    AUSCULTACIÓN 

    Presento por: Pamela Yoshianny Ávila Pedroza, Dustin Stephan Melendez y Ángie Johanna Ruíz

    Ámezquita 

    UNIVERSIDÁD SÁNTO TOMÁ S 

    Pavimentos

    Docente: Juan Miguel Sanchez Duran 22-03-2016

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    2/25

     

    Pagina 1 

    PAVIMENTO RIGIDO 

     # 

    L  A  R  G  O

     A  N C  H O

    L  A  R  G  O

     A  N C  H O

     0 + 1 2  , 5 1  m

     3 

     N- S 

     I  Z  Q U I  E  R D O

     G E 

     ME D

     I   A 

    1  ,2  9 

    1  ,2  7 

     4  , 6 

     3  , 6 

     0 + 1 2  , 9  5  m

     3 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

     A L  T 

     A 

     0  , 4  4 

     3  , 6 

     4  , 6 

     3  , 6 

     0 +  3  0  , 7  3  m

     7 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

     A L  T 

     A 

    1  , 4  7 

    2  , 3  8 

     4  , 6 

     3  , 6 

     3 

     0 +  3  4  , 5  0  m

     8 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

    B  A  J  

     A 

     0  , 3 

     3  , 6 

     4  , 6 

     3  , 6 

     4 

     0 +  3  5  , 9 1  m

     8 

     N- S 

     I  Z  Q U I  E  R D O

     G  A 

     A L  T 

     A 

     0  , 8  9 

    1  , 7  8 

     4  , 6 

     3  , 6 

     5 

     0 +  3  9  ,1  0  m

     9 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

     ME D

     I   A 

     0  ,2 

     3  , 6 

     4  , 6 

     3  , 6 

     6 

     0 +  3  6  , 8  0  m

     9 

     N- S 

     I  Z  Q U I  E  R D O

     G  A 

     A L  T 

     A 

     0  , 8  9 

    1  , 7  8 

     4  , 6 

     3  , 6 

     7 

     0 +  4  0  ,2  5  m

     9 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

    B  A  J  

     A 

     0  ,2  5 

     3  , 6 

     4  , 6 

     3  , 6 

     8 

     0 +  4 1  , 4  0  m

    1  0 

     N- S 

     I  Z  Q U I  E  R D O

     S  J  L 

     ME D

     I   A 

     4  , 6 

     0  ,1 

     4  , 6 

     3  , 6 

     9 

     0 +  4  8  , 3  0  m

    1 1 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

     ME D

     I   A 

     0  ,1  8 

     3  , 6 

     4  , 6 

     3  , 6 

     0 

     0 +  4  9  , 4  5  m

    1 1 

     N- S 

     I  Z  Q U I  E  R D O

     G  T 

    B  A  J  

     A 

     0  , 3 2 

     3  , 6 

     4  , 6 

     3  , 6 

     0 +  5  9  , 8  0  m

    1  4 

     N- S 

     I  Z  Q U I  E  R D O

     P  C  H A 

     ME D

     I   O

     4  , 6 

     3  , 6 

     4  , 6 

     3  , 6 

     0 +  6  9  , 0  0  m

    1  5 

     N- S 

     I  Z  Q U I  E  R D O

    E  J   T 

     A L  T 

     A 

     4  , 6 

     3  , 6 

     4  , 6 

     3  , 6 

     3 

    B  A  A 

     OB  S E  R  V  A  C  I   O NE  S 

     R E  F E  R 

     S E  N T  I  D O

     P  A  T  OL  O G  I   A 

     C  A  R  R  I  L 

     T  I   P  O

     S E  V E  R  I  D A D

    D A  Ñ  O

     R E  P  A  R  A  C  I   O N

    PAVIMENTO RIGIDO

    CIV 15001084-15001116

     A B  S  C  I   S  A 

     N # DE 

     P L  A  C  A B B 

    L E  T  R  A 

    B   A  A B  A B  A B 

     A  b  e r  t   u r  a e n t   r  e 3  y 1  0  m m

     A  b  e r  t   u r  a e n p r  o m e d  i   o d  e1  3  m m aL  /   3 

     P  r  o f   u n d  i   d  a d  e 4  m m y  4  0  m m d  e a b  e r  t   u r  a p r  o m e d  i   o , d  e e s  q

     u i   n a c  o n l   o n g i   t   u d  t   r  a n s  v  e r  s  a l   s  u p e r  i   o r 

