Gamma-ray Large Area Space Telescope. SIU TRR. GLAST Large Area Telescope: Presented by G. Haller SLAC [email protected] (650) 926-4257. Contents. Introduction Overview Significant Changes since CDR Objectives Status Requirements/Verification EGSE and Test-Procedures - PowerPoint PPT PresentationTRANSCRIPT
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 1
GLAST Large Area Telescope:GLAST Large Area Telescope:
Presented by G. HallerSLAC
[email protected](650) 926-4257
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
SIU TRRSIU TRR
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 2
ContentsContents
• Introduction– Overview– Significant Changes since CDR– Objectives– Status
• Requirements/Verification• EGSE and Test-Procedures• Verification Test Plan and Flow
– At Assembly Vendor• Test-plan and Flow• Facility• Man-Power• Quality Assurance• Vibration
– At SLAC• Test-plan and Flow• Thermal Vacuum Test• Mass Property• EMI/EMC (at sub-contractor)• Man-Power• Quality Assurance
• Equipment Calibration/Safety• Risk Assessment• Schedule• Status of Procedures• Issues and Concerns
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 3
LAT ElectronicsLAT Electronics
3 Event-Processor Units (EPU) (2 + 1 spare)
– Event processing CPU– LAT Communication Board– SIB
ACD
empty
EPU-3
EPU-2EPU-1
empty empty
Power Dist. Unit*
GASU*
empty
empty
SIU*SIU*
Spacecraft Interface Units (SIU)*
– Storage Interface Board (SIB): Spacecraft interface, control & telemetry
– LAT control CPU– LAT Communication
Board (LCB): LAT command and data interface
16 Tower Electronics Modules & Tower Power Supplies
* Primary & Secondary Units shown in one chassis
Power-Distribution Unit (PDU)*
– Spacecraft interface, power
– LAT power distribution
– LAT health monitoring
Global-Trigger/ACD-EM/Signal-Distribution Unit*
(GASU)
TKR
CAL
TKR Front-End Electronics (MCM)ACD Front-End Electronics (FREE)
CAL Front-End Electronics (AFEE)
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 4
SIU/EPU Mounted on LAT SIU/EPU Mounted on LAT
SIU
PDU
EPU’s
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 5
SIU/EPU Crate ElectronicsSIU/EPU Crate Electronics
PCI Interface
SIB
MIL1553*
Power Control*
EEPROM
BackPlaneHeater
Control*
PCI Interface
Event Data
Command-Response
FIFO
LCB
28-V DC/DC
Power-On Reset
LVDS ConvertionCPS
3.3V/5V
CPU
PCI Interface
Power PC
Discrete I/O
VCHP Heater Box
PDU
Spacecraft MIL1553
GASU
Spacecraft Power
GASU
Spacecraft Discretes
System Clock
GASU
• Storage Interface Board (SIB)– EEPROM– MIL1553 Communication with
spacecraft*– Power Control of PDU/GASU power
switches in PDU*– Power Control of VCHP switches in
heater box*• LAT Communication Board (LCB)
– Communication with GASU• Commanding• Read-back Data• Housekeeping Data• Event Data
• Crate Power Supply Board (CPS)– 28V to 3.3V/5V conversion– Power-On Reset– LVDS-CMOS conversion of
spacecraft discretes*– System clock to GASU
• CPU Board (RAD750)– Processor**– IO of level-converted SC discretes
• Crate Backplane (CBP)– passive • *Only used in SIU crate
• **Start-up ROM code different from EPU and SIU
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 6
SIU/EPU CrateSIU/EPU Crate
• Partially loaded crate on left (without LCB and SIB)• Fully loaded crate on right • Shown are also serial card and ethernet cards, not part of flight
assembly (cards with front-panel connections)
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 7
CBP & CPS & CPUCBP & CPS & CPU
CPS (Crate Power Supply Board)
CBP (Crate Backplane)
CPU (RAD750 from BAE)
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 8
SIB & LCBSIB & LCB
SIB (Storage Interface Board)
LCB (LAT Communication Board)
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 9
Changes since LAT CDRChanges since LAT CDR
• Code in LCB and SIB FPGA’s were modified/finalized and bugs fixed
• Some resistor/capacitor values have changed to optimize performance
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 10
