No. Jenis Material Harga Material Sat Keterangan Min1 Alumunium 4/10 - M1
2 Ampelas 3,500 LBR 3,500
3 Ampelas Kayu 3,500 LBR 3,500
4 Bak Mandi Fiber 125,000 BH 125,000
5 Bata Merah 400 BH 400
6 Batu Belah 105,000 M3 105,000
7 Batu Tempel 60,000 M2 60,000
8 Besi Beton Rata - rata 9,000 KG 9,000
9 Bubungan Genteng 25,000 BH 25,000
10 Campuran Kedap Air 25,000 KG 25,000
11 Cat Besi Merk Seiv 40,000 KG 40,000
12 Cat Tembok Vinilex 15,000 KG 15,000
13 Clear Glass + Penguat 24,000 KG 24,000
14 Dempul Gypsum 3,000 KG 3,000
15 Engsel Jendela 35,000 PS 35,000
16 Engsel Pintu 45,000 PS 45,000
17 Floor Drain Standard 50,000 BH 50,000
18 Genteng Beton Standar 3,500 BH 3,500
19 Keramik 40 x 40 Ex. Masterina 45,000 M2 45,000
20 Granito Tile Essenza 60 x 60 Polished 110,000 M2 110,000
21 Gypsum Board 9 mm 54,000 LBR 54,000
22 Hak Angin Standard 17,500 PS 17,500
23 Handle Pintu Standard 125,000 PS 125,000
24 Jalusi Kayu Samarinda ( 1 m2 = 15 m1 ) 150,000 M1 150,000
25 Kaca 5 mm 65,000 M2 65,000
26 Karet - M1
27 Kaso - kaso 5/7 Borneo Kampung 1,800,000 M3 1,800,000
28 Kawat Beton 15,000 KG 15,000
29 Kayu 2/10 cm Kamper Samarinda 65,000 BT 65,000
30 Kayu Borneo Super 3,500,000 M3 3,500,000
31 Kayu Kamper Banjar 4,500,000 M3 4,500,000
32 Kayu Kamper Samarinda 7,500,000 M3 7,500,000
33 Kayu Stoot 15,000 BH 15,000
34 Keramik KW 1 DN 42,000 M2 42,000
35 Kloset Duduk Standard Ex. CINA 800,000 UNIT 800,000
36 Kloset Jongkok Standard 75,000 BH 75,000
37 Kunci Pintu Standard 125,000 UNIT 125,000
38 Kwas 3" 5,000 BH 5,000
39 Lem Kuning 18,000 KG 18,000
40 Lem Putih 8,000 KG 8,000
41 List Kayu Profil 11,500 BT 11,500
42 List Profil kayu 2/8 11,500 BT 11,500
43 Membrance 45,000 KG 45,000
44 Meni Besi 25,000 KG 25,000
45 Minyak Cat Thinner B 15,000 LT 15,000
46 Multiplex 12 mm 145,000 LBR 145,000
47 Multiplex 9 mm 95,000 LBR 95,000
48 Paku 2 cm 17,000 KG 17,000
49 Paku 3 cm 17,000 KG 17,000
50 Paku 4 cm 17,000 KG 17,000
51 Paku 5 s.d. 7 cm 17,000 KG 17,000
52 Paku 8 s.d. 12 cm 17,000 KG 17,000
53 Paku Gypsum 20,000 KG 20,000
54 Paku Triplek 20,000 KG 20,000
55 Papan Kamper Samarinda 7,500,000 M3 7,500,000
56 Papan Terentang 350,000 M3 350,000
57 Parket Kayu Lapis 120,000 M2 120,000
58 Injuk 2,500 KG 2,500
59 Pasir Beton 160,000 M3 120,000
60 Pasir Pasang 180,000 M3 80,000
61 Pasir Urug 110,000 M3 80,000
62 Paving Block Warna 8 cm 45,000 M2 45,000
63 PC ( 50 kg ) 53,000 ZAK 53,000
64 Pipa GIP 1,5" 150,000 BT 150,000
65 Pipa PVC 4" Jenis AW 150,000 BT 150,000
66 Reng Kayu 2/3 Borneo Super 3,500 BT 3,500
67 Rol Cat 15,000 BH 15,000
68 Sealant 9,000 KG 9,000
69 Semen Warna 4,500 KG 4,500
70 Sending Sealer 45,000 KG 45,000
71 Seng Gelombang BJLS 28 ( 80 x 180 ) 65,000 LBR 65,000
72 Slot Jendela Standard 20,000 BH 20,000
73 Split Pecah Mesin 2/3 120,000 M3 120,000
74 Teakwood 4 mm Ukuran Pintu 55,000 LBR 55,000
75 Tepian Genteng 27,500 BH 27,500
76 Tinner ND 12,000 LT 12,000
77 Under Layer 20,000 M2 20,000
78 Wastafel Standard 750,000 UNIT 750,000
79 Wood Filler ( IMPRA ) 35,000 KG 35,000
80 Stop Kran 35,000 BH 35,000
81 Solatip 2,500 BH 2,500
82 Tempat Sabun 50,000 BH 50,000
83 Grendel Pintu 35,000 BH 35,000
84 Kabel NYM 2,5 mm & 1,5 mm 315,000 ROLL 315,000
85 Pipa Listrik 10,000 BT 10,000
86 T Dus 1,000 BH 1,000
87 Stop Kontak 22,500 BH 22,500
88 Saklar Engkel 15,000 BH 15,000
89 Saklar Double 17,500 BH 17,500
90 Kabel Telepon 2,500 M1 2,500
91 Stop Kontak Telepon 35,000 BH 35,000
92 Kabel Antena 2,000 M1 2,000
93 Stop Kontak Antena 35,000 BH 35,000
94 Gantungan Lampu DL 40,000 BH 40,000
95 Box MCB 65,000 BH 65,000
96 MCB 45,000 BH 45,000
97 Lampu Taman 200,000 BH 200,000
98 Pipa PVC Wavin 4" 123,500 BT 123,500
99 Pipa PVC Wavin 3" 74,500 BT 74,500
100 Pipa PVC Wavin 2,5" 54,500 BT 54,500
101 Pipa PVC Wavin 2" 37,000 BT 37,000
102 Pipa PVC Wavin 1,25" 28,500 BT 28,500
103 Pipa PVC Wavin 1,5" 28,500 BT 28,500
104 Pipa PVC Wavin 1" 16,600 BT 16,600
105 Pipa PVC Wavin 3/4" 12,500 BT 12,500
106 Pipa PVC Wavin 1/2" 9,500 BT 9,500
107 Sambungan Rata-rata 8,000 BH 8,000
108 Shower Kran 575,000 BH 575,000
109 Zink 225,000 BH 225,000
10/3/2012 BATA PRESS Pcs 1 Rp 2,300 8/6/2012 AFDUNER BTL 1 Rp 5,000 8/4/2012 AMPLAS HALUS/KASAR MTR 1 Rp 8,000
9/11/2012 BAJA RINGAN C,0,75 M3 1 Rp 110,000 9/10/2012 BALOK KELAPA 4 MTR M3 1 Rp 1,350,000
9/7/2012 BATA MERAH JUMBO PCS 1 Rp 900 9/8/2012 BATA MERAH STANDAR PCS 1 Rp 600
8/31/2012 BATAKO PRESS BH 1 Rp 2,300 9/6/2012 BATU SPLIT GILING M3 1 Rp 190,000 9/4/2012 BATU WALES M3 1 Rp 105,000
7/17/2012 BCP 50 CM BH 1 Rp 90,000 7/29/2012 BCP 90 CM BH 1 Rp 150,000 8/28/2012 BENANG F PUTIH ROLL 1 Rp 2,000 8/30/2012 BESI D 10'' BTG 1 Rp 41,000 8/13/2012 BESI D 10'' FULL. BTG 1 Rp 53,000 7/18/2012 BESI D 6 '' BTG 1 Rp 16,000 8/13/2012 BESI D 6 '' FULL BTG 1 Rp 31,000 8/30/2012 BESI D 8 '' BTG 1 Rp 31,000 8/13/2012 BESI D 8 '' FULL BTG 1 Rp 41,000 8/15/2012 BOX MCB BH 1 Rp 3,500
8/7/2012 CAT AVIAN LEATHER 305 KLG 1 Rp 42,500 8/4/2012 CAT Q-LUC 1505 PTH PAIL 1 Rp 175,000 8/4/2012 CAT Q-LUC 1550.ABU PAIL 1 Rp 175,000 8/1/2012 CAT SHINTEX 315 GLN 1 Rp 120,000
7/25/2012 CLOSED DUDUK JEPANG SET 1 Rp 1,000,000 5/31/2012 CLOSED INA JONGKOK BH 1 Rp 115,000 7/30/2012 DOP 3 '' BH 1 Rp 4,000 7/30/2012 DOP 4 '' BH 1 Rp 5,000 8/28/2012 EMBER KECIL BH 1 Rp 5,000
8/1/2012 ENGSEL 3'' PTH PSG 1 Rp 15,000 8/28/2012 ENGSEL 4 '' COMBI BH 1 Rp 10,000 8/30/2012 ENGSEL 4'' COMED BH 1 Rp 10,000 8/31/2012 GENTENG FLATT 30x40 BH 1 Rp 3,600 8/10/2012 INBODUS BH 1 Rp 500 8/10/2012 KABEL ETERNA 2X1.5 ROLL 1 Rp 255,000 7/11/2012 KABEL ETERNA 3X1.5 ROLL 1 Rp 325,000 8/13/2012 KACA 5 MILI POLOS 25,3X85,5 LBR 1 Rp 21,500 8/13/2012 KACA 5 MILI POLOS 38X76,5 LBR 1 Rp 30,500 8/13/2012 KACA 5 MILI POLOS 48,5X108,5 LBR 1 Rp 58,000 8/13/2012 KACA 5 MILI POLOS 49X108,5 LBR 1 Rp 58,000 8/13/2012 KACA 5 MILI POLOS 49X108,5 LBR 1 Rp 58,000 8/13/2012 KACA 5 MILI POLOS 49X109 LBR 1 Rp 58,000 8/10/2012 KACA 5 MILI POLOS 81,5X116 LBR 1 Rp 98,500 8/13/2012 KACA ES 3 MILI 14X85,5 LBR 1 Rp 20,000
8/1/2012 KAWAT TALI KG 1 Rp 18,000 9/9/2012 KAYU MERAHAN M3 1 Rp 1,800,000
