rab cor 5 dua semampir jalan beton 2012 2013

125
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN DAFTAR KUANTITAS PEKERJAAN PROPINSI Jateng No. RAB KOTA / KAB Banjarnegara KEGIATAN Cor Jalan Beto KECAMATAN Banjarnegara KELURAHAN Semampir UNIT PANJANG (m) RT/ RW Rt 5/2 123.00 No Uraian Pekerjaan Volume Sketsa dan Perhitungan 1 2 3 1 2 Cor Beton (V=123m x 1,5m x 0,1m) Diverifikasi Diperiksa Fasilitator Teknik UPL Junaydi Manislam Persiapan (V=123m x 1,5m)

Upload: kang-sakir

Post on 07-Dec-2015

75 views

Category:

Documents


14 download

DESCRIPTION

RAB COR 5 Dua Semampir Jalan Beton 2012 2013

TRANSCRIPT

Page 1: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN

DAFTAR KUANTITAS PEKERJAAN

PROPINSI Jateng No. RABKOTA / KAB Banjarnegara

KEGIATAN Cor Jalan BetonKECAMATAN BanjarnegaraKELURAHAN Semampir UNIT PANJANG (m)

RT/ RW Rt 5/2 123.00

No Uraian PekerjaanVolume

Sketsa dan Perhitungan

1 2 31

2 Cor Beton (V=123m x 1,5m x 0,1m)

Diverifikasi DiperiksaFasilitator Teknik UPL

Junaydi Manislam

Persiapan (V=123m x 1,5m)

Page 2: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN

DAFTAR KUANTITAS PEKERJAAN

LEMBAR /

Cor Jalan Beton

LEBAR (m) TINGGI (m)

1.5 0.1

Volume

Volume Satuan

4 5184.5 m2

18.45 m3

Diajukan Oleh :Panitia

..............................

Ketua

Page 3: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Lampiran BA No: PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM - MP)

HASIL KESEPAKATAN

HARGA SATUAN UPAH/BAHAN/ALAT BULAN : juni 2012

Propinsi : Jawa Tengah KSM/Panitia :

Kabupaten : Banjarnegara Tanggal Dilaksanakan Survey 22-Jun-12

Kecamatan : Banjarnegara Tanggal Laporan dibuat :

Kelurahan/Desa Semampir

No. Uraian

HARGA SATUAN HASIL SURVEY*)

Satuan

Kelp.Masy. - 1 Kelp.Masy.-2 Kelp.Masy.-3

KETERANGANNama: ……….. Nama: ……….. Nama: ………..

Almt : ………. Almt : ………. Almt : ……….

Telp : - Telp : - Telp : -(1) (2) (3) (4) (5) (6) (7) (8) (9)I. TENAGA KERJA :

1 Ketua Klp/Mandor HOK 36,800.00 45,000 lokal

2 Tukang HOK 32,800.00 40,000 lokal

3 Pekerja HOK 24,200.00 30,000 lokal

HARGA SATUAN HASIL SURVEY*)

No. Uraian Nama: ………… Nama: ………… Nama: …………

Almt : …………. Almt : …………. Almt : ………….

Telp : ____________ Telp : ____________(1) (2) (3) (4) (5) (6) (7) (8) (9)II. BAHAN/MATERIAL :

1 Semen portland Kg 1,260.00 1,180

2 Pasir Beton 180,000.00 150,000

3 Split 180,000.00 150,000

456789

1011121314151617181920

III. ALAT :1 Ember cor bh 7,500 2 Cangkul bh 50,000 3 linggis bh 50,000 4 palu bh 35,000 5 sekop bh 45,000 6 cetok bh 15,000 7 gergaji bh 40,000 8 catut bh 20,000 9 Benang Rol 2,000

10 papan cor lbr 500

*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport) Banjarnegara, .........................2012

HARGA SATUAN SESUAI

STANDAR KABUPATEN

REKOMENDASI HARGA TERENDAH YANG DIPILIH

UNTUK BULAN INI

HARGA SATUAN*)

HARGA SATUAN SESUAI

STANDAR KABUPATEN

REKOMENDASI HARGA TERENDAH YANG DIPILIH

UNTUK BULAN INI

Satuan

Toko/Pemasok …………….

Toko/Pemasok …………….

Toko/Pemasok …………….

HARGA SATUAN*)

Nama Toko/Pemasok

Telp : ____________

M3

M3

Mengetahui: Kades/Lurah :

.……………………Nama :

Jabatan : Kades/Lurah

Tandatangan :

Diperiksa Oleh: UPL

Nama :

Jabatan : UPL

Tandatangan :

Dibuat/Disepakati Oleh KSM/Panitia : .……………………

Nama :

Jabatan : Ketua KSM

Tandatangan :

Diperiksa Oleh: Faskel

Nama :

Jabatan : Faskel

Tandatangan :

Mengetahui : L K M :

.……………………Nama :

Jabatan : Ketua LKM

Tandatangan :

Form - RAB 9

Page 4: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM MP)

RENCANA ANGGARAN BIAYA SWADAYA DAN PNPM MP/ BLMKota : BANJARNEGARA No RAB : _____________Kecamatan : BANJARNEGARA Jenis Kegiatan Cor Jalan BetonKelurahan Semampir Volume 18,45m3Nama Panitia : _____________ Lokasi Rt 5/2

No Uraian Pekerjaan Koefisien Volume SatuanHarga Satuan ( Rp )

Jumlah Harga Dan Sumber DanaJUMLAH BIAYA ( Rp )Swadaya PNPM BLM

Bahan Upah Bahan Upah Bahan Upah1 Persiapan 184.5 m2

A TENAGA KERJA1 Pekerja 0.1 18.5 OH 30,000 553,500 553,500 2 Mandor 0.05 9.23 OH 45,000 415,125 415,125

Sub Jumlah 1 968,625 968,625 2 Cor beton 1:3:5 18.45 m3

A TENAGA KERJA1 Pekerja 1.65 30.44 OH 30,000 913,275 913,275 2 Tukang Batu 0.275 5.074 OH 40,000 202,950 202,950 3 Kepala tukang 0.028 0.517 OH 45,000 23,247 23,247 4 Mandor 0.083 1.531 OH 45,000 68,911 68,911

B BAHAN1 Semen portland 276 5,092 Kg 1,180 1,847,530 4,161,266 6,008,796 2 Pasir Beton 0.7097 13.0942 150,000 - 1,964,134 1,964,134 3 Split 0.7496 13.8307 150,000 - 2,074,600 2,074,600

Sub Jumlah 2 1,847,530 1,208,383 8,200,000 11,255,913 3 Alat

1 Cangkul Ls 3 buah 50,000 150,000 150,000 2 Ember Ls 5 buah 7,500 37,500 37,500 3 Cetok Ls 5 buah 15,000 75,000 75,000 4 Sekop Ls 2 buah 45,000 90,000 90,000 5 Benang Ls 2 roll 2,000 4,000 4,000 6 papan Ls 50 lbr 500 25,000 25,000

Sub Jumlah 3 381,500 381,500 4 BIAYA ADMINISTRASI

Pengadaan materai Ls 5 buah 6,000 30,000 30,000 Papan proyek Ls 1 buah 50,000 50,000 50,000 Dokumentasi Ls 2 lbr 2,500 5,000 5,000 Penyusunan Proposal & LPJ Ls 100 lbr 150 15,000 15,000 ATK Ls 1 set 10,000 10,000 10,000

Sub Total Administrasi 110,000 110,000 Jumlah Biaya ( RP ) 4,516,038 8,200,000 12,716,038 Jumlah Total Biaya Upah Swadaya & PNPM / BLM ( Rp ) 2,177,008 - 2,177,008 Jumlah Total Biaya Konstruksi Swadaya & PNPM / BLM ( 1 + 2 + 3 + 4 ) 4,406,038 8,200,000 12,606,038 Dibulatakan BLM 4,406,000 8,200,000 12,606,000

Diverifikasi oleh Diverifikasi olehFaskel UPL

Junaydi Manislam

M3

M3

Page 5: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM MP)REKAPITULASI ANGGARAN BIAYA SWADAYA DAN PNPM MP/ BLM

Kota : BANJARNEGARA No RAB : __________

Kecamatan : BANJARNEGARA Jenis Kegiatan Cor Jalan Beton

Kelurahan Semampir Volume 18,45m3

Nama Panitia : _____________ Lokasi Rt 5/2

No Uraian SatuanVolume Kebutuhan JUMLAH BIAYA ( Rp )

TOTAL Dari Swadaya Dari PNPM BLM1 TENAGA KERJA

Mandor HOK 11 11 - 45,000 484,036 -

Kepala Tukang HOK 1 1 - 45,000 23,247 -

Tukang batu HOK 5 5 - 40,000 202,950 -

Pekerja HOK 49 49 - 30,000 1,466,775 -

Sub Total Tenaga Kerja 2,177,008 - 2 BAHAN

Semen portland Kg 5,092 1,566 3,526 1,180 1,847,530 4,161,266

Pasir Beton M3 13 - 13 150,000 - 1,964,134

Split M3 14 - 14 150,000 - 2,074,600

Sub Total Bahan 1,847,530 8,200,000 3 Alat

Cangkul buah 3 3 - 50,000 150,000 -

Ember buah 5 5 - 7,500 37,500 -

Cetok buah 5 5 - 15,000 75,000 -

Sekop buah 2 2 - 45,000 90,000 -

Benang roll 2 2 - 2,000 4,000 -

papan lbr 50 50 - 500 25,000 -

Sub Total Alat 381,500 - 4 BIAYA ADMINISTRASI

Pengadaan materai Ls 5 5 - 6,000 30,000 -

Papan proyek Ls 1 1 - 50,000 50,000 -

Dokumentasi Ls 2 2 - 2,500 5,000 -

Penyusunan Proposal & LPJ Ls 100 100 - 150 15,000 -

ATK Ls 1 1 - 10,000 10,000 -

Pengujian Kwalitas Air Minum - - -

Sub Total Administrasi 110,000 -

5 DANA TUNAI

Uang

Sub Total Dana Tunai6 TANAH/ TANAMAN

Tanah

Tanaman Produktif

asset Lainnya

Sub Total Lahan7 KONSUMSI

Konsumsi (Teh,Kopi,Gula,Kue dll)

Sub Total konsumsiJumlah Biaya ( RP ) 4,516,038 8,200,000

Jumlah Total Biaya Upah Swadaya & PNPM / BLM ( Rp ) 2,177,008 -

Jumlah Total Biaya Konstruksi Swadaya & PNPM / BLM ( 1 + 2 + 3 + 4 ) 4,406,038 8,200,000

Diverifikasi oleh Diverifikasi oleh Disiapkan Oleh KSM

Faskel UPL

Junaydi Manislam ( …………………….)

Format ini dapat disesuaikan dengan kebutuhan pekerjaan dilapangan. Cat :Hasil Rekapitulasi volume swadaya ini menjadi dasar Berita Acara Kesepakatan swadaya

Harga Satuan ( Rp )

Dari Swadaya

Dari PNPM BLM

Form - RAB 6Lamp. BA Kesanggupan Kontribusi Swadaya Masyarakat

Page 6: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT- MANDIRI PERKOTAAN (PNPM - MP)

REKAPITULASI KEBUTUHAN TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI

Propinsi : Jawa Tengah KSM/Panitia : ...........................Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan BetonKecamatan : Banjarnegara Volume 18,45m3Kelurahan/Desa Semampir Lokasi Rt 5/2

No. Uraian Satuan Jumlah/Volume Kebutuhan

A TENAGA KERJA :1 Ketua Kelompok/Mandor HOK 11 2 Tukang HOK 5 3 Pekerja HOK 49

B BAHAN/MATERIAL : 1 Semen portland Kg 5,092 2 Pasir Beton M3 13 3 Split M3 14

C A L A T : 1 Cangkul buah 3 2 Ember buah 5 3 Cetok buah 5 4 Sekop buah 2 5 Benang roll 2 6 papan lbr 50

D ADMINISTRASI :1 Pengadaan materai Ls 5 2 Papan proyek Ls 1 3 Dokumentasi Ls 2 4 Penyusunan Proposal & LPJ Ls 100 5 ATK Ls 1 6 Pengujian Kwalitas Air Minum - -

Form ini dapat diperbanyak sesuai kebutuhan Jumlah Item Kegiatan(Harus diarsipkan oleh KSM/Panitia)

Form - RAB 5

FASKEL

(Junaydi)

UPL

)Manislam)

DIBUAT OLEH: KETUA

KSM/PANITIA

)..…………………(

DIPERIKSA OLEH: Banjarnegara,

2012

Page 7: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT - MANDIRI PERKOTAAN(PNPM - MP)

REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BLM)

Propinsi : Jawa Tengah KSM/Panitia :

Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan Beton

Kecamatan : Banjarnegara Volume 18,45m3

Kelurahan/Desa Semampir Lokasi Rt 5/2

NO U R A I A N

Kegiatan : Kegiatan :Volume : Bobot Volume : Bobot

JUMLAH TOTALJumlah : Jumlah :No.RAB : (%) No.RAB : %

Dari DariTOTAL

Dari DariTOTAL

Dari DariTOTAL

SWADAYA BLM SWADAYA BLM SWADAYA BLM

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

(1) (2) (3) (4) (5)=(3+4) (6) (7) (8) (9)=(7+8) (10) (11)=(3+7) (12) (13)=(11+12)

A TENAGA KERJA 2,177,008 - 2,177,008 17 2,177,008 - 2,177,008

B B A H A N 1,847,530 8,200,000 10,047,530 79 1,847,530 8,200,000 10,047,530

C ALAT 381,500 - 381,500 3 381,500 - 381,500

D BIAYA ADMINISTRASI 110,000 - 110,000 1 110,000 - 110,000

H JUMLAH (A s/d D) 4,516,038 8,200,000 12,716,038 100 4,516,038 8,200,000 12,716,038

I KONTRIBUSI SWADAYA MASYARAKAT LAINNYA

1 Tanah - -

2 Pohon/Tanaman - -

3 Dll.

J JUMLAH (1 s/d 3) - -

K JUMLAH (H + J) - 12,716,038

Form - RAB 7

FASKEL

( Junaydi)

