無断複製・転載禁止 東京電力ホールディングス株式会社 0 Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (as of December 31, 2019)

Upload: others

Post on 15-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 0

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet

(as of December 31, 2019)

Page 2: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 1

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-137

con

cent

ratio

n (B

q/L)

Existing ALPS (Cesium-137)告示濃度限度(90Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-137

con

cent

ratio

n (B

q/L)

Additionally installed ALPS (Cesium-137) 告示濃度限度(90Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

- - Limit for concentration required by law(90Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(90Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cesium-137 concentration)

Page 3: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 2

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-137

conc

entra

tion

(Bq/

L)

High-performance ALPS (Cesium-137) 告示濃度限度(90Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

- - Limit for concentration required by law(90Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cesium-137 concentration)

Page 4: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 3

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-134

conc

entra

tion

(Bq/

L)Existing ALPS (Cesium-134)

告示濃度限度(60Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-134

conc

entra

tion

(Bq/

L)

Additionally installed ALPS (Cesium-134)告示濃度限度(60Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cesium-134 concentration)

- - Limit for concentration required by law(60Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(60Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 5: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 4

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Ces

ium

-134

conc

entra

tion

(Bq/

L)High-performance ALPS (Cesium-134) 告示濃度限度(60Bq/L) 処理前

処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cesium-134 concentration)

- - Limit for concentration required by law(60Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 6: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 5

0.010.1

110

1001,000

10,000100,000

1,000,00010,000,000

100,000,0001,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

ntiu

m-9

0 co

ncen

tratio

n (B

q/L)

Existing ALPS (Strontium-90)告示濃度限度(30Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.010.1

110

1001,000

10,000100,000

1,000,00010,000,000

100,000,0001,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

ntiu

m-9

0 co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Strontium-90)告示濃度限度(30Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Strontium-90 concentration)

- - Limit for concentration required by law(30Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(30Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 7: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 6

0.010.1

110

1001,000

10,000100,000

1,000,00010,000,000

100,000,0001,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

ntiu

m-9

0 co

ncen

tratio

n (B

q/L)

High-performance ALPS (Strontium-90) 告示濃度限度(30Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Strontium-90 concentration)

- - Limit for concentration required by law(30Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 8: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 7

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Cob

alt-6

0 co

ncen

tratio

n (B

q/L)

Existing ALPS (Cobalt-60)告示濃度限度(200Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Cob

alt-6

0 co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Cobalt-60)告示濃度限度(200Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cobalt-60 concentration)

- - Limit for concentration required by law(200Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(200Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 9: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 8

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Cob

alt-6

0 co

ncen

tratio

n (B

q/L)

High-performance ALPS (Cobalt-60) 告示濃度限度(200Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Cobalt-60 concentration)

- - Limit for concentration required by law(200Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 10: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 9

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Antim

ony-

125

conc

entra

tion

(Bq/

L)Existing ALPS (Antimony-125)

告示濃度限度(800Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Antim

ony-

125

conc

entra

tion(

Bq/L

)

Additionally installed ALPS (Antimony-125)告示濃度限度(800Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Antimony-125 concentration)

- - Limit for concentration required by law(800Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(800Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 11: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 10

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Antim

ony-

125

conc

entra

tion

(Bq/

L)High-performance ALPS (Antimony-125) 告示濃度限度(800Bq/L) 処理前

処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Antimony-125 concentration)

- - Limit for concentration required by law(800Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 12: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 11

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rut

heni

um-1

06 c

once

ntra

tion

(Bq/

L)Existing ALPS (Ruthenium-106)

告示濃度限度(100Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rut

heni

um-1

06co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Ruthenium-106)告示濃度限度(100Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Ruthenium-106 concentration)

- - Limit for concentration required by law(100Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(100Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 13: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 12

0.1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rut

heni

um-1

06 c

once

ntra

tion

(Bq/

L)High-performance ALPS (Ruthenium-106) 告示濃度限度(100Bq/L) 処理前

処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Ruthenium-106 concentration)

- - Limit for concentration required by law(100Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 14: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 13

0.01

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Iodi

ne-1

29 c

once

ntra

tion

(Bq/

L)