8/13/2012 KENI 1/2 R BH 1 Rp 2,000 8/30/2012 KENI 3'' BH 1 Rp 4,500 8/30/2012 KENI 4 '' BH 1 Rp 7,500
8/1/2012 KERAMIK ASIA TILE 30/30.OB DUS 1 Rp 47,500 8/7/2012 KERAMIK KIA 25/40 KW 1,ATLANTIC CREMA, DUS 1 Rp 57,500
8/10/2012 KERAMIK KIA 25/40 KW 1,ATLANTIC CREMA, DUS 1 Rp 57,500 8/13/2012 KERAMIK WH 20/25 PTH DUS 1 Rp 42,500 8/10/2012 KLEM KABEL DUS 1 Rp 2,500
8/7/2012 KRAN CABANG BH 1 Rp 45,000 8/10/2012 KWAS EXITO 1,1/2'' BH 1 Rp 2,500
8/7/2012 KWAS EXITO 1/2 '' BH 1 Rp 2,500 8/10/2012 KWAS EXITO 3'' BH 1 Rp 5,000 8/10/2012 KWAS EXITO 4'' BH 1 Rp 7,500
8/4/2012 LEM FOX PUTIH BKS 1 Rp 5,000 8/15/2012 MCB 4 AMP BH 1 Rp 20,000
8/4/2012 PAKU 10/5+7/5+5/5 KG 1 Rp 12,000 8/28/2012 PAKU 2 CM KG 1 Rp 20,000 8/10/2012 PAKU 4 CM KG 1 Rp 13,000
8/1/2012 PAKU SENG 7 CM KG 1 Rp 20,000 8/1/2012 PAPAN JJ 2/20*300 LBR 1 Rp 17,500 9/2/2012 PASIR LOKAL/MERAH M3 1 Rp 115,000 9/1/2012 PASIR PASANG M3 1 Rp 180,000 9/3/2012 PASIR URUG M3 1 Rp 110,000
8/13/2012 PINTU BIGES ABU BH 1 Rp 180,000 8/10/2012 PLAMIR MATEX GLN 1 Rp 41,000 8/30/2012 PRALON MASTER 3'' BTG 1 Rp 40,000
5/6/2012 PRALON PVC 5/8 BTG 1 Rp 5,000 8/28/2012 PRALON WAVIN 1/2 AW BTG 1 Rp 14,000
7/3/2012 SAKLAR ENGKEL BROCO BH 1 Rp 10,000 7/3/2012 SAKLAR SERI BROCO BH 1 Rp 13,000
8/30/2012 SEKRAP KOALA SET 1 Rp 17,500 8/4/2012 SEMEN HOLCIM ZAK 1 Rp 63,000
8/28/2012 SEMEN PUTIH KG 1 Rp 2,000 8/1/2012 SENG GELOMBANG LBR 1 Rp 38,500 8/7/2012 SHOWER NIKKEN BH 1 Rp 50,000 9/5/2012 SIRTU M3 1 Rp 100,000
8/15/2012 SPUL MESIN SERUT SET 1 Rp 5,000 7/3/2012 STOP KONTAK BROCO BH 1 Rp 11,000
8/13/2012 TEE 1/2 R BH 1 Rp 2,500 8/1/2012 TRIPLEK 3 MILI LBR 1 Rp 44,000
8/10/2012 UNIBEL BESAR DUS 1 Rp 6,000 BAMBU 6M BTG 1 Rp 6,000 PAKU 7 KG 1 Rp 12,000 PAKU 2,5 KG 1 Rp 20,000
PAKU 10 KG 1 Rp 12,000 KAYU 5/10 300 JJ BTG 1 Rp 18,500 lisplank grc 4m btg 1 Rp 55,000 keramik 20/25 dus Rp 35,000 keramik 30/30 dus Rp 36,000 keramik 40/40 DUS Rp 38,000 list dalem Rp 10,000 list luar Rp 9,000 papan gipsum Rp 31,000 cat kiloan Rp 12,000 fllor drain Rp 25,000 kitchen zink Rp 150,000 kran bebek Rp 45,000 wuwung Rp 8,000
8.33325 9
0.015 185001 1233333
+++
No. Jenis Pekerja Harga Upah Sat Keterangan Harga Upah1 Pekerja 35,000 ORG 32,500
2 Pekerja Setengah Terampil 35,000 ORG 32,500
3 Pekerja Terampil 37,500 ORG 32,500
4 Tukang Batu Setengah Terampil 45,000 ORG 40,000
5 Tukang Batu Terampil 50,000 ORG 45,000
6 Kepala Tukang Batu - ORG -
7 Tukang Kayu Setengah Terampil 45,000 ORG 45,000
8 Tukang Kayu Terampil 50,000 ORG 45,000
9 Kepala Tukang Kayu 50,000 ORG 50,000
10 Tukang Cat / Pelitur Setengah Terampil 45,000 ORG 45,000
11 Tukang Cat / Pelitur Terampil 45,000 ORG 45,000
12 Kepala Tukang Cat / Pelitur 50,000 ORG 50,000
13 Tukang Besi Beton Setengah Terampil 45,000 ORG 40,000
14 Tukang Besi Beton Terampil 50,000 ORG 45,000
15 Kepala Tukang Besi Beton 50,000 ORG 50,000
16 Tukang Besi Profil Setengah Terampil 45,000 ORG 32,500
17 Tukang Besi Profil Terampil 50,000 ORG 40,000
18 Kepala Tukang Besi Profil 50,000 ORG 45,000
19 Tukang Listrik Setengah Terampil 45,000 ORG 40,000
20 Tukang Listrik Terampil 50,000 ORG 50,000
21 Mandor 65,000 ORG 65,000
NO. URAIAN KOEF.1 2 3
A PEKERJAAN PERSIAPAN1 M2 PEKERJAAN PEMBERSIHAN LOKASI
Tukang Batu Terampil 0.0200
Pekerja Terampil 0.0400
Peralatan 1.0000
Jumlah
1 M1 PEKERJAAN PASANGAN BOWPLANK
Papan JJ 2/20*300 0.3000
Paku 5 - 7 0.0380
Ongkos Pasang 1.0000
Jumlah
1 M2 PEKERJAAN MCK SEMENTARA
Seng Gelombang BJLS 28 ( 80 x 180 ) 3.6000
Kayu Borneo Super 0.1000
Paku 5 - 7 0.6000
Pengecatan cat minyak 2x bagian luar 0.6000
Bata Merah 50.0000
PC ( 50 kg ) 0.5250
Pasir Pasang 0.0540
Ongkos Pasang 1.0000
Jumlah
1 UNIT PEKERJAAN SEPTICTANK 2,5 x 1,5 x 2 + REMBESAN
Galian Tanah 7.5000
Lantai Kerja 0.3750
Pasangan Bata 1 PC : 3 PS + Plesteran 19.0000
Pelat Beton Penutup dan Balok 0.3750
Galian Tanah Untuk Rembesan 5.6250
Urugan Kembali Perataan Tanah 1.8750
Pipa GIP 1,5" 2.0000
Pasangan Injuk 9.0000
Urugan Kerikil 3,5 cm 1.7500
Jumlah
1 M2 PEKERJAAN PENGUKURAN KEMBALI (SITE)
Tukang Batu Terampil 0.0075
Pekerja Terampil 0.0150
Peralatan 1.0000
Jumlah
1 M2 PEKERJAAN PAGAR PENGAMAN PROYEK
Seng Gelombang BJLS 28 ( 80 x 180 ) 0.7000
Kayu Borneo Super 0.0360
Paku 5 - 7 0.2000
Pengecatan cat minyak 2x bagian luar 0.2000
Ongkos Pasang 1.0000
Jumlah
B PEKERJAAN TANAH1 M3 PEKERJAAN GALIAN TANAH BIASA MAX. KEDALAMAN 1 M1
Pekerja Setengah Terampil 0.2500
Mandor 0.0300
Alat Bantu 1.0000
Jumlah
1 M3 PEKERJAAN STRIPING TANAH TEBAL 20 CM
Pekerja Setengah Terampil 0.0500
Mandor 0.0050
Alat Bantu 1.0000
Jumlah
1 M3 PEKERJAAN PEMBUANGAN TANAH DALAM RADIUS 150 M
Pekerja Setengah Terampil 0.2500
Mandor 0.0500
Alat Bantu 1.0000
Jumlah
1 M3 PEKERJAAN URUGAN TANAH KEMBALI
Pekerja 0.1920
Mandor 0.0190
Alat Bantu 1.0000
Jumlah
1 M2 PEKERJAAN PEMADATAN TANAH SETIAP 20 CM
Pekerja Terampil 0.2500
Mandor 0.0500
Alat Bantu / Sewa Stamper 1.0000
Jumlah
1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX. KEDALAMAN 10 M1
Pekerja Terampil 0.9000
Mandor 0.0250
Alat Bantu 1.0000
Jumlah
C PEKERJAAN PONDASI1 M3 PEKERJAAN PASANGAN AANSTAMPING
Batu Belah 1.2000
Pasir Urug 0.4000
Pekerja 1.1250
Tukang Batu Setengah Terampil 0.5625
Kepala Tukang Batu 0.0750
Mandor 0.0563
Jumlah
1 bh PEKERJAAN PONDASI CAKAR AYAM
Beton K-175 (100*100*30) 0.0900
Besi beton 10mm 1.4000
Kawat Beton 0.2000
Tukang Besi Beton Setengah Terampil 0.4000
Tukang Besi Beton Terampil 0.2000
Kepala Tukang Besi Beton 0.0100
Mandor 0.0050
Jumlah
1 M3 PEKERJAAN PASANGAN BATU BELAH 1 : 5
Batu Belah 1.2000
PC ( 50 kg ) 2.1600
Pasir Pasang 0.4000
Pekerja 2.2500
Tukang Batu setengah Terampil 1.1250
Kepala Tukang Batu 0.1125
Mandor 0.0169
Jumlah
D PEKERJAAN DINDING1 M2 PEKERJAAN PASANGAN BATA MERAH 1 : 3
Bata Merah 65.0000
PC ( 50 kg ) 0.5250
Pasir Pasang 0.0540
Pekerja Setengah Terampil 0.3218
Tukang Batu Setengah Terampil 0.1805
Kepala Tukang batu 0.0158
Mandor 0.0083
Jumlah
1 M2 PEKERJAAN PASANGAN BATA PRESS
Bata Press/ Batako 12.5000
PC ( 50 kg ) 0.2500
Pasir Lokal 0.0540
Pekerja Setengah Terampil 0.1805
Tukang Batu Setengah Terampil 0.1805
