ANALISA HARGA SATUAN BOW PEKERJAAN KAYU INDEK SAT U R A I A N HARGA SATUAN (Rp) HARGA BAHAN UPAH ( Rp ) ( Rp ) A. PEKERJAAN PONDASI KAYU A.1.BOW SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 M DICINCIN, DILANCIP DAN DITUMBUK 0.0200 M3 Balok ulin @ 1,537,571.94 30,751.44 0.5100 OH tukang kayu @ 55,000.00 28,050.00 0.8750 OH pekerja @ 45,000.00 39,375.00 0.0510 OH kepala tukang @ 60,000.00 3,060.00 0.0440 OH mandor @ 60,000.00 2,640.00 JUMLAH 30,751.44 73,125.00 A.2 SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M 2 SAMBUNGAN DGN PIPA GALVANIS 0.0800 M3 Balok ulin @ 1,537,571.94 123,005.76 0.5100 OH tukang kayu @ 55,000.00 28,050.00 0.8750 OH pekerja @ 45,000.00 39,375.00 0.0510 OH kepala tukang @ 60,000.00 3,060.00 0.0440 OH mandor @ 60,000.00 2,640.00 JUMLAH 123,005.76 73,125.00 A.3 SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M' 0.0400 M3 Balok ulin @ 1,537,571.94 61,502.88 0.5100 OH tukang kayu @ 55,000.00 28,050.00 0.8750 OH pekerja @ 45,000.00 39,375.00 0.0510 OH kepala tukang @ 60,000.00 3,060.00 0.0440 OH mandor @ 60,000.00 2,640.00 JUMLAH 61,502.88 73,125.00 A. 4 1 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN 1.1000 M3 papan siring kayu ulin @ 1,737,571.94 1,911,329.13 3.0000 kg paku ulin @ 13,750.00 41,250.00 15.0000 OH tukang kayu @ 55,000.00 825,000.00 4.0000 OH pekerja @ 45,000.00 180,000.00 1.5000 OH kepala tukang @ 60,000.00 90,000.00 0.2000 OH mandor @ 60,000.00 12,000.00 JUMLAH 1,952,579.13 1,107,000.00 A. 5 1.1000 M3 balok ky ulin @ 1,537,571.94 1,691,329.13 15.0000 OH tukang kayu @ 55,000.00 825,000.00 5.0000 OH pekerja @ 45,000.00 225,000.00 1.5000 OH kepala tukang @ 60,000.00 90,000.00 0.2500 OH mandor @ 60,000.00 15,000.00 JUMLAH 1,691,329.13 1,155,000.00 KODE ANALISA 1 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk )

Upload: eddy-robby

Post on 13-Sep-2015

398 views

Category:

