RAPIDAluminium column formwork
Edition 02/2008
Assembly instructions for standard application
-
8/11/2019 RAPID Kasutujuhend ENG
2/28
-
8/11/2019 RAPID Kasutujuhend ENG
3/28 Legend
Important safety Hints Visual Check Site Tips
Page
Overview 1
Introduction 2Product features 2Intended use 2Safety instructions 3
Standard application
A1 Basic assemblyCutting-to-size of the formlining 4Formlining assembly with chamfer strip 4-5Formlining projection 5Sharp-edged solution 5Assembling the formwork halves 6
Crane lifting unit 6Push-pull props 7
A2 Safety systemConcreting platform 8Ladder access 9
A3 ShutteringPositioning the formwork 10Closing the formwork 11
A4 Application
Striking, moving 12Oversized cross-sections 13Height adjustment up to 8.10 m 14
A5 MiscellaneousMaintenance and Cleaning tips 15List of materials for the access ladder 16
Components 18-21
Contents
-
8/11/2019 RAPID Kasutujuhend ENG
4/28
4
3
21
5 22
23
2425
27
21
26
11 121314
A1 Overview
RAPID column
1 Column frame
2 Corner profile with column
tie bolt and locking pin
3 Formlining
4 Chamfer strip
5 Crane lifting unit
Access ladder
21 Ladder connector Rapid
22 Access ladder 180/2
23 Ladder 180/6
24 Ladder hook
25 Ladder base
26 Ladder safety cage 75
Concreting platform (complete)
11 Concreting landing
12 Handrail 134 or 52
13Crane hook
14 Cam nut DW 15
-
8/11/2019 RAPID Kasutujuhend ENG
5/282
These Assembly Instructions havebeen prepared in order to ensurecorrect assembly and safe use.
They describe the standard applicationof the PERI column formwork, RAPID,based on H = 3.0 m.
Introduction
The cross-section for square orrectangular-shaped columns is createdcontinuously using the wind millprinciple. Column frames are availablein three heights. They can be combinedwith each other and height incrementsof 30 cm are possible.
The access ladder with ladder safetycage and concreting platform form thesafety system for the PERI RAPID.It can be used for closing the column
formwork. Connections for push-pullprops and kicker braces are likewiseavailable in the system.
Care of the formwork is made simplerthrough the attachment of the cranelifting unit or concreting platform. Largedeposits of concrete are preventedfrom forming and any residual concreteis easily removed due to the powdercoating.
These assembly instructions containdetails regarding the intended use ofthe RAPID column formwork fromPERI. Safety instructions and loadspecifications must be observed at all
times.
Special permission must be givenby PERI if the formwork is to be usedfor applications other than thatwhich it has been designed for,together with supplementaryassembly instructions.
Product features
PERI RAPID is the column formworkfor joint-free architectural concrete
Basic assembly takes place with thecolumn frames in a horizontal positionand without the use of a crane. Theformlining sheets are cut to size andare clamped from above to the columnframework by means of clampingprofiles. With extended column frames,the formlining sheet can be fitted overthe element joint itself. Chamfer strips
are simply inserted between sheetingand clamping profile. Creation of sharp-edged column cross sections is alsopossible.
Two column frames with the integratededge connections are connected usingthe column tie yoke to form oneformwork half, fitted with appropriatesystem parts and then placed intoposition.
The intended use is presented in thebasic assembly instructions and theapplication of the safety equipment.
In addition, these assembly instructionsare supplemented by informationconcerning appropriate maintenancemeasures
Dimensions without any unit ofmeasurement are to be taken as cm.
The programme overview whichfollows at the end provides a detailedlook at all system componentscomplete with dimensions and itemnumbers. If you should have anyquestions, please contact your localPERI representative.
Technical data:Permissible fresh concrete pressure:120 kN/m2
Formlining:21 mm for chamfered columns30 mm for sharp edged columns
Column frame made of aluminium
Column cross-sections:square or rectangular-shaped
up to 60 x 60 cmSharp-edged columns:up to 58 x 58 cmOver-sized cross-sections from85 x 85 to 130 x 130 cm
Powder-coated column frame:H = 3.0 m, 2.10 m, 0.60 m
Intended use
Basically, only materials in perfectcondition may be used. Damagedcomponents must be replaced.
All valid laws and safety regulations
must be observed when using ourproducts.
This product is intended for commercialuse only.
These assembly instructions as wellas PERI offer and implementationplans do not replace specificconstruction site work and assemblyinstructions.