Kepala Tukang batu 0.0158
Mandor 0.0083
Jumlah
1 M2 PEKERJAAN PASANGAN BATA MERAH 1 : 5
Bata Merah 70.0000
PC ( 50 kg ) 0.2592
Pasir Pasang 0.0580
Pekerja Setengah Terampil 0.3218
Tukang Batu Setengah Terampil 0.1805
Kepala Tukang batu 0.0158
Mandor 0.0083
Jumlah
1 M2 PEKERJAAN PLESTERAN DINDING 1 : 2 + ACIAN
PC ( 50 kg ) 0.2368
Pasir Pasang 0.0190
Pekerja Setengah Terampil 0.2860
Tukang Batu Setengah Terampil 0.2140
Kepala Tukang batu 0.0210
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN PLESTERAN DINDING 1 : 5 + ACIAN
PC ( 50 kg ) 0.1080
Pasir Pasang 0.0190
Pekerja Setengah Terampil 0.2000
Tukang Batu Setengah Terampil 0.2140
Kepala Tukang batu 0.0210
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN PLESTERAN DINDING 1 : 5 + KAMPROT HALUS
PC ( 50 kg ) 0.1080
Pasir Pasang 0.0190
Pekerja Setengah Terampil 0.2860
Tukang Batu Setengah Terampil 0.2140
Kepala Tukang batu 0.0210
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN PASANGAN BATU TEMPEL + SIARAN
Batu Tempel 1.1000
PC ( 50 kg ) 0.1200
Pasir Pasang 0.0310
Pekerja Terampil 0.1875
Tukang Batu Terampil 0.2250
Kepala Tukang Batu 0.0375
Mandor 0.0338
Peralatan 1.0000
Jumlah
1 M2 PEKERJAAN PASANGAN KAYU TEMPEL
Papan Kamper Samarinda 0.0300
Pekerja Terampil 0.9000
Tukang Kayu Terampil 1.5000
Kepala Tukang Kayu 0.2000
Mandor 0.0200
Peralatan 1.0000
Jumlah
E PEKERJAAN ATAP1 M3 PEKERJAAN KUDA-KUDA BORNEO SUPER
Kayu Balok Borneo Super 1.1000
Paku 8 s.d. 12 cm 5.8000
Pekerja Setengah Terampil 3.0000
Tukang Kayu Setengah Terampil 5.0000
Kepala Tukang Kayu 2.0000
Mandor 0.0050
Jumlah
1 M3 PEKERJAAN GORDENG BORNEO SUPER
Kayu Balok Borneo Super 1.1000
Paku 8 s.d. 12 cm 5.8000
Pekerja Setengah Terampil 3.0000
Tukang Kayu Setengah Terampil 5.0000
Kepala Tukang Kayu 2.0000
Mandor 0.0050
Jumlah
1 M2 PEKERJAAN RANGKA ATAP GENTENG PLENTONG BORNEO SUPER ( HANYA RANGKA )
Kayu Kaso 5/7 Borneo Super 0.0168
Reng Kayu 2/3 Borneo Super 0.8000
Paku 5 s.d. 7 cm 0.1000
Pekerja Setengah Terampil 0.1500
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.0100
Mandor 0.0050
Jumlah
1 M2 PEKERJAAN PENUTUP ATAP GENTENG BETON CISANGKAN
Genteng Beton standar 9.0000
Pekerja Setengah Terampil 0.1500
Tukang Kayu Terampil 0.1500
Mandor 0.0050
Jumlah
1 M1 PEKERJAAN BUBUNGAN GENTENG MURAH
Bubungan Genteng Beton 3.0000
PC ( 50 kg ) 0.3200
Pasir Pasang 0.0300
Pekerja Terampil 0.2000
Tukang Batu Terampil 0.4000
Kepala Tukang Batu 0.0500
Mandor 0.0250
Jumlah
1 M1 PEKERJAAN TEPIAN GENTENG
Tepian Genteng 5.0000
Pekerja 0.2000
Tukang Batu setengah Terampil 0.4000
Kepala Tukang Batu 0.0500
Mandor 0.0250
Alat Bantu 1.0000
Jumlah
1 M1 PEKERJAAN PASANGAN LISPLANG KAYU KAMPER MERAHAN 3/30
Kayu Kamper Merahan 0.2500
Paku 5 s.d. 7 cm 0.0100
Pekerja Terampil 0.0700
Tukang Kayu Setengah Terampil 0.2000
Kepala Tukang Kayu 0.0200
Mandor 0.0040
Jumlah
F PEKERJAAN KERAMIK1 M2 PEKERJAAN LANTAI 40X40
Keramik WH 20/30 putih 1.0000
PC ( 50 kg ) 0.3200
Pasir Pasang 0.0300
Semen Warna 0.0130
Pekerja Terampil 0.1875
Tukang Batu Terampil 0.3750
Kepala Tukang Batu 0.0750
Mandor 0.0188
Jumlah
1 M2 PEKERJAAN KERAMIK DAPUR 20X25
Keramik KIA 25/40 KW 1,ATLANTIC CREMA 1.0000
PC ( 50 kg ) 0.1600
Pasir Lokal 0.0300
Semen Warna 0.0130
Pekerja Terampil 0.1875
Tukang Batu Terampil 0.3750
Kepala Tukang Batu 0.0750
Mandor 0.0188
Jumlah
1 M2 PEKERJAAN LANTAI GRANITO TILE ESSENZA UKURAN 60 X 60
Granito Tile Essenza 60 x 60 Polished 1.0000
PC ( 50 kg ) 0.2600
Pasir Pasang 0.0300
Semen Warna 0.0130
Pekerja Terampil 0.2500
Tukang Batu Terampil 0.6000
Kepala Tukang Batu 0.0500
Mandor 0.0250
Alat Bantu 1.0000
Jumlah
1 M2 PEKERJAAN KERAMIK EX ROMAN
Roman Tile Variant 1.0000
PC ( 50 kg ) + Campuran Khusus 0.2600
Pasir Pasang 0.0300
Semen Warna 0.0130
Pekerja Terampil 0.2500
Tukang Batu Terampil 0.6000
Kepala Tukang Batu 0.0500
Mandor 0.0250
Alat Bantu 1.0000
Jumlah
1 M2 PASANGAN LANTAI PARKET JENIS KAYU LAPIS (BAHAN JADI)
Parket Kayu Lapis 1.0000
Under Layer 1.0000
Lapisan Multiplex 9 mm 0.3472
Lem Putih 0.2000
Lem Kuning 0.2000
Pekerja Terampil 0.3000
Tukang Kayu Terampil 0.5000
Kepala Tukang Kayu 0.1000
Mandor 0.0100
Peralatan 1.0000
Jumlah
1 M2 PASANGAN LANTAI KAYU TEMPEL
Papan Kamper Samarinda 0.0300
Under Layer 1.0000
Lapisan Multiplex 9 mm 0.3472
Pekerja Terampil 1.0000
Tukang Kayu Terampil 1.5000
Kepala Tukang Kayu 0.2000
Mandor 0.0200
Peralatan 1.0000
Jumlah
1 M1 PASANGAN PLINT KERAMIK 10/30
Keramik KW 1 DN 0.5050
PC ( 50 kg ) 0.0550
Pasir Pasang 0.0100
Semen Warna 0.0040
Pekerja Terampil 0.1000
Tukang Batu Terampil 0.2000
Kepala Tukang Batu 0.0400
Mandor 0.0100
Jumlah
1 M1 PASANGAN PLINT KAYU 2/10
Kayu 2/10 cm kamper samarinda 1.1000
Paku 4 cm 0.0250
Pekerja terampil 0.0250
Tukang Kayu Terampil 0.1000
Kepala Tukang Kayu 0.0100
Mandor 0.0100
Jumlah
G PEKERJAAN CAT DINDING1 M2 PEKERJAAN PENGECATAN DINDING EX. VINILEX
Cat Tembok Vinilex 0.2500
Rol Cat 0.0100
Ampelas 0.5000
Pekerja Setengah Terampil 0.1000
Tukang Cat Setengah Terampil 0.1500
Kepala Tukang Cat 0.0250
Mandor 0.1000
Jumlah
1 M2 PEKERJAAN PENGECATAN PLAFOND EX. VINILEX
Cat Tembok Vinilex 0.2500
Rol Cat 0.0100
Ampelas 0.5000
Pekerja Setengah Terampil 0.2000
Tukang Cat Setengah Terampil 0.3000
Kepala Tukang Cat 0.0300
Mandor 0.0100
Jumlah
1 M2 PEKERJAAN PENGECATAN BESI ( 3x )
Meni Besi 0.1670
Cat Besi Merk Seiv 0.2000
Ampelas 0.4000
Minyak Cat Thinner B 0.1500
Kwas 3" 0.0500
Pekerja Terampil 0.2000
Tukang Cat Terampil 0.3000
Kepala Tukang Cat 0.0300
Mandor 0.0100
Jumlah
1 M2 PEKERJAAN SEMI MELAMIK PINTU
Wood Filler ( IMPRA ) 0.2000
Sending Sealer 0.3500
Clear Glass + Penguat 0.3500
Kwas 3" 0.0100
Tinner ND 1.4000
Ampelas Kayu 0.1000
Pekerja Terampil 0.2500
Tukang Cat / Pelitur Terampil 0.2850
Kepala Tukang Cat / Pelitur 0.0400
Mandor 0.0200
Jumlah
1 M1 PEKERJAAN SEMI MELAMIK KUSEN & DAUN JENDELA
Wood Filler ( IMPRA ) 0.0350
Sending Sealer 0.0750
Clear Glass + Penguat 0.0750
Kwas 3" 0.0100
Tinner ND 0.3000
Ampelas Kayu 0.0300
Pekerja Terampil 0.1000
Tukang Cat / Pelitur Terampil 0.1000
Kepala Tukang Cat / Pelitur 0.0150
Mandor 0.0025