Documents


70 download

DESCRIPTION

SNI 2006

TRANSCRIPT

BOW KAYUANALISA HARGA SATUAN BOWPEKERJAAN KAYUKODE ANALISAINDEKSATU R A I A NHARGA SATUAN (Rp)HARGAJUMLAH HARGA (Rp)BAHANUPAH( Rp )( Rp )A. PEKERJAAN PONDASI KAYUA.1.BOWSEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 MDICINCIN, DILANCIP DAN DITUMBUK0.0200M3Balok ulin@1,537,571.9430,751.440.5100OHtukang kayu@55,000.0028,050.000.8750OHpekerja@45,000.0039,375.000.0510OHkepala tukang@60,000.003,060.000.0440OHmandor@60,000.002,640.00JUMLAH30,751.4473,125.00103,876.44A.2SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M2 SAMBUNGAN DGN PIPA GALVANIS0.0800M3Balok ulin@1,537,571.94123,005.760.5100OHtukang kayu@55,000.0028,050.000.8750OHpekerja@45,000.0039,375.000.0510OHkepala tukang@60,000.003,060.000.0440OHmandor@60,000.002,640.00JUMLAH123,005.7673,125.00196,130.76A.3SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M'0.0400M3Balok ulin@1,537,571.9461,502.880.5100OHtukang kayu@55,000.0028,050.000.8750OHpekerja@45,000.0039,375.000.0510OHkepala tukang@60,000.003,060.000.0440OHmandor@60,000.002,640.00JUMLAH61,502.8873,125.00134,627.88A. 41 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN1.1000M3papan siring kayu ulin@1,737,571.941,911,329.133.0000kgpaku ulin@13,750.0041,250.0015.0000OHtukang kayu@55,000.00825,000.004.0000OHpekerja@45,000.00180,000.001.5000OHkepala tukang@60,000.0090,000.000.2000OHmandor@60,000.0012,000.00JUMLAH1,952,579.131,107,000.003,059,579.13A. 51 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk )1.1000M3balok ky ulin@1,537,571.941,691,329.1315.0000OHtukang kayu@55,000.00825,000.005.0000OHpekerja@45,000.00225,000.001.5000OHkepala tukang@60,000.0090,000.000.2500OHmandor@60,000.0015,000.00JUMLAH1,691,329.131,155,000.002,846,329.13Hal : 496ANALISA HARGA SATUAN BOWPEKERJAAN KAYUKODE ANALISAINDEKSATU R A I A NHARGA SATUAN (Rp)HARGAJUMLAH HARGA (Rp)BAHANUPAH( Rp )( Rp )B. PEKERJAAN LANTAI KAYUB. 11 M3 MENGERJAKAN SLOOF DAN GELAGAR KY ULIN1.1000M3balok ky ulin@1,537,571.941,691,329.1310.0000Kgpaku ulin@13,750.00137,500.0015.0000OHtukang kayu@55,000.00825,000.005.0000OHpekerja@45,000.00225,000.001.5000OHkepala tukang@60,000.0090,000.000.2500OHmandor@60,000.0015,000.00JUMLAH1,828,829.131,155,000.002,983,829.13B. 21 M2 LANTAI PAPAN KAYU ULIN DIKETAM0.0254M3papan kayu ulin@1,737,571.9444,134.330.2500Kgpaku ulin@13,750.003,437.500.8000OHtukang kayu@55,000.0044,000.000.2800OHpekerja@45,000.0012,600.000.0800OHkepala tukang@60,000.004,800.000.0140OHmandor@60,000.00840.00JUMLAH47,571.8362,240.00109,811.83B. 31 M2 LANTAI PAPAN KAYU MERANTI DIKETAM0.0254M3papan kayu meranti klas 1@1,187,571.9430,164.330.2500Kgpaku biasa@11,825.002,956.250.8000OHtukang kayu@55,000.0044,000.000.2800OHpekerja@45,000.0012,600.000.0800OHkepala tukang@60,000.004,800.000.0140OHmandor@60,000.00840.00JUMLAH33,120.5862,240.0095,360.58B. PEKERJAAN DINDING KAYUB. 