railway transport facilitation in mongolia 201 Албан хэрэгцээнд railway transport...

23
www.mrt.gov.mn 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of Roads and Transportation “Regional meeting on Cooperation for Facilitation of International Railway Transport” Bangkok, 13-15 October 2014

Upload: doankien

Post on 30-Mar-2018

242 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

www.mrt.gov.mn 201

Албан хэрэгцээнд

RAILWAY TRANSPORT FACILITATION IN MONGOLIA

Ministry of Roads and Transportation

“Regional meeting on Cooperation for Facilitation of International Railway Transport”

Bangkok, 13-15 October 2014

Page 2: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

STATE POLICY ON RAILWAY TRANSPORTATION(Parliament Resolution No.32, June 24, 2010)

Phase I - appr. 1100 kmPhase II - appr. 900 kmPhase III - appr. 3600 km

Existing railways

New railway project

Page 3: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Mining industry

100tn mining products from major 3 mining deposits, Tavan tolgoi, Oyu tolgoi and Nariin sukhait to export by 2020.

Page 4: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|4р

Railway development strategy: UBTZ development plan (2015-2020)Ministry of Roads and Transportation

North/Erdenet – Arts suuri, 770 км/

• Erdenet– Ovoot (545 км)• Оvoot– Аrts suuri (225 км) • Darkhan – Erdenet

WestWestern corridor

Central /Sukhbaatar–Zamiin-Uud 1110 км/

• Sukhbaatar–Zamiin-Uud- 100 million ton,

• Bogdkhan railway

East/Choibalsan – Ereentsav, 239 км/• Choibalsan – Ereentsav rail

rehabilitation and reconstructionto relate “New railway” project

Page 5: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|5

• Wagon - 6,577

• Locomotive - 182

• Freight transportation - 21.0 million ton

• Passenger transportation- 3.7 million persons

• Human resource• UBTZ - 15,002 • MTZ - 1,568

• Income - 310.1 billion MNT

• Ashig - 2.4 billion MNT

• Total rail line– 1,908 км

Ministry of Roads and Transportation

• Stations• UBTZ - 80 • Bold tumur yuruu

gol - 5

CURRENT RAILWAY SECTOR: General information

Page 6: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Ministry of Roads and Transportation

|6Төмөр замын тээврийн б

CURRENT RAILWAY SECTOR: FREIGHT TRANSPORTATION(1951-2013)

0.561.11

3.912.38

4.72

6.86

9.78

15.03

19.8

14.52

7.33

9.18

15.5716.8

21.04

0

5000

10000

15000

20000

25000

/mil.tn/Дотоод Экспорт

Page 7: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|7

Coal36%

Iron ore26%

Construction material 10%

Petroleum 8%

Container5%Copper

4%

Food 3%

Color andblackiron3%

Spar,coke2%

Other1%

Chemical1%

Wood, wooden goods

1%

Net weight of freight transportation/as of 2013/

CURRENT RAILWAY SECTOR: FREIGHT TRANSPORTATION (2014)Ministry of Roads and Transportation

Page 8: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|8Төмөр замын тээврийн б

0.06 0.080.43

0.741.07

1.42

2.1

2.722.83

4.294.84

3.523.76

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

/mill.person/

0.44

4.34

CURRENT RAILWAY SECTOR: PASSENGER TRANSPORTATION (1951-2013)

Ministry of Roads and Transportation

Page 9: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Existing legal basisFor Mongolia:

Law on Railway transport – 2007State policy on Railway transportation – 2010

For international railway transport: 

Membership in OSJD – SMGS, SMPS‐ “International Agreement on Freight Traffic Relations”, OSJD‐ “International Agreement on Passenger Traffic Relations”, OSJD ‐ Other Common Rules and Regulations for Railway Transport

UICTIR ConventionUNESCAP   ‐ Joint statement on Future Development of Euro‐Asian Transport links

‐ Joint Declaration on the promotion of Euro‐Asian rail transport and  activities towards unified railway law

Mutual agreement: Cross border railway agreement with China – 1955Cross border railway agreement with Russia – 1980

Ministry of Roads andTransportation

Page 10: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|10

Төмөр замын тээврийн б

34 million tn/yeat

21 million tn/year

2020 

Year >100 million tn

• Double track• Electrification

Decision by “UBTZ” General committee on 2013.11.06 for modernization with amount of 

256 million USD

2013  20 15increase60%

RAILWAY DEVELOPMENT STRATEGY: UBTZ TECHNICAL sMODERNIZATION (2013-2020)Ministry of Roads

And Transportation

“AGREEMENT FOR PARTNERSHIP IN UBTZ MODERNIZATION AND 

DEVELOPMENT STRATEGY” 2014.09.03

Page 11: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Transit Mongolia /2008/

• “Trilateral conference” on transit railway transportation passing through Mongolia, Russia and China in December 2013 and 3 countries concluded a “Joint statement”

• “Transit Mongolia” forum was held and conditions for transit transportation through Mongolia railway were introduced. 