-
8/11/2019 RAPID Kasutujuhend ENG
6/28
-
8/11/2019 RAPID Kasutujuhend ENG
7/283
Care instructions for the formlinig
Concrete immersion vibrator withrubber cap minimizes possible damageto the formlining.
Spacers for the reinforcement withlarge support area minimizesindentations and markings.
Other regulationsIn particular, this currently includes: Operational Safety Regulations
(BetrSichV) Technical Regulations for Operational
Safety (TRBS)
AdditionalPERI product information PERI formwork technology design
tables
PERI RAPID brochure
Safety instructions
These assembly instructions areintended for those persons who work
with PERI RAPID column formwork.Non-observance of assemblyguidelines and safety instructions canlead to accidents and damage tomaterials.
Responsibilities of the user:
1. The user must ensure that allrequired instructions are at theoperators disposal (including theofficial assembly instructions).
2. All persons working with the
product must be familiar with thecontent of these instructions andsafety information.
3. The user must ensure that alloperators have a full and completeunderstanding of these instructionsand safety information.
4. The user must ensure thatassembly, adjusting anddismantling work carried out, aswell as correct use of the product,is supervised by trained andauthorised personnel.
5. The user is obliged to provide allrequirements to ensurecompliance with all applicablesafety regulations.
Safety information
1. All RAPID components are to bechecked before every use to makesure they are in perfect workingcondition!Damaged parts are to bereplaced by PERI originalcomponents!
2. All loads arising during the intendeduse must not be exceeded!
3. All load effects on the RAPIDformwork must be safelytransferred!
4. Stability must be guaranteedthroughout all building phases!
5. Never remove any safetyequipment!
6. Safe access ways must beprovided for site personnel to reachall working areas!
7. Working areas must have suitablesafety barriers to prevent sitepersonnel falling to the ground!
8. All openings must be fitted withsafety barriers!
9. Avoid using in areas of risk duringunfavourable weather conditions!
10. Striking is only to take place whenthe concrete is hard enough andsite management has given thego-ahead!
11. Striking or moving are to be carried
out using suitable tools andequipment! Do not tear awayformwork elements from theconcrete with the crane!
12. Remove all non-captivecomponents!
13. Equipment should not be usedin strong winds!
14. Remove lifting accessories from alowered formwork component orunit only when it is in a stablecondition!
-
8/11/2019 RAPID Kasutujuhend ENG
8/284
A1 Basic assembly
Formlining assembly with chamferstrip
Cutting-to-size of the formlining
Plywood sheet: 21 mm
Horizontal formwork joints must bearranged on the lateral struts of theframes.
Width of plywoodExample:
Column width 55 cm 550 mm- reduction in size 8 mmCutting width of formlining 542 mm
Fig.1
Fig. 1
Fig. 2b
1. Place column frames on assemblytrestles. Fig.2a
Column width - 8 mm
SW 30
Fig. 2a
Fig. 2c
3. Mount plywood sheet and insert in theguide. Fig.2c
2. Bolt column frames together accordingto the required length (SW 30). Fig.2b
-
8/11/2019 RAPID Kasutujuhend ENG
9/285
Sharp-edged solutionMax. cross-section dimensions580 x 580 mm.For forming without chamfer strips,a 30 mm thick plywood sheet isrequired which has been milledaccordingly. Fig.6
Width of plywood sheetExample:
Column width 550 mm
+ increase in size 12 mmCutting width of formlining 562 mm
It is held in position with the clampingprofile and guide. Fig.6aSecure plywood sheet against slipping.
A1 Basic assembly
Formlining assembly with chamferstrip
4. Position chamfer strip next to theplywood sheet. Fig.3
5. Push clamping profile over chamferstrip. Fig.3a
6. Tighten by means of G-clamps. Fig.4
7. Clamp in position the plywood sheetand chamfer strip with clamping profile.(SW 17 socket wrench)
8. Remove G-clamps.
9. Nail plywood sheet to prevent slipping.Use drilled holes in the guide. Fig.3a
Install plywood sheets in additionalcolumn frames in the same way.