ObjectivesObjectives
• Demonstrate that hardware, software, procedures, and support equipment are prepared to support system environmental test
• Demonstrate that planned and completed testing meets performance and interface requirements
• Identify and understand all the risks and limitations• TRR is not intended to
– Review SIU design– Review flight readiness– Buy-off hardware or software
• RFA’s should only be of sufficient concern to stop test– Prior to start of an given test, any applicable TRR RFAs
must be closed
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 11
Test Entrance / Exit CriteriaTest Entrance / Exit Criteria
• Entrance– All required paperwork released and in place
• Procedures, drawings, etc– Test configuration verified and approved– Essential personnel in place– Pre-test SIU functional successfully passed
• Exit– As-run procedures completed– Correct and accurate application of test environment– Test data acquired and archived– No damage to SIU– SIU performance within specification limits– Post-test SIU functional successful
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 12
StatusStatus
• First SIU (to be proto-flight tested)– Assembled– Pre-conformal coat SIB, LCB,CBP,CPS in crate tested, tests
to verify that boards perform over temperature (was prerequisite to programming FPGA’s for additional SIB & LCB’s)
– Conformal coated modules are being integrated in enclosure
• Additional SIU/EPU’s (to be flight acceptance tested)– LCB/SIB/CPS/CBP at various assembly stages
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 13
Tests To-DateTests To-Date
• SIU/EPU engineering modules were extensively tested– As EGSE in DAQ/I&T
• Testbed includes SIU & EPU for > 1 year• Main difference to flight SIU/EPU: Commercial ACTEL
FPGA’s versus flight ACTEL’s.– One SIB wasassembled with mostly flight parts including
flight ACTEL and tested in one enclosure– Additional SIU tests
• Informal thermal test -40C to 55C• Informal EMI test on EGSE station sent to Lockheed for
thermal test
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 14
RequirementsRequirements
• LAT-SS-00285 Specifications, Level 4 LAT Dataflow System• LAT-SS-00019 Specifications, Level 3 T&DF Subsystem Specification• LAT-SS-00136 Specifications, Level 3 Power Supply System • LAT-SS-00183 Specifications, Level 4 Power Supply System• LAT-SS-07433 Specifications, Level 5 SIU Specification• LAT-TD-00606 LAT Inter-Module Communications• LAT-TD-01685 SIU ICD Specification & Conceptual Design• LAT-TD-01682 LCB Specification & ICD• LAT-TD-00860 LCB, Programming ICD • LAT-TD-01539 SIB Specification and ICD • LAT-SS-01538 CPS Specification• LAT-SS-01540 CBP (Backplane) Specification
• LAT-SS-00778 LAT Environmental Specification
• LAT-SS-07433 SIU lists requirements• LAT-TD-07434 contains Verification Matrix which gives approach to verify each
requirement– Lists verification method used
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 15
System PerformanceSystem Performance
• Level 3 and level 4 DAQ and TRG and power-system requirements are met with a combination of DAQ modules (TEM/TPS, GASU, SIU, PDU, etc), since the DAQ and trigger and power system is comprised of several sub-system module types– Level 5 SIU requirements which are verified are derived
from Level 3 and Level 4 DAQ and Trigger and Power system specifications (as noted in the L5 requirements doc)
– Level 5 requirement doc includes derived requirement addressing
• Functionality/performance• Power• Mass/C.G.• EMI/EMC• Environmental incl temperature and vibration
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 16
Verification StatusVerification Status
• Engineering Module SIU– EM completed full functional test program with exception of
thermal-vacuum, EMI/EMC, mass, and C.G.– Demonstrated compliance with specifications
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 17
Test-ProceduresTest-Procedures
