pure-net annual meeting 2016 working...

6
Oslo 28.09.16 Morten Dybesland PURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI

Upload: vankhuong

Post on 26-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

Forsideslide med bilde

Dette bildet kan ikke endres.

Ønsker du et annet bilde,

bruk forsideslide.

Forsideslideslide med bilde

Oslo 28.09.16 Morten Dybesland

PURE-NET ANNUAL

MEETING 2016

WORKING TABLE KPI

Page 2: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

Ønskes annen

bakgrunnsfarge

enn grå under

ikonene, velges

dette ved hjelp av

funksjonen format

background.

For å komme inn til

denne funksjonen

høyre klikker/ctr

klikker man på

bakgrunnen, velger

så format

background fra

menyen, videre

velger man fill –

solid – color. Der

velger man ønsket

farge fra Statsbygg

sin fargepallett

(øverste raden

med farger).

1-spalte ikonelement

• What

• When

• Where

• Why

• Preparations

CONTENT

Page 3: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

1-spalte layout

WORKING TABLE ON KEY PERFORMANCE INDICATORS

(KPI)

• At the annual conference in 2015

recommended to continue working

table on Key Performance Indicators

• Aim: To compare and learn from best

practise

• Statsbygg and OGRPA, Czech Republic

responsible as organizer and host

Page 4: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

Kun tittel

WT IN PRAGUE IN 2015 – AND 2017

Page 5: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

1-spalte layout

CONCLUSION 2015 AND BASE FOR FURTHER WORK KPIs we agreed to have a closer look at:

1. Square m/FTE

2. Maintenance cost/ Portfolio standard KPI

3. The maintenance rate

4. Profit or return to capital

5. Occupation rate

Key insights:

• Difficult to compare KPIs if the basic functioning of the organization is not taken into account

• Use knowledge from WT on Strategy as input for the further work with KPIs. Based on different business models we have in various countries.

Page 6: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå

Tekat og valgt element

• Conduct survey among PuRE- net

members in advance of WT

(identified KPI’s and business-model)

• Use PuRE-net homepage to share KPI

PREPARATIONS