Fig. 3a
Formlining projection
below approx. 40 mm above max. 200 mm with crane lifting
unit Fig.5
Fig. 3
Fig. 4
max.40
max.200
Fig. 5
30
8 8
8
6
5
Fig. 6a
Fig. 6
Dimensions in mm
Column width + 12 mm
-
8/11/2019 RAPID Kasutujuhend ENG
10/286
A1 Basic assembly
Assembling the formwork halves
1. Place second pre-assembled column
frame on first column frame. Fig.7
2. Insert column tie yokes through thecorner connection.
3. Peg out using the locking pin in theperforated profile.
4. Tighten with nut. Fig.7a
5. Assemble second formwork half in thesame way.
Fig. 7
Fig. 7a
Crane lifting unit
One crane lifting unit per column frame,however not with the concretingplatform.(The crane lifting unit is already attachedhere to the concreting platform).
1. Loosen bolt, SW 30, in the column
frame.
2. Position crane lifting unit on the frameand secure with the bolt, SW 30.Fig.8 + 8a
Fig. 8
Fig. 8a
SW 30
-
8/11/2019 RAPID Kasutujuhend ENG
11/287
A1 Basic assembly
Push-pull props
Mount 3 push-pull props to ensurestability!
Mount three brace connectors on oneformwork half. Fig.9
1. Pull out locking pins.
2. Fasten brace connector to perforatedprofile.
3. Insert brace connector in the perforated
profile and peg out with locking pins.Fig.9a
4. Fix push-pull prop and kicker bracewith bolts and cotter pins. Fig.10
Fig. 9
Fig. 9a
Fig. 10
-
8/11/2019 RAPID Kasutujuhend ENG
12/288
a
b
c
SW 30
A2 Safety system
Concreting platform
The concreting platform is assembled
on horizontally-positioned columnhalves lying on the ground
1. Remove cam nut of the crane eye.
2. Remove bolt (SW 30) in the columnelement.
3. Position platform by hand on its edgedirectly against the formwork half.
4. Insert locking pin of the crane eyethrough the hole aof the columnelement and screw on cam nut.
5. Same procedure using hole b.
6. Align telescopic beam with hole candmount third crane eye. Fig.11
7. Install guardrails. Fig.12
Fig. 11
Fig. 12
-
8/11/2019 RAPID Kasutujuhend ENG
13/289
SW 19
SW 19
Ladder access
The access ladder is assembled on
horizontally-positioned column halveslying on the ground.
1. Place ladder connection on frame andpeg out in the perforated profile withbolts. Fig.13
2. Pre-assemble ladder: connect access ladder 180/2 with
ladder 180/6, SW 19. Depending onthe height required, attach additionalladders 180/6.
mount ladder base and ladder hook onbottom ladder, SW 19. Fig.14
3. Attach the pre-assembled ladder withthe clamping plates to the ladderconnections, SW 19.
4. Mount ladder safety cage 150 or 75
with clamping plates according to plan.Clear spacing between the laddersafety cage elements 30 cm.
Visual check of the clamping plates.The contact surface must lie againstthe ladder profile.
5. For high columns:
Likewise install an access ladder forclosing the formwork in the oppositeformwork half.
A2 Safety system
Fig. 13
Fig. 14
Fig. 15
-
8/11/2019 RAPID Kasutujuhend ENG
14/2810
A3 Shuttering
Positioning the formwork
Always erect the formwork half withthe concreting platform first.
Locating boards make it easier to alignthe formwork.
Formwork halves with concretingplatform (placing formwork)
1. Attach 3-sling lifting gear to crane eyes,lift formwork to a vertical position andtransport to place of use.
Fig.16
2. Position formwork halves againstlocating boards. Fig.17
3. Fix base plates of push-pull props andkicker braces to load-bearingfoundations/slab, e.g. with PERI MultiMonti. Fig.18
4. Check stability and make anynecessary adjustments.
5. Remove crane lifting gear.
The first formwork half is now inposition.
Fig. 16
Fig. 17
Fig. 18
-
8/11/2019 RAPID Kasutujuhend ENG
15/2811
A3 Shuttering
Positioning the formwork
6. Attach lifting unit to crane eyes, lift2nd formwork halve to a verticalposition and transport to place of use.
7. Position this formwork half againstlocating boards. Fig.19
Closing the formwork
Use a second access ladder for highercolumns.
When closing the formwork, start atthe bottom and work upwards.
1. Insert column tie yoke through thecorner connection.
2. Peg out in the perforated profile withlocking pins.
3. Tighten with nut. Fig.20
4. Remove crane lifting gear.
The formwork is now in position.
Fig. 19
Fig. 20
-
8/11/2019 RAPID Kasutujuhend ENG
16/2812
A4 Application
Striking, moving
Push-pull props, concreting platformand access ladder remain attached.