UPL

(Manislam)

DIBUAT OLEH: KETUA KSM/PANITIA

)...………………………(

DIPERIKSA OLEH: Banjarnegara,

………....................,2012

Page 8: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT - MANDIRI PERKOTAAN(PNPM - MP)

REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BLM)

BobotTotal(%)

(14)

17

79

3

1

100

Form - RAB 7

DIBUAT OLEH: KETUA KSM/PANITIA

)...………………………(

Banjarnegara, ………....................,2012

Page 9: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI (PNPM - MANDIRI) RENCANA JADWAL PELAKSANAAN KEGIATAN SARANA & PRASARANA

Propinsi : Jawa Tengah KSM/Panitia :Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan BetonKecamatan : Banjarnegara Volume 18,45m3Kelurahan/Desa Semampir Lokasi Rt 5/2

No. Volume BiayaBobot Pelaksanaan (hari)

Keterangan(Rp)

( % ) 1 2 3 4 5 6 7 8 9 10 11 12 13 141 Persiapan 184.5 968,625 7.9236 3 m2 (pembersihan lap)2 Cor beton 1:3:5 18.45 11,255,913 92.076 7 m33456789

Jumlah 12,224,538 100 10

Uraian Pekerjaan

Durasi ( Hari )

DIKETAHUI OLEH: FASKEL

(Junaydi)

DIPERIKSA OLEH: UPL

(Manislam)

Banjarnegara, 2012DIBUAT OLEH:

KETUA KSM/PANITIA

)..………………………(

Form - RAB 8

Page 10: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

DIKETAHUI OLEH: FASKEL

(Junaydi)

DIPERIKSA OLEH: UPL

(Manislam)

Banjarnegara, 2012DIBUAT OLEH:

KETUA KSM/PANITIA

)..………………………(

Page 11: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

ANALISA BIAYA KONSTRUKSI (ABK)BANGUNAN GEDUNG DAN PERUMAHANTAHUN ANGGARAN 2012

A. PEKERJAAN PERSIAPAN

KODE Sat Uraian Koef. Sat. Harga Upah Harga Bahan

A.1 Pagar sementara dari seng gelombang tinggi 2 meterBambu 1.25 btg - 9,000.00 Semen Portland (PC) 2.5 kg - 1,260.00 Seng gelombang 3"-5" 1.2 lbr - 53,300.00 Pasir pasang 0.005 m3 - 135,900.00 Split 2/3 0.009 m3 - 180,000.00 Kayu 5/7 0.072 m3 - 2,115,000.00 Paku biasa 2"- 5" 0.06 kg - 13,400.00 Meni Besi 0.45 kg - 39,600.00 Tukang kayu 0.2 OH 32,800.00 - Pekerja 0.4 OH 24,200.00 - Kepala Tukang 0.02 OH 36,800.00 - Mandor 0.02 OH 36,800.00 -

Jumlah harga

A.2 Pengukuran dan pemasangan bouwplankKayu 5/7 0.012 m3 - 2,115,000.00 Paku biasa 2"- 5" 0.02 kg - 13,400.00 Kayu papan 3/20 0.007 m3 - 2,250,000.00 Tukang kayu 0.1 OH 32,800.00 - Pekerja 0.1 OH 24,200.00 - Kepala Tukang 0.01 OH 36,800.00 - Mandor 0.005 OH 36,800.00 -

Jumlah harga

A.3 Membersihkan lapangan dan perataanPekerja 0.1 OH 24,200.00 - Mandor 0.05 OH 36,800.00 -

Jumlah harga

A.4 Pembuatan Gudang semen dan alat - alatBambu 1.7 btg - 9,000.00 Kayu tahun 0.21 m3 - 2,115,000.00 Paku biasa 2" - 5" 0.3 kg - 13,400.00 PC 10.5 kg - 1,260.00 Pasir pasang 0.03 m3 - 135,900.00

1 M1

1 M1

1 M2

1 M2

Page 12: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Split 0.05 m3 - 180,000.00 Seng gelombang BJLS 2 1.5 lbr - 53,300.00 Tukang kayu 2 OH 32,800.00 - Pekerja 1 OH 24,200.00 - Kepala Tukang 0.2 OH 36,800.00 - Mandor 0.05 OH 36,800.00 -

Jumlah harga

A.5 Pembuatan steger dari bambu ukuran ( 40 x 50 x 20 ) cmBambu dia 6-8, 600 cm 1 btg - 9,000.00 Tali ijuk 0.25 kg - 22,500.00 Tukang kayu 0.170 OH 32,800.00 - Pekerja 0.25 OH 24,200.00 - Kepala Tukang 0.002 OH 36,800.00 - Mandor 0.0013 OH 36,800.00 -

Jumlah harga

A.6 Bongkaran beton bertulangPekerja 6.667 OH 24,200.00 - Mandor 0.333 OH 36,800.00 -

Jumlah harga

A.7 Bongkaran dinding tembok bata merahPekerja 6.667 OH 24,200.00 - Mandor 0.033 OH 36,800.00 -

Jumlah harga

B. PEKERJAAN TANAH (SNI 2835-2008)

KODE Sat Uraian Koef. Sat. Harga Upah Harga Bahan

B.1 Menggali Tanah Biasa sedalam 1 meterPekerja 0.75 OH 24,200.00 - Mandor 0.025 OH 36,800.00 -

Jumlah harga

B.2 Menggali Tanah Biasa sedalam 2 meterPekerja 0.9 OH 24,200.00 - Mandor 0.045 OH 36,800.00 -

B.3 Menggali Tanah Biasa sedalam 3 meterPekerja 1.05 OH 24,200.00 - Mandor 0.067 OH 36,800.00 -

1 M2

1 M3

1 M3

1 M3

1 M3

1 M3

Page 13: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

B.4 Menggali Tanah Keras sedalam 1 meterPekerja 1 OH 24,200.00 - Mandor 0.032 OH 36,800.00 -

B.5 Menggali Tanah Cadas sedalam 1 meterPekerja 1.5 OH 24,200.00 - Mandor 0.06 OH 36,800.00 -

B.6 Menggali Tanah lumpur sedalam 1 meterPekerja 1.2 OH 24,200.00 - Mandor 0.045 OH 36,800.00 -

B.7 Membuang tanah sejauh 15 meterPekerja 0.33 OH 24,200.00 - Mandor 0.01 OH 36,800.00 -

B.8 Urugan KembaliPekerja 0.25 OH 24,200.00 - Mandor 0.0083 OH 36,800.00 -

B.9 Pemadatan Tanah (per 20cm)Pekerja 0.5 OH 24,200.00 - Mandor 0.05 OH 36,800.00 -

B.10 Urugan Pasir

Pasir Urug 1.2 - 110,700.00 Pekerja 0.3 OH 24,200.00 - Mandor 0.01 OH 36,800.00 -

B.11 Memasang lapisan ijuk tebal 10 cm untuk resapanIjuk 6 Kg - 22,500.00 Pekerja 0.15 OH 24,200.00 - Mandor 0.015 OH 36,800.00 -

B.12 Mengurug Sirtu Padat untuk Peninggian lantai bangunan

Sirtu 1.2 - 114,750.00 Pekerja 0.25 OH 24,200.00 -

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

M3

1 M2

1 M3

M3

Page 14: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Mandor 0.025 OH 36,800.00 -

C. PEKERJAAN PONDASI (SNI 2836 - 2008)

C.1 Pasang Pondasi Batu Belah 1 Pc : 4 Ps

Batu belah 15/20 cm 1.2 - 140,400.00 Semen portland 163 Kg - 1,260.00

Pasir pasang 0.52 135,900.00 Pekerja 1.5 OH 24,200.00 - Tukang batu 0.75 OH 32,800.00 - Kepala tukang 0.075 OH 36,800.00 - Mandor 0.075 OH 36,800.00 -

C.2 Pasang Pondasi Batu Belah 1 Pc : 6 Ps

Batu belah 15/20 cm 1.2 - 140,400.00 Semen portland 117 Kg - 1,260.00

Pasir pasang 0.561 135,900.00 Pekerja 1.5 OH 24,200.00 - Tukang batu 0.75 OH 32,800.00 - Kepala tukang 0.075 OH 36,800.00 - Mandor 0.075 OH 36,800.00 -

C.2.2 Pasang Pondasi Batu Belah 1 Pc : 8 Ps

Batu belah 15/20 cm 1.2 - 140,400.00 Semen portland 91 Kg - 1,260.00

Pasir pasang 0.584 135,900.00 Pekerja 1.5 OH 24,200.00 - Tukang batu 0.75 OH 32,800.00 - Kepala tukang 0.075 OH 36,800.00 - Mandor 0.075 OH 36,800.00 -

1 M3

M3

M3

1 M3

M3

M3

1 M3

M3

M3

Page 15: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

C.3 Pasang Pondasi Batu Belah 1 Pc : 3 Kp : 10 Ps

Batu belah 15/20 cm 1.2 - 140,400.00 Semen portland 61 Kg - 1,260.00

Kapur pasang 0.147 - 134,900.00

Pasir pasang 0.492 135,900.00 Pekerja 1.5 OH 24,200.00 - Tukang batu 0.75 OH 32,800.00 - Kepala tukang 0.075 OH 36,800.00 - Mandor 0.075 OH 36,800.00 -

C.4 Pasang Pondasi Batu Kosong

Batu belah 15/20 cm 1.2 - 140,400.00

Pasir urug 0.432 110,700.00 Pekerja 0.78 OH 24,200.00 - Tukang batu 0.39 OH 32,800.00 - Kepala tukang 0.039 OH 36,800.00 - Mandor 0.039 OH 36,800.00 -

1 M3

M3

M3

M3

1 M3

M3

M3

Page 16: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

D. PEKERJAAN DINDING (SNI 6897 - 2008)

D.1 Pasangan Bata Merah tebal 1 bata, 1 Pc : 6 ps

Bata merah 5x11x22 c 140 495.00 Semen portland 18.5 Kg 1,260.00

Pasir pasang 0.122 135,900.00 Pekerja 0.6 OH 24,200.00 Tukang batu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.03 OH 36,800.00

D.2 Pasangan Bata Merah tebal 1/2 bata, 1 Pc : 4 PsBata merah 5x11x22 c 70 Bh 495.00 Semen portland 11.5 Kg 1,260.00

Pasir pasang 0.043 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

D.3 Pasangan Bata Merah tebal 1/2 bata, 1 Pc : 6 PsBata merah 5x11x22 c 70 Bh 495.00 Semen portland 8.32 Kg 1,260.00

Pasir pasang 0.049 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

D.4 Pasangan Bata Merah tebal 1/2 bata, 1 Pc : 8 PsBata merah 5x11x22 c 70 Bh 495.00 Semen portland 6.5 Kg 1,260.00

Pasir pasang 0.05 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

D.5 Pasangan Bata Merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 ps

1 M2

M3

M3

1 M2

M3

1 M2

M3

1 M2

M3

1 M2

Page 17: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Bata merah 5x11x22 c 70 Bh 495.00 Semen portland 4.5 Kg 1,260.00

Pasir pasang 0.05 135,900.00

Kapur pasang 0.015 134,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

D.6 - SNI 2 Pasang dinding roster/terawang (12 x 11 x 24 ) cm spesi 1 PC : 4 PsRoster/terawang 30 Bh 10,800.00 Semen portland 11 Kg 1,260.00

Pasir pasang 0.035 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

D.7-SNI 20 Pasang dinding Batako (5 x 11 x 24 ) cm campuran spesi 1 PC : 3 PsBatako 70 Bh 1,800.00 Semen portland 14 Kg 1,260.00

Pasir pasang 0.032 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

E. PEKERJAAN PLESTERAN ( SNI 2837 - 2008 )

E.1 Plesteran 1 Pc : 2 Ps, tebal 15 mmSemen portland 10.224 Kg 1,260.00

Pasir pasang 0.02 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

M3

M3

1 M2

M3

1 M2

M3

1 M2

M3

Page 18: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

E.2 Plesteran 1 Pc : 4 Ps, tebal 15 mmSemen portland 6.24 Kg 1,260.00

Pasir pasang 0.024 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

E.3 Plesteran 1 Pc : 5 Ps, tebal 15 mmSemen portland 5.184 Kg 1,260.00

Pasir pasang 0.026 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

E.4 Plesteran 1 Pc : 8 Ps, tebal 15 mmSemen portland 3.456 Kg 1,260.00

Pasir pasang 0.029 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

E.5 Membuat 1 m’ Plesteran Skoning lebar 10 mm 1 PC : 2 PPSemen portland 0.5 Kg 1,260.00

Pasir pasang 0.013 135,900.00 Pekerja 0.08 OH 24,200.00 Tukang batu 0.40 OH 32,800.00 Kepala tukang 0.04 OH 36,800.00 Mandor 0.004 OH 36,800.00

E.6 Membuat 1 m2 Plesteran Ciprat / Kamprotan 1 PC : 2 PPSemen portland 4.32 Kg 1,260.00

Pasir pasang 0.006 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.015 OH 36,800.00

1 M2

M3

1 M2

M3

1 M2

M3

1 M1

M3

1 M2

M3

Page 19: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

E.7 Membuat 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’)Semen portland 1.6 Kg 1,260.00 Pekerja 0.07 OH 24,200.00 Tukang batu 0.035 OH 32,800.00 Kepala tukang 0.004 OH 36,800.00 Mandor 0.004 OH 36,800.00

E.8 Membuat 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PPSemen portland 6.34 Kg 1,260.00

Pasir pasang 0.012 135,900.00 Pekerja 0.3 OH 24,200.00 Tukang batu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.015 OH 36,800.00

E.9 Membuat 1 m2 acianSemen portland 3.25 Kg 1,260.00 Pekerja 0.2 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00

