pt yamagata ishimoto 100630 [互換モード]miyachi/pdy2010/...偏極標的開発@kek shigeru...
TRANSCRIPT
偏極標的開発@KEK偏極標的開発@KEK
Shigeru IshimotoShigeru IshimotoKEK
偏極標的開発キックオフミーティング
2010年 6月30日-7月1日2010年 6月30日 7月1日山形大学
Cooling Power of 4He Cryostat
Cooling Power of 4He Cryostat
Cooling Power of 4He Cryostat
Merit of 4He 5T systemSuperfluid; better H.Ex.no 3He (neutron, cost) simple; pump/circulator
Demerit140Gh MW 213 MH NMR140Ghz MW, 213 MHz NMR5T; cost, beam bend
4He cryostat cooling power0.9W @1K, 6,000m3/hr
LHe~1.3 L/hr
Michigan PPT System
Michigan PPT SystemPol.(5T/1K) > Pol(2.5T/0.5K) ?
D.G. Crabb et al., Phys. Rev. Lett. 64, 2627 (1990)
Michigan PPT SystemM ch gan y t m
Michigan PPT to KEKg
KEK/J-PARC; (1) Neutron programbio-material researchbio material researchproton filter for pol-n beam
(2) Hadron program(2) Hadron program(3) Target material R&D
Proton Filterr t n F t r
Transfer the Michigan PPT System to J-PARC
R.S.Raymond
A.D. Krisch(UM)
y(UM;left)
H.M.Shimizu( E h )
K. Imai(Kyoto)
D.G. Crabb(Virginia)
(KEK;right)
KEK(Virginia)
K. Yonehara(UMFermi)
A.D. Krisch
Michigan PPT System
Michigan PPT System
Roots Pumps 3 000 m3/h x 2 set3,000 m /h x 2 set
Michigan PPT System (5T SC Mag.)
BEAMOpen Angle
SC Mag. PS
Michigan PPT System (EIO)
EIO(140GHz) and W-P.S.
Michigan PPT System (NMR & NH3)
NMR (213MHz)NMR (213MHz)
NH3 Irradiation cryostat (L Ar)cryostat (L-Ar)
Michigan PPT System (Target Holder)
Target holderD=20 L=32
Thin target holderD=20, L=32 holder
Teflon sample f NMR TE for NMR TE
test
Michigan PPT System Arrived at East Counter Hall/KEK, Nov-2007
PT Test Area at Tsukuba
East CHEast CH
North counter hall K5 area
Cold neutron exp. Hall
PT Test Areaat Tsukuba
Cold neutron exp. Hall
PT Test Area at TsukubaCold neutron exp. Hall
PT Test Area at TsukubaCold neutron exp. Hall
PT Test Area at TsukubaCold neutron exp. Hall
PT Test Area at KEK-K5(Pl nnin )(Planning)
North counter hall K5 area
Plan of 4He PumpPlan of He Pump
7,000 m3/hr
Pumping Speed of 4He &AirPumping Speed
EH4200+E2M275(50Hz) -Air EH4200+E2M275(50Hz) -He
2500
3000
( ) ( )
2000
2500
m³/
hr)
1500
ping
Spe
ed (
500
1000
Pum
p
0
10-5 10-4 10-3 10-2 10-1 100 101 10210 10 10 10 10 10 10 10Pipe End Pressure (mbar)
By BOC Edwards
Summary and Plan1) Set up at KEK north counter hall K52) Preparation2) Preparation
* Insulation vac. T.M.P. + R.P.* 1K pipe + support structure* Vacuum gauges (pirani + C C ) Vacuum gauges (pirani + C.C.)* Thermometer* DAQ (PC + datalogger)
3) T t f 1K t t d 5T t3) Test of 1K cryostat and 5T magnet---- F.Y. 2010
4) Preparation 213 MHz + PC-NMR5) Test of 213 MHz NMR (Tefron T.E. signal)6) Test of 105 MHz NMR + 70GHz MW
---- F.Y. 2011?7) Sample test (PE, NH3, …)
---- F.Y. 2012?---------------------------------------------------------------------) 140 GHz EIO + P.S. > Varian ; J-PARC/MLF(Shimizu) ?