Formwork is opened from top tobottom.
The corner connections remainattached to the column frames (noindividual components).
Formwork halves without push-pullprops
1. Attach crane lifting gear to the non-supported formwork half and tension.
2. Separate corner connections betweenthe formwork halves: pull locking pinsand pull back column tie yokes.Fig.21
Use second access ladder.
3. Place formwork half on ground forcleaning.
Formwork halves with push-pullprops
1. Connect lifting gear to crane eyes ofthe concreting platform.
2. Remove base plates of push-pull propsand kicker braces from ground.
3. Place formwork half on ground forcleaning and secure.
Fig.21
Fig. 21
-
8/11/2019 RAPID Kasutujuhend ENG
17/2813
A4 Application
Oversized cross-sections
Cross-sections from 85 x 85 cm to
130 x 130 cm
For oversized cross-sections, amaximum of two column frames(length and width) are connected witheach other. Connections are carriedout using the TRIO BFD alignmentcoupler.
1. For bracing, mount walers to every
perforated profile with column tie yokesand locking pins.
2. Insert anchor ties in the centre at thesame height as the walers.
Example Fig.22
Fig. 22
No. of pieces for each height
SRZ 120 U100
Height
BFD alignment coupler
steel walerColumn Frame 300 5 4
Column Frame 210 4 3
Column Frame 60 1 1
-
8/11/2019 RAPID Kasutujuhend ENG
18/2814
A4 Application
Height adjustment up to 8.10 m
With three frame heights, height
adjustments are possible in 30 cmincrements.
Combination examples: Fig.21
The column frames are connectedusing M20 x 50 bolts (SW 30).Each RAPID frame is equipped withthese bolts Fig. 2b.
Larger heights are possible.
Height Column Frame
[m] 300 210 60
2.10 - 1 -
2.70 1 1
3.00 1 - -
3.30 - 1 2
3.60 1 - 1
3.90 - 1 3
4.20 - 2 -
4.50 - 1 4
4.80 - 2 1
5.10 1 1 -
5.40 - 2 2
5.70 1 1 1
6.00 2 - -
6.30 1 1 2
6.60 2 - 1
6.90 1 1 3
7.20 2 - 2
7.50 1 1 4
7.80 2 - 3
8.10 2 1 -
-
8/11/2019 RAPID Kasutujuhend ENG
19/2815
A5 Miscellaneous
Maintenance tips
What needs to be done?
1. Spray formwork on all sides before first use witha release agent e.g. PERI BIO Clean.
2. Spray formlining every time after striking with PERIBio Clean, then clean.
3. For longer storage periods, e.g. bad weather, storeformwork materials in clean condition and sprayed.
4. Spray (grease if necessary) all moving partsregularly with a release agent.
5. Transport elements with suitable as well as safetransportation and lifting gear.
6. Ensure elements and accessories are properlystored.
7. Do not throw or drop accessories.
8. Never use unnecessary force during assemblyand dismantling.
Cleaning tips
Ensure elements are in a secure position duringcleaning!Cleaning of elements still attached to the craneis not allowed!Remove concrete surplus!
1. Immediately after concreting, spray the rear side
of the formwork with water.
2. After striking has taken place, spray formwork allover with PERI Bio Clean.
3. Remove nails, battens etc. from the plywoodbefore any mechanical cleaning.
4. Mechanically clean the elements using suitableequipment e.g. scraper.
5. Brush clean the elements after mechanical
cleaning. Remove dust and loosened concretesurplus.
6. After shuttering, element may require sprayingagain.
Why?
Provides good protection against sticking andcorrosion before first dirt accumulation.
Helps to remove concrete surplus and makes cleaningeasier. Removing by force or scraping off is notnecessary. Formlining and coating remain intact.
The frame is protected against corrosion andweathering.
Removes rust, prevents corrosion and keeps partsin good working order.
Avoids damage through improper transportation.
Prevents damage to the element frame andaccessories. Damage to the formlining throughindentations is avoided.
Maintains the functionality of the parts.
Maintains the functionality of the parts.
Concrete has not yet hardened and can easily be
removed. This reduces the amount of cleaningrequired.
Penetrates the concrete surplus, breaks it up andmakes subsequent mechanical cleaning much easier.
Unnecessary enlargement of nail holes and damageto the formlining is avoided. No damage to cleaningequipment.
Formlining surface is clean for the next use.
-
8/11/2019 RAPID Kasutujuhend ENG
20/2816
A5 Miscellaneous
List of materials for the accessladder
For higher columns, mount twoaccess ladders!