Jumlah
1 M1 PEKERJAAN SEMI MELAMIK PLINT & LIST
Wood Filler ( IMPRA ) 0.0175
Sending Sealer 0.0375
Clear Glass + Penguat 0.0375
Kwas 3" 0.0050
Tinner ND 0.1500
Ampelas Kayu 0.0150
Pekerja Terampil 0.0500
Tukang Cat / Pelitur Terampil 0.0500
Kepala Tukang Cat / Pelitur 0.0075
Mandor 0.0013
Jumlah
H PEKERJAAN PLAFOND1 M2 PEKERJAAN PASANGAN RANGKA PLAFOND KAYU BORNEO SUPER DIMENI
Kaso - kaso 5/7 Borneo Super 0.0140
Kayu 5/10 Borneo Super 0.0035
Paku 0.2200
Pekerja Setengah Terampil 0.1875
Tukang Kayu Terampil 0.2250
Kepala Tukang Kayu 0.0375
Mandor 0.0105
Jumlah
1 M2 PEKERJAAN PASANGAN GYPSUM 9 MM
Gypsum Board 9 mm 0.3500
Dempul Gypsum 0.0500
Paku Gypsum 0.0500
Pekerja Setengah Terampil 0.2000
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.0150
Mandor 0.0150
Jumlah
1 M2 PEKERJAAN PASANGAN LABRISIRING
Papan Kamper Samarinda 0.0250
Paku 2 cm 0.0500
Pekerja Setengah Terampil 0.3000
Tukang Kayu Terampil 0.2000
Kepala Tukang Kayu 0.0200
Mandor 0.0200
Jumlah
1M1 PASANGAN LIST PROFIL GYPSUM
Profil Gypsum 1.1000
Dempul Gypsum 0.5000
Pekerja Terampil 0.0250
Tukang Kayu Terampil 0.0500
Kepala Tukang Kayu 0.0100
Mandor 0.0100
Jumlah
I PEKERJAAN KUSEN1 M3 PEKERJAAN KUSEN KAYU KAMPER SAMARINDA
Kayu Kamper Samarinda 1.1000
Paku 2.5000
Lem Fox ( Putih ) 1.0000
Pekerja Terampil 4.0000
Tukang Kayu Terampil 15.0000
Kepala Tukang Kayu 2.7000
Mandor 0.5000
Jumlah
1 M1 PEKERJAAN KUSEN JENDELA ALUMINIUM
Alumunium 4/10
Sealant
Karet
Ongkos Pasang
Jumlah
J PEKERJAAN DAUN PINTU1 M2 PEKERJAAN PINTU PANIL KAYU KAMPER SAMARINDA
Rangka + Panil Kayu Kamper Samarinda 0.0500
Lem Fox ( Putih ) 0.7500
List Kayu Profil 4.0000
Pekerja Terampil 0.6000
Tukang Kayu Setengah Terampil 2.6000
Kepala Tukang Kayu 0.2600
Mandor 0.0260
Jumlah
1 M2 PEKERJAAN PINTU DOUBLE TEAK WOOD
Rangka Kayu Banjar 0.0150
Teakwood 4 mm Ukuran Pintu 2.0000
Lem Fox ( Putih ) 0.0050
Paku Triplek 0.2000
Pekerja Terampil 0.3000
Tukang Kayu Setengah Terampil 1.5000
Kepala Tukang Kayu 0.2000
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN DAUN PINTU JALUSI
Rangka Kayu Kamper Samarinda 0.0170
Lem Fox ( Putih ) 0.3000
Jalusi Kayu Samarinda ( 1 m2 = 15 m1 ) 0.0225
List Kayu 4.0000
Pekerja setengah Terampil 0.7000
Tukang Kayu Terampil 1.8000
Kepala Tukang Kayu 0.2600
Mandor 0.0150
Jumlah
1 M2 PEKERJAAN DAUN PINTU KACA ( TANPA KACA )
Rangka Kayu Kamper Samarinda 0.0200
Lem Fox ( Putih ) 0.6000
List Kayu 4.0000
Pekerja setengah Terampil 0.4000
Tukang Kayu Terampil 1.4000
Kepala Tukang Kayu 0.1400
Mandor 0.0140
Jumlah
K PEKERJAAN DAUN JENDELA1 M2 PEKERJAAN DAUN JENDELA KACA ( TANPA KACA )
Rangka Kayu Kamper Samarinda 0.0170
Lem Fox ( Putih ) 0.3000
List Kayu 4.0000
Pekerja setengah Terampil 0.3000
Tukang Kayu Terampil 1.2000
Kepala Tukang Kayu 0.1200
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN DAUN JENDELA JALUSI
Rangka Kayu Kamper Samarinda 0.0170
Lem Fox ( Putih ) 0.3000
Jalusi Kayu Samarinda ( 1 m2 = 15 m1 ) 0.0225
List Kayu 4.0000
Pekerja setengah Terampil 0.7000
Tukang Kayu Terampil 1.8000
Kepala Tukang Kayu 0.2600
Mandor 0.0150
Jumlah
1 PS PEKERJAAN ENGSEL PINTU
Engsel Pintu 1.0000
Tukang Kayu Terampil 0.3000
Kepala Tukang Kayu 0.0200
Mandor 0.0150
Jumlah
1 PS PEKERJAAN ENGSEL JENDELA
Engsel Jendela 1.0000
Tukang Kayu Terampil 0.3000
Kepala Tukang Kayu 0.0200
Mandor 0.0150
Jumlah
1 UNIT PEKERJAAN KUNCI PINTU SWING
Kunci Pintu Standard 1.0000
Tukang Kayu Terampil 0.8000
Kepala Tukang Kayu 0.0400
Mandor 0.0400
Jumlah
1 PS PEKERJAAN HANDLE PINTU
Handle Pintu Standard 1.0000
Tukang Kayu Terampil 0.2000
Kepala Tukang Kayu 0.0200
Mandor 0.0100
Jumlah
1 BH PEKERJAAN SLOT JENDELA
Slot Jendela Standard 1.0000
Tukang Kayu Terampil 0.1000
Kepala Tukang Kayu 0.0200
Mandor 0.0200
Jumlah
1 BH PEKERJAAN GRENDEL PINTU
Slot Grendel Standard 1.0000
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.0250
Mandor 0.0250
Jumlah
1 PS PEKERJAAN HAK ANGIN JENDELA
Hak Angin Standard 1.0000
Tukang Kayu Terampil 0.1000
Kepala Tukang Kayu 0.0300
Mandor 0.0250
Jumlah
1 M2 PEKERJAAN KACA 5MM
Kaca 5 mm 1.0000
Tukang Kayu Terampil 0.0500
Kepala Tukang Kayu 0.0350
Mandor 0.0250
Jumlah
L PEKERJAAN KAMAR MANDI1 BH PEKERJAAN BAK MANDI FIBER
Bak Mandi Fiber 1.0000
PC ( 50 kg ) 0.2592
Bata Merah 70.0000
Pasir Pasang 0.0580
Pekerja Terampil 0.5000
Tukang Batu Terampil 0.5000
Kepala Tukang Batu 0.0700
Mandor 0.0650
Jumlah
1 BH PEKERJAAN CLOSET JONGKOK
Kloset Jongkok Standard 1.0000
PC ( 50 kg ) 0.1592
Pasir Pasang 0.0200
Pekerja Terampil 0.4000
Tukang Batu Terampil 0.4000
Kepala Tukang Batu 0.0600
Mandor 0.0600
Jumlah
1 BH PEKERJAAN FLOOR DRAIN
Floor Drain Standard 1.0000
PC ( 50 kg ) 0.1592
Pasir Pasang 0.0200
Pekerja Terampil 0.2000
Tukang Batu Terampil 0.2000
Kepala Tukang Batu 0.0300
Mandor 0.0300
Jumlah
1 BH PEKERJAAN STOP KRAN
Stop Kran 1.0000
Solatip 0.2500
Pekerja Terampil 0.0300
Tukang Batu Terampil 0.0300
Mandor 0.0030
Jumlah
1 BH PEKERJAAN SHOWER KRAN
Shower Kran 1.0000
Solatip 0.2500
Pekerja Terampil 0.0300
Tukang Batu Terampil 0.0300
Mandor 0.0030
Jumlah
1 BH PEKERJAAN TEMPAT SABUN
Tempat Sabun 1.0000
PC ( 50 kg ) 0.1592
Pasir Pasang 0.0200
Pekerja Terampil 0.2000
Tukang Batu Terampil 0.2000
Kepala Tukang Batu 0.0300
Mandor 0.0300
Jumlah
1 UNIT PEKERJAAN KLOSET DUDUK
Kloset Duduk Standard 1.0000
Pekerja Terampil 0.2500
Tukang Batu Terampil 0.2500
Kepala Tukang Batu 0.0400
Mandor 0.0400
Jumlah
1 UNIT PEKERJAAN WASTAFEL
Wastafel Standard 1.0000
Pekerja Terampil 0.2500
Tukang Batu Terampil 0.2500
Kepala Tukang Batu 0.0400
Mandor 0.0400
Jumlah
1 UNIT PEKERJAAN KITCHEN ZINK
Kitzen Zink 1.0000
Pekerja Terampil 0.2500
Tukang Batu Terampil 0.2500
Kepala Tukang Batu 0.0400
Mandor 0.0400
Jumlah
M PEKERJAAN LANTAI LUAR1 M2 PEKERJAAN PAVING BLOCK T = 8 CM
Paving Block Warna 8 cm 1.0100
Pasir Beton 0.1000
Pekerja Setengah Terampil 0.2500
Tukang Batu Setengah Terampil 0.5000
Kepala Tukang Batu 0.0250
Mandor 0.0030
Peralatan 1.0000
Jumlah
N PEKERJAAN WATERPROOFING & SCREED1 M2 PEKERJAAN SHEET WATERPROOFING
Membrance 1.0000
PC ( 50 Kg ) 0.2368
Pasir pasang 0.0190
Pekerja Terampil 0.2860