     T  i   e n e2  m m d  e a b  e r  t   u r  a aL  /  2 

     A  b  e r  t   u r  a s  u p e r  i   o r  a1  0  m m c  o n d  e s  g a s  t   e e n l   a s  e s  q u i   n a s 

     A  b  e r  t   u r  a d  e2  m m aL  /   3 

     P  a r  c  h  e g e n e r  a r  e s  a l   t   o e n l   a v  i   a .

    E  s  c  a l   o n a m i   e n t   o d  e2  ,1  c  m

     A  b  e r  t   u r  a d  e 4  m m aL  /  2 

     A  b  e r  t   u r  a s  u p e r  i   o r  a1  0  m m c  o n d  e s  g a s  t   e e n l   a s  e s  q u i   n a s 

     U b  i   c  a d  a aL  /   3  c  o n a b  e r  t   u r  a d  e2  m m

     S  e p a r  a c  i   o n d  e j   u n t   a s  d  e1  0  m m

     A  b  e r  t   u r  a d  e 4  m m aL  /  2 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    3/25

     

    Pagina 2 

    BÁRRIO EL RESTREPO LOCÁLIDÁD ÁNTONIO NÁRIN O 

    INTERVENCIÓN: CARRERA 14 ENTRE CALLES 15 Y 13 A SUR  

    1.  y 2. Grieta de esquina (GE), Grieta Transversal (GT) 

    3. 

    Grieta transversal (GT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    4/25

     

    Pagina 3 

    4.  Grieta transversal (GT) 

    5. 

    Y 7. Grieta en pozos y sumideros (GÁ 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    5/25

     

    Pagina 4 

    6.  Grieta Transversal (GT) 

    8. Grieta Transversal (GT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    6/25

     

    Pagina 5 

    9.  Grieta por separacion de juntas longitudinales (SJL) 

    10.  Grieta transversal (GT) 

    11.  Grieta transversal (GT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    7/25

     

    Pagina 6 

    12.  Parche asfalto (PCHÁ) 

    13.  Escalonamiento junta transversal (EJT) 

    Tabla de a rea afectada y tipo de severidad segu n el dan o de pavimento rigido.  

    N° PLACA TIPO DE DAÑO ÁREA AFECTADA(m2) SEVERIDAD % AFECTADO TOTAL

    A3 Grieta de esquina (GE) 16,56 Media 2,778

    A3 Grieta Transversal (GT) 16,56 Alta 2,778

    B7 Grieta Transversal (GT) 16,56 Alta 2,778

    A8 Grieta Transversal (GT) 16,56 Baja 2,778

    B8 Grieta en pozos y sumideros (GA) 16,56 Alta 2,778

    A9 Grieta Transversal (GT) 16,56 Media 2,778

    B9 Grieta en pozos y sumideros (GA) 16,56 Alta 2,778

    B9 Grieta Transversal (GT) 16,56 Baja 2,778

    A10 Separación de juntas longitudinales (SJL) 16,56 Media 2,778

    A11 Grieta Transversal (GT) 16,56 Media 2,778

    B11 Grieta Transversal (GT) 16,56 Baja 2,778

    B14 Parche asfalto (PCHA) 16,56 Media 2,778

    B15 Escalonamiento junta transversal (EJT) 16,56 Alta 2,778

    TOTAL AREA (m2) 215,28 TOTAL AFECTADO % 36,111

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    8/25

     

    Pagina 7 

    Tabla de area y nu mero de placas afectadas 

    Grafico de porcentaje de area afectado por tipo de dan o 

    Area afectada de las placas Area de las placas N° Placas N° Placas afectadas % De deterioro de placas

    Placas A   99,36 298,08 18 4 16,667

    Placas B   115,92 298,08 18 6 19,444

    Total deterioro (%)   36,111

    ÁREA AFECTADA (%)