F. PEKERJAAN KAYU (SNI 3434 - 2008)

F.1.kr Membuat Kusen Pintu dan Jendela Kayu Kruing

Kayu Kruing, balok 1.2 5,715,000.00 Paku biasa 2" - 5" 1.25 kg 13,400.00 Lem Kayu 1 kg 16,400.00 Pekerja 6 OH 24,200.00 Tukang kayu 18 OH 32,800.00 Kepala tukang 1.8 OH 36,800.00 Mandor 0.3 OH 36,800.00

F.1. bkr Membuat Kusen Pintu dan Jendela Kayu bangkirai

Kayu Bangkirai balok 1.2 9,900,000.00 Paku biasa 2" - 5" 1.25 kg 13,400.00 Lem Kayu 1 kg 16,400.00 Pekerja 6.0 OH 24,200.00

1 M2

1 M2

M3

1 M2

1 M3

M3

1 M3

M3

Page 20: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Tukang kayu 18.0 OH 32,800.00 Kepala tukang 1.8 OH 36,800.00 Mandor 0.3 OH 36,800.00

F.2.kr Membuat Pintu Panel Kayu Kruing

Kayu Kruing, papan 0.04 - 6,300,000.00 Lem kayu 0.05 kg - 16,400.00 Pekerja 1 OH 24,200.00 - Tukang kayu 3 OH 32,800.00 - Kepala tukang 0.3 OH 36,800.00 Mandor 0.05 OH 36,800.00

F.2.bkr Membuat Pintu Panel Kayu Bangkirai

Kayu Bangkirai , papan 0.04 - 11,162,700.00 Lem kayu 0.05 kg - 16,400.00 Pekerja 1 OH 24,200.00 - Tukang kayu 3 OH 32,800.00 - Kepala tukang 0.3 OH 36,800.00 Mandor 0.05 OH 36,800.00

F.3.kr Membuat Pintu dan Jendela Kaca Kayu Kruing

Kayu Kruing, papan 0.024 6,300,000.00 Lem Kayu 0.3 kg 16,400.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00

F.3.bkr Membuat Pintu dan Jendela Kaca Kayu Bangkirai

Kayu Bangkirai papan 0.024 11,162,700.00 Lem Kayu 0.3 kg 16,400.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00

F.4.kr Membuat Pintu Kayu Lapis (plywood) Rangkap, Rangka Kayu Kruing

Kayu Kruing, papan 0.025 6,300,000.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00

1 M2

M3

1 M2

M3

1 M2

M3

1 M2

M3

1 M2

M3

Page 21: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.7 OH 24,200.00 Tukang kayu 2.1 OH 32,800.00 Kepala tukang 0.21 OH 36,800.00 Mandor 0.035 OH 36,800.00

F.4.bkr Membuat Pintu Kayu Lapis (Plywood) Rangkap, Rangka Kayu Bangkirai

Kayu Bangkirai, papan 0.025 11,162,700.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.7 OH 24,200.00 Tukang kayu 2.1 OH 32,800.00 Kepala tukang 0.21 OH 36,800.00 Mandor 0.035 OH 36,800.00

F.5.kr Membuat Pintu Plywood Rangkap, Rangka ekspose Kayu Kruing

Kayu Kruing, papan 0.0256 6,300,000.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00

F.5.bkr Membuat Pintu Plykwood Rangkap, Rangka ekspose Kayu Bangkirai

Kayu Bangkirai, papan 0.0256 11,162,700.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00

F.6.kr Memasang Konstruksi Kuda-Kuda Konvensional Kayu Kruing

Kayu Kruing, balok 1.1 5,715,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 5.6 Kg 13,400.00 Pekerja 4.0 OH 24,200.00 Tukang kayu 12.0 OH 32,800.00

1 M2

M3

1 M2

M3

1 M2

M3

1 M3

M3

Page 22: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kepala tukang 1.2 OH 36,800.00 Mandor 0.2 OH 36,800.00

F.6.bkr Memasang Konstruksi Kuda-Kuda Konvensional Kayu Bangkirai

Kayu Bangkirai, balok 1.1 9,900,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 5.6 Kg 13,400.00 Pekerja 4.0 OH 24,200.00 Tukang kayu 12.0 OH 32,800.00 Kepala tukang 1.2 OH 36,800.00 Mandor 0.2 OH 36,800.00

F.7.bkr Memasang Konstruksi Gording Kayu Bangkirai

Kayu Bangkirai, balok 1.1 9,900,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 3.0 Kg 13,400.00 Pekerja 2.4 OH 24,200.00 Tukang kayu 7.2 OH 32,800.00 Kepala tukang 0.72 OH 36,800.00 Mandor 0.12 OH 36,800.00

F.7.kr Memasang Konstruksi Gording Kayu Kruing

Kayu Kruing, balok 1.1 5,715,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 3.0 Kg 13,400.00 Pekerja 2.4 OH 24,200.00 Tukang kayu 7.2 OH 32,800.00 Kepala tukang 0.72 OH 36,800.00 Mandor 0.12 OH 36,800.00

F.8.Kr Memasang rangka atap Kayu Kruing

Kayu Kruing, balok, kas 0.014 5,715,000.00

Kayu Kruing, balok, ren 0.0036 5,715,000.00 Paku biasa 2" - 5" 0.25 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.8.thn Memasang rangka atap Kayu Tahun

1 M3

M3

1 M3

M3

1 M3

M3

1 M2

M3

M3

1 M2

Page 23: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kayu Tahun, balok kaso 0.014 2,115,000.00

Kayu Tahun, balok, ren 0.0036 2,115,000.00 Paku biasa 2" - 5" 0.25 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.9.kr Memasang Rangka Langit-Langit (1.00 x 1.00) m, Kayu Kruing

Kayu Kruing, balok 0.0154 5,715,000.00 Paku biasa 2" - 5" 0.2 Kg 13,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.075 OH 36,800.00

F.9.thn Memasang Rangka Langit-Langit (1.00 x 1.00) m, Kayu Tahun

Kayu Tahun, balok 0.0154 2,115,000.00 Paku usuk 0.2 Kg 13,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.075 OH 36,800.00

F.10.kr Memasang Rangka Langit-Langit (60 x 60) m, Kayu Kruing

Kayu Kruing, balok 0.0163 5,715,000.00 Paku usuk 0.25 Kg 13,400.00 Pekerja 0.20 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.01 OH 36,800.00

F.10.thn Memasang Rangka Langit-Langit (60 x 60) m, Kayu Tahun

Kayu Tahun, balok 0.0163 2,115,000.00 Paku usuk 0.25 Kg 13,400.00 Pekerja 0.20 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.01 OH 36,800.00

F.11.kr Memasang Lisplang ukuran (3 x 20) cm, Kayu Kruing

M3

M3

1 M2

M3

1 M2

M3

1 M2

M3

1 M2

M3

1 M1

Page 24: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kayu Kruing, papan 0.0108 6,300,000.00 Paku biasa 2" - 5" 0.1 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.11.bkr Memasang Lisplang ukuran (3 x 20) cm, Kayu Bangkirai

Kayu Bangkirai, papan 0.0108 11,162,700.00 Paku biasa 2" - 5" 0.1 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.12.kr Memasang Lisplang ukuran (3 x 30) cm, Kayu Kruing

Kayu Kruing, papan 0.011 6,300,000.00 Paku biasa 2" - 5" 0.05 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.12.bkr Memasang Lisplang ukuran (3 x 30) cm, Kayu Bangkirai

Kayu Bangkirai, papan 0.011 11,162,700.00 Paku biasa 2" - 5" 0.05 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00

F.13.kr Memasang dinding pemisah teakwood rangkap, rangka Kayu Kruing

Kayu Kruing, Balok 0.028 5,715,000.00 Paku triplek 0.15 Kg 18,600.00 Lem Kayu 0.56 Lt 16,400.00 Teakwood 120x240 cm 0.86 Lbr 33,900.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.008 OH 36,800.00

M3

1 M1

M3

1 M1

M3

1 M1

M3

1 M2

M3

Page 25: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

F.13.bkr Pasang dinding pemisah teakwood rangkap, rangka Kayu Bangkirai

Kayu Bangkirai, Balok 0.028 9,900,000.00 Paku triplek 0.15 Kg 18,600.00 Lem Kayu 0.56 Lt 16,400.00 Teakwood 120x240 cm 0.86 Lbr 33,900.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.008 OH 36,800.00

1 M2

M3

Page 26: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

G. PEKERJAAN BETON ( SNI 7394-2008 )

G.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87Semen portland 247 Kg 1,260.00

Pasir Beton 0.7449 180,000.00

Split 0.74 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78Semen portland 276 Kg 1,260.00

Pasir Beton 0.7097 180,000.00

Split 0.7496 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00

1 M3

M3

M3

1 M3

M3

M3

Page 27: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72Semen portland 299 Kg 1,260.00

Pasir Beton 0.6849 180,000.00

Split 0.7533 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87Semen portland 230 Kg 1,260.00

Pasir Beton 0.7654 180,000.00

Split 0.7607 180,000.00 Air 200 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66Semen portland 326 Kg 1,260.00

Pasir Beton 0.6514 180,000.00

Split 0.7622 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61Semen portland 352 Kg 1,260.00

Pasir Beton 0.6266 180,000.00

Split 0.7637 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00

1 M3

M3

M3

1 M3

M3

M3

1 M3

M3

M3

1 M3

M3

M3

Page 28: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Mandor 0.083 OH 36,800.00

G.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58Semen portland 371 Kg 1,260.00

Pasir Beton 0.5983 180,000.00

Split 0.7756 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56Semen portland 384 Kg 1,260.00

Pasir Beton 0.5931 180,000.00

Split 0.7696 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53Semen portland 406 Kg 1,260.00

Pasir Beton 0.5863 180,000.00

Split 0.76 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52Semen portland 413 Kg 1,260.00

Pasir Beton 0.5837 180,000.00

Split 0.7563 180,000.00

1 M3

M3

M3

1 M3

M3

M3

1 M3

M3

M3

1 M3

M3

M3

Page 29: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00

G.11 1 Kg Pembesian dengan Besi Polos atau Besi UlirBesi beton (polos/ulir) 1.05 Kg 8,550.00 Kawat beton 0.015 Kg 21,900.00 Pekerja 0.007 OH 24,200.00 Tukang kayu 0.007 OH 32,800.00 Kepala tukang 0.0007 OH 36,800.00 Mandor 0.0004 OH 36,800.00

G.12 Memasang Bekisting untuk Pondasi

Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.3 Kg 13,400.00 Minyak bekisting/solar 0.1 Lt 6,100.00 Pekerja 0.52 OH 24,200.00 Tukang kayu 0.26 OH 32,800.00 Kepala tukang 0.026 OH 36,800.00 Mandor 0.026 OH 36,800.00

G.13 Memasang Bekisting untuk Sloof

Kayu tahun 0.045 2,115,000.00 Paku biasa 2' - 5" 0.3 Kg 13,400.00 Minyak bekisting/solar 0.1 Lt 6,100.00 Pekerja 0.520 OH 24,200.00 Tukang kayu 0.260 OH 32,800.00 Kepala tukang 0.026 OH 36,800.00 Mandor 0.026 OH 36,800.00

G.14 Memasang Bekisting untuk Kolom

Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00

Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00

2 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.033 OH 36,800.00

1 M2

M3

1 M2

M3

1 M2

M3

M3

Bambu Æ (8-10 cm)

Page 30: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

G.15 Memasang Bekisting untuk Balok

Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00

Balok kayu tahun 0.02 2,115,000.00 Papan bekisting kayu t 1.50 Lbr 26,100.00 Bambu 2.0 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.006 OH 36,800.00

G.16 Memasang Bekisting untuk Lantai

Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00

Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00

6 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.006 OH 36,800.00

G.17 Memasang Bekisting untuk Tangga

Kayu tahun terentang 0.03 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.15 Lt 6,100.00

Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00 Bambu 2 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.033 OH 36,800.00

1 M2

M3

M3

1 M2

M3

M3

Bambu Æ (8-10 cm)

1 M2

M3

M3

Page 31: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

G.22 Membuat Dinding Beton Bertulang ( 150 kg besi + bekisting )

Kayu tahun 0.24 2,115,000.00 Paku biasa 2" - 5" 3.2 Kg 13,400.00 Minyak bekisting/solar 1.6 Lt 6,100.00 Besi beton polos 157.5 Kg 8,550.00 Kawat beton 2.25 Kg 21,900.00 Semen portland 336 Kg 1,260.00

Pasir beton 0.54 180,000.00

Koral beton 0.81 180,000.00

Kayu Tahun balok 0.16 2,115,000.00 Papan kayu tahun 2.8 lbr 26,100.00 Bambu 24 btg 9,000.00 Pekerja 5.3 OH 24,200.00 Tukang batu 0.275 OH 32,800.00 Tukang kayu 1.3 OH 32,800.00 Tukang besi 1.05 OH 32,800.00 Kepala tukang 0.262 OH 36,800.00 Mandor 0.265 OH 36,800.00

G.23 Membuat Tangga Beton Bertulang ( 200 kg besi + bekisting )

Membuat 1 m3 beton mut 1 718,896.94 Pembesian dengan Besi 200 Kg 9,745.48

Memasang Bekisting un 1.4 187,824.80

G.24 Membuat Kolom Penguat Beton Bertulang (11 X 11) cm

Kayu tahun 0.002 2,115,000.00 Paku biasa 2" - 5" 0.01 Kg 13,400.00

1 M3

M3

M3

M3

M3

1 M3

M3

M2

1 M1

M3

Page 32: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Besi beton polos 3 Kg 8,550.00 Kawat beton 0.045 Kg 21,900.00 Semen portland 4 Kg 1,260.00

Pasir beton 0.006 180,000.00

Split 0.009 180,000.00 Pekerja 0.18 OH 24,200.00 Tukang batu 0.02 OH 32,800.00 Tukang kayu 0.02 OH 32,800.00 Tukang besi 0.02 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.009 OH 36,800.00