Ladder access A:withaccess to the concreting platform
Ladder access B:withoutaccess to the concretingplatform, only for connecting the two
formwork halves
For heights of 7.80 m and more, werecommend the use of two concretingplatforms
Ladder access B Ladder access A
Item no. Description A* B* A* B* A* B* A* B* A* B* A* B*
037400 Concreting Platform, complete 1 0 1 0 1 0 1 0 1 0 1 0
051410 Ladder 180/6 2 2 2 2 3 3 4 4 5 5 6 6
103724 Access Ladder 180/2 1 0 1 0 1 0 1 0 1 0 1 0
051450 Ladder Safety Cage 150 0 0 1 1 2 2 3 3 4 4 5 5
104132 Ladder Safety Cage 75 1 1 1 0 2 1 2 1 2 1 2 1
051460 Ladder Base 1 1 1 1 1 1 1 1 1 1 1 1
103718 Ladder Hook 2 2 2 2 2 2 2 2 2 2 2 2
103369 Ladder Connector RAPID 2 2 2 2 3 3 4 4 5 5 6 6
2.70 3.90 4.50 6.00 7.80 9.60
3.60 m 4.20 m 5.70 m 7.50 m 9.30 m 10.80 m
A*= ladder access AB* = ladder access B
-
8/11/2019 RAPID Kasutujuhend ENG
21/28
-
8/11/2019 RAPID Kasutujuhend ENG
22/28
290
205
165
20
16
20
20
35
15
15
5
4
794
600
300
654
120
19x30=57025
60 80
23
21
800
243
500 64
794
2100
250
800
800
250
250
1000
794
3000
1000
500
250
18
Column Frames RAPID, AluFor column cross section up to 600x600mm.Complete with:Clamping Profile, Column Tie Yoke DW15,Spherical Nut DW15, galv., Locking Pin 20x205, galv., and Hex. Bolt ISO 4017M20x50-8.8, galv. with Hex. NutISO 7042 M20-8, galv. (2x).
Column Frame 300 59,90 037250Column Frame 210 42,70 037260Column Frame 60 14,30 037270
Chamfer Strip RAPID L = 3,00m 0,32 037210For clamping plywood to the ColumnFrames RAPID.
Brace Connector-3 RAPID, galv. 3,05 037190For fixing Push-Pull Props andKicker Braces to the Column Frames RAPID.Complete with:Locking Pin 20x205, galv. (1x)Pin 16x42, (1x), and Cotter Pin 4/1 (2x).
Weight kg Item no.
20x205FS 4/1
16x42FS 4/1
DW15
M20x50
-
8/11/2019 RAPID Kasutujuhend ENG
23/28
106
68
125
120
205
20
20
34
290
28
21
42
250
100
119
400 118
400118
500
798
18
22
178
230
195
50
260
661
469SW 19
19
Crane Lifting Unit-2 RAPID 14,00 0373204 for a fully assembled column form.Only 2 needed when a concreting platformis used.
Load-bearing pointPermissible load: 500kg
Column Tie Yoke DW15 0,60 037150For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)
Permissible Load to DIN 18216: 90kN
Locking Pin 20x205, galv. 0,74 037160For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)Complete with:Cotter Pin 4/1 (1x)
Spherical Nut DW 15, galv. 0,49 030440For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)
Permissible Load to DIN 18216: 90kN
Ladder connector RAPID, galv. 6,58 103369For connecting ladders to RAPIDcolumn frames.Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. (2x) andClamping plate (2x)
Weight kg Item no.
SW 27
DW15
FS 4/1
DW15
-
8/11/2019 RAPID Kasutujuhend ENG
24/28
20 405 4020
130
50
130
20 13
1810
25
220
155
1960
5
x
298
=1
490
95
40025
405
25
100
210
50
53
130
40
13
80
80
50
400
534
1885
1200
220
168
298
405
120
320
355
50
50
325
294
710
450
750
(1500)
79
25
20
20
Weight kg Item no.
Ladder 180/6, galv. 13,10 051410Access Ladder 180/2, galv. 11,10 103724Complete with:Hex. Bolts ISO 4017 M12x40-8.8, galv. andHex. Nut ISO 7042 M12-8, galv. (4x)
Accessories:Formwork chain 3kN, 2,5m 1,37 065073
Ladder Hook, galv. 0,68 103718Only for the lower ladder (2x)Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. andHex. Nut ISO 7042 M12-8, galv. (2x)
Ladder Base 2,36 051460For preventing the ladders sliding.