• SIU/EPU Crate– LAT-TD-07194 SIU Electrical Interface Continuity and Isolation Test procedure
• Power-off impedance tests of I/O– LAT-TD-07195 SIU Stray-Voltage-Test Procedure
• Power-on voltage test of I/O– LAT-TD-01686 SIU Comprehensive Test Procedure
• Functionality and Performance test • LCB
– LAT-TD-01683 LCB Test Procedure– LCB-TD-06939 LCB Qualification Test Procedure
• SIB– LAT-TD-07382 Procedures for Uploading Files to SIB EEPROMs in a cCPI crate– LAT-TD-01678 SIB Test Procedure– LAT-TD-06978 SIB Qualification Test Procedure
• CPS– LAT-TD-04811 CPS Electrical Interface Continuity and Isolation Test procedure
• Power-off impedance tests of I/O– LAT-TD-04812 CPS Stray-Voltage-Test Procedure
• Power-on voltage test of I/O– LAT-TD-01673 CPS Test Procedure (Electrical)
• CBP– LAT-TD-07012 Backplane Assembly Continuity Test Procedure
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 18
Test ConfigurationsTest Configurations
• Test-Procedures/Configurations– LAT-TD-01686– Examples (SIB and LCB) test configurations shown in
following slides
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 19
Upload SIB EEPROM ConfigurationUpload SIB EEPROM Configuration
• Upload SIB EEPROM Configuration (LAT-TD-07382)
cPCI Crate
Slot 0SBC Mcp750 Card
2094A
1553 Mezzanine Card
VME Crate
Slot 0SBC MVME
2304 Card
1553 Mezzanine Card
A
2094B B
SIB
DBP2-stub
DBP 2-stub
2094
2094
J3 J4
J3 J4
Ethernet
Serial
Ethernet
Serial
Local Area Connection
Xyplex
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 20
SIB Test ConfigurationSIB Test Configuration
• SIB Test Configuration (LAT-TD-01686)
VME CrateLCB(Unit Under Test)
SIB(Unit Under Test)
Ethernet
Serial/Debug
RAD750
SIU Crate
Crate Tester Box
Ethernet
Slot 0SBC MVME 2304 Card
Ethernet
Serial/Debug
LCB Mezzanine CardLAT-TD-00860
1553 Mezzanine Card
GASU
SIU7
2094
Local Network Connection
JL-45
J5
2094
RS-232
J4J3
DC Power Supply #1 BK PercisionBK 1697
P1
P2JL-40 JL-41
Local PC
(-)
(+)
15531553
Y+ heater controlY- heater control
P1
P2
P3
P4
P5
CLK/2
AD[31:0]PCI_RSTNCONTROLCLK
Reset RequestCLK_20MHz
PORReset SIU_RST
Event[7..0]Event BusyCMD/RESP
J7
J1J2
J1
J2
J3
Crate Power SupplyJ8 DC Power Supply #2
BK Precision BK 1697
P1
P2
(-)
(+)
ENET
2104
28V
DC Power Supply #3 BK Precision BK 1697
P1
P2
(-)
(+)
4130
4130
J6PDU Power Control
SIU/PDU Command DisplayLAT-DS-07216
5V
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 21
LCB Test ConfigurationLCB Test Configuration
LCB Test Configuration (LAT-TD-01686)
VME CrateLCB
(Unit Under Test)
SIB
Ethernet
Serial/Debug
RAD750
SIU Crate
Crate Tester Box
Ethernet
Slot 0SBC MVME 2304 Card
10/100Base
Debug
LCB Mezzanine CardLAT-TD-00860
1553 Mezzanine Card
GASU
SIU7
2094
Local Network Connection
JL-45
J5
2094
RS-232
J4
J3
DC Power Supply #2 BK PercisionBK 1786
P1
P2JL-40 JL-41
Local PC
(-)
(+)
1553
1553
Y+ heater control
Y- heater control
Reset
P1
P2
P3
P4
P5
SYSCLK/2
AD[31:0]PCI_RSTNCONTROLCLK
Reset RequestCLK_20MHz
POR
Reset SIU_RST
Event[7..0]Event BusyCommand/Response
J7
J1
J2
J1
J2
J3
Power SupplyJ8 DC Power Supply #1
BK Precision BK 1697
P1
P2
(-)
(+)
ENET
GASU Test BoxLAT-DS-04969
GASU Test
External Clock
28V
Function Generator
JL153
5218
2104
Power
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 22
Verification Level – Module DetailVerification Level – Module Detail
• Breakout of verification at SIU-EPU Module Level• Tests to be conducted after successful TRR (order may change
depending on availability of resourced (TV/EMI)• EICIT & SVT• Functional test• Vibration (Wyle)• Functional test• Thermal cycle• Functional test• Mass properties including CG• Thermal vacuum (in-situ testing)• EMI/EMC (at CKC-lab for proto-flight, at SLAC for flight
acceptance)• Functional test • Review• Deliver to I&T
– DAQ (out-going) / I&T (incoming) test combined
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 23
VerificationVerification
• Test-Stand– Supplied by SLAC– Operated by SLAC engineers