Tukang Batu Terampil 0.2140
Kepala Tukang Batu 0.0210
Mandor 0.0200
Jumlah
1 M2 PEKERJAAN PLESTERAN + ACIAN PELINDUNG WATER PROOFING 1 : 3
PC ( 50 Kg ) 0.2750
Pasir Pasang 0.3880
Pekerja Terampil 0.3500
Kepala Tukang Batu 0.0200
Mandor 0.0200
Jumlah
O PEKERJAAN LUAR BANGUNAN
1 BH PEKERJAAN BAK KONTROL 40/40
Urugan Pasir 0.0160
Galian tanah 0.6400
Pasangan bata 1.6400
Plesteran + acian 1.6400
Bekisting 0.1600
Upah pasang 1.0000
Jumlah
P PEKERJAAN BETON & LANTAI KERJA1 M3 PEKERJAAN COR BETON SITE MIX K-175
Semen PC ( 50 kg ) 5.8000
Split Pecah Mesin 2/3 0.8300
Pasir Beton 0.5400
Pekerja 2.5000
Tukang Batu Setengah Terampil 0.5000
Kepala Tukang Batu 0.0500
Mandor 0.0100
Peralatan 1.0000
Jumlah
1 M3 PEKERJAAN COR BETON SITE MIX K-225
Semen PC ( 50 kg ) 6.8960
Split Pecah Mesin 2/3 0.8100
Pasir Beton 0.4900
Pekerja 2.5000
Tukang Batu Setengah Terampil 0.5000
Kepala Tukang Batu 0.0500
Mandor 0.0100
Peralatan 1.0000
Jumlah
1 KG PEKERJAAN BESI BETON TERPASANG U-24
Besi Beton Rata - rata 1.0500
Kawat Beton 0.1000
Tukang Besi Beton Setengah Terampil 0.0250
Tukang Besi Beton Terampil 0.0150
Kepala Tukang Besi Beton 0.0100
Mandor 0.0050
Peralatan, Spanser 1.0000
Jumlah
1 KG PEKERJAAN BESI BETON TERPASANG U-39
Besi Beton Rata - rata 1.0500
Kawat Beton 0.0100
Tukang Besi Beton Setengah Terampil 0.0360
Tukang Besi Beton Terampil 0.0160
Kepala Tukang Besi Beton 0.0110
Mandor 0.0050
Peralatan, Spanser 1.0000
Jumlah
1 M2 PEKERJAAN BEKISTING DENGAN PAPAN
Kaso 5/7 Borneo Super ( 2x Pakai ) 50 % 0.0170
Papan Terentang ( 2x Pakai ) 75 % 0.0240
Paku 0.4000
Pekerja 0.1200
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.1500
Mandor 0.0500
Tukang Kayu Setengah Terampil ( Bongkar ) 0.1200
Jumlah
1 M2 PEKERJAAN BEKISTING DENGAN MULTIPLEX 9 MM
Kaso 5/7 Borneo Super ( 2x Pakai ) 50 % 0.0170
Multiplex 9 mm ( 2x Pakai ) 75 % 0.3470
Paku 0.4000
Pekerja 0.1200
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.1500
Mandor 0.0500
Tukang Kayu Setengah Terampil ( Bongkar ) 0.1200
Jumlah
1 M2 PEKERJAAN BEKISTING DENGAN MULTIPLEX 12 MM
Kaso 5/7 Borneo Super ( 2x Pakai ) 50 % 0.0170
Multiplex 12 mm ( 2x Pakai ) 75 % 0.3470
Paku 0.4000
Pekerja 0.1200
Tukang Kayu Terampil 0.1500
Kepala Tukang Kayu 0.1500
Mandor 0.0500
Tukang Kayu Setengah Terampil ( Bongkar ) 0.1200
Jumlah
1 M2 PEKERJAAN PASANGAN STOOT WERK
Kayu Stoot ( dinding 2x Pakai ) 50 % 9.0000
Papan Terentang ( 2x Pakai ) 0.0160
Paku 0.5000
Pekerja 0.1500
Tukang Kayu Terampil 0.2000
Kepala Tukang Kayu 0.2000
Mandor 0.0170
Jumlah
1 M3 PEKERJAAN LANTAI KERJA 1 PC : 3 PS : 5 KR
PC ( 50 kg ) 3.9560
Pasir Beton 0.5500
Split Pecah Mesin 2/3 0.9300
Pekerja 2.0000
Tukang Batu Setengah Terampil 0.5000
Kepala Tukang Batu 0.0500
Mandor 0.0100
Jumlah
Q PEKERJAAN INSTALASI LISTRIK, TELEPON & ANTENA1 TTK PEKERJAAN INSTALASI LISTRIK ( HANYA KABEL )
Kabel NYM 2,5 mm & 1,5 mm 0.1300
Pipa Listrik 0.5000
T Dus 2.0000
Tukang Listrik Setengah Terampil 0.5000
Tukang Listrik Terampil 0.5000
Jumlah
1 TTK PEKERJAAN PEMASANGAN STOP KONTAK
Stop Kontak 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN PEMASANGAN SAKLAR ENGKEL
Saklar Engkel 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN PEMASANGAN SAKLAR DOUBLE
Saklar Double 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN INSTALASI TELEPON ( HANYA KABEL )
Kabel Telepon 20.0000
Pipa Listrik 0.5000
T Dus 1.0000
Tukang Listrik Setengah Terampil 0.5000
Tukang Listrik Terampil 0.5000
Jumlah
1 TTK PEKERJAAN PEMASANGAN STOP KONTAK TELEPON
Stop Kontak Telepon 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN INSTALASI ANTENA TV ( HANYA KABEL )
Kabel Antena 20.0000
Pipa Listrik 0.5000
T Dus 1.0000
Tukang Listrik Setengah Terampil 0.5000
Tukang Listrik Terampil 0.5000
Jumlah
1 TTK PEKERJAAN PEMASANGAN STOP KONTAK ANTENA
Stop Kontak Antena 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN PEMASANGAN GANTUNGAN LAMPU DL
Gantungan Lampu Down Light 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 BH PEKERJAAN PEMASANGAN BOX MCB
Box MCB 1.0000
Tukang Listrik Setengah Terampil 0.2000
Tukang Listrik Terampil 0.2000
Jumlah
1 BH PEKERJAAN PEMASANGAN MCB
MCB 1.0000
Tukang Listrik Setengah Terampil 0.0500
Tukang Listrik Terampil 0.0500
Jumlah
1 TTK PEKERJAAN PEMASANGAN LAMPU TAMAN
Lampu Taman 1.0000
Tukang Listrik Setengah Terampil 0.5000
Tukang Listrik Terampil 0.5000
Jumlah
R PEKERJAAN INSTALASI AIR KOTOR & BERSIH (PLUMBING)1 M1 PEKERJAAN PIPA PVC DIAMETER 1/2"
Pipa PVC dia. 1/2" 0.2500
Pekerjaan Sambungan 0.5000
Tukang Batu Terampil 0.1000
Kepala Batu Kayu 0.0300
Mandor 0.0250
Jumlah
1 M1 PEKERJAAN PIPA PVC DIAMETER 3/4"
Pipa PVC dia. 3/4" 0.2500
Pekerjaan Sambungan 0.5000
Tukang Batu Terampil 0.1000
Kepala Batu Kayu 0.0300
Mandor 0.0250
Jumlah
1 M1 PEKERJAAN PIPA PVC DIAMETER 2,5"
Pipa PVC dia. 2,5" 0.2500
Pekerjaan Sambungan 0.5000
Tukang Batu Terampil 0.1000
Kepala Batu Kayu 0.0300
Mandor 0.0250
Jumlah
1 M1 PEKERJAAN PIPA PVC DIAMETER 3"
Pipa PVC dia. 3" 0.2500
Pekerjaan Sambungan 0.5000
Tukang Batu Terampil 0.1000
Kepala Batu Kayu 0.0300
Mandor 0.0250
Jumlah
1 M1 PEKERJAAN PIPA PVC DIAMETER 4"
Pipa PVC dia. 4" 0.2500
Pekerjaan Sambungan 0.5000
Tukang Batu Terampil 0.1000
Kepala Batu Kayu 0.0300
Mandor 0.0250
Jumlah
HARGA SAT. SAT. JUMLAH KETERANGAN 5 4 6 7
50,000 ORG 1,000
37,500 ORG 1,500
750 LS 750
M2 3,250
17,500 LBR 5,250
12,000 KG 456
3,500 LS 3,500
M1 9,206
65,000 LBR 234,000
17,500 M3 1,750
12,000 KG 7,200
15,000 KG 9,000
5,000 BH 250,000
41,000 ZAK 21,525
13,000 M3 702
15,000 LS 15,000
M2 539,177
12,350 M3 92,625
618,078 M3 231,779
125,129 M2 2,377,451
2,355,159 M3 883,185
12,350 M3 69,469
8,035 M3 15,066
150,000 BT 300,000
2,500 KG 22,500
110,000 M3 192,500
UNIT 4,184,574
50,000 ORG 375
37,500 ORG 563
125 LS 125
M2 1,063
65,000 LBR 45,500
17,500 M3 630
17,000 KG 3,400
15,000 KG 3,000
30,000 LS 30,000
M2 82,530
35,000 ORG 8,750
65,000 ORG 1,950
1,650 LS 1,650
M3 12,350
37,500 ORG 1,875
65,000 ORG 325
875 LS 875
M2 3,075
37,500 ORG 9,375
65,000 ORG 3,250
175 LS 175
M3 12,800
35,000 ORG 6,720
65,000 ORG 1,235
80 LS 80
M3 8,035