Ministry of Roads and Transportation

Page 12: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|12

Sainshand

Darkhan

Transit from Russia to China

6 million ton/year

Ovoot coking coal deposit : 10 million

ton/year

Tuva, Elista coal mining deposit, Russia: 15

million ton/year

Transit from China to Russia/Europe

3 million ton/year

Railway Development Strategy: NORTHERN FREIGHT FLOWMinistry of Roads and Transportation

Page 13: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|13

ОХУ

Улаанбаатар

Салхит

Дархан

Багахангай

Чойр

Замын-Үүд

Сайншанд

Сүхбаатар

Existing railway

Proposed line

Track length: 1,071 км

Completed: Feasibility study /comparison with 1520mm and 1435mm gauges/

Railway development strategy: FEASIBILITY STUDY FOR SECOND RAILWAY (2007)Ministry of Roads

and Transportation

Page 14: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

|14

Төмөр замын тээврийн б

EXISTING RAIL

Bogdkhan rail

RASHAANT

MAANIT

ULAANBAATAR

149.1 км

- 167 км

Railway Development Strategy: BOGDKHAN RAILWAY PLANNINGMinistry of Roads and Transportation

Page 15: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Access to seaports

Page 16: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Trans asian railway corridor

Ekaterinburg

Astana

Óðóìчè

Óâåé

Lyaniyunigan

Ulaanbaatar

Beijing

DalyanTyanitszini

Õàðáèí

ÊàðûìñêàÿÇàóäèíñêèé çàâîä

Irkutsk

6488 кмEkaterinburg – AStana – Urumchi– Ubei - Lyaniyunigan

6723 кмEkaterinburg –Irkutsk – Carimskaya – Kharbin – Dalyan

5975 кмEkaterinburg –Irkutsk – Ulaanbaatar – Beijing – Tyanitszini

16

Page 17: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Tariff, USD/1ton‐km

RJDMongolianrailway KJD KZK

Coal 0,011 0,014 0,031 0,038

Petroleum 0,038 0,027 0,033 0,043

Container 0,015 0,031 0,039 0,028

Wood 0,019 0,017 0,026 0,031

Cross border rail transport: “Flexible tariff”

Page 18: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

l 18“Транзит тээвэр 2014” 

Үнэ

Хэмжээ0 3 сая тн

1 сая тн

0,5 сая тн

2 сая тн

“Strict term”

Zamiin-Uud

Sukhbaatar

Zamiin-Uud

Sukhbaatar

Russia to China

36 hours

40 hours

China to Russia

Page 19: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

“Single window” serviceGeneral Administration for Cross Border ‐ 2014

Custom

General agency for specialized inspection

Border military Inspection

Single window service

Single window service

Page 20: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Zone‐2: 70Т GANTRY CRANE OPERATIONAL AREA

Zone‐3: Open Warehouse 

Zone‐1: 50T CRANE 4 RAILWAY ACROSS 

Zone‐3Enclosed Warehouse 

Multimodal Logistics Center in Zamiin-Uud cross border

Freight capacity 5 mill. ton/ year

Financing 71,64 million USD

Operation 2016

After completion of this project Zamyn‐Uud border point’s freight turnover will increase 80 percent, transportation delay time or congestion will decrease 50 percent  in 2018  comparing  with in 2009.

Page 21: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Major challenges in cross border and transit railway

• Gauge difference – 1520 and 1435mm • Cost of tariffs • Length of documentation• Railway transit period for passing through Mongolia• Customs and rolling stock sealing • Development of multimodal transportation modes and logistics centers• Coal transportation through the cross border

- Frequency of freight transshipment at the border- Environmental damages- Time consuming- Expensive for vehicle transportation

• Lack of capacity, track, site and efficiency of technology at the transshipment center and stations

• Freight interlock affects development of stations, freight terminals and operation of logisitcs companies

Ministry of Roads and Transportation

Page 22: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Further actions needed: 

• Interconnection of customs

• Introduction of common standard/system for freight entry

declaration

• Real time information

• Flexible tariffs /apply potentially domestic tariff for regional

transit, especially through China, Mongolia and Russia/

• Agree with Border cross technology for certain distance and

transport modes with common interested conditions

Ministry of Roads and Transportation

Page 23: RAILWAY TRANSPORT FACILITATION IN MONGOLIA 201 Албан хэрэгцээнд RAILWAY TRANSPORT FACILITATION IN MONGOLIA Ministry of

Thank you for attention.

Ministry of Roads and Transportationof Mongolia

|23

Төмөр замын тээврийн б