scada survey formats
TRANSCRIPT
-
7/29/2019 SCADA Survey Formats
1/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:Page-1/Cover
Date of Visit:
Sl. No. Details Particulars Remarks
1 Name of the Transmission Zone
2Name of the ESCOM in case of
33 kV Station and O&M Circle
3 Name of the W&M Circle
4 Name of the TL&SS Dn.
5 District
6 Name of the substation :
7 Voltage Class
8 Code No. of the Station
9 Address of the Sub Station
10 VSAT No.
11 PSTN No.
12 FCT/Mobile No.
13Approximate distance from
Nearest Airport
14 Customer Project Coordinator
15 Name of the Nodal Officer
16 Date of Commissioned
17 GPS - Longitude
18 GPS - Latitude
19 GPS - Elevation
-
7/29/2019 SCADA Survey Formats
2/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code
Page-2/Control Room
Date of Visit:
Sl. No. Control Room Details Particulars Remarks
1 Lay out Diagram of the Control Room
2Is there any space in the CR for
installing RTU and Interface Cabinet ?
3Is there any space in Battery Room to
install UPS Batteries ?
4 Is there any place in the PLCC Room toinstall RTU and IF Cabinet ?
5 Locate position of RTU
6 Locate the position of IF Cabinet
7What is the distance between RTU and
associated equipments to Earth Strip ?
8Whether all indication lamps are
functional ?
9Type of TTB, whether 3 Ph-3W or 3 Ph-
4W System employed in Panels
10 Do you suggest additional TTBs ?
11Whether Control Cables brought from
Yard to Control Room are intact ?
12Do you suggest any new cables to be
laid and brought from Yard ?
13 Is the Annunciation Desk working ?
14 Is the 11 kV Desk working ?
-
7/29/2019 SCADA Survey Formats
3/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code
Page-3/Single Line Dgm.
Date of Visit:
Sl. No. Control Room Details Particulars Remarks
1
Single Line Diagram of the Station
showing all existing points as well as
future points
2 Make sure that available CT Ratios andconnected CT Ratio is marked
3
Make sure that Breakers, CTs, PTs,
LAs, Reactors, Capacitor Banks,
Isolators, Earth Switches, Bus
Couplers, are shown in SLD
-
7/29/2019 SCADA Survey Formats
4/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-4/Circuit Breakers. Date of Visit:
Local
Manual
Local
Electrical
Remote
Electrical
1
2
3
4
5
6
7
8
9
10
11
12
13
1415
16
17
18
19
20
21
22
23
24
No. of
Aux.
Contacts
Type of Operation
RemarksType
Rupturing
MVA
Rating
DC Trip
VoltageSl. No. Voltage
Line/Trr/Capacitor
Bank DetailsMake
Whether
Potential free
Contacts are
avilable or not
-
7/29/2019 SCADA Survey Formats
5/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-5/Isolators Date of Visit:
Local
Manual
Local
Electrical
Remote
Electrical
1
2
3
4
5
6
7
8
9
10
11
12
1314
15
16
17
18
19
20
21
22
23
Type
No. of Aux.
Contacts
available or
not
Sl. No. Voltage
Line/Trr /
Capacitor
Bank Details
Make
Whether Control
and Indication
wiring is brought
to C&R Panel ornot
Type of Operation
-
7/29/2019 SCADA Survey Formats
6/19
Remarks
-
7/29/2019 SCADA Survey Formats
7/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Page-6/Transformers Station Code:
Date of Visit:
HV IV LV HV IV LVLocal
Manual
Local
Elec.
1
2
3
4
5
6
7
8
9
Max.
Load in
MWs
recorded
Type of OLTCVoltage Current
Class of
Cool-ing
Vector
Group
Sl.
No.
MVA
RatingMake
Whether
wiring has
beenbrought to
CR to record
Oil temp,
winding
Temp and
Fan Control
% Z
-
7/29/2019 SCADA Survey Formats
8/19
TAP POSITION
Remote
ElectricalMIN NORMAL MAX
Operation
-
7/29/2019 SCADA Survey Formats
9/19
DETAILED SURVEY FORMAT FOR STATION
Station:
Station Code:
Page-7/Energy Meters
Date of Visit:
Electro-
MechanicalETVM
ETVM with
ABT FeaturesCT PT Meter
Overall
Mult
Factor
Optical RS-232 RS-4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Sl.
No.
Line/Trr/
FeederMake
Type of Energy Meter
Voltage
Constants
Model No
Ports Available
-
7/29/2019 SCADA Survey Formats
10/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-8/CTs Date of Visit:
1
2
3
4
5
6
7
8
9
10
1112
13
14
15
16
17
18
19
20
21
22
23
Sl. No. Line/Trr/Feeder MakeVoltage
LevelRemSerial No.
Accuracy
ClassAvaialble Ratios
Connected
Ratio
-
7/29/2019 SCADA Survey Formats
11/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-9/PTs
Date of Visit:
1
2
3
4
5
6
7
8
9
10
1112
13
14
15
16
17
18
19
20
21
22
23
Sl. No. Voltage Level Line/Trr/Feeder Make RemarksSerial No.Accuracy
ClassVoltage Ratio
-
7/29/2019 SCADA Survey Formats
12/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-10/Relays
Date of Visit:
Electro-
MechanicalStatic Numeric
No. Port
AvailableOptical RS-232 RS-48
1
2
3
4
5
6
7
8
9
1011
12
13
14
15
16
17
18
19
20
21
Model
No
Ports Available
Sl. No.