37,500 ORG 9,375
65,000 ORG 3,250
1,000 LS 1,000
M2 13,625
37,500 ORG 33,750
65,000 ORG 1,625
2,000 LS 2,000
M3 37,375
1 M1 PEKERJAAN PASANGAN BAMBU RUCUKAN (LEBAR 50 CM)
105,000 M3 126,000 Bambu
63,000 M3 25,200 Pekerja
35,000 ORG 39,375 Mandor
45,000 ORG 25,313
- ORG -
65,000 ORG 3,660 1 M1 ROLAGAN BATA
M3 219,547 BATA
Pekerja
Tukang Batu
739,600 M3 66,564
53,000 Btg 74,200 1.4 16.8 15,000 KG 3,000
45,000 ORG 18,000
50,000 ORG 10,000
- ORG -
65,000 ORG 325
M3 172,089
105,000 M3 126,000
63,000 ZAK 136,080
115,000 M3 46,000
35,000 ORG 78,750
45,000 ORG 50,625
- ORG -
65,000 ORG 1,099
M3 438,554
600 BH 39,000
63,000 ZAK 33,075
115,000 M3 6,210
35,000 ORG 11,263
45,000 ORG 8,123
- ORG -
65,000 ORG 540
M2 98,210
2,300 BH 28,750
63,000 ZAK 15,750
115,000 M3 6,210
35,000 ORG 6,318
45,000 ORG 8,123
- ORG -
- ORG -
M2 65,150
600 BH 42,000
63,000 ZAK 16,330
115,000 M3 6,670
35,000 ORG 11,263
45,000 ORG 8,123
- ORG -
65,000 ORG 540
M2 84,925
63,000 ZAK 14,918
115,000 M3 2,185
35,000 ORG 10,010
45,000 ORG 9,630
- ORG -
65,000 ORG 1,300
M2 38,043
63,000 ZAK 6,804
115,000 M3 2,185
35,000 ORG 7,000
45,000 ORG 9,630
- ORG -
65,000 ORG 1,300
M2 26,919
63,000 ZAK 6,804
115,000 M3 2,185
35,000 ORG 10,010
45,000 ORG 9,630
- ORG -
65,000 ORG 1,300
M2 29,929
60,000 M2 66,000
63,000 ZAK 7,560
115,000 M3 3,565
37,500 ORG 7,031
50,000 ORG 11,250
- ORG -
65,000 ORG 2,197
8,935 LS 8,935
M2 106,538
7,500,000 M3 225,000
37,500 ORG 33,750
50,000 ORG 75,000
50,000 ORG 10,000
65,000 ORG 1,300
450 LS 450
M2 345,500
3,500,000 M3 3,850,000
17,000 KG 98,600
35,000 ORG 105,000
45,000 ORG 225,000
50,000 ORG 100,000
65,000 ORG 325
M3 4,378,925
3,500,000 M3 3,850,000
17,000 KG 98,600
35,000 ORG 105,000
45,000 ORG 225,000
50,000 ORG 100,000
65,000 ORG 325
M3 4,378,925
3,500,000 M3 58,800
3,500 BT 2,800
17,000 KG 1,700
35,000 ORG 5,250
50,000 ORG 7,500
50,000 ORG 500
65,000 ORG 325
M2 76,875
3,500 BH 31,500
35,000 ORG 5,250
50,000 ORG 7,500
65,000 ORG 325
M2 44,575
8,000 BH 24,000
63,000 ZAK 20,160
115,000 M3 3,450
37,500 ORG 7,500 0
50,000 ORG 20,000
- ORG -
65,000 ORG 1,625
M1 76,735
27,500 BH 137,500
35,000 ORG 7,000
45,000 ORG 18,000
- ORG -
65,000 ORG 1,625
750 LS 750
M1 164,875
55,000 M3 13,750
17,000 KG 170
37,500 ORG 2,625
45,000 ORG 9,000
50,000 ORG 1,000
65,000 ORG 260
M1 26,805
1 M2 PEKERJAAN LANTAI 30X30
38,000 M2 38,000 Keramik WH 2 1.0000 36,000
63,000 ZAK 20,160 PC ( 50 kg ) 0.3200 63,000
115,000 M3 3,450 Pasir Pasang 0.0300 115,000
4,500 KG 59 Semen Warn 0.0130 4,500
37,500 ORG 7,031 Pekerja Teram 0.1875 37,500
50,000 ORG 18,750 Tukang Batu 0.3750 50,000
- ORG - Kepala Tukan 0.0750 -
65,000 ORG 1,222 Mandor 0.0188 65,000
M2 88,672 Jumlah
1 M2 PEKERJAAN KERAMIK DAPUR 20X20
35,000 M2 35,000 Keramik KIA 1.0000 35,000
63,000 ZAK 10,080 PC ( 50 kg ) 0.1600 63,000
115,000 M3 3,450 Pasir Lokal 0.0300 115,000
4,500 KG 59 Semen Warn 0.0130 4,500
37,500 ORG 7,031 Pekerja Teram 0.1875 37,500
50,000 ORG 18,750 Tukang Batu 0.3750 50,000
- ORG - Kepala Tukan 0.0750 -
65,000 ORG 1,222 Mandor 0.0188 65,000
M2 75,592 Jumlah
110,000 M2 110,000
63,000 ZAK 16,380
115,000 M3 3,450
4,500 KG 59
37,500 ORG 9,375
50,000 ORG 30,000
- ORG -
65,000 ORG 1,625
4,414 LS 4,414
M2 175,303
45,000 M2 45,000
63,000 ZAK 16,380
115,000 M3 3,450
4,500 KG 59
37,500 ORG 9,375
50,000 ORG 30,000
- ORG -
65,000 ORG 1,625
4,414 LS 4,414
M2 110,303
120,000 M2 120,000
20,000 M2 20,000
95,000 LBR 32,986
8,000 KG 1,600
18,000 KG 3,600
37,500 ORG 11,250
50,000 ORG 25,000
50,000 ORG 5,000
65,000 ORG 650
350 LS 350
M2 220,436
7,500,000 M3 225,000
20,000 M2 20,000
95,000 LBR 32,986
37,500 ORG 32,500
50,000 ORG 67,500
50,000 ORG 10,000
65,000 ORG 1,300
450 LS 450
M2 389,736
42,000 BT 21,210
63,000 ZAK 3,465
180,000 M3 1,800
4,500 KG 18
37,500 ORG 3,250
50,000 ORG 9,000
- ORG -
65,000 ORG 650
M1 39,393
65,000 BT 71,500
17,000 KG 425
37,500 ORG 938
50,000 ORG 5,000
50,000 ORG 500
65,000 ORG 650
M1 79,013
12,000 KG 3,000
15,000 BH 150
3,500 LBR 1,750
37,500 ORG 3,750
45,000 ORG 6,750
50,000 ORG 1,250
100,000 ORG 10,000
M2 26,650
12,000 KG 3,000
15,000 BH 150
3,500 LBR 1,750
37,500 ORG 7,500
45,000 ORG 13,500
50,000 ORG 1,500
- ORG -
M2 27,400
25,000 KG 4,175
40,000 KG 8,000
3,500 LBR 1,400
15,000 LT 2,250
5,000 BH 250
37,500 ORG 7,500
45,000 ORG 13,500
50,000 ORG 1,500
- ORG -
M2 38,575
35,000 KG 7,000
45,000 KG 15,750
24,000 KG 8,400
5,000 BH 50
12,000 LT 16,800
3,500 LBR 350
37,500 ORG 9,375
45,000 ORG 12,825
50,000 ORG 2,000
- ORG -
M2 72,550
35,000 KG 1,225
45,000 KG 3,375
24,000 KG 1,800
5,000 BH 50
12,000 LT 3,600
3,500 LBR 105
37,500 ORG 3,750
45,000 ORG 4,500
50,000 ORG 750
- ORG -
M1 19,155
35,000 KG 613
45,000 KG 1,688
24,000 KG 900
5,000 BH 25
12,000 LT 1,800
3,500 LBR 53
37,500 ORG 1,875
45,000 ORG 2,250
50,000 ORG 375
- ORG -
M1 9,578
1,800,000 M3 25,200
1,800,000 M3 6,300
17,000 KG 3,740
37,500 ORG 7,031
50,000 ORG 11,250
- ORG -
- ORG -
M2 53,521
54,000 LBR 18,900
3,000 KG 150
20,000 KG 1,000
37,500 ORG 7,500
50,000 ORG 7,500
- ORG -
- ORG -
M2 35,050
7,500,000 M3 187,500
17,000 KG 850
37,500 ORG 11,250
50,000 ORG 10,000
- ORG -
- ORG -
M2 209,600
7,500 BT 8,250
3,000 KG 1,500
37,500 ORG 938
50,000 ORG 2,500
- ORG -
- ORG -
M1 13,188
7,500,000 M3 8,250,000
17,000 KG 42,500
8,000 KG 8,000
37,500 ORG 150,000
50,000 ORG 750,000
- ORG -
- ORG -
M3 9,273,000
7,500,000 M3 375,000
8,000 KG 6,000
11,500 BT 46,000
37,500 ORG 22,500
50,000 ORG 130,000
- ORG -
- ORG -
M2 579,500
4,500,000 M3 67,500
55,000 LBR 110,000
8,000 KG 40
20,000 KG 4,000
37,500 ORG 11,250
50,000 ORG 75,000
- ORG -
- ORG -
M2 267,790 -
7,500,000 M3 127,500
8,000 KG 2,400
7,500,000 M1 168,750
11,500 BT 46,000
35,000 ORG 24,500
50,000 ORG 90,000
- ORG -
- ORG -
M2 459,150
7,500,000 M3 150,000
8,000 KG 4,800
11,500 BT 46,000
35,000 ORG 14,000
50,000 ORG 70,000
- ORG -
- ORG -
M2 284,800
7,500,000 M3 127,500
8,000 KG 2,400
11,500 BT 46,000
35,000 ORG 10,500
50,000 ORG 60,000
- ORG -
- ORG -
M2 246,400
7,500,000 M3 127,500
8,000 KG 2,400
150,000 M1 3,375
11,500 BT 46,000
35,000 ORG 24,500
50,000 ORG 90,000