Ladder Safety Cage 75, galv. 15,50 104132Ladder Safety Cage 150, galv. 25,20 051450Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. (4x),Clamping plate (4x)
SW 19
Eyes for security chain
SW 19
-
8/11/2019 RAPID Kasutujuhend ENG
25/28
840
520
1340
1005
100
525
74
137 60
225
150 19
70
1524
1420
1340
52540
1524
50052 5
710
40
20
14
1305
38
50
110
130
21
Concreting Platform, complete 126,00 037400Used for TRIO, RAPID and QUATTRO columns.Consisting of:Concreting Landing (1x)Handrail 52 galv. (2x)Handrail 134 galv. (2x)Crane Hook Concreting Platform (3x)
Concreting Landing, Alu 51,50 037410Powder-coatedSuitable for any cross section up to amaximum of 600x600mm. It is mountedwith the Crane Hook Concreting Platform.
Permissible Load: 150kg/m2
Handrail 52, galv. 10,50 037420
Handrail 134, galv. 18,10 0374302 of each per concreting platform.Locks in place automatically.
Crane Hook Concreting Platform 5,70 0374403 per concreting platform.Complete with: Captive Fixing Pinand Cam Nut DW15, galv.
Load-bearing pointPermissible load: 1000kg
Weight kg Item no.
adjustable620
DW15
Eyes for security chain
-
8/11/2019 RAPID Kasutujuhend ENG
26/2822
02 PERI S.A.S. Zone Industrielle Nord 34-36 rue des Frres Lumire 77109 Meaux Cedex
[email protected] www.peri.fr
03 PERI AG Aspstrae 17 8472 Ohringen [email protected] www.peri.ch
04 PERI S.A. Sociedad Unipersonal Ctra. Paracuellos - Fuente el Saz km. 18,9 Camino de Malatones, km. 0,5 28110 Algete/Madrid [email protected] www.peri.es
05 N.V. PERI S.A. Industriepark Nijverheidsstraat 6 PB 54 1840 Londerzeel [email protected] www.peri.be
06 PERI B.V. v. Leeuwenhoekweg 23 Postbus 304 5480 AH-Schijndel [email protected] www.peri.nl
07
PERI Formwork Systems, Inc. 7135 Dorsey Run Road Elkridge, MD 21075
[email protected] www.peri-usa.com
08 PT Beton Perkasa Wijaksana P.O. Box 3737 Jakarta 10210 [email protected]
www.peri.de
09
PERI S.p.A. Via G. Pascoli, 4 20060 Basiano (MI) [email protected] www.peri.it
10 PERI Japan K.K. 7F Hakozaki 314 Building, 31-4 Hakozaki-cho, Nihonbashi Chuo-ku Tokyo 103-0015 [email protected] www.perijapan.jp
11 PERI Ltd.
Market Harborough Road Clifton upon Dunsmore Rugby, CV23 0AN [email protected] www.peri.ltd.uk
12 PERI Kalp ve skeleleri San. ve Tic. Ltd. Sti. akmakl Mahallesi Akaburgaz Cad. 72. Sokak No: 23 Kra - Bykekmece/
Istanbul 34500 [email protected] www.peri.com.tr
13 PERI Kft. Zdor u. 4.
1181 Budapest [email protected] www.peri.hu
14 PERI Formwork Malaysia Sdn. Bhd. Unit 19-07-4, Level 7 PNB Damansara
19 Lorong Dungun Damansara Heights 50490 Kuala Lumpur
[email protected] www.perimalaysia.com
15 PERI ASIA Pte. Ltd Formwork Pte. Ltd. No. 1 Sims Lane # 06-10 Singapore 387355 [email protected] www.periasia.com
16 PERI Ges.mbH Traisenstrae 3 3134 Nudorf ob der Traisen [email protected] www.peri.at
17 PERI spol. s r.o. Prmyslov 392 252 42 Jesenice [email protected] www.peri.cz
18 PERI Danmark A/S forskalling og stillads Greve Main 26 2670 Greve [email protected] www.peri.dk
19
PERI Suomi Ltd. Oy Hakakalliontie 5 05460 Hyvink
[email protected] www.perisuomi.fi
20 PERI NORGE AS Kobbervikdalen 156 3036 Drammen [email protected] www.peri.no
21 PERI Polska Sp. z o.o. ul. Stoeczna 62 05-860 Pochocin [email protected]
www.peri.pl.pl
22
PERIform SVERIGE AB Montrgatan 4-6 Box 9073 30013 Halmstad [email protected] www.periform.se
23 PERI (Korea) Ltd. 8-9th Fl., Yuseong Bldg. 830-67, Yeoksam-dong, Kangnam-ku, Seoul 135-080 [email protected] www.perikorea.com
24
PERIcofragens Lda. Cofragens e Andaimes Rua Cesrio Verde, n 5 - 3 Esq. Linda-a-Pastora
2790-326 Queijas [email protected] www.peri.pt
25 PERI S.A. Ruta Nacional N. 9, km 47,5 (Panamericana Ramal Escobar) (1625) Escobar/Prov. Bs. As. [email protected] www.peri.com.ar