    GE

    GT

    GA

    SJL

    PCHA

    EJT

    SIN DAÑO

    : 2,778%

    : 9,444%

    : 5,556%

    : 2,778%

    : 2,778%

    : 2,778%

    63,889%

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    9/25

     

    Pagina 8 

     S E  N T  I  D O

    L  A  R  G  O

     A  N C  H O

    L  A  R  G  O

     A  N C  H O

     0 + 1  3  , 6  3  m

     N- S 

    2  , 5 2  m

    DE  R E  C  H O

     F B D

     A L  T  A 

    2  , 7  9 

     0  , 0 2 

     3  , 3  9 

     0  , 6 2 

     0 + 2  3  , 4  8  m

     N- S 

     0  ,1  0  m

    DE  R E  C  H O

     F  A 

     A L  T  A 

     3  ,2  0 

    2  , 5  0 

     3  , 8  0 

     3  ,1  0 

     0 +  3  4  , 8  9  m

     N- S 

     0  , 0  0  m

     I  Z  Q-DE  R 

    D S  U

     A L  T  A 

    1  4  , 3 2 

     6  ,1  0 

    1  4  , 9 2 

     6  , 7  0 

     3 

     0 +  3  4  , 8  9  m

     N- S 

     0  , 0  0  m

     I  Z  Q-DE  R 

     F  C  T 

     A L  T  A 

     0  , 0  3 

     6  ,1  0 

     0  , 6  3 

     6  , 7  0 

     4 

     0 +  5 2  , 9  7  m

     N- S 

    -

    2  , 6  5  m

     I  Z  Q U I  E  R D O

     F  T 

     A L  T  A 

     0  , 0 1 

     0  , 6  5 

     0  , 6 1 

    1  ,2  5 

     5 

     0 +  5 2  , 8  4  m

     N- S 

    -

     0  , 7 2  m

     I  Z  Q U I  E  R D O

     F B 

     A L  T  A 

     3  , 5  4 

    1  ,1  4 

     4  ,1  4 

    1  , 7  4 

     6 

     0 +  5  8  ,1  9  m

     N- S 

     0  , 0  0  m

    DE  R E  C  H O

     F L 

     A L  T  A 

     6  ,2  0 

    1  , 4  8 

     6  , 8  0 

    2  , 0  8 

     7 

     0 +  7 1  , 3 2  m

     N- S 

     0  , 7  4  m

    DE  R E  C  H O

     F L 

     A L  T  A 

     4  , 3  0 

     0  , 0 1 

     4  , 9  0 

     0  , 6 1 

     8 

     0 +  7  7  , 7  3  m

     N- S 

    -

     0  , 9  0  m

     I  Z  Q U I  E  R D O

     F  T 

     A L  T  A 

     0  , 0 1 

    2  , 4  0 

     0  , 6 1 

     3  , 0  0 

     9 

     0 +  7  7  , 6  6  m

     N- S 

     0  , 3  5  m

    DE  R E  C  H O

     F  T 

     A L  T  A 

     0  , 4 1 

     0  , 7  3 

    1  , 0 1 

    1  , 3  3 

    1  0 

     0 +  7  8  , 5  0  m

     N- S 

     0  , 0  0  m

    DE  R E  C  H O

     F  C  T 

     A L  T  A 

     0  , 0 2 

    2  , 0  6 

     0  , 6 2 

    2  , 6  6 

    1 1 

     0 + 2 1  , 0  4  m

     W-E 

    -

     0  , 0  0  m

     I  Z  Q U I  E  R D O

     F  A 

     A L  T  A 

    1  , 9  0 

    2  ,1  3 

    2  , 5  0 

    2  , 7  3 

    1 2 

     0 + 1  9  , 5 1  m

     W-E 

     0  , 4  5  m

     I  Z  Q U I  E  R D O

     P  C  H

     A L  T  A 

     5  , 5  5 

     0  , 5 1 

     6  ,1  5 

    1  ,1 1 

    1  3 

     0 + 2  4  , 0  5  m

     W-E 

     0  , 4  5  m

     I  Z  Q U I  E  R D O

     H U N

     A L  T  A 

     0  , 7  0 

     0  , 5 1 

    1  , 3  0 

    1  ,1 1 

    1  4 

     0 + 2  4  , 4  9  m

     W-E 

     0  , 0  0  m

     I  Z  Q U I  E  R D O

     P  C 

     A L  T  A 

    2  , 8  8 

    1  , 6  8 

     3  , 4  8 

    2  ,2  8 

    1  5 