- ORG -
- ORG -
M2 293,775
15,000 PS 15,000
50,000 ORG 15,000
- ORG -
- ORG -
PS 30,000
35,000 PS 35,000
50,000 ORG 15,000
50,000 ORG 1,000
65,000 ORG 975
PS 51,975
125,000 UNIT 125,000
50,000 ORG 40,000
50,000 ORG 2,000
65,000 ORG 2,600
UNIT 169,600
125,000 PS 125,000
50,000 ORG 10,000
50,000 ORG 1,000
65,000 ORG 650
PS 136,650
20,000 BH 20,000
50,000 ORG 5,000
50,000 ORG 1,000
65,000 ORG 1,300
BH 27,300
20,000 BH 20,000
50,000 ORG 7,500
50,000 ORG 1,250
65,000 ORG 1,625
BH 30,375
17,500 PS 17,500
50,000 ORG 5,000
50,000 ORG 1,500
65,000 ORG 1,625
PS 25,625
58,000 M2 58,000
50,000 ORG 2,500
50,000 ORG 1,750
65,000 ORG 1,625
M2 63,875
125,000 BH 125,000
63,000 ZAK 16,330
600 BH 42,000
180,000 M3 10,440
37,500 ORG 18,750
50,000 ORG 25,000
- ORG -
65,000 ORG 4,225
BH 241,745
75,000 BH 75,000
63,000 ZAK 10,030
180,000 M3 3,600
37,500 ORG 15,000
50,000 ORG 20,000
- ORG -
65,000 ORG 3,900
BH 127,530
25,000 BH 25,000
63,000 ZAK 10,030
180,000 M3 3,600
37,500 ORG 7,500
50,000 ORG 10,000
- ORG -
65,000 ORG 1,950
BH 58,080
1 BH PEKERJAAN KRAN BEBEK
35,000 BH 35,000 Stop Kran 1.0000 45,000
2,500 ZAK 625 Solatip 0.2500 2,500
37,500 ORG 1,125 Pekerja Teram 0.0300 37,500
50,000 ORG 1,500 Tukang Batu 0.0300 50,000
65,000 ORG 195 Mandor 0.0030 65,000
BH 38,445 Jumlah
50,000 BH 50,000 1 BH PEKERJAAN KRAN CABANG
2,500 ZAK 625 Stop Kran 1.0000 45,000
37,500 ORG 1,125 Solatip 0.2500 2,500
50,000 ORG 1,500 Pekerja Teram 0.0300 37,500
65,000 ORG 195 Tukang Batu 0.0300 50,000
BH 53,445 Mandor 0.0030 65,000
Jumlah
50,000 BH 50,000
53,000 ZAK 8,438
80,000 M3 1,600
37,500 ORG 7,500
50,000 ORG 10,000
- ORG -
65,000 ORG 1,950
BH 79,488
1,000,000 UNIT 1,000,000
37,500 ORG 9,375
50,000 ORG 12,500
- ORG -
65,000 ORG 2,600
UNIT 1,024,475
750,000 UNIT 750,000
37,500 ORG 9,375
50,000 ORG 12,500
- ORG -
65,000 ORG 2,600
UNIT 774,475
150,000 UNIT 150,000
37,500 ORG 9,375
50,000 ORG 12,500
- ORG -
65,000 ORG 2,600
UNIT 174,475
45,000 M2 45,450
120,000 M3 12,000
35,000 ORG 8,750
45,000 ORG 22,500
- ORG -
65,000 ORG 195
9,610 LS 9,610
M2 98,505
45,000 KG 45,000
53,000 ZAK 12,550
80,000 M3 1,520
37,500 ORG 9,295
50,000 ORG 9,630
- ORG -
65,000 ORG 1,300
M2 79,295
53,000 ZAK 14,575
80,000 M3 31,040
37,500 ORG 11,375
- ORG -
65,000 ORG 1,300
M2 58,290
110,000 M3 1,760
12,350 M3 7,904
98,210 M2 161,064
26,919 M2 44,147
72,600 M2 11,616
20,000 LS 20,000
BH 246,492
63,000 ZAK 365,400
190,000 M3 157,700
180,000 M3 97,200
35,000 ORG 87,500
45,000 ORG 22,500
- ORG -
65,000 ORG 650
8,650 LS 8,650
M3 739,600
63,000 ZAK 434,448
190,000 M3 153,900
180,000 M3 88,200
35,000 ORG 87,500
45,000 ORG 22,500
- ORG -
65,000 ORG 650
4,014 LS 4,014
M3 791,212
9,000 KG 9,450
15,000 KG 1,500
45,000 ORG 1,125
50,000 ORG 750
50,000 ORG 500
65,000 ORG 325
95 LS 95
KG 13,745
9,000 KG 9,450
15,000 KG 150
45,000 ORG 1,620
50,000 ORG 800
50,000 ORG 550
65,000 ORG 325
155 LS 155
KG 13,050
1,800,000 M3 30,600
350,000 M3 8,400
17,000 KG 6,800
35,000 ORG 4,200
50,000 ORG 7,500
50,000 ORG 7,500
65,000 ORG 3,250
45,000 ORG 5,400
M2 73,650
1,800,000 M3 30,600
95,000 LBR 32,965
17,000 KG 6,800
35,000 ORG 4,200
50,000 ORG 7,500
50,000 ORG 7,500
65,000 ORG 3,250
45,000 ORG 5,400
M2 98,215
1,800,000 M3 30,600
145,000 LBR 50,315
17,000 KG 6,800
35,000 ORG 4,200
50,000 ORG 7,500
50,000 ORG 7,500
65,000 ORG 3,250
45,000 ORG 5,400
M2 115,565
15,000 BH 135,000
350,000 M3 5,600
17,000 KG 8,500
35,000 ORG 5,250
50,000 ORG 10,000
50,000 ORG 10,000
65,000 ORG 1,105
M2 175,455
63,000 ZAK 249,228
180,000 M3 99,000
190,000 M3 176,700
35,000 ORG 70,000
45,000 ORG 22,500
- ORG -
65,000 ORG 650
M3 618,078
255,000 ROLL 33,150
10,000 BT 5,000
1,000 BH 2,000
45,000 ORG 22,500
50,000 ORG 25,000
TTK 87,650
11,000 BH 11,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 15,750
10,000 BH 10,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 14,750
13,000 BH 13,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 17,750
2,500 M1 50,000
10,000 BT 5,000
1,000 BH 1,000
45,000 ORG 22,500
50,000 ORG 25,000
TTK 103,500
35,000 BH 35,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 39,750
2,000 M1 40,000
10,000 BT 5,000
1,000 BH 1,000
45,000 ORG 22,500
50,000 ORG 25,000
BH 93,500
35,000 BH 35,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 39,750
40,000 BH 40,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 44,750
3,500 BH 3,500
45,000 ORG 9,000
50,000 ORG 10,000
UNIT 22,500
20,000 BH 20,000
45,000 ORG 2,250
50,000 ORG 2,500
BH 24,750
200,000 BH 200,000
45,000 ORG 22,500
50,000 ORG 25,000
BH 247,500
9,500 BT 2,375
8,000 BH 4,000
50,000 ORG 5,000
- ORG -
65,000 ORG 1,625
M1 13,000
12,500 BT 3,125
8,000 BH 4,000
50,000 ORG 5,000
- ORG -
65,000 ORG 1,625
M1 13,750
54,500 BT 13,625
8,000 BH 4,000
50,000 ORG 5,000
- ORG -
65,000 ORG 1,625
M1 24,250
74,500 BT 18,625
8,000 BH 4,000
50,000 ORG 5,000
- ORG -
65,000 ORG 1,625
M1 29,250
123,500 BT 30,875
8,000 BH 4,000
50,000 ORG 5,000
- ORG -
65,000 ORG 1,625
M1 41,000
1 M1 PEKERJAAN PASANGAN BAMBU RUCUKAN (LEBAR 50 CM)
1.0000 6,000 M1 6,000
0.0500 35,000 ORG 1,750
0.0100 65,000 ORG 650
M3 8,400
5.0000 2,300 M1 11,500
0.1000 35,000 ORG 3,500
0.1000 50,000 ORG 5,000
M3 20,000
-
-
-
-
-
M2 36,000
ZAK 20,160
M3 3,450
KG 59
ORG 7,031
ORG 18,750
ORG -
ORG 1,222
M2 86,672
M2 35,000
ZAK 10,080
M3 3,450
KG 59
ORG 7,031
ORG 18,750
ORG -
ORG 1,222
M2 75,592
BH 45,000
ZAK 625
ORG 1,125
ORG 1,500
ORG 195
BH 48,445
BH 45,000
ZAK 625
ORG 1,125
ORG 1,500
ORG 195
BH 48,445
PERHITUNGAN BETON BERTULANG
NO. URAIAN HASIL ANALISA HARGA SAT KETERANGAN
1 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 739,600 M3
2 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 791,212 M3
3 Hasil Analisa Pekerjaan Besi Beton U-24 13,745 KG
4 Hasil Analisa Pekerjaan Besi Beton U-39 13,050 KG
5 Hasil Analisa Pekerjaan Bekisting Papan 73,650 M2
6 Hasil Analisa Pekerjaan Bekisting Multiplex 9 mm 98,215 M2
7 Hasil Analisa Pekerjaan Bekisting Multiplex 12 mm 115,565 M2
8 Hasil Analisa Pekerjaan Stoot Werk 175,455 M2
A. KOLOM- Beton Site mix K-175 739,600 M3