G.25 Membuat Ring Balok Beton Bertulang (10 X 15) cm

Kayu tahun 0.003 2,115,000.00 Paku biasa 2" - 5" 0.02 Kg 13,400.00 Besi beton polos 3.6 Kg 8,550.00 Kawat beton 0.05 Kg 21,900.00 Semen portland 5.5 Kg 1,260.00

Pasir beton 0.009 180,000.00

Koral beton 0.015 180,000.00 Pekerja 0.297 OH 24,200.00 Tukang batu 0.033 OH 32,800.00 Tukang kayu 0.033 OH 32,800.00 Tukang besi 0.033 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

G.26 Membuat Plat Lantai/Atap Beton Bertulang ( 150 kg besi + bekisting )

Membuat 1 m3 beton mut 1 718,896.94 Pembesian dengan Besi 150 Kg 9,745.48

Memasang Bekisting un 1.4 244,286.20

M3

M3

1 M1

M3

M3

M3

1 M3

M3

M2

Page 33: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

H. PEKERJAAN PENUTUP ATAP (SNI 3436 -2002)

H.1 Pasang Atap Genteng Plentong KecilGenteng plentong 25 Bh 1,700.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.075 OH 32,800.00 Kepala tukang 0.008 OH 36,800.00 Mandor 0.008 OH 36,800.00

1 M2

Page 34: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

H.2 Pasang Atap Genteng MagasGenteng Magas 22 Bh 2,025.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.008 OH 36,800.00

H.3 Pasang Genteng Bubung PlentongGenteng bubung plent 4 Bh 3,900.00 Semen portland 8 Kg 1,260.00

Pasir pasang 0.032 135,900.00 Pekerja 0.4 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.002 OH 36,800.00

H.4 Pasang Genteng Bubung magasGenteng Magas 4 Bh 6,400.00 Semen portland 8 Kg 1,260.00

Pasir pasang 0.032 135,900.00 Pekerja 0.4 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.002 OH 36,800.00

H.5.a Pasang atap asbes gelombang (2,25 x 0,92) x 5 mmAsbes gelombang 0.6 lbr 50,500.00 Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.075 OH 32,800.00 Kepala tukang 0.008 OH 36,800.00 Mandor 0.008 OH 36,800.00

H.5.b Pasang atap asbes gelombang (2,00 x 0,92) x 5 mmAsbes gelombang 0.6 lbr 35,800.00 Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00

1 M2

1 M1

M3

1 M1

M3

1 M2

1 M2

Page 35: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Mandor 0.007 OH 36,800.00

H.5.c Pasang atap asbes gelombang (3,00 x 1,05) x 5 mmAsbes gelombang 0.35 lbr - Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00 Mandor 0.007 OH 36,800.00

H.5.d Pasang atap asbes gelombang (2,10 x 1,05) x 4 mmAsbes gelombang 0.51 lbr - Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.067 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00 Mandor 0.007 OH 36,800.00

H.6 Pasang atap seng gelombangSeng gelombang 3" x 6" 0.7 lbr 78,000.00 Paku seng 0.02 Kg 25,000.00 Pekerja 0.12 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.006 OH 36,800.00

H.7 Pasang nok sengSeng plat 3"x6" BJLS 30 0.3 lbr 28,200.00 Paku Sekrup 3.5" 0.04 Kg 27,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.008 OH 36,800.00 Mandor 0.006 OH 36,800.00

H.8 Pasang atap genteng betonGenteng beton 11 bh 6,200.00 Paku biasa 0.03 kg 13,400.00 Pekerja 0.2 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00

1 M2

1 M2

1 M2

1 M1

1 M2

Page 36: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

H.9 Pasang atap genteng metalGenteng Metal 1.25 lbr 97,200.00 Paku biasa 0.03 kg 13,400.00 Pekerja 0.2 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00

H.10 Pasang Nok genteng metalGenteng Metal 3 lbr 19,800.00 Paku biasa 0.05 kg 13,400.00 Pekerja 0.25 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.013 OH 36,800.00

I PEKERJAAN LANGIT LANGIT ( SNI 2839 - 2008 )

I.1 Memasang 1 m2 langit-langit asbes semen, tebal 5 mmAsbes semen 1.1 Lbr 8,650.00 Paku triplek 0.01 kg 18,600.00 Pekerja 0.03 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00 Mandor 0.004 OH 36,800.00

I.2 Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cmAkustik 12 Lbr 4,500.00 Paku triplek 0.05 kg 18,600.00 Pekerja 0.12 OH 24,200.00 Tukang kayu 0.12 OH 32,800.00 Kepala tukang 0.012 OH 36,800.00 Mandor 0.006 OH 36,800.00

I.3 Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cmAkustik 5.8 Lbr 10,950.00 Paku triplek 0.05 kg 18,600.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

1 M2

1 M1

1 M2

1 M2

1 M2

Page 37: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

I.4 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mmTripleks 0.375 Lbr 54,600.00 Paku triplek 0.03 kg 18,600.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

I.5 Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm,Gypsum Board 0.364 Lbr 57,600.00 Paku sekrup 0.11 kg 27,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.05 OH 32,800.00 Kepala tukang 0.005 OH 36,800.00 Mandor 0.005 OH 36,800.00

I.6 Memasang 1 m’ list plafond gysum profil, polos tebal 10 cmList Gypsum profil 1.05 m1 6,900.00 Tepung Gypsum 0.15 kg 4,950.00 Pekerja 0.06 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00

I.6 Memasang 1 m’ list plafond gysum profil, polos tebal 12 cmList Gypsum profil 1.05 m1 8,300.00 Tepung Gypsum 0.15 kg 4,950.00 Pekerja 0.06 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00

I.7 List Langit-langit kayu profilList kayu profil 1.05 m1 3,450.00 Paku 0.01 kg 18,600.00 Pekerja 0.05 OH 24,200.00 Tukang kayu 0.05 OH 32,800.00 Kepala tukang 0.005 OH 36,800.00 Mandor 0.003 OH 36,800.00

1 M2

1 M2

1 M1

1 M1

1 M1

Page 38: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

I.8. Kr Langit-langit asbes (1,00x1,00) tbl 3,2 mm, rangka kayu kruingKayu Kruing balok 0.0120 m3 5,715,000.00 Paku eternit 0.0600 kg 18,600.00 Asbes 1,00 x 1,00 m 1.1000 lbr 8,650.00 Pekerja 0.1800 OH 24,200.00 Tukang kayu 0.3200 OH 32,800.00 Kepala tukang 0.0320 OH 36,800.00 Mandor 0.0090 OH 36,800.00

I.8. Thn Langit-langit asbes (1,00x1,00) tbl 3,2 mm, rangka TahunKayu Tahun balok 0.0120 m3 2,115,000.00 Paku eternit 0.0600 kg 18,600.00 Asbes 1,00 x 1,00 m 1.1000 lbr 8,650.00 Pekerja 0.1800 OH 24,200.00 Tukang kayu 0.3200 OH 32,800.00 Kepala tukang 0.0320 OH 36,800.00 Mandor 0.0090 OH 36,800.00

J PEKERJAAN SANITASI

J.1 1 Bh Memasang 1 bh kloset duduk monoblokKloset duduk/monoblo 1 bh 724,700.00 Perlengkapan hrg kloset ls 43,482.00 Pekerja 3.3 OH 24,200.00 Tukang batu 1.1 OH 32,800.00 Kepala tukang 0.001 OH 36,800.00 Mandor 0.16 OH 36,800.00

J.2 1 Bh Memasang 1 bh kloset jongkok porselenKloset jongkok porsele 1 bh 137,250.00 Semen Portland 6 kg 1,260.00 Pasir pasang 0.01 m3 135,900.00 Pekerja 1 OH 24,200.00 Tukang batu 1.5 OH 32,800.00 Kepala tukang 1.5 OH 36,800.00 Mandor 0.16 OH 36,800.00

J.3 1 Bh Memasang 1 bh urinoirUrinoir 1 bh 422,700.00 Perlengkapan hrg urinoir ls 126,810.00 Semen Portland 6 kg 1,260.00 Pasir pasang 0.01 m3 135,900.00

1 M1

1 M1

Page 39: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pekerja 1 OH 24,200.00 Tukang batu 1 OH 32,800.00 Kepala tukang 0.1 OH 36,800.00 Mandor 0.1 OH 36,800.00

J.4 1 Bh Memasang 1 bh bak mandi fiberglass vol 0,30 m3Bak fiberglass 1 bh 313,000.00 Perlengkapan 8% hrg bak ls 56,340.00 Pekerja 1.8 OH 24,200.00 Tukang batu 2.7 OH 32,800.00 Kepala tukang 0.54 OH 36,800.00 Mandor 0.11 OH 36,800.00

J.5 1 Bh Memasang 1 bh bak mandi batu bata vol. 0,30 m3Batu bata 417 bh 495.00 Semen portland 120 kg 1,260.00 Pasir pasang 0.3 m3 135,900.00 Keramik 20 x 20 4.356 m2 42,000.00 Semen nat (pc putih) 6 kg 1,980.00 Pekerja 6 OH 24,200.00 Tukang batu 3 OH 32,800.00 Kepala tukang 0.3 OH 36,800.00 Mandor 0.3 OH 36,800.00

J.6 1 Bh Memasang 1 bh bak kontrol pasangan batu bata ukuran (30x30) cmBatu bata 151 bh 495.00 Semen portland 44 kg 1,260.00 Pasir pasang 0.07 m3 135,900.00 Batu kerikil 0.07 m3 180,000.00 Besi beton 1.6 kg 8,550.00 Pasir beton 0.06 m3 180,000.00 Pekerja 6 OH 24,200.00 Tukang batu 3 OH 32,800.00 Kepala tukang 0.3 OH 36,800.00 Mandor 0.3 OH 36,800.00

J.7 Memasang 1 m' pipa galvanis Ø 3" QBPipa galvanis 1.2 M1 130,500.00 Perlengkapan % hrg pipa ls 45,675.00 Pekerja 0.108 OH 24,200.00 Tukang batu 0.18 OH 32,800.00 Kepala tukang 0.018 OH 36,800.00 Mandor 0.0054 OH 36,800.00

1 M1

Page 40: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

J.8 Memasang 1 m' pipa PVC type S.10 Ø 1/2"Pipa PVC 1.2 M1 3,500.00 Perlengkapan % hrg pipa ls 1,225.00 Pekerja 0.036 OH 24,200.00 Tukang batu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.0018 OH 36,800.00

J.9 Memasang 1 m' pipa PVC type S.10 Ø 3/4"Pipa PVC 1.2 M1 5,200.00 Perlengkapan % hrg pipa ls 1,820.00 Pekerja 0.036 OH 24,200.00 Tukang batu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.0018 OH 36,800.00

J.10 Memasang 1 m' pipa PVC type S.10 Ø 2"Pipa PVC 1.2 M1 31,700.00 Perlengkapan % hrg pipa ls 11,095.00 Pekerja 0.054 OH 24,200.00 Tukang batu 0.09 OH 32,800.00 Kepala tukang 0.009 OH 36,800.00 Mandor 0.0027 OH 36,800.00

J.11 Memasang 1 m' pipa PVC type S.10 Ø 3"Pipa PVC 1.2 M1 64,400.00 Perlengkapan % hrg pipa ls 22,540.00 Pekerja 0.081 OH 24,200.00 Tukang batu 0.135 OH 32,800.00 Kepala tukang 0.0135 OH 36,800.00 Mandor 0.0041 OH 36,800.00

J.12 Memasang 1 m' pipa PVC type S.10 Ø 4"Pipa PVC 1.2 M1 96,800.00 Perlengkapan % hrg pipa ls 33,880.00 Pekerja 0.081 OH 24,200.00 Tukang batu 0.135 OH 32,800.00 Kepala tukang 0.0135 OH 36,800.00 Mandor 0.0041 OH 36,800.00

1 M1

1 M1

1 M1

1 M1

1 M1

Page 41: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

J.13 1 Bh Memasang 1 bh bak cuci piring stainless steelBak cuci stainles steel 1 bh 356,850.00 Water drain + assesoris 1 set 25,000.00 Pekerja 0.03 OH 24,200.00 Tukang batu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.0015 OH 36,800.00

J.14 1 Bh Memasang 1 bh kran air 3/4" atau 1/2"Kran air 1 bh 30,150.00 Seal tape 0.025 bh 3,500.00 Pekerja 0.03 OH 24,200.00 Tukang batu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.0015 OH 36,800.00

J.15 1 Bh Memasang 1 bh floor drainFloor drain 1 bh 10,800.00 Pekerja 0.01 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

J.16. Sl. U b 1 M1 Memasang saluran U dijepit batu bata galian tanah 0.25 M3 19,070.00 - pasir urug 0.025 M3 140,468.00 batu bata 1.2 M2 63,252.30 plesteran 0.7 M2 21,579.66 beton cor u 1 m1 27,000.00

J.17. Sl. U b 1 M3 Memasang saluran U dijepit batu kali galian tanah 0.615 M3 19,070.00 - batu batu kali 0.27 M2 428,925.60 pasir urug 0.0225 M3 140,468.00 plesterran 0.3 M2 21,579.66 beton cor u 0.075 M3 27,000.00

K. PEKERJAAN KUNCI DAN KACA

K.1 1 Bh Pasang Kunci Tanam BiasaKunci Tanam Bisa 1 Bh 63,000.00 Pekerja 0.01 OH 24,200.00 Tukang kayu 0.5 OH 32,800.00

Page 42: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

K.2 1 Bh Pasang Kunci Tanam kamar mandiKunci Tanam kamar Ma 1 Bh 63,000.00 Pekerja 0.005 OH 24,200.00 Tukang kayu 0.5 OH 32,800.00 Kepala tukang 0.005 OH 36,800.00 Mandor 0.0025 OH 36,800.00

K.3 1 Bh Pasang Engsel pintuEngsel Pintu 1 Bh 8,200.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.4 1 Bh Pasang Engsel JendelaEngsel Jendela 1 Bh 5,700.00 Pekerja 0.01 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.0005 OH 36,800.00

