – AILg
www.ef4.be 13
2525ELECTRABEL BELUX GENERATIONELECTRABEL BELUX GENERATION LABORELEC
Questions
?