reference plant msw boiler zurich / ch: 1x twinl · ch-zurich_twinl_en_rev2 reference plant msw...

3
CH-Zurich_TwinL_EN_rev2 Reference Plant MSW Boiler Zurich / CH: 1x TwinL 52 t/h steam flow, 40 bar, 420°C Boiler width 7.2 m The 3 rd pass contains a separation wall in the middle of the pass 1 x Shock Pulse Generator TwinL, since 30.11.2015, at 2 nd pass Good cleaning effect at 2 nd an 3 rd pass, significantly lower flue gas temperature at inlet to horizontal pass; reduced fouling at heat exchanger bundles, boiler can be operated in overload easily during high district heat demand During maintenance stop: reduced standstill period, less blasting material for disposal Plant supplier: ABB Enertech AG Plant operator: Fernwaerme Zurich AG 1 SH2 SH1

Upload: others

Post on 19-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reference Plant MSW Boiler Zurich / CH: 1x TwinL · CH-Zurich_TwinL_EN_rev2 Reference Plant MSW Boiler Zurich / CH: 1x TwinL • 52 t/h steam flow, 40 bar, 420°C • Boiler width

CH-Zurich_TwinL_EN_rev2

Reference PlantMSW Boiler Zurich / CH: 1x TwinL

• 52 t/h steam flow, 40 bar, 420°C• Boiler width 7.2 m• The 3rd pass contains a separation

wall in the middle of the pass• 1 x Shock Pulse Generator TwinL,

since 30.11.2015, at 2nd pass• Good cleaning effect at 2nd an 3rd

pass, significantly lower flue gastemperature at inlet to horizontalpass; reduced fouling at heatexchanger bundles, boiler can beoperated in overload easily duringhigh district heat demand

• During maintenance stop: reducedstandstill period, less blastingmaterial for disposal

• Plant supplier: ABB Enertech AG• Plant operator: Fernwaerme

Zurich AG1

SH2 SH1

Page 2: Reference Plant MSW Boiler Zurich / CH: 1x TwinL · CH-Zurich_TwinL_EN_rev2 Reference Plant MSW Boiler Zurich / CH: 1x TwinL • 52 t/h steam flow, 40 bar, 420°C • Boiler width

CH-Zurich_TwinL_EN_rev2

Reference PlantMSW Boiler Zurich / CH: 1x TwinL

2

The Shock Pulse Generator TwinL is mounted at the 2nd pass and cleans the 2nd

and 3rd pass.

Page 3: Reference Plant MSW Boiler Zurich / CH: 1x TwinL · CH-Zurich_TwinL_EN_rev2 Reference Plant MSW Boiler Zurich / CH: 1x TwinL • 52 t/h steam flow, 40 bar, 420°C • Boiler width

CH-Zurich_TwinL_EN_rev2

Reference PlantMSW Boiler Zurich / CH: 1x TwinLFlue gas temperatures after planned shut down

3

2015:Shower Cleaning System in empty passes,rapping system in horizontal pass, 5-6 manualonline boiler cleaning interventions per year

2016:TwinL in 2nd pass; SCS stopped,rapping in horizontal pass, 1-2 manual onlineboiler cleaning interventions per year