Existing ALPS (Iodine-129)告示濃度限度(9Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Iodi

ne-1

29 c

once

ntra

tion

(Bq/

L)

Additionally installed ALPS (Iodine-129)告示濃度限度(9Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Iodine-129 concentration)

- - Limit for concentration required by law(9Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(9Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 15: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 14

0.01

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Iodi

ne-1

29 c

once

ntra

tion

(Bq/

L)

High-performance ALPS (Iodine-129) 告示濃度限度(9Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Iodine-129 concentration)

- - Limit for concentration required by law(9Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 16: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 15

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

100,000,000

1,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss β

con

cent

ratio

n (B

q/L)

Existing ALPS (Gross β) 処理前 処理前(ND)※1設備出口A 設備出口A(ND)※1設備出口B 設備出口B(ND)※1設備出口C 設備出口C(ND)※1

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

100,000,000

1,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss β

con

cent

ratio

n (B

q/L)

Additionally installed ALPS (Gross β) 処理前 処理前(ND)※1設備出口A 設備出口A(ND)※1設備出口B 設備出口B(ND)※1設備出口C 設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Gross β concentration)

● Prior to treatment 〇 Prior to treatment(ND) ※1■ Equipment outlet A □ Equipment outlet A(ND) ※1▲ Equipment outlet B △ Equipment outlet B(ND) ※1◆ Equipment outlet C ◇ Equipment outlet C(ND) ※1

● Prior to treatment 〇 Prior to treatment(ND) ※1■ Equipment outlet A □ Equipment outlet A(ND) ※1▲ Equipment outlet B △ Equipment outlet B(ND) ※1◆ Equipment outlet C ◇ Equipment outlet C(ND) ※1

Page 17: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 16

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

100,000,000

1,000,000,000

10,000,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss β

con

cent

ratio

n (B

q/L)

High-performance ALPS (Gross β) 処理前 処理前(ND)※1設備出口 設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Gross β concentration)

● Prior to treatment 〇 Prior to treatment (ND) ※1

■ Equipment outlet □ Equipment outlet (ND) ※1

Page 18: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 17

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Man

gane

se-5

4 co

ncen

tratio

n (B

q/L)

Existing ALPS (Manganese-54) 告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Man

gane

se-5

4 co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Manganese-54)告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Manganese-54 concentration)

- - Limit for concentration required by law(1,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(1,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 19: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 18

0.01

0.1

1

10

100

1,000

10,000

100,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Man

gane

se-5

4 co

ncen

tratio

n (B

q/L)

High-performance ALPS (Manganese-54) 告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Manganese-54 concentration)

- - Limit for concentration required by law(1,000Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 20: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 19

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

ntiu

m-8

9 co

ncen

tratio

n (B

q/L)

Existing ALPS (Strontium-89)告示濃度限度(300Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

nriu

m-8

9 co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Strontium-89)告示濃度限度(300Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Strontium-89 concentration)

- - Limit for concentration required by law(300Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(300Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 21: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 20

0.01

0.1

1

10

100

1,000

10,000

100,000

1,000,000

10,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31Stro

ntiu

m-8

9co

ncen

tratio

n (B

q/L)

High-performance ALPS (Strontium-89) 告示濃度限度(300Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Strontium-89 concentration)

- - Limits for concentrations required by law(300Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1

■ Equipment outlet□ Equipment outlet (ND) ※1

Page 22: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 21

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Tech

netiu

m-9

9 co

ncen

tratio

n (B

q/L)

Existing ALPS (Technetium-99)告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Tech

netiu

m-9

9 co

ncen

tratio

n (B

q/L)

Additionally installed ALPS (Technetium-99)告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Technetium-99 concentration)

- - Limit for concentration required by law(1,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(1,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 23: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 22

0.1

1

10

100

1,000

10,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Tech

netiu

m-9

9 co

ncen

tratio

n (B

q/L)

High-performance ALPS (Technetium-99) 告示濃度限度(1000Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Technetium-99 concentration)

- - Limit for concentration required by law((1,000Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 24: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 23

