s4 satyendra kumar (lanco solar)

15
© LANCO Group, All Rights Reserved © LANCO Group, All Rights Reserved POWER EPC INFRASTRUCTURE SOLAR RESOURCES Venue: The Gateway Hotel, Jodhpur Date: September 13, 2011 Workshop for Solar Energy and Smart Grid Development, Sept 13-15, 2011

Upload: adbsaenprojects

Post on 22-Feb-2015

285 views

Category:

Documents


2 download

TRANSCRIPT

© LANCO Group, All Rights Reserved© LANCO Group, All Rights Reserved

POWEREPC INFRASTRUCTURESOLAR RESOURCES

Venue: The Gateway Hotel, Jodhpur Date: September 13, 2011

Workshop for Solar Energy and Smart Grid Development, Sept 13-15, 2011

© LANCO Group, All Rights Reserved

One of India’s leading Integrated Infrastructure players

Gross Revenue over11000 crores(as on March 2011)

Diverse businesses in 5 Sectors

Global Presence(20 states in India &7 other Countries)

Employees over 7000

Partners in progress: Genting, Harbin, GE, Dongfang, Doosan etc

Member of

Corporate Overview

© LANCO Group, All Rights Reserved

Relevance: Lanco Group- Pan India Presence

3290 MW of Installed Capacity (Thermal, Hydro, PV)

8000 MW Power Plants under construction

Largest Pvt Sector Power Trader

Strong EPC Capabilities

7000 Employees

© LANCO Group, All Rights Reserved

Strategy• Use Lanco group’s leverage as an EPC player to become an important player in

Solar Thermal space, globally

• Scale can be achieved by offering complete solution, at a competitive price

• Place teams in established as well as upcoming markets, globally, to develop healthy project pipeline, supply-chain logistics and specialized knowledge base

Lanco Solar Thermal – Value chain strategy

DeveloperDeveloper EPCEPC O&MO&M Asset Management

Asset Management

© LANCO Group, All Rights Reserved

Diwakar Solar – 100 MW

• Location – Askandra village, Nachna Tehsil, Jaisalmer district, Rajasthan• Capacity – 100MW with 4 hour Thermal Energy Storage (Molten Salt)• Technology: Parabolic Trough• Technology Tie-up: Initec energia SA, a group company of ACS Cobra

group.• EPC: Lanco Solar energy Private Limited.• Estimated CUF = 35%• Financing: Closed - (Debt – Consortium of Banks) + Equity (Diwakar Solar)• Present status – Basic engineering is currently under progress. Major

equipment orders are being placed.• Timelines – Project is on track to be commissioned as per the timelines

indicated in the PPA.• Target COD – March 2013

© LANCO Group, All Rights Reserved

Our View on the Mission – a National Opportunity

- Job Creation (at all levels : unskilled to highly skilled)- Wealth Creation

- Knowledge Creation

- Lower Costs- Widespread use of clean solar power

© LANCO Group, All Rights Reserved

Solar – Knowledge base and Technology

Grid Extension, Availability and Stability

Solar Photovoltaics (PV)

Technology PV production – whole value chain

Equipment PV production – whole value chain

Grid Connected Solar Farms – EPC, Inverters, Monitoring Systems

Design and Engineering

Solar Thermal (CSP)

Equipment/Technology: Solar Fields, Power Block

Suitability of technology for local geographic and environment conditions

Technology

Equipment

Design and Engineering

Risk Assessment and Insurance

Solar Resource Assessment (GHI, DNI) : Satellite Based Estimates & Ground Measurements

Financing

© LANCO Group, All Rights Reserved

Salt storage – Generate steam at night!

Source: SENER, SolarPACES

© LANCO Group, All Rights Reserved

CSP - Parabolic Trough

• Steam turbines specific for solar • Absorber tubes• New generation heat transfer fluids like

molten salts etc• Direct steam generation• Heat storage media

© LANCO Group, All Rights Reserved

Demo Projects - Proposed configurations :Global Case 1 bidding

Sl # Technology configurationNo of

projects Other remarks

1

Up to 50 MW capacity with air/ hybrid cooling; the minimum capacity would be 20 MW. 1

Reduction in water consumption to 25% or less of the benchmark figure of 3000 litre per MWh. Stand alone solar power plant with up to 10% energy from auxiliary source

250 MW capacity with up to 30% gas hybridization 1

Total gas consumption in a year will not be more than 30% of the total generation of the plant based on total units of electricity generated in a year.

350 MW capacity having operating temperature over 500 C 1

Stand alone solar power plant with up to 10% energy from auxiliary source

4Solar Augmentation of the existing coal thermal power plant

To bedecided

Integration Strategy: Solar energy to be added to supply steam to the plant’s cold reheat line and/ or the steam extraction lines for the plant’s feed water heater.· Energy output of the solar plant to be monitored against declared performance.· May be considered under R&D programme to provide capital subsidy.

5Solar - biomass hybrid plant of 1- 3 MW capacity

4 to 5 projects

The turbine capacity to be maximized for solar radiation conditions.· Solar contribution to be over 25%.· The developer to have dedicated biomass supply chain for the project

6

Base load capacity solar stand alone plant of up to 10 MW capacity; the minimum capacity would be 3 MW. 1

The project may have thermal storage for non-solar hours with up to 10% energy from auxiliary source

© LANCO Group, All Rights Reserved

1. Air cooling

• Up to 50 MW capacity with air/ hybrid cooling; the minimum capacity would be 20 MW.• Reduction in water consumption to 25% or less of the benchmark figure of 3000 litre per MWh.• Stand alone solar power plant with up to 10% energy from auxiliary source

– ACC is a critical technology for CSP, given that water may not be available for all future projects.

– Hence this option must be explored.– Project size may be capped at 50MW, but storage should also be allowed – to take

advantage of lower backpressures at late evenings/night.

© LANCO Group, All Rights Reserved

2. Gas hybrid

• 50 MW capacity with up to 30% gas hybridization• Total gas consumption in a year will not be more than 30% of the total generation of the plant

based on total units of electricity generated in a year.

– Gas support helps to stabilize the operations of a CSP plant.– This would require a natural gas fired heater in the plant.– But there is no great technology aspect to gas support.– Gas support should be considered for innovative configurations– Gas supply must be clearly provided by government at a fixed price for the duration of the

PPA.

© LANCO Group, All Rights Reserved

3. Working temp > 500 C

• 50 MW capacity having operating temperature over 500 C• Stand alone solar power plant with up to 10% energy from auxiliary source

– This would mean either:• parabolic trough technology with molten salt as HTF (Archimede) or• power tower technology (SENER, Solar Reserve, BrightSource etc)

– Except SENER none has a commercially operating plant as of today.– Technology risk is significant.

– This option may be clubbed with the option 6 “Base load plant”, to create a project of higher capacity.

© LANCO Group, All Rights Reserved

Summary

• The Idea of Demo Projects to Introduce/Validate new Technologies is excellent

• Case -1 bidding at present may not yield desired results

• BOT model may be explored

© LANCO Group, All Rights Reserved

Thank you!

[email protected]