root causes
TRANSCRIPT
Unrealis)c Performance Expecta/ons, missing Measures of Effec/veness (MoE), and Measures of Performance (MoP)
Unrealis)c Cost and Schedule es/mates based on inadequate risk adjusted growth models.
Inadequate assessment of risk and unmi/gated exposure to these risks without proper handling plans.
Unan)cipated technical issues without alterna/ve plans and solu/ons to maintain effec/veness.
Unan/cipated Cost and Schedule Growth
The Lens of the
Perform
ance
Assessmen
t “Borrowed” with permission from Gary Bliss, Director, Performance Assessments and Root Cause Analyses (PARCA), Office of Assistant Secretary of Defense for Acquisi/on. Originally Observa/ons from AT&L/PARCA's Root Cause Analyses February 16th, 2011
1
IPMR is our lens to reveal early unan/cipated growth in Cost and Schedule through early assessment of physical percent complete, .e.g. Technical Performance Measures
4 Root Causes of ACAT1 Program Performance Shor\alls