smartline startup. smartline initial wirings initial wirings

32
SmartLine Startup

Upload: marybeth-gordon

Post on 23-Dec-2015

225 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLineStartup

Page 2: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Initial wirings

Initial Wirings

Page 3: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Balance Zones with a 3.9kΩ resistance

Initial wirings

Page 4: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

If Zones aren’t balanced panel displays “Zone open”

Fault 01/04Zone OpenZone 01<Zone 01>

Initial wirings

Page 5: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Balance Dialler with a 10 kΩ resistance(between terminals 19 and 23 )

Initial wirings

Page 6: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

If Dialler isn’t balanced panel displays “Fault Dialler”

Fault 01/01FaultDialler

Initial wirings

Page 7: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Balance NAC with a 47kΩ resistance

Initial wirings

Page 8: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

If NAC isn’t balanced panel displays “Open I/O Panel NAC”

Fault 01/01Open I/OPanel NAC

Initial wirings

Page 9: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Detectors wiring

3.9 kΩ End of Line resistance on the last detector

Balance other zones with a 3.9 kΩ resistance

Detectors Wiring

Page 10: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Callpoints wiring

3.9 kΩ End of Line resistance on the last callpoint

Balance other zones with a 3.9 kΩ resistance

Callpoints Wiring

Page 11: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

NAC

47 kΩ End of Line resistance on the last device

NAC Wiring

NAC output activates on Alarm: it can activate alarm devices

Page 12: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

NAC

47 kΩ End of Line resistance on the last device

If panel displays “Short I/O Panel NAC” it will need connect a diode in series (if devices haven’t it)

Fault 01/01Short I/OPanel NAC

Page 13: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Other wirings

17-18 FAULT Terminalsactivated on Fault.

Fault output can activate some devices

Other wirings

Page 14: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Dialer

19-20 DIALER Terminalsactivated on Alarm.

DIALER Output can activate an external dialler.

Page 15: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

AUX R

25-26 AUX R Terminalsturn off 24V on Reset

They can reset latching linear beam smoke detector

Page 16: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Relay

27-28-29 RELAY Terminals activated on Alarm (at default)

They can activate some devices

Page 17: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Generic contact

Generic Contact Wiring

680Ω resistance

3.9kΩ resistance

NO Alarm Contact

Alarm contact only

Page 18: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Generic contact

680Ω resistance

NO Alarm Contact

NC Fault Contact

3.9kΩ resistance

Alarm Contact and

Fault Contact

Page 19: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Gas Detector Wiring

Gas Detector Wiring

3.9kΩ resistance

INE55/ING55 Detector

Detection-Line Zone Wiring

It have to program the Zone as “Gas (Relay Output)

Page 20: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Gas Detector Wiring

3.9kΩ zone balancing resistance

INE55/ING55Detector

I/O 4-20mA Input Wiring

150Ω resistance

INA55-101board

It have to program I/O Line as “Gas 4-20mA Input”

Page 21: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Gas Detector Wiring

Generic 4-20mA Gas Detector Wiring

4-20mAoutput

3.9kΩ zone balancing resistance

150Ω resistance

Generic4-20mA

gas detector

Detector have to supply current

It have to program I/O Line as “Gas 4-20mA Input”

Page 22: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

To next expansion board

Expansion Boards Wiring

Expansion boards

Page 23: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Expansion boards

Expansion Zones are similar to panel ones

Balance Zones with a 3.9kΩ resistance

Page 24: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Espansions board

Expansion NAC output is programmable(at default output is activated on Alarm)

Balance NAC with a 47kΩ resistance

Page 25: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Expansion boards

It have to configure expansion boards

Enable panel programming phase

Control PanelIN PROGRAMMiING

Ver: 2.0301/01/12 17:45

Page 26: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

Expansion boards

Control PanelIN PROGRAMMING

Ver: 2.0301/01/12 17:45

Control PanelIN PROGRAMMING

Ver: 2.0301/01/12 17:45

SettingsDisablementMaintenanceProgramming

ConfigurationProgr. ZoneProgr. OutputProgr. Timer

Acquire int.busAcquire ext.bus

Current DevicesExtin.module OExpansion OOk to execute

Current DevicesExtin.module OExpansion 1Ok to execute

Page 27: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus Wiring

RS485 Bus

Up to4 Repeater2 Power Station

SmartLetUSee/LCD-LiteRepeater

SmartLevelPower Station

Page 28: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus

It have to address RS485 Bus devices

SmartLetUSee/LCD-LiteRepeater

SmartLevelPower Station

Address

DIPSwitchPosition

Page 29: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus

It have to address RS485 Bus devices

SmartLetUSee/LCD-LiteRepeater

View logLED TestResetMaintenance

LED testResetMaintenanceProgramming

BoosterOptionsAddress RS485Default Data

SmartLevelPower Station

Address: 01

Address: 02

Prog

Enable SmartLevel programming phase

Page 30: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus

RipetitoreSmartLetUSee/LCD-Lite

SmartLevelPower Station

Set End of Line jumper in EOL position on the last device

SmartLevelRepeater

Page 31: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus

SmartLetUSee/LCD-LiteRepeater

SmartLevelPower Station

It have to address RS485 Bus devices

Enable panel programming phase

Control PanelIN PROGRAMMING

Ver: 2.0301/01/12 17:45

Page 32: SmartLine Startup. SmartLine Initial wirings Initial Wirings

SmartLine

RS485 Bus

SmartLetUSee/LCD-LiteRepeater

SmartLevelPower Station

CentraleIN PROGRAMMAZ.!!

Ver: 2.0301/01/12 17:45

Control PanelIN PROGRAMMING

Ver: 2.0301/01/12 17:45

Control PanelIN PROGRAMMING

Ver: 2.0301/01/12 17:45

SettingsDisablementMaintenanceProgramming

ConfigurationProgr. ZoneProgr. OutputProgr. Timer

Acquire int.busAcquire ext.bus

Current DevicesRepeater OPower Station OOk to execute

Current DevicesRepeater 2Power Station 1Ok to execute