41 M3 MENGERJAKAN RANGKA RUMAH KAYU ULIN (termasuk kusen)1.1000M3balok ky ulin@1,537,571.941,691,329.135.0000Kgpaku ulin@13,750.0068,750.0020.0000OHtukang kayu@55,000.001,100,000.0010.0000OHpekerja@45,000.00450,000.002.0000OHkepala tukang@60,000.00120,000.000.5000OHmandor@60,000.0030,000.00JUMLAH1,760,079.131,700,000.003,460,079.13Hal : 497ANALISA HARGA SATUAN BOWKODE ANALISAINDEKSATU R A I A NHARGA SATUAN (Rp)HARGAJUMLAH HARGA (Rp)BAHANUPAH( Rp )( Rp )B. 51 M3 MENGERJAKAN RANGKA RUMAH KAYU MERANTI (termasuk kusen)1.1000M3balok ky meranti@1,037,571.941,141,329.135.0000Kgpaku biasa@11,825.0059,125.0020.0000OHtukang kayu@55,000.001,100,000.0010.0000OHpekerja@45,000.00450,000.002.0000OHkepala tukang@60,000.00120,000.000.5000OHmandor@60,000.0030,000.00JUMLAH1,200,454.131,700,000.002,900,454.13B. 61 M2 DINDING PAPAN ULIN DIKETAM0.0240M3papan kayu ulin@1,737,571.9441,701.730.2000Kgpaku ulin@13,750.002,750.000.8000OHtukang kayu@55,000.0044,000.000.2800OHpekerja@45,000.0012,600.000.0800OHkepala tukang@60,000.004,800.000.0100OHmandor@60,000.00600.00JUMLAH44,451.7362,000.00106,451.73B. 71 M2 DINDING PAPAN MERANTI DIKETAM0.0240M3papan kayu meranti@1,187,571.9428,501.730.2000Kgpaku biasa@11,825.002,365.000.8000OHtukang kayu@55,000.0044,000.000.2800OHpekerja@45,000.0012,600.000.0800OHkepala tukang@60,000.004,800.000.0100OHmandor@60,000.00600.00JUMLAH30,866.7362,000.0092,866.737,623.49B. 81 M2 DINDING SUSUN SIRIH PAPAN MERANTI0.0250M3papan kayu meranti@1,187,571.9429,689.300.1500Kgpaku biasa@11,825.001,773.750.4000OHtukang kayu@55,000.0022,000.000.1400OHpekerja@45,000.006,300.000.0400OHkepala tukang@60,000.002,400.000.0070OHmandor@60,000.00420.00JUMLAH31,463.0531,120.0062,583.0553,679.67Hal : 498ANALISA HARGA SATUAN BOWKODE ANALISAINDEKSATU R A I A NHARGA SATUAN (Rp)HARGAJUMLAH HARGA (Rp)BAHANUPAH( Rp )( Rp )B. 91 M2 DINDING PAPAN MERANTI SUSUN SIRIH DIKETAM0.0250M3papan kayu meranti@1,187,571.9429,689.300.2000Kgpaku biasa@11,825.002,365.000.8000OHtukang kayu@55,000.0044,000.000.2800OHpekerja@45,000.0012,600.000.0800OHkepala tukang@60,000.004,800.000.0100OHmandor@60,000.00600.00JUMLAH32,054.3062,000.0094,054.30B. 101 M2 MENGERJAKAN DINDING PARTISI KAYUMERANTI DAN LAPISAN MULTIPLEK 9 MM0.0210M3papan kayu meranti@1,187,571.9424,939.010.7000LBRMultiplek 9 mm@150,000.00105,000.000.0400KGPaku biasa@11,825.00473.000.0400KGPaku plywood@20,000.00800.000.0150OHTukang kayu@55,000.00825.000.8000OHPekerja@45,000.0036,000.000.0150OHkepala tukang@60,000.00900.000.0400OHMandor@60,000.002,400.00JUMLAH131,212.0140,125.00171,337.01117,670.42Hal : 499