- Besi Beton U-24 ; 50 x Hasil Analisa 687,250 M3
- Bekisting Papan ( 1 : 0,15 : 0,15 ) x ( 0,15 + 0,15 + 0,15 + 0,15 ) x HA 982,000 M3
- Stoot Werk 175,455 M3
Jumlah 2,334,180 M3
B. BALOK- Beton Site mix K-175 739,600 M3
- Besi Beton U-24 ; 75 x Hasil Analisa 1,030,875 M3
- Bekisting Papan ( 1 : 0,15 : 0,15 ) x ( 0,15 + 0,15 + 0,15 ) x Hasil Analisa 736,500 M3
- Stoot Werk 175,455 M3
Jumlah 2,682,430 M3
C. PLAT LANTAI- Beton Site mix K-175 739,600 M3
- Besi Beton U-24 ; 75 x Hasil Analisa 1,030,875 M3
- Bekisting Multiplex ( 1 : 0.12 ) x Hasil Analisa 409,229 M3
- Stoot Werk 175,455 M3
Jumlah 2,355,159 M3
D. SLOOF / PONDASI SETEMPAT- Beton Site mix K-175 739,600 M3
- Besi Beton U-24 ; 50 x Hasil Analisa 687,250 M3
- Bekisting Papan ( 1 : 0,15 : 0,2 ) x ( 0,2 + 0,2 ) x Hasil Analisa 491,000 M3
Jumlah 1,917,850 M3
E. RABAT BETON- Beton Site mix K-175 739,600 M3
- Besi Beton U-24 ; 50 x Hasil Analisa 687,250 M3
- Bekisting Multiplex ( 1 : 0.12 ) x Hasil Analisa M3
- Stoot Werk M3
Jumlah 1,426,850 M3
RENCANA ANGGARAN BIAYA PELAKSANAANMESJID SETIA BUDI
PERUMAHAN SETIA BUDI PASAWAHANPENGEMBANG : PT.SETIA BUDI PERSADA
NYANGKOWEK, SUKABUMI
NO. URAIAN PEKERJAAN VOLUME SAT
ANGGARAN BIAYA PEMBANGUNAN
A PEKERJAAN PENGECORAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali (0.6*0.6*0 3.02 M3
2 Pekerjaan Urugan Tanah Kembali ex. Galian 3.02 M3
3 Pekerjaan pemasangan cakar ayam 14.00 bh
4 Pekerjaan Sloof 10/15 2.00 M3
5 Pekerjaan Kolom 30/30 4.41 M3
6 Pekerjaan Ring Balok Struktur 15/25 4.00 M3
7 Pekerjaan Dak Beton t = 10 cm 13.50 M3
8 Pekerjaan Lisplank t=8cm tinggi=30cm 1.08 M3
9 Bongkaran keramik lama 1.00 Ls
10 keramik lantai di bawah dak-an 135.00 M2
11 Bongkaran Dak Existing 1.00 Ls
B PEMBUATAN WC PUTRI
1 Pekerjaan persiapan (bongkaran) 1.00 Ls
2 Pasangan bata 9.00 M2
3 Plesteran + acian 18.00 M2
4 Instalasi Air + Acecories 1.00 Ls
5 Keramik Lantai dan Dinding 18.00 M2
6 Pintu Pvc 1.00 bh
C PENAMBAHAN RUANG MESJID
1 Bongkaran kusen lama 1.00 Ls
2 Kusen 5.00 M1
3 Daun Pintu 1.00 bh
D PERBAIKAN GUDANG
1 Pengecetan ulang 60.00 M2
2 Kusen 5.00 M1
3 Daun Pintu 1.00 bh
E GAPURA DEPAN
1 Kolom 30*30 1.00 M3
2 Balok 15*25 0.50 M3
3 Cat 9.60 M2
F PAGAR LUAR
1 Pagar hollow 44.00 M2
F PEKERJAAN TAMBAHAN
1 Karpet Sajadah 85.00 M2
2 Mimbar 1.00 bh
3 Speaker sistem 1.00 Set
4 Pengecetan ulang ruang mesjid dalam 180.00 M2
L PEKERJAAN LUAR BANGUNAN
1 Pekerjaan Paving Depan 200.00 M2
TOTAL
TOTAL NILAI PEKERJAAN
CATATAN:
HARGA PER BULAN SEPTEMBER 2012
RENCANA ANGGARAN BIAYA PELAKSANAANMESJID SETIA BUDI
PERUMAHAN SETIA BUDI PASAWAHANPENGEMBANG : PT.SETIA BUDI PERSADA
NYANGKOWEK, SUKABUMI
HARGA SAT SUB TOTAL JUMLAH
12,350 37,346 n.galian 14 8,035 24,298
172,089 2,409,246
1,917,850 3,835,700
2,334,180 10,293,734 n.kolom 14 2,682,430 10,729,720
2,355,159 31,794,649 area dak 135 2,355,159 2,543,572 p. lisplank 45 320,000 320,000
88,672 11,970,686
640,000 640,000
74,598,951
480,000 480,000
65,150 586,350
38,043 684,781
1,000,000 1,000,000
86,672 1,560,092
200,000 200,000
4,511,223
80,000 80,000
80,000 400,000
400,000 400,000
880,000
26,650 1,599,000
80,000 400,000
400,000 400,000
2,399,000
2,334,180 2,334,180
2,682,430 1,341,215
26,650 255,840
3,931,235
350,000 15,400,000
15,400,000
50,000 4,250,000
1,000,000 1,000,000
2,000,000 2,000,000
26,650 4,797,000 1857250
12,047,000 1391800
105,000 21,000,000
21,000,000
TOTAL 134,767,409TOTAL NILAI PEKERJAAN #REF! 134,767,409
Bandung, 16 Mei 2013Dibuat Oleh,
Aditya Rahman, A.MdSite Manager
#REF!
OPNAMANMESJID SETIA BUDI
PERUMAHAN SETIA BUDI PASAWAHANPENGEMBANG : PT.SETIA BUDI PERSADA
NYANGKOWEK, SUKABUMI
NO. URAIAN PEKERJAAN VOLUME SAT
ANGGARAN BIAYA PEMBANGUNAN
A PEKERJAAN PENGECORAN
1 Pekerjaan Galian Tanah Pondasi Batu Kali (0.6*0.6*0 3.02 M3
2 Pekerjaan Urugan Tanah Kembali ex. Galian 3.02 M3
3 Pekerjaan pemasangan cakar ayam 14.00 bh
4 Pekerjaan Sloof 10/15 2.00 M3
5 Pekerjaan Kolom 30/30 4.41 M3
6 Pekerjaan Ring Balok Struktur 15/25 4.00 M3
7 Pekerjaan Dak Beton t = 10 cm 13.50 M3
8 Pekerjaan Lisplank t=8cm tinggi=30cm 1.08 M3
9 Bongkaran keramik lama 1.00 Ls
10 keramik lantai di bawah dak-an 135.00 M2
11 Bongkaran Dak Existing 1.00 Ls
B PEMBUATAN WC PUTRI
1 Pekerjaan persiapan (bongkaran) 1.00 Ls
2 Pasangan bata 9.00 M2
3 Plesteran + acian 18.00 M2
4 Instalasi Air + Acecories 1.00 Ls
5 Keramik Lantai dan Dinding 18.00 M2
6 Pintu Pvc 1.00 bh
C PENAMBAHAN RUANG MESJID
1 Bongkaran kusen lama 1.00 Ls
2 Kusen 5.00 M1
3 Daun Pintu 1.00 bh
D PERBAIKAN GUDANG
1 Pengecetan ulang 60.00 M2
2 Kusen 5.00 M1
3 Daun Pintu 1.00 bh
E GAPURA DEPAN
1 Kolom 30*30 1.00 M3
2 Balok 15*25 0.50 M3
3 Cat 9.60 M2
F PAGAR LUAR
1 Pagar hollow 44.00 M2
F PEKERJAAN TAMBAHAN
1 Karpet Sajadah 85.00 M2
2 Mimbar 1.00 bh
3 Speaker sistem 1.00 Set
4 Pengecetan ulang ruang mesjid dalam 180.00 M2
L PEKERJAAN LUAR BANGUNAN
1 Pekerjaan Paving Depan 200.00 M2
TOTAL
CATATAN:
HARGA PER BULAN SEPTEMBER 2012
OPNAMANMESJID SETIA BUDI
PERUMAHAN SETIA BUDI PASAWAHANPENGEMBANG : PT.SETIA BUDI PERSADA
NYANGKOWEK, SUKABUMI
HARGA SAT SUB TOTAL BOBOT PROSENTASEPROGRESS
XZ
12,350 37,346 0.028 100 0.028 n.galian
8,035 24,298 0.018 100 0.018
172,089 2,409,246 1.788 100 1.788
1,917,850 3,835,700 2.846 100 2.846
2,334,180 10,293,734 7.638 100 7.638 n.kolom
2,682,430 10,729,720 7.962 -
2,355,159 31,794,649 23.592 - area dak
2,355,159 2,543,572 1.887 - p. lisplank
320,000 320,000 0.237 -
88,672 11,970,686 8.882 -
640,000 640,000 0.475 -
480,000 480,000 0.356 -
65,150 586,350 0.435 -
38,043 684,781 0.508 -
1,000,000 1,000,000 0.742 -
86,672 1,560,092 1.158 -
200,000 200,000 0.148 -
80,000 80,000 0.059 -
80,000 400,000 0.297 -
400,000 400,000 0.297 -
26,650 1,599,000 1.186 -
80,000 400,000 0.297 -
400,000 400,000 0.297 -
2,334,180 2,334,180 1.732 -
2,682,430 1,341,215 0.995 -
26,650 255,840 0.190 -
350,000 15,400,000 11.427 -
50,000 4,250,000 3.154 -
1,000,000 1,000,000 0.742 -
2,000,000 2,000,000 1.484 -
26,650 4,797,000 3.559 - 1857250
1391800
105,000 21,000,000 15.582 -
TOTAL 12.318
#REF!
Bandung, 11 Juni 2013Dibuat Oleh,
Aditya Rahman, A.MdSite Manager