26 PERI Formas e Escoramentos Ltda.
Rodovia Raposo Tavares, km 41 Colinas Bandeirante CEP 06730-000
Vargem Grande Paulista
So Paulo [email protected] www.peribrasil.com.br
27 PERI Chile Ltda. C/Jos de San Martin N 104 Parque Industrial Los Libertadores
Colina, Santiago de Chile [email protected] www.peri.cl
28 PERI Romnia SRL Calea Bucureti nr. 2B 077015 Baloteti - ILFOV [email protected] www.peri.ro
29 PERI SLOWENIEN Goran Opalic Obrena 137 2000 Maribor [email protected] www.peri.de
30
PERI spol. s r.o. amornska 18 903 01 Senec [email protected] www.peri.sk
31 PERI Australia Pty. Ltd. 116 Glendenning Road Glendenning NSW 2761 [email protected] www.periaus.com.au
32 PERI AS Valdme 8 Tnassilma Tehnopark 76401 Saku vald Harjumaa [email protected]
www.peri.ee
2
1
3
4
5
6
9
11
12
1316
17
18
19
20
22
21
24
2829
30
32
33
34
38
41
42
46
48
52
53
01 PERI GmbH Rudolf-Diesel-Strasse 89264 Weissenhorn [email protected] www.peri.de
France
Switzerland
Spain
Belgium/Luxembourg
Netherlands
USA
Indonesia
Italy
Japan
United Kingdom/Ireland
Turkey
Hungary
Malaysia
Singapore
Austria
Czech Republic
Denmark
Finland
Norway
Poland
Sweden
Korea
Portugal
Argentina
Brazil
Chile
Romania
Slovania
Slovakia
Australia
Estonia
PERI International
-
8/11/2019 RAPID Kasutujuhend ENG
27/2823
33 PERI Hellas Ltd. Sokratous Str. 5th kil. Koropi-Varis Ave. P. O. Box 407
194 00 Koropi [email protected] www.perihellas.gr
34 PERI SIA Granita 26 1057 Riga [email protected] www.peri-latvija.lv
35 PERI (L.L.C.) Brashy Building, Office No. 212 Shk. Zayed Road P.O. Box 27933 Dubai [email protected] www.perime.com
36 PERI Formwork Systems, Inc. 45 Nixon Road Bolton, Ontario
L7E 1K1 [email protected] www.peri.ca
37 PERI GmbH Lebanon Representative Office AYA Commercial Center, 7th floor, Dora Highway, Beirut
P.O. Box 90 416 Jdeidet [email protected] www.peri.de
38
PERI UAB Titnago st. 19 02300 Vilnius [email protected] www.peri.lt
39 PERI S.A. Route de Rabat, km. 5 Piste de Beni Touzine Tanger
[email protected] www.peri.de
40 PERI Formwork Engineering Ltd 16 Moshe Dayan st., P.O. Box 10202 Petach Tikva, 49002 Israel [email protected] www.peri.co.il
41 PERI BULGARIA EOOD Kv. Vragdebna m. Nova Machala Nr. 46 1839 Sofia [email protected] www.peri.bg
42 MEST ltd., Fornubudum 5 220 Hafnarfjordur [email protected] www.mest.is
43 TOO PERI Kazakhstan Rubenstein Street 10 (Corner Dostyk Str. 7) 050010 Almaty [email protected] www.peri.kz
44
OOO PERI 8 Etage, OOO PERI Buro Krasnaya Presnya Str. 24
123022 Moskau [email protected] www.peri.ru
45 PERI Wiehahn (Pty.) Ltd. P.O. Box 2668 Bellville 7535 [email protected]
www.periwiehahn.co.za
46
TOW PERI Ukraina 23, M. Raskowa Str., B. 822 02002 Kiew [email protected] www.peri.ua
47 PERI GmbH Egypt Branch Office 24 A, Obour Gardens, 4th Floor, apt. # 1 Salah Salem Street 11361 Heliopolis
Cairo [email protected] www.peri.com.eg
48 PERI Oplate d.o.o. Jurija Gagarina 81 11070 Novi Beograd [email protected] www.peri.co.yu
