  • 8/13/2019 Signature Case Unilever

    1/2

    Z

    A

    SEPTEMBER 82003

    SEPTEMBER 62003

    START OFTRANSPORTATION

    ROTTERDAMSNEW SKYLINE

    MAY 52003

    SEPTEMBER 62003

    SEPTEMBER 62003

    THE BRIDGE UNDERCONSTRUCTION

    3,500 TONS OF OFFICEON THE MOVE

    SKIDDING THE BRIDGEOVER THE FACTORY

    In 2003, Unilevers new headquarters changed the Rotterdamskyline. But before it did, it had to be placed on top of theexisting factory, without impacting operations below. Togetherwith Mammoet, Unilever decided to build the new ofce nextto the factory. Once the building nicknamed The Bridge was nished, it was positioned in its nal position above theexisting facilities in one go. The job was completed in a singleweekend, in time for the Monday morning shift to get to work.

    Discover more on mammoet.com

    FOUR WAYS TO PUT ANOFFICE ON TOP OF A

    FACTORY. ONLY ONE WAYTO DO IT BEFORE THE

    MONDAY SHIFT ARRIVES.

  • 8/13/2019 Signature Case Unilever

    2/2

    APRIL 122003

    SEPTEMBER 62003

    SEPTEMBER 72003

    SEPTEMBER 82003

    THE INNER FRAMEGOING FOR A DRIVE

    140 METERS OFSKIDDING TO GO

    SPMTs IN TIGHTQUARTERS

    READY FOR THE MONDAYMORNING SHIFT

    MONTHS OF PLANNING CHANGED ROTTERDAMS SKYLINE OVERNIGHT.

    A Z

    RESOURCES

    CRANES

    2 hydraulic cranes2 crawler cranes

    TRANSPORT

    160 axle lines of SPMT

    SPECIAL EQUIPMENT

    skidshoes with tracks

    CREW

    18 Mammoet professionals