Handling various site activities like optimization, debottlenecking, upgrade and maintenance issues.
Handled various Green/Brown field cement projects from feasibility report preparation, done budgeting, basic Engineering, procurement for main & aux. machinery, Detailed Engineering and Project planning & control.
Awarded for Best Technical Case Study 2009 at Holtec Consulting Pvt. Ltd. Bachelor of Mechanical Engineering (Hons.) from REC Rewa Willing to except challenges, Innovative & flexible
Selected Professional Accomplishments
Handling Engineering, procurement, debottlenecking, upgrade & optimization for 10000 TPD Clinkerisation Unit at Kutch and Grinding Unit at Surat for ABG Cement Ltd.
Member of Strategic Management team as Technical Expert at ABG Cement Ltd. Study of Feasibility for various BRUs for ABG Cement Ltd., various green field cement projects for
Abhijeet Cement Limited. Prepared and finalized various design specification for procurement of main machinery for
Abhijeet Cement Limited. Prepared Tender Document on EPC mode for complete Project for the same project.
Prepared tender document, technical evaluation report and contract for main machinery for Ultratech Cement Limited for 3 different 10000 tpd clinkerisation units and 5 assosiated Grinding Units.
Having a Sound knowledge of material grinding technologies and well acquainted with pyro processing system.
ENGINEERING of water utilization system, compressed air system, water cooling system, HSD Piping, Venting & Ducting for nuisance Bag filters for:
o ABGCL – 10,000 tpd - Kutch and Surat unito JSW Cement – 6000 tpd – Nandyal unito Grasim India Ltd – 1.3 MTPA - Aligarh Unit
Assisted in preparing and updating of project schedule for different Green field and Brown Field Projects
Careen Addendum
ABG Cement Ltd. (Mumbai) : Dy. Manager (Projects) (Jan12- Present)Abhijeet Cement Ltd. (Nagpur) : Asst. Manager (Projects) (Feb11-Dec11)Holtec Consulting Pvt. Ltd. (Gurgaon) : Project Executive (May08–Feb11)
Key Responsibilities
1 of 3
Project Engineering
Conceptualizing plant / system ( Checking of capacity calculations & process selection) Review / Prepare / Approval of concept layout and plant flow sheet. Technology Selection for different Systems / Machines and processes applying company’s design
philosophies and technical specifications & criteria. General arrangement drawing Review / Approval Conceptualizing Utility systems ( Compressed air and water distribution)
Project Procurement
Preparation of Tender document for Main plant & machinery and Aux. Equipment keeping optimization in view
Preparation of Technical evaluation report for Main & Auxiliary machinery and services. Assisting in order finalization and contract formulation.
Project Management & Control
Preparing detailed project schedule & project Control Co - Ordination with OEM suppliers, technical Consultant, Internal team and execution team on
various issues Follow - up with OEM suppliers, technical Consultant, Internal & site Team to ensure timely
delivery of deliverables to ensure smooth and on time project growth
Strategy & Expansion
Providing Technical Support to Strategy team for finalizing TEFR (Techno Economical feasibility Report)
Optimization/Debottlenecking/Maintenance/Operation
Addressing and analyzing various maintenance/operation related issue and provide solutions. Suggesting up-gradation of Machinery & System for better operation parameters Preparing Optimization/ Upgrade proposals and presenting it to Top Management.
Relationship Management
Establish and maintain harmonious relationships with all Stakeholders involved in the Project Implementation.
Work cohesively with other departments both Internal/External to improve on Customer Satisfaction and satisfaction of external parties involved.
Identifying potential risk and keep action plan ready to cope up the situation. Building a Good Project Team to meet the expectations of the Organization for Timely Completion
of Projects.
Document Control
Preparing equipment dossier and inter department co – ordination for system optimization Document control and Assisting in Project management Preparation of various Project reports by coordinating with all dept. at site and corporate office
Skills
2 of 3
MS Project, MS Office, MS Visio, MS Robotic Studio Mat lab and Simulink SAP Various Engineering and Management related software
Training Exposure
Training on French Language. Training on MS Project at Holtec Consulting Pvt. Ltd. 45 days Industrial Training at Thermal Power Plant located at Shambhupura, Chittor (Raj) Training on MATLAB at REC Rewa.
Academic Qualifications
Bachelor of Mechanical Engineering with first with Hons degree from R.E.C. Rewa in August 200710+2 from Ujjain Public School with first division in May 200310th from S.V.M. Ujjain with first division in May 2001
Capabilities
Innovative & Technology Management Leadership skills & Team Management Willingness to accept challenges, Flexible Optimization and Excellence
Career Achievements
Engineer Scientist in ISRO (Selected) Championship winner :
o Inter college chess championship (3 years)o Inter Holtec Football championship (Captioned Department’s team)
Awarded for Best technical Case study 2009 at Holtec consulting Pvt. Ltd
Member of Management committee of engineer's day function & organized several functions at college.
Lead school & college and achieved many applaud in debates, extempore & speeches.
Personal Details
Date of Birth : 31st March 1986Hobbies : Learning new skills, adventure sports & PC based strategy Games
3 of 3