Penajam, Januari 2005

Dibuat Oleh : Konsultan PerencanaCV. ALFREDO JAYA KONSULTAN

Ir. A. FARHANI Direktur

ANGKUTDAFTAR ONGKOS ANGKUT MATERIALBIDANG:CIPTA KARYATAHUN:Juli 2006NOMATERIALSATHARGA MATERIALJARAK ANGKUT RATA-RATA 0 - 15JARAK ANGKUT RATA-RATA 16 - 30JARAK ANGKUT RATA-RATA 31 - 45JARAK ANGKUT RATA-RATA 46 - 70ONGKOS ANGKUTJUMLAHONGKOS ANGKUTJUMLAHONGKOS ANGKUTJUMLAHONGKOS ANGKUTJUMLAH1Balok Klas I Bangkiraim31,700,000.00123,950.581,823,950.58154,938.221,854,938.22185,925.861,885,925.86237,571.941,937,571.942Balok Klas I Ulinm31,300,000.00123,950.581,423,950.58154,938.221,454,938.22185,925.861,485,925.86237,571.941,537,571.943Balok Kayu Merantim3800,000.00123,950.58923,950.58154,938.22954,938.22185,925.86985,925.86237,571.941,037,571.944Batu Gunungm365,000.0035,945.67100,945.6766,933.31131,933.3197,920.96162,920.96149,567.03214,567.035Kayu Klas 2m3650,000.00123,950.58773,950.58154,938.22804,938.22185,925.86835,925.86237,571.94887,571.946Kayu galam dia 10 - 12 cmbtg9,500.00123,950.58133,450.58154,938.22164,438.22185,925.86195,425.86237,571.94247,071.947Kerikil Beton / Split ( 2-3 cm )m3165,000.0035,945.67200,945.6766,933.31231,933.3197,920.96262,920.96149,567.03314,567.038Koralm3165,000.0035,945.67200,945.6766,933.31231,933.3197,920.96262,920.96149,567.03314,567.039Papan Kayu Bangkiraim31,900,000.00123,950.582,023,950.58154,938.222,054,938.22185,925.862,085,925.86237,571.942,137,571.9410Papan Kayu Ulinm31,500,000.00123,950.581,623,950.58154,938.221,654,938.22185,925.861,685,925.86237,571.941,737,571.9411Papan Kayu kelas 2m3800,000.00123,950.58923,950.58154,938.22954,938.22185,925.86985,925.86237,571.941,037,571.9412Papan Kayu Merantim3950,000.00123,950.581,073,950.58154,938.221,104,938.22185,925.861,135,925.86237,571.941,187,571.9413Pasir Betonm3175,000.0035,945.67210,945.6766,933.31241,933.3197,920.96272,920.96149,567.03324,567.0314Pasir Pasang sungaim3175,000.0035,945.67210,945.6766,933.31241,933.3197,920.96272,920.96149,567.03324,567.0315Pasir pasang putihm3100,000.0035,945.67135,945.6766,933.31166,933.3197,920.96197,920.96149,567.03249,567.0316Pasir Urugm350,000.0035,945.6785,945.6766,933.31116,933.3197,920.96147,920.96149,567.03199,567.0317Sirtum360,000.0035,945.6795,945.6766,933.31126,933.3197,920.96157,920.96149,567.03209,567.0318Tanah Urugm313,500.0035,139.9948,639.9966,127.6379,627.6397,115.28110,615.28148,761.35162,261.35

