smarter manufacturing sustainable futures 3 flexinet project overview
TRANSCRIPT
FLEXINET project 608627
Intelligent Systems Configuration Services for Flexible Dynamic Global Production Networks
The FLEXINET project no. 608627 is funded under the Seventh Framework Programme FP7-2013-NMP-ICT-FOF (RTD)
Duration: 1st July 2013 – 30th June 2016
For further informa.on contact the project coordinator, Prof Bob Young. Email: [email protected]
FLEXINET project 608627
! To understand how best to configure and re-configure a global production network, in the context of ever changing product-service requirements.
! To provide services that support the design and provision of flexible interoperable networks of production systems that can rapidly and accurately be re-configured.
FLEXINET Aims
FLEXINET – Configuring a global (product-service) production network – ‘early’ business decision support
FLEXINET emphasis on ‘early’ business decision support
There are many poten-al global produc-on network solu-ons
Network knowledge supports network configura-on
Produc-on Network knowledge supports early product/service viability decisions
FLEXINET: especially targeted at an improved and rapid understanding of new business development opportunities
FLEXINET Services
Strategic Business Model Evaluator
Produc;on Network Configurator
Product-‐Service Co-‐evolu;on Management
The FLEXINET approach – FLEXINET Software Services
analyse proposed changes in the context of the existing network inter-relationships in a simulation based “what-if” analysis of cost and risk
support network configuration based on Social, Technological, Economic, Environmental and Political factors
ensure that new product-service-production network elements remain compliant in terms of combined PLM/SLM requirements
FLEXINET project 608627
Legal factors
Social factors
Economic factors
Poli-cal factors
Technological factors
Risk factors
A world of Production Systems, Service Systems, external factors, risks, markets and business opportunities
FLEXINET project 608627
Evaluate potential Product-Service Systems Configurations
PNES: Tac;cal business model configura;on
ERAS: Business cost and risk evalua;on
PSCoMS: Product-‐Service Co-‐evolu;on
We provide software services to support the evaluation of these configurations at the Strategic, Tactical and Product-Service Co-Evolution levels
FLEXINET project 608627
Underlying the Services are Formal Ontologies
Capture Knowledge about your “world” of interest • knowledge harmonisa-on • clearly defined vocabularies • computer interpretable -‐> consistency checks • use KB to answer ques-ons
Enterprise ontologies must be built from a common base
for ease of construc;on, effec;ve interoperability and
flexible re-‐use
Level 2 Natural Systems
Level 3
Level 5
Level 0
Level 1
Ontology Layers CORE (ULO)
Systems
Designed Systems
Manufacturing Business Systems
Product-‐Service Lifecycle Systems Marke-ng Finance
Produce Dispose/ End of life
Enterprise Specific
(Highfleet)
FLEXINET is concerned with modeling the elements of global produc;on network systems
FLEXINET will use these models to support ‘what-‐if” queries on the
configura;on of these elements into global produc;on systems
Healthcare Systems Banking Systems
Design Operate
Level 2 Designed Systems
Level 3 Manufacturing Business Systems
class Level 3 - Manufacturing Business Systems
ParticipatorRole
Manufacturer
ParticipatorProduct
RoleManufactured
Product
BasicOrganisation
SystemManufacturing Organisation
Lower level layers are specialisations of higher level layers
Level 1 Systems
Level 5 Enterprise Specific -‐ Custom Drinks
class Level 1 - System
BasicSystem
Level 0 - Core::TimeSpan
BasicInformation
BasicMaterial
BasicEnergy
RoleInput
RoleOutput
RoleResource
RoleConstraint
Basic Role
class Level 4 - Product Service Production Systems
RoleManufacturer
ParticipatorProducer
RoleParticipator
Production Engineer
BasicSystem
Production Method
class Level 5- Enterprise Specific
RoleManufactured Product
ParticipatorProduct
CD_Container
Role Task
Feasibility StudyCD_Feasibility
Study
RoleComponent
FunctionCD_Content
RoleComponent
FunctionCD_Ingredients
BasicInformation
LocationCD_Country
class Level 2 - Designed Systems
BasicInformation
VisualisationReport
ParticipatorRole
Customer
ParticipatorRole
Supplier
ParticipatorRole
Product
FunctionRole
Product Request
BasicInformationLocation
BasicExternal Factors
InformationLegislation/Legal
Factors
FunctionRole
Component
BasicSystem
Organisation
BasicMaterial
Equipment
RoleParticipator
BasicSystem
Level 2 - Natural
Systems::Person
RoleTask
Feasibility Study
RoleTask
RoleFunction
BasicInformationExternal Factors
BasicInformation
MetricDistance
BasicInformation
Metric
FLEXINET Applications mapped to Service Packages
Strategic business model evaluator
Early warning no-fica-on applica-on
Strategic risk assessment applica-on
Ini-al risk analysis and documenta-on
P/S ideas management
product-‐ service compliance
STRATEGIC (ERAS)
Product Service Co-‐Evolu;on (PSCoMS)
TACTICAL (PNES)
Business model impact analysis
Reference model fragments for GPN
Technology Effect Analyser
Business Model Accelerator
Opera;onal Business Model Configurator
Opera;onal risk assessment applica;on
Business model Configurator
Knowledge Maintenance
User Experience Evalua-on
Collabora-ve design review
KSB Scenario – Product Innovation through new technology
Iden-fy poten-al new applica-on areas for the technology
Develop details of GPN design scenarios
Analyse GPN scenarios to support management proposi-ons
FLEXINET project 608627
FLEXINET: expected impact for end users
! Improved response to customer requirements.
! Radical improvements in the evaluation of the critical parameters involved in network configuration.
! Reduced cost of introducing new product/service variants.
! Improved scheduling and decision making within the production network.
! Improved robustness of the supply network in its ability to work to forecast.