K.5 1 Bh Pasang Kait AnginKait Angin 1 Bh 15,400.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.6 1 Bh Pasang Grendel jendelaGrendel Jendela 1 Bh 8,200.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.7 1 Bh Pasang Tarikan jendelaTarikan Jendela 1 Bh 14,850.00 Pekerja 0.015 OH 24,200.00

Page 43: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.8 Pasang Kaca bening tebal 5 mm

Kaca bening 5 mm 1.1 83,250.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.9 Pasang Kaca bening tebal 3 mm

Kaca bening 3 mm 1.1 61,650.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

K.10 Pasang Kaca patri kuningan tebal 5 mm

Kaca Patri kuningan 1.1 1,640,250.00 Pekerja 0.015 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.0008 OH 36,800.00

L. PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395 - 2008)

1 M2

M2

1 M2

M2

1 M2

M2

Page 44: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

L.1 Pasang Lantai ubin abu-abu ukuran 20 x 20 cmUbin abu-abu 20x20 c 26.5 bh 1,800.00 Semen Portland 10.4 Kg 1,260.00

Pasir Pasang 0.045 135,900.00 Pekerja 0.27 OH 24,200.00 Tukang batu 0.135 OH 32,800.00 Kepala tukang 0.014 OH 36,800.00 Mandor 0.014 OH 36,800.00

L.2 Pasang plint keramik ukuran 10 x 20 cmKeramik 5.3 bh 840.00 Semen Portland 1.14 Kg 1,260.00

Pasir Pasang 0.003 135,900.00 Semen Warna 0.025 Kg 1,980.00 Pekerja 0.09 OH 24,200.00 Tukang batu 0.09 OH 32,800.00 Kepala tukang 0.009 OH 36,800.00 Mandor 0.005 OH 36,800.00

L.3 Pasang lantai keramik 20 x 20 cmKeramik 20 x 20 26.5 bh 1,680.00 Semen Portland 10.4 Kg 1,260.00

Pasir Pasang 0.045 135,900.00 Semen Warna 1.62 Kg 1,980.00 Pekerja 0.7 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.035 OH 36,800.00

L.4.a Pasang lantai keramik 30 x 30 cm Polos Keramik 30 x 30 cm 11.87 bh 3,272.73 Semen Portland 10 Kg 1,260.00

Pasir Pasang 0.045 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.7 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.035 OH 36,800.00

L.4.b Pasang lantai keramik 30 x 30 cm warnaKeramik 30 x 30 cm 11.87 bh 3,818.18 Semen Portland 10 Kg 1,260.00

1 M2

M3

1 M1

M3

1 M1

M3

1 M2

M3

1 M2

Page 45: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pasir Pasang 0.045 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.7 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.035 OH 36,800.00

L.5.a - 2002 Pasang lantai keramik 40 x 40 cm polos

Keramik 40 x 40 cm 1 42,000.00 Semen Portland 11.38 Kg 1,260.00

Pasir Pasang 0.042 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.62 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.03 OH 36,800.00

L.5.b - 2002 Pasang lantai keramik 40 x 40 cm warna

Keramik 40 x 40 cm 1 48,000.00 Semen Portland 11.38 Kg 1,260.00

Pasir Pasang 0.042 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.62 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.03 OH 36,800.00

L.6.a Pasang dinding keramik 20 x 20 cm polosKeramik dinding 20 x 2 26.5 bh 1,680.00 Semen Portland 9.3 Kg 1,260.00

Pasir Pasang 0.018 135,900.00 Semen Warna 1.94 Kg 1,980.00 Pekerja 0.9 OH 24,200.00

M3

1 M2

M2

M3

1 M2

M2

M3

1 M2

M3

Page 46: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Tukang batu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.045 OH 36,800.00

L.6.b Pasang dinding keramik 20 x 20 cm warnaKeramik dinding 20 x 2 26.5 bh 1,920.00 Semen Portland 9.3 Kg 1,260.00

Pasir Pasang 0.018 135,900.00 Semen Warna 1.94 Kg 1,980.00 Pekerja 0.9 OH 24,200.00 Tukang batu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.045 OH 36,800.00

L.7.a - 2002 Pasang dinding keramik 20 x 25 cm polos

Keramik dinding 20 x 2 1 42,000.00 Semen Portland 11.38 Kg 1,260.00

Pasir Pasang 0.042 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.62 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.03 OH 36,800.00

L.7.b - 2002 Pasang dinding keramik 20 x 25 cm warna

Keramik dinding 20 x 2 1 48,000.00 Semen Portland 11.38 Kg 1,260.00

Pasir Pasang 0.042 135,900.00 Semen Warna 1.5 Kg 1,980.00 Pekerja 0.62 OH 24,200.00 Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.03 OH 36,800.00

L.8.a - BOW Pasang Pavingblock Natural

Pavingblock Natural 1 51,400.00

Pasir Urug 0.1 110,700.00

Pekerja 0.4 OH 24,200.00 Tukang batu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.02 OH 36,800.00

1 M2

M3

1 M2

M2

M3

1 M2

M2

M3

1 M2

M2

M3

Page 47: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

L. PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395 - 2008)

L.8.a - BOW Pasang Pavingblock Natural

Pavingblock Natural 1 225,000.00

Pasir Urug 0.1 1,000.00 Pekerja 0.4 OH 24,200.00 Tukang batu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.02 OH 36,800.00

L.8.b - BO Pasang Pavingblock Warna

Pavingblock Warna 1 57,500.00

Pasir Urug 0.1 110,700.00

Pekerja 0.4 OH 24,200.00 Tukang batu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.02 OH 36,800.00

L.9 Pasang dinding batu tempel hitam

Batu tempel hitam 1.1 90,000.00 PC 11.75 Kg 1,260.00

Pasir pasang 0.035 135,900.00 Pekerja 0.7 OH 24,200.00

Tukang batu 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.035 OH 36,800.00

L.10 Pemasangan Wall paperWall paper 1.2 M2Perekat 0.2 Kg - Pekerja 0.02 OH 24,200.00 Tukang cat 0.2 OH 32,800.00 Kepala tukang 0.002 OH 36,800.00

1 M2

M2

M3

1 M2

M2

M3

1 M2

M2

M3

1 M2

Page 48: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Mandor 0.0025 OH 36,800.00

Page 49: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

M. PEKERJAAN PENGECATAN

M.6 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )Plamir 0.1 Kg 19,250.00 Cat dasar 0.1 Kg 15,950.00 Cat penutup 3 kali 0.26 Kg 15,950.00 Pekerja 0.02 OH 24,200.00 Tukang cat 0.063 OH 32,800.00 Kepala tukang 0.0063 OH 36,800.00 Mandor 0.0025 OH 36,800.00

M.7 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )Cat dasar 0.1 Kg 15,950.00 Cat penutup 3 kali 0.18 Kg 15,950.00 Pekerja 0.028 OH 24,200.00 Tukang cat 0.042 OH 32,800.00 Kepala tukang 0.0042 OH 36,800.00 Mandor 0.0025 OH 36,800.00

M.8 Pengecatan permukaan baja dengan meni besiMeni besi 0.1 Kg 39,600.00 Perekat/Lem 0.01 Kg 16,400.00 Pekerja 0.02 OH 24,200.00 Tukang cat 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.01 OH 36,800.00

M.9 Pengecatan permukaan baja dengan meni besi dan perancahMeni besi 0.1 Kg 39,600.00 Perekat/Lem 0.01 Kg 16,400.00

1 M2

1 M2

1 M2

1 M2

Page 50: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Perancah kayu 0.002 M3 2,115,000.00 Pekerja 0.25 OH 24,200.00 Tukang cat 0.225 OH 32,800.00 Kepala tukang 0.0225 OH 36,800.00 Mandor 0.0075 OH 36,800.00

Page 51: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

O. PEKERJAAN BESI DAN ALUMUNIUM (SNI 7392 - 2008)

O.1 1 Kg Memasang besi ProfilBesi Profil 1.15 Kg 10,700.00 Meni Besi 0.06 Kg 39,600.00 Pekerja 0.06 OH 24,200.00 Tukang besi 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00

O.2 1 Kg Memasang Rangka Kuda-kuda Baja IWFBesi Baja IWF 1.15 Kg 10,600.00 Pekerja 0.06 OH 24,200.00 Tukang besi 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00

O.3 100 Kg Mengerjakan Pekerjaan Perakitan (Kuda-kuda baja)Solar 1 ltr 6,100.00 Minyak Pelumas 0.10 ltr 31,700.00 Pekerja 0.10 OH 24,200.00 Tukang besi 0.10 OH 32,800.00 Kepala tukang 0.001 OH 36,800.00 Mandor 0.005 OH 36,800.00 Sewa alat 0.008 jam 72,000.00

O.4 1 m2 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja sikuBesi siku L.30.30.3 15 Kg 10,700.00 Besi Plat Baja 32.80 Kg 10,700.00 Kawat Las 0.05 Kg 26,800.00 Pekerja 1.05 OH 24,200.00 Tukang besi 1.05 OH 32,800.00 Kepala tukang 0.105 OH 36,800.00 Mandor 0.052 OH 36,800.00

O.5 10 cm Mengerjakan pengelasan dengan las listrik

Page 52: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Kawat Las 0.04 Kg 26,800.00 Solar 0.03 ltr 6,100.00 Minyak Pelumas 0.004 ltr 31,700.00 Pekerja 0.04 OH 24,200.00 Tukang besi 0.02 OH 32,800.00 Kepala tukang 0.002 OH 36,800.00 Mandor 0.002 OH 36,800.00 Sewa alat 0.17 jam 72,000.00

O.6 1 m2 Memasang Pintu Rolling Door BesiPintu Gulung Besi 1 m2 255,300.00 Pekerja 1.2 OH 24,200.00 Tukang besi 1.2 OH 32,800.00 Kepala tukang 0.1 OH 36,800.00 Mandor 0.006 OH 36,800.00

O.7 1 m2 Memasang Pintu Lipat (folding Door)Pintu Lipat 1 m2 491,300.00 Pekerja 0.44 OH 24,200.00 Tukang besi 0.44 OH 32,800.00 Kepala tukang 0.044 OH 36,800.00 Mandor 0.022 OH 36,800.00

O.8 1 m2 Memasang Pintu Rolling Door AlumuniumRolling Alumunium 1 m2 451,800.00 Pekerja 1 OH 24,200.00 Tukang besi 1 OH 32,800.00 Kepala tukang 0.1 OH 36,800.00 Mandor 0.05 OH 36,800.00

O.9 1 m1 Memasang Kusen Pintu dan Jendela AlumuniumProfil Alumunium 1.1 m1 67,500.00 Skrup Fixer 2 bh 175.00 Sealant 0.06 Tube 11,000.00 Pekerja 0.043 OH 24,200.00 Tukang besi 0.043 OH 32,800.00 Kepala tukang 0.0043 OH 36,800.00 Mandor 0.0021 OH 36,800.00

O.10 1 m2 Memasang Pintu Alumunium Strip Lebar 8 cmProfil Alumunium 4.4 m1 67,500.00 Alumunium Strrip 14.6 m1 13,200.00

Page 53: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pekerja 0.085 OH 24,200.00 Tukang besi 0.085 OH 32,800.00 Kepala tukang 0.0085 OH 36,800.00 Mandor 0.0042 OH 36,800.00

O.11 1 m2 Memasang Pintu Kaca Rangka AlumuniumPintu Alumunium 4.4 m1 67,500.00 Propil Kaca 4.5 m1 9,000.00 Sealant 0.27 Tube 11,000.00 Pekerja 0.085 OH 24,200.00 Tukang besi 0.085 OH 32,800.00 Kepala tukang 0.0090 OH 36,800.00 Mandor 0.0050 OH 36,800.00

O.12 1 m2 Memasang Venetions Blinds & Vertikal BlindsVenetions Blinds/Vertic 1 m2 328,100.00 Pekerja 0.35 OH 24,200.00 Tukang besi 0.35 OH 32,800.00 Kepala tukang 0.035 OH 36,800.00 Mandor 0.018 OH 36,800.00

O.13 1 m2 Memasang Teralis Besi Strip (2x3) cmBesi Strip 2x3 6.177 m2 10,700.00 Pengelasan 27.08 cm 1,539.30 Pekerja 1.67 OH 24,200.00 Tukang besi 1.67 OH 32,800.00 Kepala tukang 0.167 OH 36,800.00 Mandor 0.083 OH 36,800.00

O.14 1 m2 Memasang Kawat NyamukKawat Nyamuk Nylon 1.1 m2 21,900.00 Pengelasan 11.11 cm 1,539.30 Baja Strip (0,2x2) cm 1.716 kg 10,700.00 Pekerja 0.1 OH 24,200.00 Tukang besi 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00

O.15 1 m1 Memasang Talang Datar/Jurai, Seng BJLS 20 Lebar 50 cmSeng Plat 1.05 lbr 24,400.00 Paku Biasa 1 -2,5 cm 0.015 kg 13,400.00 Kayu Papan tahun 0.019 m3 2,250,000.00

Page 54: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pekerja 0.2 OH 24,200.00 Tukang besi 0.4 OH 32,800.00 Kepala tukang 0.025 OH 36,800.00 Mandor 0.01 OH 36,800.00

O.16.Dihit 1 m2 Memasang Pintu Kaca Buram Rangka Alumunium CoatedPropil Alumunium 4.4 m1 121,500.00 Kaca Buram 1.0 M2 58,500.00 Sealant 0.27 Tube 11,000.00 Pekerja 0.085 OH 24,200.00 Tukang besi 0.085 OH 32,800.00 Kepala tukang 0.0090 OH 36,800.00 Mandor 0.0050 OH 36,800.00

O.17.Dihit 1 m2 Memasang Pintu Kaca Bening Rangka Alumunium 120 x 200Propil Alumunium 7.0 m1 67,500.00 Kaca Bening 2.4 M2 83,250.00 Sealant 0.27 Tube 11,000.00 Pekerja 0.085 OH 24,200.00 Tukang besi 0.085 OH 32,800.00 Kepala tukang 0.0090 OH 36,800.00 Mandor 0.0050 OH 36,800.00

