s1-001 - foundation plan
TRANSCRIPT
B1
B2
B3
B4
B5
B7
B9
BC
BB
BD
BE
C1
C2
C3
C4
C6
CE
CD
CB
A3 A2 A1
AF
AE
AD
CG
A2.5 A2.3
CH
CH
DA
C7
C9
C10
D9
D8
D7
D6
D5
D2
CF
C5
EA
E2
E1D10
CA
D1
DB
D3
A3.7
DC
AB
AC
C8
B10
A2.7
AA
B6
D4
B8
A4
E3
CC
CD.2
A5
BAB4.6
D5.6
C11
26' - 0"
20' - 11 7/8"
30' - 8"
16' - 0"
27' - 6"
27' - 2"
41' - 6 1/4"
17' - 7 7/8"
50.0°
14.0°
16.0
°
112.0°
14.0°
40.0
°
76.0°
60.0°
60.0°
58.0°
32.0°
90.0°
30.0°
76.0°
90.0°
40.0°
THICK CONCRETE SLAB ON GRADE REINFORCED W/ @ - REBAR SHALL BE CHAIRED TO MAINTAIN THEREINFORCING AT ONE THIRD THE DEPTH BELOW THE TOPSURFACE DURING CONCRETE PLACEMENT. PLACE SLABOVER 36" COMPACTED FILL - RE: GEOTECHNICAL REPORT.
16" O.C.#44"
THICK CONCRETE SLAB ON GRADE REINFORCED W/ @ - REBAR SHALL BE CHAIRED TO MAINTAIN THEREINFORCING AT ONE THIRD THE DEPTH BELOW THE TOPSURFACE DURING CONCRETE PLACEMENT. PLACE SLABOVER 36" COMPACTED FILL - RE: GEOTECHNICAL REPORT.
16" O.C.#45"
GARAGE SLABS:
LOBBY / RESIDENTIAL SLABS:
THICK CONCRETE SLAB ON GRADE REINFORCED W/ @ - REBAR SHALL BE CHAIRED TO MAINTAIN THEREINFORCING AT ONE THIRD THE DEPTH BELOW THE TOPSURFACE DURING CONCRETE PLACEMENT. PLACE SLABOVER 36" COMPACTED FILL - RE: GEOTECHNICAL REPORT.
12" O.C.#57"
LOADING / BACK OF HOUSE SLABS:
7.91
%
DD
D9.9
D8.5
1
S3.101
7 1/2"
2
S3.103
1' - 5 3/8"
21' - 5"
23' - 11 1/8"
19' - 5 7/8"
3' - 5"
AE.9
C1.3CB.9
CB.1
CD.9
B1.3
BD.9
BB.1
SW-1.3
SW-1.3
SW-1.2
SW-1.4
SW-1.4
SW-1.1
SW-4
SW-2
SW-3
SW-5
BE.1
BC.3
C-5
C-3
C-4
C-5C-6
C-13
C-14
C-13
C-14
C-5
C-5
C-4
C-5
C-4
C-4
C-5
C-5
C-4
C-5
C-5
C-4
C-13
C-13C-1
C-13
C-13
C-13
C-1
C-13
C-13 C-13
C-1 C-18
C-5
C-4
C-19
C-18
C-18
C-19
C-5
C-4
C-11 C-11
C-10
C-5
C-10 C-3C-1
C-17C-4
C-13
C-4C-5C-5C-16
C-7
C-20
C-1
C-20C-21
C-13
C-13
C-13
C-13
C-13C-13
C-1
C-13
C-13C-19
C-19
C-19
C-1
C-13
C-13
C-13
C-13
C-18C-18
C-13
C-18
C-1
C-9
C-9
C-9
C-9
C-13
C-1
C-13
C-17
C-1
C-13
C-19
C-5
C-6
C-8
C-13
C-14
C-4
29' -
0"
15' -
7"
17' -
5"
28' -
4"
14' -
2 3
/4"
2' - 1
0 1/
4"
18' - 5 3/4"
17' - 2 1/4"
27' - 2"
17' - 7"
17' - 0 1/2"
28' - 9 1/2"
17' - 0"
20' - 1 1/8"
21' -
3 7/8"
20' -
0"
20' -
0"
20' -
0"
29' -
0"
20' -
0"
20' -
0"
9' - 0"
11' -
0"
20' -
0"
29' -
0"
20' -
0"
29' -
0"
