september 3, 2013 project on inventory control system (pics) p.i.c.s - 2013
TRANSCRIPT
September 3, 2013
Project on Inventory Control System (PICS)
P.I.C.S - 2013
P.I.C.S - 2013
Introduction to the Team
Name Duty
Contact E-mail
Mohammed Abdul
Jabbar Zeeshan
Project Manager /
Technical Head
+61 410793218 [email protected]
Chandran Johanan
Programmer / Design
Architect
+61 450614011 [email protected]
Kanwaljeetsingh
Dhaliwal
System Analyst / Quality
Analyst
+61 450452488 [email protected]
Kavitha Poola Risk Manager / Database
Administrator
+61 432432849 [email protected]
P.I.C.S - 2013
ResponsibilitiesProject managerMohammed Abdul Jabbar Zeeshan
To distribute tasks amongst group members and record tasks allocated at the regular meetings.
To provide regular feedback to supervisors and team members.
To be available for team members to see when there is a problem within the group. To ensure that the project keeps to the schedule.
P.I.C.S - 2013
ResponsibilitiesProgrammerChandran Johanan
Prepare programs and codes for the running the project programs.
Write the test cases earlier to avoid the errors in the programs.
Write proper program and define all codes perfectly to understand others.
Divide the task in to the programming team.
Run the program before implement it and solve the errors.
P.I.C.S - 2013
Responsibilities
System Analyst Kanwaljeet Singh Dhaliwal
Collect the requirements from the user or clients.
Prepare well defined specifications for all the requirements.
Analyze the system properly for the project requirements.
Check that all the requirements should be met in the project.
P.I.C.S - 2013
ResponsibilitiesDatabase AdministratorKavitha Poola
Collect all the data needed for the project.
Manage the database system.
Define all the entities and objects for the project.
Prepare use case diagrams, ER diagrams, network diagrams for the project.
Distribute the task in to the database team.
P.I.C.S - 2013
Introduction to the client
Role Name Phone E-mail
Sponsor Michael Forth 61410793218 [email protected]
Client Jake Robinson 61455442392 [email protected].
Project Supervisor KT Lau 61421122628 [email protected]
P.I.C.S - 2013
Introduction to the Project
Project Detail:
Creating an application in order to control the inventory system of the client “ Rundle bistro bar”.
Budget: $12,000
Time: 3 months
P.I.C.S - 2013
Client requirements
Dynamic inventory control management application.
Manage stock, order stock and request the stock
Add/delete product(s)
Update
P.I.C.S - 2013
User requirements
Login
View Products
Add/Remove product(s)
Place Order
Generate Invoice
Update Stock
Request Stock
P.I.C.S - 2013
Project Scope
Project name- Project on inventory control system (PICS) Project Justification Product Characteristics and Requirements Project/Product Deliverables Risk Management Success Criteria Assumptions
P.I.C.S - 2013
Project Scope
Project Title: Project on inventory control system (PICS)Project Justification: Interactive system to order , verify and request new stock. An application for inventory management which allows user to
put entries database.Verification and validation of stock. easy access to request the
stock.
P.I.C.S - 2013
Project Scope
Product Characteristics and Requirements:
Application with login ID at front page.
Second page, user categories selection.
Drop down list of products of category and quantity required.
Final page , item list , quantity with unique product ID.
Invoice to order required products.
P.I.C.S - 2013
Project Scope
Risk
Absence of team members.
Lack of communication.
Conflict with client.
System failure.
P.I.C.S - 2013
Project Scope
Success Criteria: Weekly report.Proper communication.Kick off meetings.Responsibility and help each other.Contingency plan Avoid absentism which leads to the failure.
P.I.C.S - 2013
Project Deliverables
SPMP WBS Status Reports Milestone Reports SRS SADD
SDD Test Plan Quality Assurance Plan Risk Management Plan Source and Object code
P.I.C.S - 2013
Development Methodology
Agile methodology
1. Active user involvement
2. Decisions making
3. Requirements evolve
4. Capture requirements at a high level; lightweight & visual
5. Incremental releases
6. Frequent delivery of products
7. Complete each feature before moving on to the next
8. Apply the 80/20 rule
9. Integrated Testing
10. Collaborative & cooperative approach
P.I.C.S - 2013
Tools and Technologies
MS SQL 2008
Visual Studio 2012
TortoiseSVN
Araxis Merge
Ultra Edit
Enterprise Architect
P.I.C.S - 2013
Quality Control
Internal review
• Spell check and functionality.• IEEE Standards-Documents.
Coding
Testing • Unit testing- methods• Test case scenario – done on each module