HARGA 2006 JuliDAFTAR HARGA SATUAN UPAH DAN BAHANBIDANG:Cipta KaryaTAHUN ANGGARAN:2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN1234 = 6+5567AUPAH KERJA1Pekerja ( Buruh semi terlatih )Hari45,000.000.045,000.002Tukang BatuHari55,000.000.055,000.003Tukang KayuHari55,000.000.055,000.004Tukang BesiHari55,000.000.055,000.005Tukang CatHari55,000.000.055,000.006Kepala TukangHari60,000.000.060,000.007MandorHari60,000.000.060,000.008SopirHari50,000.000.050,000.009Pembantu SopirHari40,000.000.040,000.00BHarga Bahan20051Aluminium foil single sidedRoll450,000.000.0450,000.00341,500.002AmpelasLbr2,500.000.02,500.002,500.003Atap Asbes Gelombang BesarLbr23,000.000.023,000.0016,000.004Atap Genteng KodokBh1,550.000.01,550.001,500.005Atap Metal Berkualitas ( 2 ssn, 8 daun )Lbr40,000.000.040,000.0031,500.006Atap Metal Surya Roof ( 2 ssn, 8 daun )Lbr0.00.045,000.007Atap Metal Mega Color ( 1 ssn, 5 daun )Lbr0.00.017,500.008Atap Metal Verza roof ( 1 ssn, 5 daun )Lbr0.00.025,000.009Atap Metal Multi roof ( 2 susun )Lbr0.00.097,500.0010Atap Metal Multi color ( 1 susun )Lbr0.00.087,500.006Atap Plastik gelombang 60 x 170Lbr14,500.000.014,500.0016,000.007Atap SirapIkat50,000.000.050,000.00isi 100 bh50,000.008Atap TiluxBh21,000.000.021,000.0018,000.009Bahan Plafond Asbes Semen 5 mmM221,000.000.021,000.0016,000.0010Bahan Plafond eternit 4 mmM225,000.000.025,000.0015,000.0011Bahan Plafond Hardplex 5 mm 120 x 130Lbr42,500.000.042,500.0070,000.0012Bahan Politur ( sirlak ) IndiaKg32,000.000.032,000.0026,000.0013Bak Air Fiber (60 x 60 cm)Bh145,000.000.0145,000.00220,000.0014Bak Air Fiber (60 x 80 cm)Bh185,000.000.0185,000.00330,000.0015Bak Cuci Piring Stainles Lobang 1Bh195,000.000.0195,000.00315,000.0016Bak Cuci Piring Stainles Lobang 2Bh250,000.000.0250,000.00350,000.0017Bak Kontrol 50 x 50 x 40 cmBh75,000.000.075,000.0055,000.0018Bak air Traso BesarBh185,000.000.0185,000.00185,000.0019Balok Klas I BangkiraiM31,937,571.94237,571.941,700,000.00Jarak 46 - 701,279,091.391,041,519.4590,994.05jarak angkut 0 - 1520Balok Klas I UlinM31,537,571.94237,571.941,300,000.00Jarak 46 - 701,279,091.391,041,519.45T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN21Balok Kayu MerantiM31,037,571.94237,571.94800,000.00Jarak 46 - 70829,091.39591,519.4522BatakoBh1,500.000.01,500.001,925.0023Batu alamM2120,000.000.0120,000.00120,000.0024Batu BataBh550.000.0550.00550.0025Batu apungKg15,125.000.015,125.0015,125.0026Batu GunungM3214,567.03149,567.0365,000.00Jarak 46 - 70147,608.93(1,958.10)149,750.21jarak angkut 46 - 7027BautBh2,000.000.02,000.003,300.0028BensinLt4,500.000.04,500.002,860.0029Besi Beton Polos Dia 6 - 22 mmKg11,000.000.011,000.0010.689,000.0030Besi Beton Ulir Dia 6 - 22 mmKg16,000.000.016,000.007022.471910112412,500.0031Besi penggantung plafondKg11,000.000.011,000.0014513.10861423229,000.0032Besi stripKg18,000.000.018,000.0010,350.0033Box MCB 2 groupUnit150,000.000.0150,000.00150,000.0034Box MCB 4 groupUnit250,000.000.0250,000.00250,000.0035BreakerBh20,000.000.020,000.0020,000.0036Buis Beton Dia 80 cm tanpa tulanganBh364,000.000.0364,000.0088,000.0037Buis Beton Dia 60Bh150,000.000.0150,000.00121,000.0038Buis Beton Dia 80Bh175,000.000.0175,000.00165,000.0039Buis Beton Dia 100 cm tanpa tulanganBh450,000.000.0450,000.00214,500.0040Buis Beton Dia 120Bh275,000.000.0275,000.00247,500.0041Cat Air / tembokKg15,400.000.015,400.0015,000.0042Cat besiKg25,000.000.025,000.0034,500.0043Cat Dasar / plamirKg22,500.000.022,500.0019,000.0044Cat Kilap / KayuKg35,000.000.035,000.0028,000.0045Cat Menie kayuKg13,000.000.013,000.0017,000.0046Closed