     0 +  3  4  ,2  5  m

     W-E 

     0  ,2  3  m

     I  Z  Q U I  E  R D O

     F  T 

     A L  T  A 

     0  , 0 2 

    1  , 4  7 

     0  , 6 2 

    2  , 0  7 

    1  6 

     0 +  3  6  , 8  0  m

     W-E 

     0  , 0  0  m

     I  Z  Q U I  E  R D O

     F  T 

     A L  T  A 

     0  , 0  0  5 

    2  ,1  3 

     0  , 6 1 

    2  , 7  3 

    1  7 

     0 +  3  7  , 4 1  m

     W-E 

     0  , 5  8  m

     I  Z  Q U I  E  R D O

     F  T 

     A L  T  A 

     0  , 0  0  5 

    1  ,2  0 

     0  , 6 1 

    1  , 8  0 

    1  8 

     0 +  3  6  , 8  3  m

     W-E 

    2  , 3  4  m

     I  Z  Q U I  E  R D O

     P  C 

     A L  T  A 

    1  , 7  5 

    1  , 5  6 

    2  , 3  5 

    2  ,1  6 

    1  9 

     0 +  3  9  , 4  7  m

     W-E 

    2  , 3  6  m

     I  Z  Q U I  E  R D O

     P  C 

     ME D I   A 

     0  , 7  8 

     0  , 7  3 

    1  , 3  8 

    1  , 3  3 

    2  0 

     0 +  4  0  , 8  0  m

     W-E 

     0  , 0  0  m

     I  Z  Q U I  E  R D O

     P  C 

     A L  T  A 

    1  , 8  5 

    2  ,1  9 

    2  , 4  5 

    2  , 7  9 

    2 1 

     0 +  3  4  ,2  8  m

     W-E 

    -

    1  , 8 1  m

     I  Z  Q U I  E  R D O

    D S  U

     A L  T  A 

     8  ,2  9 

    2  , 3  4 

     8  , 8  9 

    2  , 9  4 

    2 2 

     0 +  4 2  , 4  9  m

     W-E 

     0  , 0  0  m

     I  Z  Q U I  E  R D O

    D S  U

     A L  T  A 

     3 2  , 8  0 

     8  , 4  0 

     3  3  , 4  0 

     9  , 0  0 

    2  3 

     O O R DE  N A D A 

    L  O C  A L  I  Z  A  C  I   O N

     A B  S  C  I   S  A 

     P  A  T  OL  O G  I   A 

     C  A  R  R  I  L 

     T  I   P  O

     S E  V E  R  I  D A D

    D A  Ñ  O

     R E  P  A  R  A  C  I   O N

     A  c  o m e nz  a d  o a

     d  e s  i   n t   e g r  a r  s  e l   a s  u p e r  f   i   c  i   e

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e1  5  m m y  p r  o f   u n d  i   d  a d  d  e1  9  m m

     P  a r  c  h  e c  o n d  a ñ 

     o s  d  e s  e v  e r  i   d  a d  a l   t   a

     R E  F E  R E  N C  I   A 

     OB  S E  R  V  A  C  I   O NE  S 

     A  b  e r  t   u r  a m a y  o

     r  a 3  m m f   u e d  e1  9  ,2  0  m m

     F  i   s  u r  a m a y  o r  a

    1  0  m m , s  e o b  s  e r  v  o f   i   s  u r  a d  e1  ,2  c  m y  p r  o f   u n d  i   d  a d  d  e 5  m m

     P  o s  e e a l   t   o d  e s 

     g a s  t   e c  o n a b  e r  t   u r  a d  e1  . 3  c  m

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e 6  m m

     A  r  e a c  o n b  l   o q u

     e s  s  u e l   t   o s  d  e b  o r  d  e s  d  e s  g a s  t   a d  o s 

    B  l   o q u e s  d  e f   i   n i  

     d  o s  c  o n f   i   s  u r  a s  d  e1  0  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e1  0  m m y  p r  o f   u n d  i   d  a d  d  e 4  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a1  0  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e1  0  m m y  p r  o f   u n d  i   d  a d  9  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a 8  m m y  p r  o f   u n d  i   d  a d  d  e 3  m m

