EOW work scope Page 1 Ocean Yatzy Subsea End of Well Report EOW – 1820325 TO: Carlos De Souza CC: Anderson Almeida, Scotty Boyington, Paul Hobart, Bobby Vandegevel, Yatzy OIM, Yatzy Rig Supt Report Date: 24/October/2013 From: Molina % Complete # LCEPM Number Description Today To Date 1 18263017R1 INSPECT RAMS AND PACKERS 100 % 100 % 2 18263017R2 INSPECT RAM BORE, CAVITIES,BONNET SEALING SURFACES & SEALS 100 % 100 % 3 18263017R3 TEST HYDRAULIC SYSTEM & INSPECT RAM SHAFTS & RAM CHANGE PISTONS 100 % 100 % 4 18263017R4 TEST BALANCE CHAMBERS & WEDGE LOCKS 100 % 100 % 5 18263017R6 INSPECT BOP GUIDE FRAME 10 0 % 10 0 % 6 18263121R1 INSPECT ANNULAR BORE & PACKER ELEMENTS 100 % 100 % 7 18263121R2 INSPECT & TEST HYDRAULIC SYST. PRESS. TEST BORE/CONDUCT DRIFT TEST 100 % 10 0 % 8 18263211R1 INSPECT AND TEST HOSES 10 0 % 10 0 % 9 18263211R2 INSPECT AND TEST SHUTTLE VALVES 10 0 % 10 0 % 10 18263211R3 INSPECT AND TEST ALL ACCUMULATORS AND SURGE BOTTLES 100 % 100 % 11 18263211R4 FAILSAFE VALVE ACCUMULATOR INSPECTION 10 0 % 10 0 % 12 18263311R1 INSPECT POD MOUNTED ACCUMULATORS AND POD LOCKS 10 0 % 10 0 % 13 18263311R2 INSPECT AND TEST STINGERS 10 0 % 10 0 % 14 18263311R3 INSPECT AND TEST POD VALVES 100 % 10 0 % 15 18263311R4 INS/TEST POD STINGER, REGULATORS, ANODES, BLEEDERS, POD TUBING 100 % 100 % 17 18263311R6 FUNCTION TEST PODS TO BE REUSED & POD ACCUMULATOR 10 0 % 10 0 % 18 18263311R7 INSPECT AND LUBRICATE POD REELS 10 0 % 10 0 % 19 18263311R8 INSPECT CONDUIT VALVE PKG, BLUE AND YELLOW (TRIVALVE INSP.) 10 0 % 10 0 % 20 18263311R9 INSPECT POD HOSE JUNCTION BOXES AND PLATES 10 0 % 10 0 % 21 18263411R1 CLEANING & GREASING OF H4 CONNECTOR 10 0 % 10 0 % 22 18263411R2 INSPECT / TEST VX GASKET, SEALING SURFACE & HYD RETAINERS 10 0 % 10 0 % 23 18263411R3 ACTUATION TEST 10 0 % 10 0 % 24 18263411R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 10 0 % 10 0 % 18263431R1 CLEANING & GREASING OF TYPE 70 COLLET

Upload: paulo-de-tarso-molina

Post on 15-Feb-2017

63 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Relatório de Fim de Poço - DODI

  

EOW work scope Page 1

 Ocean YatzySubsea End of Well Report 

EOW – 182­0325TO: Carlos De SouzaCC: Anderson Almeida, Scotty Boyington, Paul Hobart, Bobby Vandegevel, Yatzy OIM, Yatzy Rig SuptReport Date: 24/October/2013From: Molina