29' -
0"
27' -
0"
13' -
9"
25' -
0"
29' -
0"
107'
- 5"
98' - 1"
29' - 0" 20' - 0" 20' - 0" 29' - 1"
17' - 10" 6' - 0" 14' - 0" 5' - 0" 4' - 0"
2' - 6"
4' - 6" 4' - 0"
170' -
3 7/8
"
12' -
0"
8' - 0"
82' - 11 1/8"
16' - 0"
27' - 6"
17' - 6"
14' - 5 1/2"
1' - 1" 15' - 11 1/2"
1' - 5 1/4"17' - 2 1/4"
3' - 9 1/2" 20' - 8"
2' - 8 1/2"
2' - 0
"18
' - 0"
5' - 0
"
9' - 0
"
15' -
0"
94' - 10 1/2"
21' - 4"
29' - 0"
29' - 0"
20' - 8"
19' - 3"
20' - 0 3/4"
18' - 11 3/4"
20' - 1 1/2"
29' - 2"
10' - 0"9' - 3"
207' - 7"
1' - 1"2' - 8"
17' - 7"
1' - 1"
5' - 3
1/2"
14' -
11 3/
8"
2' - 7"
1' - 1"
15' - 11 1/2"
22' - 5"
6' - 4 1/2"
15' - 8 1/8"
1' - 3 7/8"
18' - 1 1/8"
2' - 0"
221'
- 9"
10' -
9"
18' -
3"
C-1
SW-7
SW-6
LEVEL 1T.O. SLAB = 0"
D6.3
BA.2
A4.7 A2.6
2
S3.105
1
S3.100
12" T
HK. MIN.
17.5"
THK. M
AX.
ELEVATED 12
" THK. M
IN.
5" TH
K. SOG
17.5"
THK. M
AX.
ELEVATED 12
" THK. M
IN.
5" TH
K. SOG
17.5"
THK. M
AX.
B1.2
D5.4
C1.1
C6.2
CC.9
RAM
P U
P15
.98%
4
S3.102
2
S3.101
PC-4
PC-5 PC-5
PC-3
PC-4
PC-9
PC-6PC-2
PC-1
PC-2
PC-6
PC-4
PC-1
PC-1
PC-1PC-2
PC-3
PC-1
PC-3
PC-1
PC-8
PC-9
PC-6
PC-3
PC-4
PC-3
PC-3
PC-3
PC-3
PC-2
PC-4
PC-9
PC-7
PC-4 PC-4
PC-7
PC-3
PC-1
PC-3
PC-2
PC-3
PC-2
PC-3
PC-2
PC-2
PC-6
PC-6
PC-8
PC-6
PC-2
PC-2
PC-4
PC-6
PC-7
PC-4
PC-2
PC-2
PC-1
PC-1
PC-2
PC-1
PC-4
PC-2
PC-4
PC-2
C-1
7
S4.104
PC-4
C-12
6
S3.1028
S3.102
S2.4011
S2.4031
S2.4041
S2.4051
S2.4061
2
S3.104
S2.4071
-0'-4"
-0'-7 1/2"
-0'-7 1/2"
-0'-3"
-0'-3"
-0'-3"
-0'-3"
-0'-3"
-0'-7 1/2"
4" THK.
7" THK.
7" T
HK.
4" T
HK.
4" THK.
7" THK.
7" T
HK.
T.O. SLAB = -2"
T.O. SLAB = -2"
2"
T.O. SLAB = 0"
CIVIL = 41.70
5
S3.104
6
S3.107
1
S3.102
2
S3.102
5
S3.102
-0'-7 1/2"
-0'-7 1/2"
-0'-7 1/2"
-0'-7 1/2"
-0'-4"
-0'-4"
8
S3.105
7
S3.102
1
S3.103
.D8.83
S3.103
5
S3.103
6
S3.103
PARKING
C3.5
12' - 0 3/4"
7
S3.103
7
S3.103
.
8
S3.103
1
S3.104
5
S4.100
10
S3.103
C-10
9
S3.103
STAIR 3
STAIR 5
STAIR 1
STAIR 2
S5.410
1Elevation E
S5.4102
Elevation F
S5.411
2Elevation G
S5.4111
Elevation H
S5.410
3Elevation A
S5.411
3
Elevati
on B
S5.412
2 Elevation C
S5.4121 El
evat
ion
D
PC-2
PC-8
PC-4A
9
S3.102
4
S3.103
4
S3.103
.
3
S3.104
8
S3.106
3
S3.102
3
S3.102
.
3
S3.102
.
3
S3.102
.
7
S3.107
S4.10011
.
