seattle’s testing and application of low impact development bmps in wwhm3 july 2006 doug...

39
Seattle’s Testing and Seattle’s Testing and Application of Low Impact Application of Low Impact Development BMPs in Development BMPs in WWHM3 WWHM3 July 2006 July 2006 Doug Beyerlein, P.E. Doug Beyerlein, P.E. Clear Creek Solutions, Inc. Clear Creek Solutions, Inc.

Upload: kathlyn-atkinson

Post on 16-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Seattle’s Testing and Seattle’s Testing and Application of Low Application of Low

Impact Development Impact Development BMPs in WWHM3BMPs in WWHM3

July 2006July 2006

Doug Beyerlein, P.E. Doug Beyerlein, P.E.

Clear Creek Solutions, Inc.Clear Creek Solutions, Inc.

Page 2: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Seattle’s Testing and Seattle’s Testing and Application of Low Application of Low

Impact Development Impact Development BMPs in WWHM3BMPs in WWHM3

Presented at Stormcon 2006 in Presented at Stormcon 2006 in Denver, CODenver, CO

© 2006 Clear Creek Solutions, Inc.All rights reserved.

Page 3: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Clear Creek Solutions’ Clear Creek Solutions’ Stormwater LID ExpertiseStormwater LID Expertise

Clear Creek Solutions, Inc., provides complete range of hydrologic and stormwater modeling services.

• Clear Creek specializes in continuous simulation hydrologic modeling.

• We have 30+ years of experience modeling complex hydrologic and stormwater problems.

• We created the Western Washington Hydrology Model Version 3 (WWHM3) for Washington State Department of Ecology.

• We teach WWHM and HSPF workshops.

Page 4: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

PresentationPresentation

IntroductionIntroduction

Eco-Roof ModelingEco-Roof Modeling

Bioretention Swale ModelingBioretention Swale Modeling

Questions & AnswersQuestions & Answers

Page 5: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Introduction

Seattle Public Utilities (SPU) is using new approaches to managing stormwater with the use of BMPs that mimic natural drainage systems.

These BMPs are designed to:1. Manage flooding in neighborhoods2. Improve the appearance and function

of the street right-of-way3. Provide responsible stewardship of the

environment4. Help the City meet local, state, and

federal environmental regulations

Page 6: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Introduction

Seattle Public Utilities (SPU) has selected the following LID practices that can be used to return Seattle neighborhood creeks to more natural conditions:

1. Eco/green/vegetated roofs2. Bioretention/landscape swales/rain

gardens3. Rainwater cisterns4. Compost amended soils5. Porous pavements

Page 7: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsGreen/vegetated/eco-roof

Page 8: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsGreen roofs

Page 9: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsRain garden/bioretention/landscape swale

Page 10: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsRain garden/bioretention/landscape swale

Page 11: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsRainwater cisterns

Page 12: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsCompost amended soil

Page 13: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsPermeable/porous pavement

Page 14: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Examples of stormwater LIDsPermeable/porous pavement

Page 15: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Introduction

Seattle Public Utilities (SPU) uses monitoring and computer modeling to evaluate the effectiveness of different LID BMPs.

LID computer modeling has been achieved by adding the LID practices to the Washington State Department of Ecology’s Western Washington Hydrology Model (WWHM), developed by Clear Creek Solutions, Inc.

Page 16: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Stormwater Modeling

Traditional: Single event

Today: Continuous simulation

Page 17: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Stormwater ModelingStormwater Modeling

Single event modeling doesn’t work because:

Single-event flow frequency standards are based on inappropriate assumptions.

The need is to NOT increase flow durations for the range of erosive flows (for Western Washington the range is from 1/2 of the 2-year to 50-year flow event).

Page 18: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Stormwater Modeling

Today: Continuous simulation

Continuous simulation hydrology models the entire hydrologic cycle for multiple years.

Page 19: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Western Washington Hydrology Model (WWHM)

Developed for the State of Washington Department of Ecology.

Project Manager: Dr. Foroozan LabibDepartment of EcologyPO Box 47600Olympia, WA 98504-7600(360) 407-6439email: [email protected]

Page 20: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Western Washington Hydrology Model (WWHM)

Developed for the 19 counties of western Washington.

Part of Ecology’sStormwater ManagementManual

Page 21: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

WWHM

Available free from the Washington State Department of Ecology web site:

http://www.ecy.wa.gov/programs/wq/stormwater/

Page 22: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

WWHM

Flow duration standard: based on erosive flows.

Erosive flow range: ½ of the 2-year to the 50-year

Page 23: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

WWHM

Guidance/help is provided by User Manual Training Workshops CCS Project Book

Page 24: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

WWHM: LID Modeling

WWHM3 includes the following LID options:

Green roof/eco-roof/vegetated roof

Bioretention/rain garden/landscape swale

Page 25: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingStudy performed for Seattle Public Utilities

Eco-roof modeled: Portland Hamilton Building

Data provided by Portland BES

Page 26: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingPurpose: To determine appropriate HSPF hydrology parameter values to represent the eco-roof’s shallow soil depth and lack of a groundwater reservoir.

Page 27: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingModel Results: West Roof (2002-2005)

Page 28: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingModel Results: East Roof (2002-2005)

Page 29: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingModel Results: West Roof (January 2004)

Page 30: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingModel Results: East Roof (January 2004)

Page 31: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingSeattle Roof Flood Frequency Comparison

Return Period (years) Reduction

2 24%

5 20%

10 18%

25 16%

50 15%

100 15%

Page 32: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingSeattle Roof Flow Duration Comparison

Conventional RunoffEco-Roof Runoff

Page 33: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Eco-Roof ModelingSeattle Roof Peak Runoff Comparison

Page 34: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Bioretention ModelingModel results: Seattle Swale N-2 (2004)

Page 35: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Bioretention ModelingSeattle Bioretention Frequency Comparison

Return Period (years) Reduction

2 66%

5 63%

10 64%

25 66%

50 67%

100 69%

Page 36: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Bioretention/Rain Garden ModelingStormwater volume reduction:

Stormwater Reduction (%) for Seattle Soils

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Ratio of Rain Garden Area to Impervious Area

Red

uct

ion

Till Outwash

Page 37: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Summary

Eco-roofs and bioretention swales reduce stormwater runoff and its associated problems.

WWHM is a powerful stormwater modeling tool to help inform and persuade the public and policy makers of the benefits of using low impact development BMPs.

Page 38: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Acknowledgements

Seattle Public Utilities provided information used in the modeling of eco-roofs and bioretention swales.

The City of Portland, Oregon, Bureau of Environmental Services (BES) provided the Hamilton eco-roof monitoring data.

Page 39: Seattle’s Testing and Application of Low Impact Development BMPs in WWHM3 July 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc

Questions?Contact:

Doug Beyerlein425.892.6454

[email protected]

or Joe Brascher360.943.0304

[email protected]