% Complete# LCE­PM Number Description Today To Date

1 182­630­1­7­R1 INSPECT RAMS AND PACKERS 100% 100%2 182­630­1­7­R2 INSPECT RAM BORE, CAVITIES,BONNET SEALING 

SURFACES & SEALS100% 100%

3 182­630­1­7­R3 TEST HYDRAULIC SYSTEM & INSPECT RAM SHAFTS & RAM CHANGE PISTONS

100% 100%

4 182­630­1­7­R4 TEST BALANCE CHAMBERS & WEDGE LOCKS 100% 100%5 182­630­1­7­R6 INSPECT BOP GUIDE FRAME 100% 100%6 182­631­2­1­R1 INSPECT ANNULAR BORE & PACKER ELEMENTS 100% 100%7 182­631­2­1­R2 INSPECT & TEST HYDRAULIC SYST. PRESS. TEST 

BORE/CONDUCT DRIFT TEST100% 100%

8 182­632­1­1­R1 INSPECT AND TEST HOSES 100% 100%9 182­632­1­1­R2 INSPECT AND TEST SHUTTLE VALVES 100% 100%10 182­632­1­1­R3 INSPECT AND TEST ALL ACCUMULATORS AND SURGE 

BOTTLES100% 100%

11 182­632­1­1­R4 FAILSAFE VALVE ACCUMULATOR INSPECTION 100% 100%12 182­633­1­1­R1 INSPECT POD MOUNTED ACCUMULATORS AND POD 

LOCKS100% 100%

13 182­633­1­1­R2 INSPECT AND TEST STINGERS 100% 100%14 182­633­1­1­R3 INSPECT AND TEST POD VALVES 100% 100%15 182­633­1­1­R4 INS/TEST POD STINGER, REGULATORS, ANODES, 

BLEEDERS, POD TUBING100% 100%

17 182­633­1­1­R6 FUNCTION TEST PODS TO BE REUSED & POD ACCUMULATOR

100% 100%

18 182­633­1­1­R7 INSPECT AND LUBRICATE POD REELS 100% 100%19 182­633­1­1­R8 INSPECT CONDUIT VALVE PKG, BLUE AND YELLOW 

(TRI­VALVE INSP.)100% 100%

20 182­633­1­1­R9 INSPECT POD HOSE JUNCTION BOXES AND PLATES 100% 100%21 182­634­1­1­R1 CLEANING & GREASING OF H4 CONNECTOR 100% 100%22 182­634­1­1­R2 INSPECT / TEST VX GASKET, SEALING SURFACE & HYD 

RETAINERS100% 100%

23 182­634­1­1­R3 ACTUATION TEST 100% 100%

24 182­634­1­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100%182­634­3­1­R1 CLEANING & GREASING OF TYPE 70 COLLET 

Page 2: Relatório de Fim de Poço - DODI

  

EOW work scope Page 2

25 CONNECTOR 100% 100%

26 182­634­2­1­R2 INSPECT / TEST AX GASKET SEALING SURFACE & HYD RETAINERS

100% 100%

27 182­634­3­1­R3 CHECK ACTUATION AND MEASURE AMOUNT OF ACTUATOR RING STROKE

100% 100%

28 182­634­2­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100%29 182­635­4­1­R1 DISASSEMBLE / INSPECT AND TEST FAILSAFE VALVES 100% 100%30 182­635­4­1­R2 TEST AND LUBRICATE STACK VALVES 100% 100%31 182­635­4­1­R3 INSPECT AND TEST CHOKE AND KILL STAB AND 