Banjarnegara, - Januari - 2012

MenyetujuiKabid Cipta Karya Kasie Pemb. Dan Pemeliharaan

Bangunan Gedung

YUSUF WINARSONO, ST RESIATI WIDIASTUTI, STNIP. 19710507 199803 1 007 NIP. 19740226 200212 2 006

MengetahuiKEPALA DINAS PEKERJAAN UMUM

KABUPATEN BANJARNEGARA

Ir. SUPRIYO, MMNIP. 19570405 197903 1 010

Page 55: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Jml.Upah Jml. Bahan Total Biaya

- 11,250.00 - 3,150.00 - 63,960.00 - 679.50 - 1,620.00 - 152,280.00 - 804.00 - 17,820.00 6,560.00 9,680.00 736.00 736.00 17,712.00 251,563.50 269,275.50

- 25,380.00 - 268.00 - 15,750.00 3,280.00 2,420.00 368.00 184.00 6,252.00 41,398.00 47,650.00

2,420.00 1,840.00 4,260.00 - 4,260.00

- 15,300.00 - 444,150.00 - 4,020.00 - 13,230.00 - 4,077.00

Page 56: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

- 9,000.00 - 79,950.00 65,600.00 24,200.00 7,360.00 1,840.00 99,000.00 569,727.00 668,727.00

- 9,000.00 - 5,625.00 5,576.00 6,050.00 73.60 47.84 11,747.44 14,625.00 26,372.44

161,341.40 12,254.40 173,595.80 - 173,595.80

161,341.40 1,214.40 162,555.80 - 162,555.80

Jml.Upah Jml. Bahan Total Biaya

18,150.00 920.00 19,070.00 - 19,070.00

21,780.00 1,656.00 23,436.00 - 23,436.00

25,410.00 2,465.60 27,875.60 - 27,875.60

Page 57: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

24,200.00 1,177.60 25,377.60 - 25,377.60

36,300.00 2,208.00 38,508.00 - 38,508.00

29,040.00 1,656.00 30,696.00 - 30,696.00

7,986.00 368.00 8,354.00 - 8,354.00

6,050.00 306.67 6,356.67 - 6,356.67

12,100.00 1,840.00 13,940.00 - 13,940.00

132,840.00 7,260.00 368.00 7,628.00 132,840.00 140,468.00

135,000.00 3,630.00 552.00 4,182.00 135,000.00 139,182.00

137,700.00 6,050.00

Page 58: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

920.00 6,970.00 137,700.00 144,670.00

- 168,480.00 - 205,380.00

- 70,668.00 36,300.00 24,600.00 2,760.00 2,760.00 66,420.00 444,528.00 510,948.00

- 168,480.00 - 147,420.00

- 76,239.90 36,300.00 24,600.00 2,760.00 2,760.00 66,420.00 392,139.90 458,559.90

- 168,480.00 - 114,660.00

- 79,365.60 36,300.00 24,600.00 2,760.00 2,760.00 66,420.00 362,505.60 428,925.60

Page 59: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

- 168,480.00 - 76,860.00

19,830.30

- 66,862.80 36,300.00 24,600.00 2,760.00 2,760.00 66,420.00 332,033.10 398,453.10

- 168,480.00

- 47,822.40 18,876.00 12,792.00 1,435.20 1,435.20 34,538.40 216,302.40 250,840.80

Page 60: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

69,300.00 23,310.00

16,579.80 14,520.00 6,560.00 736.00 1,104.00 22,920.00 109,189.80 132,109.80

34,650.00 14,490.00

5,843.70 7,260.00 3,280.00 368.00 552.00 11,460.00 54,983.70 66,443.70

34,650.00 10,483.20

6,659.10 7,260.00 3,280.00 368.00 552.00 11,460.00 51,792.30 63,252.30

34,650.00 8,190.00

6,795.00 7,260.00 3,280.00 368.00 552.00 11,460.00 49,635.00 61,095.00

Page 61: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

34,650.00 5,670.00

6,795.00

2,023.50 7,260.00 3,280.00 368.00 552.00 11,460.00 49,138.50 60,598.50

324,000.00 13,860.00

4,756.50 7,260.00 3,280.00 368.00 552.00 11,460.00 342,616.50 354,076.50

126,000.00 17,640.00

4,348.80 7,260.00 4,920.00 552.00 552.00 13,284.00 147,988.80 161,272.80

12,882.24

2,718.00 7,260.00 4,920.00 552.00 552.00 13,284.00 15,600.24 28,884.24

Page 62: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

7,862.40

3,261.60 7,260.00 4,920.00 552.00 552.00 13,284.00 11,124.00 24,408.00

6,531.84

3,533.40 7,260.00 4,920.00 552.00 552.00 13,284.00 10,065.24 23,349.24

4,354.56

3,941.10 7,260.00 4,920.00 552.00 552.00 13,284.00 8,295.66 21,579.66

630.00

1,766.70 1,936.00 13,120.00 1,472.00 147.20 16,675.20 2,396.70 19,071.90

5,443.20

815.40 7,260.00 3,280.00 368.00 552.00 11,460.00 6,258.60 17,718.60

Page 63: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

2,016.00 1,694.00 1,148.00 147.20 147.20 3,136.40 2,016.00 5,152.40

7,988.40

1,630.80 7,260.00 4,920.00 552.00 552.00 13,284.00 9,619.20 22,903.20

4,095.00 4,840.00 3,280.00 368.00 368.00 8,856.00 4,095.00 12,951.00

6,858,000.00 16,750.00 16,400.00

145,200.00 590,400.00 66,240.00 11,040.00 812,880.00 6,891,150.00 7,704,030.00

11,880,000.00 16,750.00 16,400.00

145,200.00

Page 64: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

590,400.00 66,240.00 11,040.00 812,880.00 11,913,150.00 12,726,030.00

252,000.00 820.00

24,200.00 98,400.00 11,040.00 1,840.00 135,480.00 252,820.00 388,300.00

446,508.00 820.00

24,200.00 98,400.00 11,040.00 1,840.00 135,480.00 447,328.00 582,808.00

151,200.00 4,920.00

19,360.00 78,720.00 8,832.00 1,472.00 108,384.00 156,120.00 264,504.00

267,904.80 4,920.00

19,360.00 78,720.00 8,832.00 1,472.00 108,384.00 272,824.80 381,208.80

157,500.00 558.00 8,200.00

Page 65: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

54,700.00 16,940.00 68,880.00 7,728.00 1,288.00 94,836.00 220,958.00 315,794.00

279,067.50 558.00 8,200.00 54,700.00

16,940.00 68,880.00 7,728.00 1,288.00 94,836.00 342,525.50 437,361.50

161,280.00 558.00 8,200.00 54,700.00

19,360.00 78,720.00 8,832.00 1,472.00 108,384.00 224,738.00 333,122.00

285,765.12 558.00 8,200.00 54,700.00

19,360.00 78,720.00 8,832.00 1,472.00 108,384.00 349,223.12 457,607.12

6,286,500.00 243,000.00 75,040.00

96,800.00 393,600.00

Page 66: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

44,160.00 7,360.00 541,920.00 6,604,540.00 7,146,460.00

10,890,000.00 243,000.00 75,040.00

96,800.00 393,600.00 44,160.00 7,360.00 541,920.00 11,208,040.00 11,749,960.00

10,890,000.00 243,000.00 40,200.00

58,080.00 236,160.00 26,496.00 4,416.00 325,152.00 11,173,200.00 11,498,352.00

6,286,500.00 243,000.00 40,200.00

58,080.00 236,160.00 26,496.00 4,416.00 325,152.00 6,569,700.00 6,894,852.00

80,010.00

20,574.00 3,350.00

2,420.00 3,280.00 368.00 184.00 6,252.00 103,934.00 110,186.00

Page 67: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

29,610.00

7,614.00 3,350.00

2,420.00 3,280.00 368.00 184.00 6,252.00 40,574.00 46,826.00

88,011.00 2,680.00

3,630.00 9,840.00 1,104.00 2,760.00 17,334.00 90,691.00 108,025.00

32,571.00 2,680.00

3,630.00 9,840.00 1,104.00 2,760.00 17,334.00 35,251.00 52,585.00

93,154.50 3,350.00

4,840.00 9,840.00 1,104.00 368.00 16,152.00 96,504.50 112,656.50

34,474.50 3,350.00

4,840.00 9,840.00 1,104.00 368.00 16,152.00 37,824.50 53,976.50

Page 68: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

68,040.00 1,340.00

2,420.00 6,560.00 736.00 184.00 9,900.00 69,380.00 79,280.00

120,557.16 1,340.00

2,420.00 6,560.00 736.00 184.00 9,900.00 121,897.16 131,797.16

69,300.00 670.00

2,420.00 6,560.00 736.00 184.00 9,900.00 69,970.00 79,870.00

122,789.70 670.00

2,420.00 6,560.00 736.00 184.00 9,900.00 123,459.70 133,359.70

160,020.00 2,790.00 9,184.00 29,154.00

3,630.00 14,760.00 1,656.00 294.40 20,340.40 201,148.00 221,488.40

Page 69: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

277,200.00 2,790.00 9,184.00 29,154.00

3,630.00 14,760.00 1,656.00 294.40 20,340.40 318,328.00 338,668.40

Page 70: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 311,220.00

134,074.29

133,200.00 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 579,139.29 632,174.09

Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 347,760.00

127,748.57

134,933.33 645.00

39,930.00 9,020.00

Page 71: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

1,030.40 3,054.40 53,034.80 611,086.90 664,121.70

Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 376,740.00

123,274.29

135,600.00 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 636,259.29 689,294.09

Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 289,800.00

137,777.14

136,933.33 600.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 565,110.48 618,145.28

Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 410,760.00

117,257.14

137,200.00 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 665,862.14 718,896.94

Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 443,520.00

112,782.86

137,466.67 645.00

39,930.00 9,020.00 1,030.40

Page 72: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

3,054.40 53,034.80 694,414.52 747,449.32

Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 467,460.00

107,691.43

139,600.00 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 715,396.43 768,431.23

Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 483,840.00

106,765.71

138,533.33 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 729,784.05 782,818.85

Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 511,560.00

105,531.43

136,800.00 645.00

39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 754,536.43 807,571.23

Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 520,380.00

105,068.57

136,133.33

Page 73: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

645.00 39,930.00 9,020.00 1,030.40 3,054.40 53,034.80 762,226.90 815,261.70

8,977.50 328.50

169.40 229.60 25.76 14.72 439.48 9,306.00 9,745.48

84,600.00 4,020.00 610.00

12,584.00 8,528.00 956.80 956.80 23,025.60 89,230.00 112,255.60

95,175.00 4,020.00 610.00

12,584.00 8,528.00 956.80 956.80 23,025.60 99,805.00 122,830.60

84,600.00 5,360.00 1,220.00

31,725.00 39,150.00 18,000.00

15,972.00 10,824.00 1,214.40 1,214.40

Page 74: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

29,224.80 180,055.00 209,279.80

84,600.00 5,360.00 1,220.00

38,070.00 39,150.00 18,000.00

15,972.00 10,824.00 1,214.40 220.80 28,231.20 186,400.00 214,631.20

84,600.00 5,360.00 1,220.00

31,725.00 39,150.00 54,000.00

15,972.00 10,824.00 1,214.40 220.80 28,231.20 216,055.00 244,286.20

63,450.00 5,360.00 915.00

31,725.00 39,150.00 18,000.00

15,972.00 10,824.00 1,214.40 1,214.40

Page 75: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

29,224.80 158,600.00 187,824.80

507,600.00 42,880.00 9,760.00 1,346,625.00 49,275.00 423,360.00

97,200.00

145,800.00

338,400.00 73,080.00 216,000.00

128,260.00 9,020.00 42,640.00 34,440.00 9,641.60 9,752.00 233,753.60 3,249,980.00 3,483,733.60

718,896.94 1,949,096.00

262,954.72 2,930,947.66 2,930,947.66

4,230.00 134.00

Page 76: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

25,650.00 985.50 5,040.00

1,080.00

1,620.00 4,356.00 656.00 656.00 656.00 220.80 331.20 6,876.00 38,739.50 45,615.50

6,345.00 268.00 30,780.00 1,095.00 6,930.00

1,620.00

2,700.00 7,187.40 1,082.40 1,082.40 1,082.40 368.00 184.00 10,986.60 49,738.00 60,724.60