4
S3.104
1' - 0"1' -
0"
1' - 2"
1' - 4"
10"
7 1/2"
8" HIGHCONC.CURB
8" HIGHCONC.CURB
11 3/4"4' - 0" 5' - 5 1/4"
2' - 4 1/2"4' - 2"
8"5'
- 2 1
/2"
1' - 11"
5' - 4 1/2"
2"6"
11' -
8 5/8"
4' - 8
1/2"
3' - 5
7/8"
8"
1' - 4"
8"
4"
C-9
13
S4.004
.
4
S3.106
5
S3.104
.
1
S3.105
3
S3.105
4' - 4"
6' - 6
3/8"
4
S3.105
5
S3.105
6
S3.105
7
S3.105
8
S3.103
.
9
S3.103
.
9
S3.103
.
9
S3.103
.
9
S3.105
7
S3.103
.
1
S3.106
7
S3.103
.
2
S3.106
3
S3.106
5
S3.106
7
S3.1066
S3.106
5
S3.104
.
5
S3.104
.
2
S3.107
4
S3.107
3
S3.107
2"
5
S3.107
1
S3.108
5
S3.107
.
STAIR 4
8
S3.107
RAMP DN 0.95%
9
S3.10710
S3.103
.
9
S3.107
.
10
S3.103
.
9
S3.107
.
10
S3.107
10
S3.103
.
1' - 0"
1' - 3"
3
S3.108
2
S3.108
4
S3.108
5
S3.108
6
S3.108
6
S3.108
.
7
S3.108
8
S3.108
9
S3.108
10
S3.108
4" T
HK.
11
S3.108
FOUNDATION NOTES:
1.) TOP OF CONCRETE ELEVATION = SEE PLAN.
2.) SLAB THICKNESS = SEE PLAN.
3.) CONCRETE STRENGTH SEE SPEC.
4.) C-"X" INDICATES C.I.P. CONCRETE COLUMN.SEE SHEET S5.100 FOR SCHEDULE.
5.) SW-"X" INDICATES CIP CONCRETE SHEAR WALL.SEE SHEETS S5.200-S5.229 FOR SCHEDULE, ELEVATIONS, & PLANS.
6.) REINF. @ POOL CONST. JOINTS TO BE EPOXY COATED.
7.) = INDICATES ELEVATION RELATIVETO FINISH FLOOR ELEVATION.
8.) = CMU WALLS.
9.) = CMU WALLS ABOVE 2'-9" TALL BUMPER WALL.
10.) = INTERIOR CMU WALLS, ALL CELLS FIRST 5 COURSESREINF. W/ #5 @ 8" O.C. VERT. & FILLED W/ 2,500 PSIGROUT.
11.) ALL REBAR #9 AND LARGER TO BE 75 KSI STEEL.
12.) SEE SHEETS S3.001-S3.004 FOR ENLARGED PILE CAP DETAILS.
13.) SEE SHEET S1.002 FOR TOP OF PILE CAP ELEVATIONS.
X'-X"
TEMPERATURE MONITORING NOTES:
1.) TEMPERATURE MONITORING SHALL BE CONDUCTED AT THE PILE CAPS WITH A TOTALTHICKNESS OF GREATER THAN 5'-6". TEMPERATURE MONITORING SHALL CONSIST OF(12) TEMPERATURE TREES CONSISTING OF (4) MATURITY METERS. TEMPERATURE READINGTO BE TAKEN AT 6 HOUR INTERVALS AND REPORTED TO THE STRUCTURAL ENGINEER ON ADAILY BASIS UNTIL NOTICE IS GIVEN TO DISCONTINUE.2.) PROVIDE CURING BLANKETS TO TOP OF PILE CAPS TO MINIMIZE TEMPERATURE DIFFERENTIAL.
1' - 0
"1'
- 0"
MID
-DEP
TH O
F PI
LE C
AP
1' - 0
"
(4) MATURITY METERSPER TEMPERATURE TREE
Drawn By:
Checked By:
Project Number:
Sheet Number:
© 2013 Solomon Cordwell Buenz
Foundation Plan
HOUSTON, TEXAS
CAMBRIDGE &HOLCOMBEAPARTMENTS
S1.001Author
Checker
214080
3/32" = 1'-0"1 Foundation Plan - Level 1
3/4" = 1'-0"Temperature Monitoring Detail
NO. DATE DESCRIPTION07.10.2014 Schematic Design2014.07.15 SD Addendum #12014.09.05 50% Design Development2014.09.26 Superstructure Bid Package2014.10.03 Design Development2014.11.03 Superstructure Permit2014.11.21 95% GMP