RECEPTACLES100% 100%

32 182­637­5­2­R1 CLEAN AND INSPECT FLEX JOINT 100% 100%33 182­637­5­2­R2 CLEAN INSPECT AND GREASE RISER ADAPTER 100% 100%34 182­638­5­1­R1 INSPECT RISER  100% 100%35 182­638­5­1­R2 INSPECT CHOKE AND KILL LINES 100% 100%36 182­638­5­1­R3 INSPECT RISER HANDLING TOOLS 100% 100%37 182­638­5­1­R4 INSPECT RISER FLOATATION MODULES 100% 100%38 182­639­1­1­R1 INSPECT DIVERTER ASSEMBLY 100% 100%39 182­640­5­1­R1 INSPECT SLIP JOINT 100% 100%40 182­640­5­1­R2 INSPECT SLIP JOINT LOCKING MECHANISM 100% 100%41 182­641­4­1­R1 INSPECT HYDRAULIC CHOKES 100% 100%42 182­642­7­1­R1 INSPECT BOP TEST UNIT 100% 100%43 182­642­7­1­R2 CHECK AND CORRECT ACCUMULATOR PRECHARGE 100% 100%44 182­642­7­1­R3 TEST BOP HYDRAULIC CONTROL UNIT 100% 100%45 182­642­7­1­R4 TEST PUSH AND HOLD BUTTONS­REMOTE PANELS 100% 100%46 182­643­5­1­R1 CHECK OIL LEVEL, GAUGE SHEAVES AND INSPECT 

WIRE ROPE100% 100%

47 182­643­5­1­R2 INSPECT AIR SYSTEM, PISTON AND ROD PACKING, AND POSITION INDICATOR

100% 100%

48 182­643­5­1­R3 INSPECT TENSIONER CONTROL PANELS 100% 100%49 182­645­4­1­R1 INSPECT CROWN BLOCK / ROCKER ARMS, CONTROL 

VALVE BOX, HYD PWR UNITHYD ENG

HYD ENG

50 182­645­4­1­R2 INSPECT AIR SYSTEM HYD ENG

HYD ENG

51 182­645­4­1­R3 INSPECT CONTROL CONSOLE AND TRACK ROLLERS HYD ENG

HYD ENG

52 182­645­4­1­R4 INSPECT THE DSC CYLINDER AND ACCUMULATOR OIL LEVELS

HYD ENG

HYD ENG

53 182­646­1­1­R1 INSPECT HIGH PRESSURE CONNECTIONS 100% 100%54 182­646­1­1­R2 INSPECT TORQUE EQUIPMENT 100% 100%

56 182­648­0­4­R1 INSPECT BOP HANDLING SYSTEM 100% 100%

58 182­655­0­0­R1 INSPECT AND TEST THE EDS POD 100% 100%

Page 3: Relatório de Fim de Poço - DODI

  

EOW work scope Page 3

Unscheduled Work ­ Tab 380 Check turn­down sheave retainer plate/bolts – retaining plate bolts 

quote has arrived (May, 16th 2013) place the order for 112 bolts and 112 lock washers FR#182­037729 PO due date Aug, 8th (asked storekeeper to get a feedback on it)

­ EDS solenoid valves sequence #2, on order FR#182­037026 (15% rotation plan)­ Koomey Room HPU unit solenoid sequence #1 we have only 3 on hand  were used 

to replace the ones with air leak­ Rebuild auto shear trigger valve repair kits are on FR# 182­036957 Dec, 21st 2012­ Replace or rebuild fill up valve (under RKB) ­ Replace bearing house on triplex pump #1 FR#182­037281­ Install new EDS pod – parts were ordered (pressure switch, solenoid valve and 

coils)­ Replace upper annular (expired since 25/July/2012), upper annular is available on 

upper deck, decision was made to issue an MOC and after pulling BOPs concluding next 

well, upper annular will be replaced)

 Work­scope Accomplished Last 24 Hours

­ Read Handover notes­ Assisted Rig Manager with information on risers, slip joint, flex joint and diverter­ Assisted Anderson Almeida with ANP/DUM report­ Performed BOP  function  tests on main panel and  toolpusher’s panel  (blue and 

yellow pod)­ Left yellow pod energized to check for leaks­ Worked with storekeeper on opened FRs x material/equipment traceability  

Discrepancy / Recommendations / Components 24 Hr Forecast

­ Finish up with BOP function tests on driller’s panel­ Perform EDS/Autoshear and acoustic test­ Get BOP monthly samples to be send x analysis­ PM triplex pumps and get oil samples­ PM BOP fluid mixing unit system­ Replace some anodes on BOP stack