TT2 Welding Joint Control Sheet(Doosan Skoda Turbine System)
SheetNo.
ISO NO
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
PLANT_PP
-
3810Welding
JointShop D / Inch 5,990.25 Field D / Inch 0
JOINT
SYSTEM B/F S/F SIZENo Repair Rev
2 BW S 10
3 SW S 1
1 BW F 10
3A (10) BW F 10
B1 BW S 10
4 BW S 10
4A BW F 10
4B BW F 10
4C (8) BW F 10
4D (9) BW F 10
TT2 Welding Joint Control Sheet(Doosan Skoda Turbine System)
-
Welding Bolting TotalD / in Joint D / in Joint D / in
0 0 0 5,990 0 100,630 0 0 0 100,630
SCH SPEC System SUPPORT
Fit -Up
Date
S-XXS P91 OIL SYSTEM TURBINE JC_T 4/25/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 4/25/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 3/11/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 4/24/2015
S-XXS P91 OIL SYSTEM TURBINE
S-XXS P91 OIL SYSTEM TURBINE JC_T 3/2/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 3/11/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 3/11/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 2/12/2015
S-XXS P91 OIL SYSTEM TURBINE JC_T 3/11/2015
-
Completed ProgressJoint D / in0 0 #DIV/0!0 0 0.00%
Fit -Up Welding Visual Test
Date Date
R&F-12 4/25/2015 R&F-12 R&F-12
R&F-12 4/25/2015 R&F-12 R&F-12
R&F-12 3/11/2015 R&F-12 R&F-12
R&F-049 2/12/2015 R&F-049 R&F-049
3/2/2015
R&F-11 3/11/2015 R&F-11 R&F-11
R&F-11 3/11/2015 R&F-11 R&F-11
R&F-012 2/12/2015 R&F-012 R&F-012
R&F-50 3/11/2015 R&F-50 R&F-50
WelderNo.
Root Stamp
FinalStamp
R&F-26 R&F-50
R&F-26 R&F-50
R&F-26 R&F-50
-
Visual Test NDE
Result Date Result
4/9/2015 UT 24 ACCEPT
4/1/2015 UT 22 ACCEPT
4/1/2015 UT 22 ACCEPT
4/9/2015 UT 24 ACCEPT
4/9/2015 UT 24 ACCEPT
ReportNo.
RT/PT/MT/UT
ReportNo.
-
PWHT
Date ResultReportNo.
-