     A  b  e r  t   u r  a d  e2  0 

     m m y  p r  o f   u n d  i   d  a d  d  e 4  m m

     H  u n d  i   m i   e n t   o d 

     e 5  , 4  c  m

     A  r  e a c  o n b  l   o q u

     e s  s  u e l   t   o s  d  e b  o r  d  e s  d  e s  g a s  t   a d  o s 

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e 4  m m y  p r  o f   u n d  i   d  a d  3  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e 5  m m

     F  i   s  u r  a c  o n a b  e r  t   u r  a d  e 5  m m

     C  o n b  o r  d  e s  d  e s  g a s  t   a d  o s  l   e v  e m e n t   e

     A  r  e a c  o n b  l   o q u

     e s  s  u e l   t   o s  d  e b  o r  d  e s  d  e s  g a s  t   a d  o s  y  e x  i   s  t   e b  o m b  e o

     E  s  t   a d  e s  i   n t   e g r 

     a d  a l   a s  u p e r  f   i   c  i   e

     E  s  t   a d  e s  i   n t   e g r 

     a d  a l   a s  u p e r  f   i   c  i   e

    PAVIMENTO FLEXIBLE CIV

    15000822

    PAVIMENTO FLEXIBLE CIV

    50001352

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    10/25

     

    Pagina 9 

    BARRIO LA VALVANERA LOCALIDAD ANTONIO NARIÑO 

    CARRERA 24D ENTRE CALLES 12B Y 13 SUR 

    1) 

    Fisura de borde (FBD) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    11/25

     

    Pagina 10 

    2) 

    Fisura de pozo y sumidero (FÁ) 

    3)  Desgaste superficial (DSU) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    12/25

     

    Pagina 11 

    4)  Fisura en junta de construccion transversal (FCT)  

    5)  Fisura Transversal (FT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    13/25

     

    Pagina 12 

    6) 

    Fisura en bloque (FB) 

    7)  Fisura logitudinal (FL) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    14/25

     

    Pagina 13 

    8) 

    Fisura Longitudinal (FL) 

    9) 

    Fisura Transversal (FT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    15/25

     

    Pagina 14 

    10) 

    Fisura transversal (FT) 

    11. Fisura en junta de construccion transversal (FCT)  

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    16/25

     

    Pagina 15 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    17/25

     

    Pagina 16 

    CALLE 17 SUR ENTRE CARRERAS 24 C Y 24 D  

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    18/25

     

    Pagina 17 

    12.  Fisura de pozo y sumideros (FÁ) 

    13.  Parche (PCH) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    19/25

     

    Pagina 18 

    14. 

    Hundimiento (HUN) 

    15.  Piel de cocodrilo (PC) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    20/25

     

    Pagina 19 

    16.  Fisura Transversal (FT) 

    17.  Fisura Transversal (FT) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    21/25

     

    Pagina 20 

    18.  Fisura Transversal (FT) 

    19.  Piel de cocodrilo (PC) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    22/25

     

    Pagina 21 

    20.  Piel de cocodrilo (PC) 

    21.  Piel de cocodrilo (PC) 

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    23/25

     

    Pagina 22 

    22. 

    Y 23. Desgaste superficial (DSU) 

    Tabla de a rea afectada y severidad segu n el tipo de dano de pavimento flexible.