• Vibration facility at Wyle– LAT-TD-03648 Vibration test-procedure (not signed off as of
Oct 3)– SLAC engineers present for vibration tests
• Thermal Cycle in thermal chamber in SLAC clean-room
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 24
TC and Vibration RequirementsTC and Vibration Requirements
Parameter Required Characteristic Thermal Cycling (4 cycles) -40 to +55 °C (Qualification and
Proto-flight) Thermal Cycling (4 cycles) -35 to +50 °C (Acceptance) Random Vibration See Figure 1. Sinusoidal Vibration 0.5g rms, 20 to 2000Hz
Figure 1. Vibration Levels, Duration, and Spectra
Electronics Module (Special Boxes)Random Vibration Spectra
ASD Level (G2/Hz)Freq (Hz) Accept Qual20 0.010 0.01075 0.037 0.03880 0.040 0.055115 0.180 0.360160 0.180 0.360325 0.040 0.060350 0.040 0.050500 0.040 0.0502000 0.025 0.050Overall 8.91 Grms 11.51 GrmsDuration 60s/axis AT, PT
120s/axis QT
0.001
0.010
0.100
1.000
10 100 1000 10000Freq. (Hz)
AS
D L
evel
(G
^2/H
z)
Accept
Qual
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 25
Mass PropertyMass Property
• Mass properties checked at SLAC – Procedure LAT-PS-07372 (performed at SLAC Metrology)– Expected: (ref LAT-TD-00564)
• Total 6.2 kg• Allocation 12% above = 7.5 kg
– C.G. to be measured for the proto-flight unit only
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 26
Thermal Vacuum TestThermal Vacuum Test
• Thermal Vacuum facility in Building 33 at SLAC– Thermal Vacuum Chamber Operating Procedure LAT-TD-
02541 – SIU Thermal Vacuum Test-Procedure LAT-TD-03649– First SIU tested to proto-flight specifications (same
Temperatures as qualification, but 4 TV cycles versus 12 cycles)
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 27
Proto-Flight and Flight Acceptance Thermal Proto-Flight and Flight Acceptance Thermal Vacuum TestVacuum Test
• See SIU Thermal Vacuum Test-Procedure LAT-TD-03638
+55C +2/-2C
PROTO-FLIGHT THERMAL VACUUM CYCLE TIMELINE
Hot Qualification Limit
4 Cycles Total
Open Chamber
CloseChamber
Start Pump Down
Chamber
Vent ChamberSetup Flight Unit
CPT
Start of Cycle 1
End of Cycle 12
Hot Survival Limit+60C +2/-2C
-40C +2/-2C Cold Survival/Cold Qualification Limit
EGSE Unit
Start Bake Out/Outgas
CPT
Open Chamber
Turn OFF+30C +2/-2C
CPTFlight Unit
Turn OFF
Verify End Bake Out O
N-O
FF-O
N
4Hrs
4Hrs
OFFCP
T
LP
T
ON
-OFF
-ON
CP
T
LP
T
4Hrs 4Hrs
4Hrs
4Hrs
OFF
-ON
OFF
-ON
OFF
-ON
OFF
-ON
ContinuePeriodic
LPT
CP
T
Continue Periodic
LPT
4Hrs
Cycles 2-3
CP
T
ContinuePeriodic
LPT
OFF
CP
TO
FF
OFF
-ON
Start Periodic
LPT
ContinuePeriodic
LPTOFF
-ON
At < 10-5 Torr
X 4
+50C +2/-2C
ACCEPTANCE THERMAL VACUUM CYCLE TIMELINE
Hot Acceptance Limit
4 Cycles Total
Open Chamber
CloseChamber
Start Pump Down
Chamber
Vent ChamberSetup Flight Unit
CPT
Start of Cycle 1
End of Cycle 4
Hot Survival Limit+60C +2/-2C
-35C +2/-2CCold Acceptance Limit
EGSE Unit
Start Bake Out/Outgas
CPT
Open Chamber
Turn OFF+30C +2/-2C
CPTFlight Unit
Turn OFF
Verify End Bake Out O
N-O
FF-
ON
4Hrs
4Hrs
OF
FC
PT
LPT
ON-OFF-ON
CPT
LPT
4Hrs 4Hrs
4Hrs
4Hrs
OF
F-O
N
OF
F-O
N
OF
F-O
N
OF
F-O
N
ContinuePeriodic
LPTC
PT
Continue Periodic
LPT
4Hrs
Cycles 2-3
CPT
ContinuePeriodic
LPT
OF
F
CPT OF
F
OF
F-O
N
Start Periodic
LPT
ContinuePeriodic
LPT
-40C +2/-2CCold Survival Limit4Hrs
OF
F-O
N
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 28
EMI/EMC TestEMI/EMC Test
• Proto-Flight = Qualification Test (Conductive & Radiative)
– Sub-contracted to CK Labs
– Statement of Work: LAT-PS- 04568
• CE102, CECN, CS102, CSCM, CS06, RE101, RE102, RS101, RS103
– Detailed EMI/EMC procedure provided by CKC lab (to be provided)
– SLAC engineers present at vendor for tests
– Vendor supplies test-report
– LAT QA at SLAC present for tests
• Flight Acceptance Test (Conductive)
– Performed at SLAC
– LAT-TD-07107
• Only CE102, CS102
– SLAC supplies test-report
– LAT QA at SLAC present for tests
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 29
Manpower & Quality AssuranceManpower & Quality Assurance