Relay in
Line/Trr/Bus
Coupler Panels
Type of Relay
MakeVoltage
-
7/29/2019 SCADA Survey Formats
13/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-11/C&R Panels
Date of Visit:
OC EF REFMaster
TripDifferential Distance LBB
Trip Coil
Supervision
DC Supply
Supervisio
1
2
3
4
5
6
7
8
910
11
12
13
14
15
16
17
18
19
20
Relays
Sl. No.
C&R Panel for
Line/Trr/Bus/ Bus
Coupler
Make
-
7/29/2019 SCADA Survey Formats
14/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-12/Power Supply
Date of Visit:
Sl. No. Power Supply Details Particulars Remarks
Part-A- A/C Supply
1 Aux. Trr. Details
2 LT A/C Ph-Ph Voltage
3 LT A/C Ph-Neutral Voltage
4 Neutral to Ground Voltage
5 No. of Circuits
6 Whether MCCBs are Functioning?
7 Whether Fuses are intact?
Part-B- D/C Supply
1 DC Voltage for Breakers on HV
2 DC Voltage for Breakers on IV
3 DC Voltage for Breakers on LV
4 Details of Battery Sets
5 Details of Battery Charger
6 Details of Battery Sets of PLCC
7 Details of Battery Charger of PLCC
Part-C- UPS
1 Is there any UPS in the Station?
2 Capacity & Make
3 Identify place for UPS in this Project
-
7/29/2019 SCADA Survey Formats
15/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code:
Page-13/Station Layout
Date of Visit:
Sl. No. Layout Details Particulars Remarks
1Draw approximate Layout Sketch of the
Yard
2 Whether Ground Mat exists ?
3 What is the Ground Resistance ?
4 Are LA Grounds intact ?
5Do you suggest separate LA Ground
also ?
-
7/29/2019 SCADA Survey Formats
16/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station Code
Page-14/Existing Automation
Date of Visit:
Sl. No. Existing Automation Details Particulars Remarks
1 WhetherIF Point ETVMs are instaled ? Yes/No
2 Whether RS-485/232 Converter instaled? Yes/No
3 Whether ETVMs are wired to Converter? Yes/No
4 Whether PSTN Modem Installed ? Yes/NoNot reqd. in this
Project
5 WhetherFeeder ETVMs are read ? Yes/No
6 What is the Mode of Communication? RF/GSM/PSTN
7 Is the System working ? Yes/No
8 Where Data is gathered ? Yes/No
9 WhetherLine ETVMs are read ? Yes/No
10 What is the Mode of Communication? RF/GSM/PSTN
11 Is the System working ? Yes/No
12 Where Data is gathered ? Yes/No
13 Are Micro-Controllers Installed ? Yes/No
14 What is the Mode of Communication? RF/GSM/PSTN
15 Is the System working ? Yes/No
16 Where Data is gathered ? Yes/No
17Any other Data Acqusition Programe of
ESCOM.
18
-
7/29/2019 SCADA Survey Formats
17/19
DETAILED SURVEY FORMAT FOR STATIONS
Station:
Station CodePage-15/Earthing
Date of Visit:
Sl. No. Control Room Details Particulars Remarks
1Is the Earth Mat strip extended to
Control Room ?
2 What is the Ground Resistance?
3 Is the Earth Mat intact?
4Is there any protection to Control Room
against Lightning?
5Is the Control Room situated within 30
0
shielding angle of the Yard LAs ?
6Is the Control Room situated right
underneath Faraday's Cage?
7What is the distance between RTU and
associated equipments to Earth Strip ?
-
7/29/2019 SCADA Survey Formats
18/19
DETAILED SURVEY FORMAT
Station:
Station Code:
Page-16/Minor SCADA Adaptation
Date of Visit:
Sl. No. Layout Details Particulars Remarks
1 Whether 11 kV Desk is available ?
2 Is it available for all Banks?
3 Whether Controls are working ?
4 Whether Indications are working ?
5 How may Controls are not working ?
6 How many indications are not functioning ?
7 How many Control Contactors you need ?
8 How many Closing Coils you require ?
9 How mauch 19 Core 2.5 sq mm cable you require ?
10Do you require an additional 6 " PVC Pipe and the Length
?
11
List the BoQ for indications bulbs, LEDs, Control knobs
and misc. materials, required for this purpose.
12Measure length of 50 X 6 mm MS Flat required to connect
CI pipe to Yard Earth Mat
13Measure length of 50 X 6 mm MS Flat required to connect
CI pipe to 11 kV Kisoks
14
Measure length of 50 X 6 mm GI Flat required to connect
CI pipe to Control Room to terminate to C&R panels ,
VSAT and RTU.
15Count how many indication Contactors have failed in HV
side
16Take the inventory of Indication Lamps to be repllaced for
CB open and Close
17 Do you require additional wiring for this activity ?
-
7/29/2019 SCADA Survey Formats
19/19
Sl. No. Layout Details Particulars Remarks
18
For Indication to identify 'Operaion through SCADA' take
inventory of Indication Bulbs/LEDs required for all
switchable equipments, with Push to re-set arrangement.
19Install one common alarm for 'opeartion through SCADA'
in main Annunciation Board.
20 How much control cable you require for this activity ?