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rho

dium

-106

con

cent

ratio

n (B

q/L)

Existing ALPS (Rhodium-106)告示濃度限度(300000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rho

dium

-106

con

cent

ratio

n (B

q/L)

Additionally installed ALPS (Rhodium-106)告示濃度限度(300000Bq/L) 処理前処理前(ND)※1 設備出口A設備出口A(ND)※1 設備出口B設備出口B(ND)※1 設備出口C設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Rhodium-106 concentration)

- - Limit for concentration required by law(300,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

- - Limit for concentration required by law(300,000Bq/L)● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet A□ Equipment outlet A (ND) ※1▲ Equipment outlet B△ Equipment outlet B (ND) ※1◆ Equipment outlet C◇ Equipment outlet C (ND) ※1

Page 25: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 24

1

10

100

1,000

10,000

100,000

1,000,000

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Rho

dium

-106

con

cent

ratio

n (B

q/L)

High-performance ALPS (Rhodium-106) 告示濃度限度(300000Bq/L) 処理前処理前(ND)※1 設備出口設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Rhodium-106 concentration)

- - Limit for concentration required by law((300,000Bq/L)

● Prior to treatment〇 Prior to treatment (ND) ※1■ Equipment outlet□ Equipment outlet (ND) ※1

Page 26: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 25

0.01

0.1

1

10

100

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss α

con

cent

ratio

n (B

q/L)

Existing ALPS (Gross α) 処理前 処理前(ND)※1設備出口A 設備出口A(ND)※1設備出口B 設備出口B(ND)※1設備出口C 設備出口C(ND)※1

0.01

0.1

1

10

100

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss α

con

cent

ratio

n (B

q/L)

Additionally installed ALPS (Gross α) 処理前 処理前(ND)※1設備出口A 設備出口A(ND)※1設備出口B 設備出口B(ND)※1設備出口C 設備出口C(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Gross α concentration)

● Prior to treatment 〇 Prior to treatment(ND) ※1■ Equipment outlet A □ Equipment outlet A(ND) ※1▲ Equipment outlet B △ Equipment outlet B(ND) ※1◆ Equipment outlet C ◇ Equipment outlet C(ND) ※1

● Prior to treatment 〇 Prior to treatment(ND) ※1■ Equipment outlet A □ Equipment outlet A(ND) ※1▲ Equipment outlet B △ Equipment outlet B(ND) ※1◆ Equipment outlet C ◇ Equipment outlet C(ND) ※1

Page 27: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 26

0.01

0.1

1

10

100

2013/4/1 2013/12/3 2014/8/7 2015/4/10 2015/12/13 2016/8/15 2017/4/19 2017/12/21 2018/8/25 2019/4/28 2019/12/31

Gro

ss α

con

cent

ratio

n (B

q/L)

High-performance ALPS (Gross α) 処理前 処理前(ND)※1設備出口 設備出口(ND)※1

※ 1 “ND” means that concentrations were below detectable limits.

Radiation concentrations measured at the multi-nuclide removal equipment (ALPS) outlet (Gross α concentration)

● Prior to treatment 〇 Prior to treatment (ND) ※1■ Equipment outlet □ Equipment outlet (ND) ※1

Page 28: Radiation concentrations measured at the multi …...〇Prior to treatment (ND) ※1 Prior to treatment Equipment outlet (ND) ※1 Equipment outlet Radiation concentrations measured

無断複製・転載禁止 東京電力ホールディングス株式会社 27

10,000

100,000

1,000,000

10,000,000

2011/3/1 2012/6/4 2013/9/8 2014/12/13 2016/3/18 2017/6/22 2018/9/26 2019/12/31

Triti

um c

once

ntra

tion

(Bq/

L)Tritium (H-3) 告⽰濃度限度(60,000Bq/L)

H-3(RO装置⼊⼝)

※ 1 “ND” means that concentrations were below detectable limits.

[Reference] Tritium (H-3) concentration trends at desalination (RO) equipment inlets

- - Limit for concentration required by law(600,000Bq/L)

● Tritium(desalination (RO) equipment inlets)