RENCANA KERJA PROJECT ROXY MALL JEMBER NO ITEM PEKERJAAN JUMLAH TENAGA KERJA FOREMAN WAKTU MEI 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 PEKERJAAN PASANGAN TANGGA LANTAI 1-2 A.MEMBIKIN BEKISTING TANGGA LANTAI 1-2 2 ENGINEER 1 HELPER PAK NGADI LIBUR LIBUR B.PEKERJAAN MEMASANG SEPATU UNTUK GORDES PAK SANTOSO C.PEMASANGAN SEPATU UNTUK TANGGA D.PENGECORAN TANGGA LANTAI 1-2 2 PEKERJAAN PASANGAN LANTAI 2 A.PASANGAN BATU BATA LANTAI 2,BENANGI,KUSEN JENDELA 8 ENGINEER DAN 10 HELPER PAK NGADI B.PLESTERAN & ACIAN LUAR LANTAI 2 C.PLESTERAN & ACIAN DALAM LANTAI 2 D.PENGECATAN LUAR LANTAI 2 E PENGECATAN DALAM LANTAI 2 PAK NGADI LIBUR 3 PEKERJAAN TEMPAT SAMPAH 2 ENGINEER 2 HELPER A.PASANG KANSTIN DAN TIMBUNAN PAK SANTOSO 4 PEKERJAAN RIGID JALAN BELAKANG A.BONGKAR PAVING KANAN DAN KIRI 3 ENGINEER 6 HELPER B.GALIAN T = 8 ,KETINGGIAN = 10 CM PAK SANTOSO C.PASANG PIPA DRAIN,PIPA PEMBUANGAN AIR,PIPA SALURAN PAK NGADI D.PASANG WIREMEST M8 E.PENGECORAN T = 8 5 PEKERJAAN PLAFON JEMBATAN A.PEMASANGAN RANGKA PLAFON PAK DAYAT B.PEMASANGAN PLAFON GYPSUM 6 PEKERJAAN PEMASANGAN ATAP BAJA LANTAI 2 LIBUR LIBUR LIBUR A.PEMASANGAN SENG ATAP 1 ENGINEER 1 HELPER PAK MUJI BAJA B.PEMASANGAN DINDING SENG (SENG PENUTUP) 1 ENGINEER 1 HELPER 7 PEKERJAAN ATAP TOL GADE A.GALIAN UNTUK STROUSS B.PASANG PIPA ATAP & BESI STROUSS PAK SANTOSO C.PENGECORAN & FINISHING 8 PASANG KANSTIN DEPAN 1 ENGINEER 1 HELPER 9 PEKERJAAN BESI UNTUK GORDES,SEPATU DAN BEKISTING TANGGA 1 ENGINEER 1 HELPER PAK NGADI 10 PEKERJAAN UNDAKAN SAMPAH 1 ENGINEER 1 HELPER PAK SANTOSO

Upload: afan-dwi-anwar

Post on 24-Sep-2015

219 views

Category:

Documents


5 download

DESCRIPTION

dhdqwe

TRANSCRIPT

Sheet1RENCANA KERJA PROJECT ROXY MALL JEMBER

NOITEM PEKERJAANJUMLAH TENAGA KERJAFOREMAN WAKTU MEI02345678910111213141516171819202122232425262728293031

1PEKERJAAN PASANGAN TANGGA LANTAI 1-2A.MEMBIKIN BEKISTING TANGGA LANTAI 1-22 ENGINEER 1 HELPERPAK NGADILIBURLIBURLIBURLIBURB.PEKERJAAN MEMASANG SEPATU UNTUK GORDESPAK SANTOSOC.PEMASANGAN SEPATU UNTUK TANGGAD.PENGECORAN TANGGA LANTAI 1-2

2PEKERJAAN PASANGAN LANTAI 2A.PASANGAN BATU BATA LANTAI 2,BENANGI,KUSEN JENDELA8 ENGINEER DAN 10 HELPERPAK NGADIB.PLESTERAN & ACIAN LUAR LANTAI 2C.PLESTERAN & ACIAN DALAM LANTAI 2D.PENGECATAN LUAR LANTAI 2E PENGECATAN DALAM LANTAI 2PAK NGADILIBURLIBURLIBUR3PEKERJAAN TEMPAT SAMPAH2 ENGINEER 2 HELPERA.PASANG KANSTIN DAN TIMBUNANPAK SANTOSO

4PEKERJAAN RIGID JALAN BELAKANGA.BONGKAR PAVING KANAN DAN KIRI3 ENGINEER 6 HELPERB.GALIAN T = 8 ,KETINGGIAN = 10 CMPAK SANTOSOC.PASANG PIPA DRAIN,PIPA PEMBUANGAN AIR,PIPA SALURANPAK NGADID.PASANG WIREMEST M8E.PENGECORAN T = 8

5PEKERJAAN PLAFON JEMBATANA.PEMASANGAN RANGKA PLAFONPAK DAYATB.PEMASANGAN PLAFON GYPSUM

6PEKERJAAN PEMASANGAN ATAP BAJA LANTAI 2LIBURLIBURLIBURLIBURA.PEMASANGAN SENG ATAP1 ENGINEER 1 HELPERPAK MUJI BAJAB.PEMASANGAN DINDING SENG (SENG PENUTUP)1 ENGINEER 1 HELPER

7PEKERJAAN ATAP TOL GADEA.GALIAN UNTUK STROUSSB.PASANG PIPA ATAP & BESI STROUSSPAK SANTOSOC.PENGECORAN & FINISHING

8PASANG KANSTIN DEPAN1 ENGINEER 1 HELPER

9PEKERJAAN BESI UNTUK GORDES,SEPATU DAN BEKISTING TANGGA1 ENGINEER 1 HELPERPAK NGADI

10PEKERJAAN UNDAKAN SAMPAH 1 ENGINEER 1 HELPERPAK SANTOSO

RENCANA KERJA PROJECT VILLA JEMBER

NOITEM PEKERJAANJUMLAH TENAGA KERJAFOREMAN WAKTUMEI 12345678910111213141516171819202122232425262728293031

1PEKERJAAN PONDASIA.GALIAN STROUSPAK MUDJILIBURLIBURLIBURLIBURB.GALIAN PONDASIC.PASANGAN BATU KALI1 ENGINEER 2 HELPERD.PEMBESIAN DAN BEKESTING SLOOFE.PENGECORAN SLOOF

2PEKERJAAN PAGAR KELILINGA.PASANGAN BATU BATA3 HELPER 2 ENGINEERPAK MUDJIB.PASANG BESI KOLOM,BALOK DAN BEKESTINGC.PLESTERAN DAN ACIAN LUAR DALAM

LIBURLIBURLIBUR3PEKERJAAN TIMBUNANGALI & BUANG TIMBUNAN KOLAM RENANG

4PEKERJAAN TIMBUNAN PERATAAN TIMBUNAN DALAM BANGUNAN6 HELPERPAK MUDJI

5PEKERJAAN SALURAN DALAMA.GALIAN KELILING BANGUNAN2 HELPERPAK MUDJIB.PASANG BETON BUIS & BAK KONTROL1 ENGINEER DAN 2 HELPERPAK MUDJI

LIBURLIBURLIBURLIBUR6PASANG BATA RUMAH 4 ENGINEER 8 HELPER