Jongkok Keramik berkualitasBh120,000.000.0120,000.0085,000.0047Closed Jongkok Keramik TotoBh125,000.000.0125,000.00125,000.0048Closed Jongkok TerasoBh80,000.000.080,000.0025,000.0049Closet Duduk Type Keramik BerkualitasUnit1,200,000.000.01,200,000.001,250,000.0050Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mmBh250,000.000.0250,000.00250,000.0051Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mmBh200,000.000.0200,000.00200,000.0052Daun Pintu Plywood Bag. Dlm Lapis Aluminium FoilBh350,000.000.0350,000.00350,000.0053Daun VentilasiBh60,000.000.060,000.0060,000.0054Dempul Halus ( INFRA )Kg25,000.000.025,000.0025,000.0055Dempul kayuKg12,500.000.012,500.0012,500.00T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN56Dempul PoliturKg12,500.000.012,500.0012,500.0057Engsel Jendela Lokal 3 "Bh20,000.000.020,000.0011,500.0058Engsel Pintu Lokal 5 "Bh25,000.000.025,000.0017,500.0059EspagnoletBh125,000.000.0125,000.00125,000.0060Floor DrainBh17,500.000.017,500.0027,500.0061Formika Ukuran PintuLbr75,000.000.075,000.0075,000.0062Genteng keramikBh8,500.000.08,500.008,500.0063Glass blockBh18,500.000.018,500.0020,000.0064Grendel JendelaBh7,500.000.07,500.007,500.0065Grendel PintuBh12,500.000.012,500.007,500.0066Grendel tanam PintuBh25,000.000.025,000.0025,000.0067Gypsum board, t = 9 mmLbr45,000.000.045,000.0085,000.0068Hak AnginBh8,000.000.08,000.008,800.0069Handle Jendela putihBh5,000.000.05,000.005,000.0070Handle PintuBh16,500.000.016,500.0016,500.0071Jalusi AtapBh425,000.000.0425,000.00400,000.0072Jalusi Kayu BangkiraiM'15,000.000.015,000.0012,000.0073Kabel NGA 2,5Rol155,000.000.0155,000.00110,000.0074Kaca Naco ( kerangka/daun ) 7 mmSet125,000.000.0125,000.00105,000.0074Kaca Naco ( kerangka/daun ) 5 mmSet150,000.000.0150,000.00120,000.0075Kaca polos 2 mmM232,000.000.032,000.0038,000.0076Kaca polos 3 mmM248,000.000.048,000.0040,000.0077Kaca polos 5 mmM280,000.000.080,000.0016,000.0080,000.0078Kaca Rayben 5 mmM295,000.000.095,000.0090,000.0079Kanopi AtapBh325,000.000.0325,000.00325,000.0080Kawat Bendrat / BetonKg10,000.000.010,000.0012,100.0081Kawat BronjongKg27,500.000.027,500.0027,500.0082Kawat DuriKg11,000.000.011,000.0030,000.0083Kawat Harmonikam237,500.000.037,500.0024,200.0084Kawat nyamuk besim210,000.000.010,000.0012,500.0085Kawat nyamuk plastikm25,000.000.05,000.007,500.0086Kayu Klas 2M3650,000.000.0650,000.00550,000.0087Kayu galam dia 10 - 12 cmBtg9,500.000.09,500.007,500.0088Keramik 10 x 20 cmM235,000.000.035,000.0048,400.0089Keramik 20 x 25 cmM244,000.000.044,000.0046,400.00T. A 20060.16NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN6.2590Keramik 20 x 20 cmM244,000.000.044,000.0041,800.0091Keramik 30 x 30 cm HalusM237,000.000.037,000.0036,800.0092Keramik 30 x 30 cm KasarM241,000.000.041,000.0042,750.0093Keramik 40 x 40 anti slipM249,500.000.049,500.0066,000.0094Karet TalangM'5,500.000.05,500.007,500.0095Kerikil Beton / Split ( ukuran 2-3 cm )M3314,567.03149,567.03165,000.00Jarak 46 - 70202,608.93149,750.21Jarak angkut 46 - 7096KoralM3314,567.03149,567.03165,000.00Jarak 46 - 70202,608.9397Kran Air Dia 1"Bh25,000.000.025,000.0019,800.0098Kran Air Dia 3/4Bh20,000.000.020,000.0016,500.0099Kuas 3 "Bh7,500.000.07,500.006,500.00100Kunci Pintu 2 Slag berkualitasBh150,000.000.0150,000.00150,000.00101Kunci Pintu Double Ex CisaBh350,000.000.0350,000.00350,000.00102Kunci Pintu Double Lengkap Dgn AccecoriesBh750,000.000.0750,000.00750,000.00103Kunci Pintu Tanam antikBh125,000.000.0125,000.00125,000.00104Kusen aluminium 10.00.0105Kusen aluminium 20.00.0106Kusen