718,896.94 1,461,822.00

342,000.68 2,522,719.62 2,522,719.62

Page 77: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

42,500.00 3,630.00 2,460.00 294.40 294.40 6,678.80 42,500.00 49,178.80

Page 78: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

44,550.00 3,630.00 1,968.00 220.80 294.40 6,113.20 44,550.00 50,663.20

) 15,600.00 10,080.00

4,348.80 9,680.00 6,560.00 736.00 73.60 17,049.60 30,028.80 47,078.40

25,600.00 10,080.00

4,348.80 9,680.00 6,560.00 736.00 73.60 17,049.60 40,028.80 57,078.40

30,300.00 3,000.00

3,388.00 2,460.00 294.40 294.40 6,436.80 33,300.00 39,736.80

21,480.00 3,000.00

3,388.00 2,296.00 257.60

Page 79: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

257.60 6,199.20 24,480.00 30,679.20

- 3,000.00

3,388.00 2,296.00 257.60 257.60 6,199.20 3,000.00 9,199.20

- 3,000.00

3,388.00 2,197.60 257.60 257.60 6,100.80 3,000.00 9,100.80

54,600.00 500.00

2,904.00 1,968.00 220.80 220.80 5,313.60 55,100.00 60,413.60

8,460.00 1,096.00

3,630.00 2,296.00 294.40 220.80 6,441.20 9,556.00 15,997.20

68,200.00 402.00

4,840.00 3,280.00 368.00 368.00 8,856.00 68,602.00 77,458.00

Page 80: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

121,500.00 402.00

4,840.00 3,280.00 368.00 368.00 8,856.00 121,902.00 130,758.00

59,400.00 670.00

6,050.00 4,920.00 552.00 478.40 12,000.40 60,070.00 72,070.40

9,515.00 186.00

726.00 2,296.00 257.60 147.20 3,426.80 9,701.00 13,127.80

54,000.00 930.00

2,904.00 3,936.00 441.60 220.80 7,502.40 54,930.00 62,432.40

63,510.00 930.00

2,420.00 3,280.00 368.00 184.00 6,252.00 64,440.00 70,692.00

Page 81: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm 20,475.00 558.00

2,420.00 3,280.00 368.00 184.00 6,252.00 21,033.00 27,285.00

20,966.40 3,014.00

2,420.00 1,640.00 184.00 184.00 4,428.00 23,980.40 28,408.40

7,245.00 742.50

1,452.00 1,968.00 220.80 110.40 3,751.20 7,987.50 11,738.70

8,715.00 742.50

1,452.00 1,968.00 220.80 110.40 3,751.20 9,457.50 13,208.70

3,622.50 186.00

1,210.00 1,640.00 184.00 110.40 3,144.40 3,808.50 6,952.90

Page 82: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

68,580.00 1,116.00

- 9,515.00 4,356.00 10,496.00 1,177.60 331.20 16,360.80 79,211.00 95,571.80

25,380.00 1,116.00 9,515.00

4,356.00 10,496.00 1,177.60 331.20 16,360.80 36,011.00 52,371.80

724,700.00 43,482.00

79,860.00 36,080.00 36.80 5,888.00 121,864.80 768,182.00 890,046.80

137,250.00 7,560.00 1,359.00

24,200.00 49,200.00 55,200.00 5,888.00 134,488.00 146,169.00 280,657.00

422,700.00 126,810.00 7,560.00 1,359.00

Page 83: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

24,200.00 32,800.00 3,680.00 3,680.00 64,360.00 558,429.00 622,789.00

313,000.00 56,340.00

43,560.00 88,560.00 19,872.00 4,048.00 156,040.00 369,340.00 525,380.00

206,415.00 151,200.00 40,770.00 182,952.00 11,880.00

145,200.00 98,400.00 11,040.00 11,040.00 265,680.00 593,217.00 858,897.00

74,745.00 55,440.00 9,513.00 12,600.00 13,680.00 10,800.00

145,200.00 98,400.00 11,040.00 11,040.00 265,680.00 176,778.00 442,458.00

156,600.00 45,675.00

2,613.60 5,904.00 662.40 198.72

Page 84: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

9,378.72 202,275.00 211,653.72

4,200.00 1,225.00

871.20 1,968.00 220.80 66.24 3,126.24 5,425.00 8,551.24

6,240.00 1,820.00

871.20 1,968.00 220.80 66.24 3,126.24 8,060.00 11,186.24

38,040.00 11,095.00

1,306.80 2,952.00 331.20 99.36 4,689.36 49,135.00 53,824.36

77,280.00 22,540.00

1,960.20 4,428.00 496.80 150.88 7,035.88 99,820.00 106,855.88

116,160.00 33,880.00

1,960.20 4,428.00 496.80 150.88 7,035.88 150,040.00 157,075.88

Page 85: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

356,850.00 25,000.00

726.00 9,840.00 1,104.00 55.20 11,725.20 381,850.00 393,575.20

30,150.00 3,500.00

726.00 9,840.00 1,104.00 55.20 11,725.20 33,650.00 45,375.20

10,800.00 242.00 3,280.00 368.00 184.00 4,074.00 10,800.00 14,874.00

4,767.50 - 3,511.70 75,902.76 15,105.76 27,000.00 126,287.72 - 126,287.72

11,728.05 - 115,809.91 3,160.53 6,473.90 2,025.00 139,197.39 - 139,197.39

63,000.00 242.00 16,400.00

Page 86: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

368.00 184.00 17,194.00 63,000.00 80,194.00

63,000.00 121.00 16,400.00 184.00 92.00 16,797.00 63,000.00 79,797.00

8,200.00 363.00 4,920.00 552.00 27.60 5,862.60 8,200.00 14,062.60

5,700.00 242.00 3,280.00 368.00 18.40 3,908.40 5,700.00 9,608.40

15,400.00 363.00 4,920.00 552.00 27.60 5,862.60 15,400.00 21,262.60

8,200.00 363.00 4,920.00 552.00 27.60 5,862.60 8,200.00 14,062.60

14,850.00 363.00

Page 87: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

4,920.00 552.00 27.60 5,862.60 14,850.00 20,712.60

91,575.00 363.00 4,920.00 552.00 27.60 5,862.60 91,575.00 97,437.60

67,815.00 363.00 4,920.00 552.00 27.60 5,862.60 67,815.00 73,677.60

1,804,275.00 363.00 4,920.00 552.00 27.60 5,862.60 1,804,275.00 1,810,137.60

Page 88: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

47,700.00 13,104.00

6,115.50 6,534.00 4,428.00 515.20 515.20 11,992.40 66,919.50 78,911.90

4,452.00 1,436.40

407.70 49.50

2,178.00 2,952.00 331.20 184.00 5,645.20 6,345.60 11,990.80

44,520.00 13,104.00

6,115.50 3,207.60

16,940.00 11,480.00 1,288.00 1,288.00 30,996.00 66,947.10 97,943.10

38,847.27 12,600.00

6,115.50 2,970.00

16,940.00 11,480.00 1,288.00 1,288.00 30,996.00 60,532.77 91,528.77

45,321.82 12,600.00

Page 89: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

6,115.50 2,970.00

16,940.00 11,480.00 1,288.00 1,288.00 30,996.00 67,007.32 98,003.32

42,000.00 14,338.80

5,707.80 2,970.00

15,004.00 11,480.00 1,288.00 1,104.00 28,876.00 65,016.60 93,892.60

48,000.00 14,338.80

5,707.80 2,970.00

15,004.00 11,480.00 1,288.00 1,104.00 28,876.00 71,016.60 99,892.60

44,520.00 11,718.00

2,446.20 3,841.20

21,780.00

Page 90: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

14,760.00 1,656.00 1,656.00 39,852.00 62,525.40 102,377.40

50,880.00 11,718.00

2,446.20 3,841.20

21,780.00 14,760.00 1,656.00 1,656.00 39,852.00 68,885.40 108,737.40

42,000.00 14,338.80

5,707.80 2,970.00

15,004.00 11,480.00 1,288.00 1,104.00 28,876.00 65,016.60 93,892.60

48,000.00 14,338.80

5,707.80 2,970.00

15,004.00 11,480.00 1,288.00 1,104.00 28,876.00 71,016.60 99,892.60

51,400.00

11,070.00

9,680.00 M.1 Mengikis/mengerok permukaan cat tembok lama 6,560.00 Soda api 0.05 Kg 736.00 Pekerja 0.15 OH 736.00 Mandor 0.0025 OH 17,712.00 62,470.00 80,182.00

1 M2

Page 91: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

M.2 Pengecatan bidang kayu lamaPlamir 0.15 KgCat dasar 0.17 KgCat penutup 0.17 KgPekerja 0.07 OHTukang cat 0.075 OHKepala tuk 0.0075 OH

Mandor 0.0025 OH

225,000.00 M.3 Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

100.00 Cat meni 0.2 Kg 9,680.00 Plamir 0.15 Kg 6,560.00 Cat dasar 0.17 Kg 736.00 Cat penutup 0.26 Kg 736.00 Pekerja 0.07 OH 17,712.00 225,100.00 242,812.00 Tukang cat 0.009 OH

Kepala tuk 0.006 OH

Mandor 0.0025 OH

57,500.00

11,070.00

9,680.00 M.4 Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup ) 6,560.00 Cat meni 0.2 Kg 736.00 Plamir 0.15 Kg 736.00 Cat dasar 0.17 Kg 17,712.00 68,570.00 86,282.00 Cat penutup 0.35 Kg

Pekerja 0.07 OH

Tukang cat 0.105 OH

99,000.00 Kepala tuk 0.004 OH 14,805.00 Mandor 0.0025 OH

4,756.50 16,940.00

11,480.00 M.5 Pengecatan Bidang kayu dengan politur 1,288.00 Politur 0.2 Kg 1,288.00 Politur Jadi 0.372 Kg 30,996.00 118,561.50 149,557.50 Amplas 2 lbr

Tukang cat 0.06 OH

Kepala tuk 0.016 OH - Mandor 0.0025 OH -

484.00 6,560.00 73.60

1 M2

1 M2

1 M2

1 M2

Page 92: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

92.00 7,209.60 - 7,209.60

Page 93: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) 1,925.00 1,595.00 4,147.00

484.00 2,066.40 231.84 92.00 2,874.24 7,667.00 10,541.24

1,595.00 2,871.00

677.60 1,377.60 154.56 92.00 2,301.76 4,466.00 6,767.76

3,960.00 164.00

484.00 6,560.00 736.00 368.00 8,148.00 4,124.00 12,272.00

3,960.00 164.00

Page 94: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

4,230.00 6,050.00 7,380.00 828.00 276.00 14,534.00 8,354.00 22,888.00

Page 95: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

12,305.00 2,376.00

1,452.00 1,968.00 220.80 110.40 3,751.20 14,681.00 18,432.20

12,190.00 1,452.00 1,968.00 220.80 110.40 3,751.20 12,190.00 15,941.20

6,100.00 3,170.00

2,420.00 3,280.00 36.80 184.00 576.00 6,496.80 9,270.00 15,766.80

160,500.00 350,960.00 1,340.00

25,410.00 34,440.00 3,864.00 1,913.60 65,627.60 512,800.00 578,427.60

Page 96: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

1,072.00 183.00 126.80

968.00 656.00 73.60 73.60 12,240.00 14,011.20 1,381.80 15,393.00

255,300.00 29,040.00 39,360.00 4,416.00 220.80 73,036.80 255,300.00 328,336.80

491,300.00 10,648.00 14,432.00 1,619.20 809.60 27,508.80 491,300.00 518,808.80

451,800.00 24,200.00 32,800.00 3,680.00 1,840.00 62,520.00 451,800.00 514,320.00

74,250.00 350.00 660.00

1,040.60 1,410.40 158.24 77.28 2,686.52 75,260.00 77,946.52

297,000.00 192,720.00

Page 97: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

2,057.00 2,788.00 312.80 154.56 5,312.36 489,720.00 495,032.36

297,000.00 40,500.00 2,970.00

2,057.00 2,788.00 331.20 184.00 5,360.20 340,470.00 345,830.20

328,100.00 8,470.00 11,480.00 1,288.00 662.40 21,900.40 328,100.00 350,000.40

66,093.90 41,684.24

40,414.00 54,776.00 6,145.60 3,054.40 104,390.00 107,778.14 212,168.14

24,090.00 17,101.62 18,361.20

2,420.00 3,280.00 368.00 184.00 6,252.00 59,552.82 65,804.82

25,620.00 201.00 42,750.00

Page 98: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

4,840.00 13,120.00 920.00 368.00 19,248.00 68,571.00 87,819.00

534,600.00 58,500.00 2,970.00

2,057.00 2,788.00 331.20 184.00 5,360.20 596,070.00 601,430.20

475,200.00 199,800.00 2,970.00

2,057.00 2,788.00 331.20 184.00 5,360.20 677,970.00 683,330.20

Banjarnegara, - Januari - 2012

Kasie Pemb. Dan PemeliharaanBangunan Gedung

RESIATI WIDIASTUTI, STNIP. 19740226 200212 2 006

MengetahuiKEPALA DINAS PEKERJAAN UMUM

KABUPATEN BANJARNEGARA

Ir. SUPRIYO, MMNIP. 19570405 197903 1 010

Page 99: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Mengikis/mengerok permukaan cat tembok lama### 742.50

### 3,630.00 ### 92.00

3,722.00 742.50 4,464.50

Page 100: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

### 2,887.50 ### 9,911.00 ### 9,911.00

### 1,694.00 ### 2,460.00 ### 276.00

### 92.00 92.00 - 92.00

Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

### 7,920.00 ### 2,887.50 ### 9,911.00 ### ###

### 1,694.00 ### 295.20 ### 220.80

### 92.00

2,302.00 ### ###

Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )### 7,920.00 ### 2,887.50 ### 9,911.00 ### ###

### 1,694.00

### 3,444.00

### 147.20 ### 92.00

5,377.20 ### ###

Pengecatan Bidang kayu dengan politur### 3,435.00 ### 8,518.80

3,350.00 6,700.00 ### 1,968.00

### 588.80 6.4 7.04

### 92.00 2,648.80 ### ###

Page 101: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

DAFTAR HARGA SATUAN BAHAN BANGUNANTAHUN : 2 0 1 2KABUPATEN : BANJARNEGARA

NO. JENIS BAHAN SATUANHARGA

DAERAH A

I. BAHAN DASAR 1 BATU KALI Batu pecah 2/3 spli M3 210,000.00

Batu belah/kali M3 163,800.00

2 PASIR Pasir urug/timbun M3 129,150.00 Pasir beton M3 210,000.00 Pasir pasang M3 158,550.00 Sirtu / krosok M3 133,875.00

3 TANAH Tanah Urug 73,920.00

4 BATU BATA Batu bata merah Bh 577.50

5 KAPUR Kapur pasang M3 157,395.00

6 PORTLAND CEMENT Semen Portland ( P Kg 1,470.00 Semen putih Kg 2,310.00

II. BAHAN PENUTUP ATAP 1 GENTENG BETON Genteng beton bes Bh 8,383.50

Genteng beton keci Bh 5,985.00 Genteng bubungan Bh 8,925.00

2 GENTENG TANAH LIAT Genteng Vlaam Bh 1,155.00 Genting plentong Bh 1,942.50 Genteng Magas Bh 2,362.50 Genteng Morando Bh 3,360.00 Genteng Morando Bh 6,510.00 Genting bubungan Bh 4,515.00 Genteng bubungan Bh 7,455.00 Genteng bubungan Bh 8,505.00

