Grid-connected PV installation
Best practice guidelines
1AuSES PV Installation Best Practice Workshop
-
8/7/2019 PV Best Practice
2/31
Why best practice?
AS/NZS mandate minimum requirements
Best practices go above and beyond and
include non-technical aspects
Improve the quality/reputation of the PV
industry
Some best practices may be included in
new versions of AS/NZS
2AuSES PV Installation Best Practice Workshop
-
8/7/2019 PV Best Practice
3/31
Before installation
Visit customers site before preparing
quote, dont use satellite imagery
Watch out for shading
Solar Pathfinder, SunEye, mobile phone apps,
visual estimate
Plan cable routes, inverter location, panel
layout Minimize effect of shading
AuSES PV Installation Best Practice Workshop 3
-
8/7/2019 PV Best Practice
4/31
Before installation
Watch out for meter box upgrades
Give a firm quote, no hidden costs
Give a timeline to installation and stick to
it
Assist with regulatory approvals
Grid connection, planning, RECs
AuSES PV Installation Best Practice Workshop 4
-
8/7/2019 PV Best Practice
5/31
Before installation
Give an accurate estimated energy yield
(in writing)
PVSyst
RETScreen
Manual calculations using BOM or NASA or
the ASRDH
AuSES PV Installation Best Practice Workshop 5
-
8/7/2019 PV Best Practice
6/31
Before installation
AuSES PV Installation Best Practice Workshop 6
Azimuth
-90 -60 -30 0 30 60 90
Inclination
0 90% 90% 90% 90% 90% 90% 90%
15 88% 93% 96% 98% 96% 93% 88%
30 83% 92% 98% 100% 98% 92% 83%
45 77% 88% 95% 97% 95% 88% 77%
60 69% 80% 87% 90% 87% 80% 69%
75 60% 70% 77% 78% 77% 70% 60%
90 51% 59% 63% 63% 63% 59% 51%
-
8/7/2019 PV Best Practice
7/31
Health and Safety
AuSES PV Installation Best Practice Workshop 7
-
8/7/2019 PV Best Practice
8/31
Health and Safety
AuSES PV Installation Best Practice Workshop 8
-
8/7/2019 PV Best Practice
9/31
PV modules
AuSES PV Installation Best Practice Workshop 9
-
8/7/2019 PV Best Practice
10/31
PV modules
AuSES PV Installation Best Practice Workshop 10
-
8/7/2019 PV Best Practice
11/31
PV modules
AuSES PV Installation Best Practice Workshop 11
-
8/7/2019 PV Best Practice
12/31
PV modules
AuSES PV Installation Best Practice Workshop 12
-
8/7/2019 PV Best Practice
13/31
A note on fuses
Overcurrent protection may be requiredwhen multiple stings are connected in
parallel
AS/NZS 5033:2005 provides sizingrequirements for overcurrent protection
AS/NZS 5033:2005 does notprovide
mandatory trip times for protection
AuSES PV Installation Best Practice Workshop 13
-
8/7/2019 PV Best Practice
14/31
A note on fuses
IEC 61730.2 tests modules to withstand135% of the maximum series fuse rating
for 2 hours
=> size overcurrent protection so that it
does not trip under normal operation, but
trips within 2 hours of an overcurrentsituation. Look at fuse/MCB
manufacturers datasheets.
AuSES PV Installation Best Practice Workshop 14
-
8/7/2019 PV Best Practice
15/31
A note on fuses
AuSES PV Installation Best Practice Workshop 15
-
8/7/2019 PV Best Practice
16/31
Polarized DC circuit breakers
Pay attention to thedirection of current
Generally speaking,
the PV array goes inthe terminals marked
+ and
Check wiring withmanufacturer
AuSES PV Installation Best Practice Workshop 16
-
8/7/2019 PV Best Practice
17/31
DC cabling
AuSES PV Installation Best Practice Workshop 17
-
8/7/2019 PV Best Practice
18/31
DC cabling
AuSES PV Installation Best Practice Workshop 18
-
8/7/2019 PV Best Practice
19/31
DC cabling
AuSES PV Installation Best Practice Workshop 19
-
8/7/2019 PV Best Practice
20/31
DC cabling
AuSES PV Installation Best Practice Workshop 20
-
8/7/2019 PV Best Practice
21/31
DC cabling
AuSES PV Installation Best Practice Workshop 21
-
8/7/2019 PV Best Practice
22/31
Inverters - good
AuSES PV Installation Best Practice Workshop 22
-
8/7/2019 PV Best Practice
23/31
Inverters - good
AuSES PV Installation Best Practice Workshop 23
-
8/7/2019 PV Best Practice
24/31
Inverters - better
AuSES PV Installation Best Practice Workshop 24
-
8/7/2019 PV Best Practice
25/31
Inverters - best
AuSES PV Installation Best Practice Workshop 25
-
8/7/2019 PV Best Practice
26/31
Inverters - best
AuSES PV Installation Best Practice Workshop 26
-
8/7/2019 PV Best Practice
27/31
Labelling and documentation
AuSES PV Installation Best Practice Workshop 27
-
8/7/2019 PV Best Practice
28/31
Labelling and documentation
AuSES PV Installation Best Practice Workshop 28
-
8/7/2019 PV Best Practice
29/31
Labelling and documentation
Documentation should be given tocustomer after installation is complete:
Overall working of system
Data sheets and handbooks (PV modules,inverters, mounting rails)
List of equipment supplied, with serial
numbers
Wiring diagrams and string layout
AuSES PV Installation Best Practice Workshop 29
-
8/7/2019 PV Best Practice
30/31
Labelling and documentation
Commissioning sheet and installation checklist
Expected annual yield
Warranty certificates and manufacturers
contact details Maintenance procedures, shutdown
procedure, alarms installed and action
required.
AuSES PV Installation Best Practice Workshop 30
-
8/7/2019 PV Best Practice
31/31
Thank you