signature case unilever
TRANSCRIPT
-
8/13/2019 Signature Case Unilever
1/2
Z
A
SEPTEMBER 82003
SEPTEMBER 62003
START OFTRANSPORTATION
ROTTERDAMSNEW SKYLINE
MAY 52003
SEPTEMBER 62003
SEPTEMBER 62003
THE BRIDGE UNDERCONSTRUCTION
3,500 TONS OF OFFICEON THE MOVE
SKIDDING THE BRIDGEOVER THE FACTORY
In 2003, Unilevers new headquarters changed the Rotterdamskyline. But before it did, it had to be placed on top of theexisting factory, without impacting operations below. Togetherwith Mammoet, Unilever decided to build the new ofce nextto the factory. Once the building nicknamed The Bridge was nished, it was positioned in its nal position above theexisting facilities in one go. The job was completed in a singleweekend, in time for the Monday morning shift to get to work.
Discover more on mammoet.com
FOUR WAYS TO PUT ANOFFICE ON TOP OF A
FACTORY. ONLY ONE WAYTO DO IT BEFORE THE
MONDAY SHIFT ARRIVES.
-
8/13/2019 Signature Case Unilever
2/2
APRIL 122003
SEPTEMBER 62003
SEPTEMBER 72003
SEPTEMBER 82003
THE INNER FRAMEGOING FOR A DRIVE
140 METERS OFSKIDDING TO GO
SPMTs IN TIGHTQUARTERS
READY FOR THE MONDAYMORNING SHIFT
MONTHS OF PLANNING CHANGED ROTTERDAMS SKYLINE OVERNIGHT.
A Z
RESOURCES
CRANES
2 hydraulic cranes2 crawler cranes
TRANSPORT
160 axle lines of SPMT
SPECIAL EQUIPMENT
skidshoes with tracks
CREW
18 Mammoet professionals