49 PERI Cimbras y Andamios, S.A. de C.V. Parque de las Amricas KM 3.5 de la Carretera Jorobas - Tula Huehuetoca Estado de Mxico,
C.P. 54680 [email protected] www.peri.com.mx
50
PERI Kalp ve skeleleri Baku Branch Office 28 May K. Ev 72 Menzil 27 Baku [email protected] www.peri.com.tr
51PERI Kalp ve skeleleri
Agabat Branch Office Groglu Sokak No. 130, Kat 2 744035 Agabat
[email protected] www.peri.com.tr
52 PERI Belarus Pr. Nesawisimosti 11 Kopus-2 Zimmer: 526,528 220030 Minsk [email protected] www.peri.com.tr
53 PERI oplate i skele d.o.o. Dolenica 20 10 250 Donji Stupnik/
Zagreb [email protected] www.peri.com.hr
54
PERI GmbH Iran Branch Office Flat 27, Blvd. KAVE,
Building No. 246 P.O. Box 9 3979 3669 Tehran [email protected] www.peri.ir
55 PERI (India) Pvt Ltd 717 Palm Springs Palm Court Malad Link Road Malad (West) Mumbai 400064 [email protected] www.peri.in
56 PERI Jordan Saad 5 Center, 4th Floor Office No. 404 Al Madineh
Al Munawara Street P.O. Box 367 11947 Amman
[email protected] www.peri.de
57 PERI Kuwait Arraya Center, 29th Floor Al-Shuhada Street, Sharq P.O. Box 1060 Safat 13011 Kuwait [email protected] www.peri.de
58 PERI Saudi Arabia 33 AL-Batraa Street AL -Shurbatiy Building AL - Bughdadiah AL -
Gharbiah Distrect 6th Floor, Flat # 61 P.O. Box 11641 Jeddah [email protected] www.peri.de
59 PERI Qatar LLC P.O. Box 24133 Doha [email protected] www.peri.de
60 Socit PERI S.A.S. Bureau de liaison dAlger 50 bis, Route de Gu de Constantine Hai El Badr (ex Apreval)
Immeuble FADLI Kouba - Alger
[email protected] www.peri.fr
7
8
10
1415
23
25
26
2731
35
36
3739 40
43
44
45
4749
5051
54
595558
5760 56
Greece
Latvia
United Arab Emirates
Canada
Libanon
Lithuania
Marocco
Israel
Bulgaria
Iceland
Kazakhstan
Russian Federation
South Africa
Ukraine
Egypt
Serbia
Mexico
Azerbaijan
Turkmenistan
Belorussia
Croatia
Iran
India
Jordan
Kuwait
Saudi Arabia
Qatar
Algeria
-
8/11/2019 RAPID Kasutujuhend ENG
28/28
De
02/2008
3ma
Art.
Nr.:792216
C
opyrightbyP
ERIGmbH
Wall Formwork
Panel FormworkGirder FormworkCircular FormworkFacade FormworkBrace Frame
Column Formwork
Square
RectangularCircular
Slab Formwork
Panel FormworkBeam Grid FormworkGirder FormworkSlab TableBeam Formwork
Shoring Systems
Steel Slab PropsAluminium Slab PropsTower SystemsHeavy-Duty Props
Climbing Systems
Climbing ScaffoldSelf-Climbing SystemClimbing Protection PanelPlatform Systems
Scaffold, Stairways,
Working Platforms
Facade ScaffoldWorking PlatformWeather Protection RoofStairway Access
Bridge and Tunnel
Formwork
Cantilevered Parapet CarriageCantilevered Parapet PlatformEngineers Construction Kit
Services
Formwork AssemblyCleaning / RepairsFormwork PlanningSoftwareStaticsSpecial Constructions
Additional Systems
PlywoodFormwork GirdersStopend SystemsPalletsTransportation Containers
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 126489259 Weissenhorn
GermanyTel +49 (0)73 09.9 50- 0Fax +49 (0)73 09.9 51- 0info@peri de
PERI Product Range