3 ASBES GELOMBANG 200 x 92 x 5 mm lbr 41,790.00 225 x 92 m x 5 mm lbr 58,905.00 300 x 105 m x 5 m lbr 210 x 105 m x 5 m lbr Bubungan Asbes G lbr 29,820.00 Bubungan Asbes G lbr

4 SENG GELOMBANG BJLS 0,18 panjang lbr BJLS 0,20 panjang lbr 62,160.00 BJLS 0,30 panjang lbr 90,930.00 BJLS 0,40 panjang lbr

5 SENG PLAT BJLS 0,18 lebar 55 m'

M3

Page 102: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

BJLS 0,20 lebar 55 m' 28,455.00 BJLS 0,30 lebar 55 m' 32,865.00 BJLS 0,40 lebar 55 m'

6 POLYCARBONAT Polycarbonat rangk M2 630,315.00 Polycarbonat rangk M2 997,080.00

7 GENTENG METAL Genteng Metal lapi lbr 113,400.00 Bubungan Genteng lbr 23,100.00 Genteng Metal lapi lbr 45,675.00 Bubungan Genteng lbr 16,800.00

III. BAHAN KAYU1 KAYU TAHUN Kayu tahun M3 2,467,500.00

Kaso 5x7x300 Kayu btg 25,725.00 Papan Kayu tahun M3 2,625,000.00 Papan Kayu tahun lbr 30,450.00

2 KAYU KRUING Kayu kruing M3 6,667,500.00 Papan Kayu kruing M3 7,350,000.00

3 KAYU BANGKIRAI Kayu bengkirai M3 11,550,000.00 Papan Kayu bengki M3 13,023,150.00

4 BAMBU Bambu Btg 11,000.00

5 KAYU KERAS LOKAL Kayu Mahoni M3 5,683,466.25 Kayu Suren M3 5,683,466.25

IV. BAHAN PENUTUP DINDING / LANTAI1 TEGEL Tegel Lantai 20 x bh 2,100.00

2 PAVINGBLOCK Paving Blok Natura M2 59,976.00 Paving Blok Warna M2 67,032.00

3 KERAMIK Keramik dinding po M2 49,116.38 Keramik dinding po M2 49,116.38 Keramik dinding mo M2 56,133.00 Keramik dinding mo M2 56,133.00 Keramik lantai pol M2 49,116.38 Keramik lantai mot M2 56,133.00 Keramik Lantai KM M2 49,116.38 Keramik Lantai KM M2 56,133.00 Keramik lantai pol M2 42,099.75 Keramik lantai mot M2 49,116.38

4 BATU TEMPEL Batu Alam Abu-abu M2 262,500.00 Batu Alam Hitam (s M2 262,500.00 Batu alam 10 x 20 Bh 19,740.00 Batu Lempeng RTM M2 105,000.00

5 KERAMIK HOMOGEN 30x30 M2 262,500.00 40x40 M2 315,000.00 60x60 M2 367,500.00

V. BAHAN CETAK1 BUIS BETON Ǿ 10 CM - 100 CM Bh 17,850.00

Ǿ 20 CM - 100 CM Bh 21,000.00 Ǿ 30 CM - 100 CM Bh 31,500.00

Page 103: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Ǿ 50 CM - 100 CM Bh 57,750.00 Ǿ 60 CM - 100 CM Bh 78,750.00 Ǿ 70 CM - 100 CM Bh 94,500.00 U 10 CM - 100 CM Bh 17,850.00 U 15 CM - 100 CM Bh 23,100.00 U 20 CM - 100 CM Bh 31,500.00 U 30 CM - 100 CM Bh 36,750.00 U 50 CM - 100 CM

2 LUBANG ANGIN Rooster Super bata M2 304,605.00 Rooster semen 12 Bh 12,600.00

3 BATAKO Batako Bh 2,100.00

VI. BAHAN BESI1 BESI BETON Besi beton polos Kg 9,975.00

Besi beton ulir Kg 11,025.00

2 BESI PLAT Besi Plat kg 12,495.00

3 BESI PROFIL Besi Profil kg 12,495.00

4 BESI SIKU L 40x40x4 Kg 12,495.00 L 50x50x5 Kg 12,495.00 L 60x60x6 Kg 12,495.00

5 KAWAT Kawat beton/bend Kg 25,515.00 Kawat Las Kg 31,237.50 Pengelasan cm Kawat nyamuk M2 25,515.00

6 BAJA KONSTRUKSI Baja Konstruksi Kg 12,285.00

VII. BAHAN LANGIT - LANGIT1 ASBES Eternit polos KER Lbr 10,080.00

2 GYPSUM 120 x 240 x 9 mm Lbr 67,200.00 120 x 240 x 9 mm Lbr 67,200.00 Tepung Gypsum kg 5,775.00 List Propil Gypsum M1 7,980.00 List Propil Gypsum M1 9,607.50

3 PLYWOOD Teak wood - 90x210 tebal 3mm lbr 39,532.50 - 120x240 tebal 3m lbr 48,457.50 - 90x210 tebal 4mm lbr 63,787.50 - 90x210 tebal 9mm lbr 130,095.00 - 90x210 tebal 12m lbr 168,367.50 - 90x210 tebal 15m lbr 213,045.00 - 90x210 tebal 18m lbr 248,771.25

Tripleks - 120x240 tebal 3m lbr 47,250.00 - 120x240 tebal 4m lbr 63,682.50 - 120x210 tebal 6m lbr 76,125.00

Multipleks - 120x240 tebal 9m lbr 127,417.50 - 120x240 tebal 12 lbr 162,225.00

Page 104: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

- 120x240 tebal 15 lbr 208,162.50 - 120x240 tebal 18 lbr 231,183.75

4 AKUSTIK - uk. (30 x 60) cm Lbr 12,757.50 uk. (30 x 30) cm Lbr 5,250.00

5 LIST PROPIL KAYU M1 3,990.00

VIII. BAHAN FINISHING1 KAYU Sirlak Kg 191,362.50

Amplas kayu Lb 3,885.00 Plamur kayu/demp Kg 22,417.50 Cat kayu (avian,pr Kg 67,935.00 Minyak cat Lt 17,955.00 Lem Kayu Kg 19,136.25 Plitur Kemasan Lt 26,355.00 Menie Kg 46,200.00 Soda api Kg 17,325.00 Spritus Lt 19,136.25

2 TEMBOK Rol kuas Bh Plamur tembok Kg 22,417.50 Cat tembok Kg 18,585.00 Sintex 5 kg 140,332.50 Danabrite 5 kg Catylac 5 kg 99,487.50 Mowilex 5 kg 255,150.00

3 GENTENG Cat Genting tamite Kg 32,025.00

4 LAIN-LAIN Kuas Cat Bh 13,125.00 Skrap Cat Bh 7,245.00

IX. BAHAN KACA1 POLOS/BENING 3 mm M2 71,925.00

5 mm M2 97,125.00

2 RAY BAND 3 mm M2 84,525.00 5 mm M2 121,065.00

3 ES/BURAM 3 mm M2 57,750.00 5 mm M2 68,250.00

4 LAIN - LAIN Glass Blok 20 x 20 Bh 29,505.00 Kaca Patri kuninga M2 1,913,625.00 Propil Kaca M1 10,500.00

X. ALAT-ALAT PENGUNCI & PENGGANTUNG1 KUNCI TANAM Union 2 x slag 73,500.00

Union 3 x slag Yale 2 x slag 108,438.75 Yale 3 x slag Kuda 2 x slag 121,196.25 Kuda 3 x slag Tessa 2 x slag Tessa 3 x slag

2 ENGSEL DAN GRENDEL Esel pintu standart Bh 9,555.00

Page 105: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Esel jendela Bh 6,615.00 Tangan gareng / W Bh 17,955.00 Grendel Pintu 3" Bh 14,175.00 Grendel Jendela 2" Bh 9,555.00 Grendel tanam/Esp Bh 68,958.75 Tarikan Jendela Bh 17,325.00

XI. BAHAN SANITAIR1 KLOSET DUDUK Kloset duduk INA Bh 845,460.00

2 KLOSET JONGKOK Kloset Jongkok INA Bh 160,125.00

3 WASTAFEL Wastafel Gantung Bh 325,421.25

4 URINOIR Urinoir Keramik st Bh 493,158.75

5 BAK PENAMPUNG AIR Bak Penampung (32 Bh 888,195.00 Bak Penampung (1. Bh 1,490,160.00

6 BAK CUCI Bak cuci piring sta Bh 416,325.00

7 BAK MANDI Bak mandi fiber g Bh 365,085.00

8 LAIN - LAIN Kran air 3/4" atau Bh 35,175.00 Seal Tape Bh 4,042.50 Floor drain plastik Bh 12,600.00

XII. ALAT PENGIKAT KAYU1 Paku usuk, reng dan dudur Kg 15,540.00 2 Paku triplek/eternit Kg 21,630.00 3 Paku seng Kg 29,085.00 4 Paku sekrup Kg 31,893.75 5 Baud beugel Kg 18,900.00

XIII. POMPA AIR1 POMPA AIR LISTRIK Nasional

NASIONAL 9 meter Bh 448,350.00 NASIONAL 15 mete Bh 1,345,050.00 NASIONAL 30 mete Bh 1,793,400.00

XIV. BAHAN PIPA Pipa PVC SNI Ø 1/2" S.10 M1 4,042.50 Pipa PVC SNI Ø 3/4" S.10 M1 6,006.00 Pipa PVC SNI Ø 1" S.10 M1 10,279.50 Pipa PVC SNI Ø 1-1/4" S.10 M1 15,130.50 Pipa PVC SNI Ø 1-1/2" S.10 M1 23,446.50 Pipa PVC SNI Ø 2" S.10 M1 36,960.00 Pipa PVC SNI Ø 2-1/2" S.10 M1 62,254.50 Pipa PVC SNI Ø 3" S.10 M1 75,075.00 Pipa PVC SNI Ø 4" S.10 M1 112,843.50 Pipa PVC SNI Ø 6" AW Wavin M1 234,234.00 Pipa PVC SNI Ø 8" AW Wavin M1 369,484.50 Pipa Besi Galvanis QA Pipa Galvanis Ø 0,5" M1 24,675.00 Pipa Galvanis Ø 3/4" M1 37,380.00 Pipa Galvanis Ø 1" M1 53,550.00 Pipa Galvanis Ø 1 1/4" M1 79,800.00

Page 106: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

Pipa Galvanis Ø 1,5" M1 86,100.00 Pipa Galvanis Ø 2" M1 92,400.00 Pipa Galvanis Ø 2,5" M1 131,250.00 Pipa Galvanis Ø 3" M1 152,250.00 Pipa Galvanis Ø 4" M1 205,800.00 Pipa Besi Galvanis QB Pipa Galvanis Ø 0,5" M1 16,012.50 Pipa Galvanis Ø 3/4" M1 18,375.00 Pipa Galvanis Ø 1" M1 23,625.00 Pipa Galvanis Ø 1 1/4" M1 31,500.00 Pipa Galvanis Ø 1,5" M1 37,327.50 Pipa Galvanis Ø 2" M1 64,050.00 Pipa Galvanis Ø 2,5" M1 92,400.00 Pipa Galvanis Ø 3" M1 152,250.00 Pipa Galvanis Ø 4" M1 205,800.00

XV. LAIN - LAIN1 Rolling door besi M2 297,780.00 2 Rolling door aluminium M2 527,100.00 3 Folding Gate standar M2 573,090.00 4 Pintu besi lipat M2 724,290.00 5 Pintu Aluminium 70 x 190 cm Bh 378,105.00 6 Pintu KM/WC PVC Bh 664,650.00 7 Railling Tangga Staenless M2 1,237,845.00 8 Awning Aluminium M2 274,995.00 9 Profil Alumunium M1 78750

10 Alumunium Strip M1 15,330.00 11 Skrup Fixer bh 199.50 12 Sealant Tube 12,757.50 13 Vertical Blind M2 382,725.00 14 Tali ijuk kg 26,250.00 15 Lampu 5 - 20 Watt Bh 4,830.00 16 Lampu Neon 40 Watt Bh 119,490.00 17 Lampu pijar 25 Watt Bh 11,865.00 18 Adukan beton K-225 Ready mix M3 681,870.00 19 Stop Kontak Bh 31,500.00 20 Pelumas Liter 36,960.00 21 Kawat las listrik M1 20,475.00 22 Minyak Solar Liter 7,008.75 23 Sewa Alat Jam 84,000.00

Menyetujui Banjarnegara, - - 2012Kabid Cipta Karya

Kasi Pembangunan dan PemeliharaanBangunan Gedung

ARIF NURUL HUDHA, ST, MsiNIP. 19660722 199603 1 003

RESIATI WIDIASTUTI, STNIP. 19740226 200212 2 006

Mengetahui :

Page 107: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

KEPALA DINAS PEKERJAAN UMUMKABUPATEN BANJARNEGARA

Ir. ARIFIN ROMLI, MsiNIP. 19610712 199003 1 006

Toko Bangunan

------------------------------

Page 108: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

DAFTAR HARGA SATUAN BAHAN BANGUNAN

KETERANGAN

Page 109: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

5,412,825.00 5,683,466.25 5,967,639.56

* * *

* * *

Page 110: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

* * * * * * *

*

*

*

* * *

Page 111: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

* *

Page 112: RAB COR 5 Dua Semampir Jalan Beton 2012 2013
Page 113: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

14580 15309 16074.45187.65 197.0325 206.88412512150 12757.5 13395.375

364500 382725 401861.25

681,870.00 715,963.50 751,761.68

Banjarnegara, - - 2012 MenyetujuiKabid Cipta Karya

Kasi Pembangunan dan PemeliharaanBangunan Gedung

ARIF NURUL HUDHA, ST, MsiNIP. 19660722 199603 1 003

RESIATI WIDIASTUTI, STNIP. 19740226 200212 2 006

Mengetahui :

Page 114: RAB COR 5 Dua Semampir Jalan Beton 2012 2013

KEPALA DINAS PEKERJAAN UMUMKABUPATEN BANJARNEGARA

Ir. ARIFIN ROMLI, MsiNIP. 19610712 199003 1 006