• Test man-power – SIU: L. Sapozhnikov/ J. Thayer– Test Support: J. Ludvik– Thermal Cycle and TV support: R. Williams, P. Hart– TV shift support: 2 contractors– EMI support: D. Nelson – Vibration support: D. Tarkington
• Quality assurance: Joe Cullinan– QA representative (Y.C. Liew) present during tests, review
of test-procedure and results– Required changes to documentation are red-lined and
included in new revisions– NCR are created for non-conformance (e.g. exceeding of
min/max test limits) and submitted for disposition
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 30
Problem Failure Report/ Configuration Problem Failure Report/ Configuration ManagementManagement
• Problem Failure Reporting– Via standard SLAC LAT Non-Conformance Reporting (NCR)
System• NCR is entered• Reviewed/accepted/resolved
– LAT engineering
– LAT QC
• Already exercised during pre-conformal coat SIU assembly
• Configuration Management– Via standard LATDOC system
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 31
Planned TestsPlanned Tests
• Function/Performance Tests (LAT-TD-01686)– Verifies all requirements in SIU Specification Document except
below• Thermal Vacuum Tests
– Verifies performance/function over temperature• Mass/C.G.
– Verifies/measures mass and C.G.• Vibrations test
– Verifies vibration performance requirements• EMI/EMC
– Verifies EMI/EMC performance• Note to margin testing
– External Voltage margin testing is performed at the CPS and Full-crate level only (28V +/-1V)
– Internal Voltage margin testing (3.3V/2.5V) is not performed– Frequency margin testing only perfromed on LCB LAT-side
interface, no clock frequency margin is tested on cCPI bus
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 32
Equipment CalibrationEquipment Calibration
• EMI/EMC Test Equipment– Quantitative measurement equipment (sensors, antennas,
etc) calibrated to NIST standards– Calibration performed annually
• All item are (will be) within calibration at time of testing• Vibration Test Equipment
– Accelerometers calibrated against a standard accelerometer traceable to NIST
– Signal conditioners calibrated annually• TVAC Equipment
– Thermocouples calibrated against standard temperature; calibrated prior to test
– Thermocouple reader calibrated very 2 years
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 33
Sub-System SafetySub-System Safety
• EGSE– Safe-to-mate– Configuration control– Calibration verification– Functionality verification with “golden” EGSE SIU prior to
test with flight hardware• MGSE
– No custom MGSE• Environment
– Temperature controlled in all test-facilities– Cleanliness actively controlled in clean-room; hardware
bagged and purged when required• Training
– ESD training completed– Clean room training completed
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 34
Risk AssessmentRisk Assessment
• Schedule– Pressure to deliver flight hardware could force less than
complete characterization and analysis of modules, could result in replicating a problem in the following modules
• Performance– None known
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 35
Test-ScheduleTest-Schedule
• Estimated as follows, order subject to EMI/TV availability• First SIU (proto-flight)
– 10/5: functional test – 10/13: TC– 10/14: functional test – 10/17: vibration test – 10/18: functional test– 10/24: TV start– 10/31: TV end– 11/1: mass, c.g. property – 11/2: EMI start – 11/16: EMI end
• Following SIU’s– Lag first SIU by about 4 days each
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 36
Status of Main Test ProceduresStatus of Main Test Procedures
• All procedures must be released before respective test• Procedures to be released
– EMI vendor procedure to be released– CPT and TV modified, revisions are in review
GLAST LAT Project SIU TRR
4.1.7 DAQ & FSW V1 37
Issue & ConcernsIssue & Concerns
• Schedule– Tight
• Vibration test– Concern that harness/connectors pass vibration tests
• (should be ok, but is concern)