    SENTIDO

    N-S + 2,52m Fisura de borde (FBD) 2,10 Alta 0,430

    N-S + 1,58m Fisura de pozo y sumideros (FA) 11,78 Alta 2,414

    N-S + 0,00m Desgaste Superficial (DSU) 99,96 Alta 20,484

    N-S + 0,00m Fisuras en junta de construcción transversal (FCT) 4,22 Alta 0,865

    N-S - 2,65m Fisura transversal (FT) 0,76 Alta 0,155

    N-S - 0,72m Fisura en bloque (FB) 7,20 Alta 1,476

    N-S + 0,00m Fisura longitudinal (FL) 14,14 Alta 2,898

    N-S + 0,74m Fisura longitudinal (FL) 2,99 Alta 0,613

    N-S - 0,90m Fisura transversal (FT) 1,83 Alta 0,375

    N-S + 0,35m Fisura transversal (FT) 1,34 Alta 0,275

    N-S + 0,00m Fisura en junta de construcción transversal (FCT) 1,65 Alta 0,338

    W-E - 0,00m Fisura de pozo y sumideros (FA) 6,83 Alta 1,079

    W-E + 0,45m Parche (PCH) 6,83 Alta 1,079

    W-E + 0,45m Hundimiento (HUN) 1,44 Alta 0,228

    W-E + 0,00m Piel de cocodrilo (PC) 7,93 Alta 1,254

    W-E + 0,23m Fisura transversal (FT) 1,28 Alta 0,203W-E + 0,00m Fisura transversal (FT) 1,65 Alta 0,261

    W-E + 0,58m Fisura transversal (FT) 1,09 Alta 0,172

    W-E + 2,34m Piel de cocodrilo (PC) 5,08 Alta 0,803

    W-E + 2,36m Piel de cocodrilo (PC) 1,84 Media 0,290

    W-E + 0,00m Piel de cocodrilo (PC) 6,84 Alta 1,081

    W-E - 1,81m Desgaste Superficial (DSU) 26,14 Alta 4,132

    W-E + 0,00m Desgaste Superficial (DSU) 300,60 Alta 47,524

    VIA

    CIV

    15000822

    ÁREA AFECTADA(m2) SEVERIDAD % AFECTADO TOTAL

    VIA

    CIV

    50001352

    LOCALIZACION

    COORDENADA

    TIPO DE DAÑO

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    24/25

     

    Pagina 23 

    Tabla de area y porcentaje afectado de cada tramo vial. 

    Tipo de dano y porcentaje de area afectada del tramo 1.  

    Grafica de porcentaje de area afectado por tipo de dan o del tramo 1  

    Tipo de dano y porcentaje de area afectada del tramo 2.  

    Área afectada de la via(m2) Área de la vía (m2) % De deterioro de la vía

    VIA CIV 5001352 147,98 488 30,324

    Via flexible

    VIA CIV 5001352 360,71 488 58,107

    Via flexible

    FBD FA DSU FCT FT FB FL Sin daño

    Área afectada (m2) 2,10 11,78 99,96 5,87 3,93 7,20 17,13 340,02

    Área afectada (%) 0,43 2,41 20,48 1,20 0,81 1,48 3,51 69,68

    ÁREA AFECTADA Y AREA SIN DAÑO (%)

    FBD

    FA

    DSU

    FCT

    FA DSU PC FT HUN PCH SIN DAÑO

    Área afectada (m2) 6,83 326,74 21,68 4,02 1,44 6,83 264,98

    Área afectada (%) 1,08 51,66 3,43 0,64 0,23 1,08 41,89

  • 8/18/2019 PROYECTO FINAL AUSCULTACION docx.pdf

    25/25

     

    Grafica de porcentaje de area afectado por tipo de dan o del tramo 2  

    CONCLUSIONES

      Para el tramo de vía de pavimento rígido se puede decir que el porcentaje de deterioro

    y el área del mismo es bajo con respecto a la totalidad del tramo estudiado, los daños

    más comunes que se presentan son grietas transversales y grietas en pozos y sumideros

    de las cuales sus posibles causas pueden ser cargas excesivas.

     

    Para los dos tramos estudiados de pavimento flexible se encontró también un

    porcentaje menor o bajo de deterioro y los principales daños que afectan la vía son

    fisuras transversales y longitudinales la cuales pueden ser causadas por fatiga, además

    encontramos áreas grandes de desgaste superficial las cuales sus causas pueden ser

    relacionados con el desgaste del pavimento ya sea por deficiente dosificación de asfalto

    en la mezcla o acción intensa del agua u otros agentes abrasivos.

    ÁREA AFECTADA Y AREA SIN DAÑO(%)

    FA

    DSU

    PC

    FT

    HUN

    PCH

    SIN DAÑO