aluminium 30.00.0107Lampu 1 - TL 40 Watt Double + InstalasiBh150,000.000.0150,000.00150,000.00107Lampu 2 - TL 40 Watt Double + InstalasiBh150,000.000.0150,000.00150,000.00108Lampu Down Light Type A003 CD5 RSL E 27Unit125,000.000.0125,000.00125,000.00108Lampu Merkury 250 wtBh165,000.000.0165,000.00165,000.00109Lampu Pijar 10 WattBh3,500.000.03,500.003,300.00110Lampu Pijar 100 WattBh15,000.000.015,000.006,600.00111Lampu Pijar 15 WattBh3,850.000.03,850.003,850.00112Lampu Pijar 25 WattBh4,500.000.04,500.004,400.00113Lampu Pijar 40 WattBh10,000.000.010,000.0010,000.00114Lampu Pijar 5 WattBh3,500.000.03,500.002,200.00115Lampu Pijar 60 WattBh5,500.000.05,500.005,500.00116Lampu Philip SL 20 Watt + FittingBh50,000.000.050,000.0045,000.00117Lampu TL 10 wattBh26,000.000.026,000.0026,000.00117Lampu TL Philip + Fitting 20 WattBh37,000.000.037,000.0034,000.00118Lampu TL 20 Watt Double (Trafo)Bh125,000.000.0125,000.0065,000.00119Lampu TL 40 Watt (Trafo)Bh85,000.000.085,000.0045,000.00120Lampu TL 40 Watt Double (Trafo)Bh160,000.000.0160,000.0090,000.00121Lem Kayu ( Fox )Ltr9,500.000.09,500.0015,000.00T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN122Lem ParalonBh5,000.000.05,000.005,000.00123List Cornice GypsumM'15,000.000.015,000.0015,000.00124List Plafond GypsumM'30,000.000.030,000.0030,000.00125List Plafond PlywoodM'1,500.000.01,500.001,500.00126List Profil Sudut 3/5 Ky BangkiraiM'4,250.000.04,250.004,250.00127List Profil Sudut 3/5 Ky MerantiM'3,750.000.03,750.003,750.00128Listplank kayu ukirM'37,692.620.037,692.6232,692.6231,250.00129List plafond gypsumM'31,250.000.031,250.005,000.0031,250.00130Macam2 Sambungan PVC AW Dia 1 "Bh3,500.000.03,500.002,500.00131Macam2 Sambungan PVC AW Dia 1/2 "Bh2,000.000.02,000.001,500.00132Macam2 Sambungan PVC AW Dia 2 "Bh5,000.000.05,000.003,500.00133Macam2 Sambungan PVC AW Dia 3/4 "Bh6,500.000.06,500.002,000.00134Macam2 Sambungan PVC AW Dia 4 "Bh11,000.000.011,000.006,500.00135Marmer lokalm20.00.060,000.00136Minyak catLtr12,500.000.012,500.0013,200.00137Minyak bekistingLtr5,000.000.05,000.002,750.00138Multiplek 4 mmLbr67,000.000.067,000.0066,666.6750,000.00139Multiplek 6 mmLbr100,000.000.0100,000.00100,000.0068,750.00140Multiplek 9 mmLbr150,000.000.0150,000.0016,666.6794,000.00141Multiplek 15 mmLbr250,000.000.0250,000.00250,000.00134,960.00142Multiplek 18 mmLbr300,000.000.0300,000.00300,000.00160,000.00143Multiplex 12 mmLbr200,000.000.0200,000.00200,000.00110,000.00144Nok Genteng KodokBh2,000.000.02,000.0015,000.00145Nok Genteng keramikBh19,500.000.019,500.0012,500.00146Nok Model U ukuran 110 x 5 x 6 cmM'35,000.000.035,000.0027,500.00147Nok Model U Verza Roof 40 x 12 cmBh18,000.000.018,000.0015,000.00148OkerKg15,000.000.015,000.0015,000.00149Oli / pelumasLtr24,750.000.024,750.0024,750.00150Pagar besi motif BRC 1,2 x 2,4 m'M'297,916.670.0297,916.67715,000.00151Pagar besi motif BRC 1,75 x 2,4 m'M'343,750.000.0343,750.00825,000.00152Paku Asbes + KaretKg16,000.000.016,000.0027,500.00153Paku BetonBh250.000.0250.00500.00154Paku borKg25,000.000.025,000.0020,000.00155Paku Genteng metalKg27,500.000.027,500.0027,500.00156Paku Kayu / biasaKg11,825.000.011,825.0011,825.00T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN157Paku KelingKg25,000.000.025,000.0025,000.00158Paku SengKg14,300.000.014,300.0014,300.00159Paku UlinKg13,750.000.013,750.0013,750.00160Paku PlywoodKg20,000.000.020,000.0020,000.00161Paku SekrupKg14,300.000.014,300.0014,300.00162Papan Kayu BangkiraiM32,137,571.94237,571.941,900,000.00Jarak 46 - 701,479,091.39163Papan Kayu UlinM31,737,571.94237,571.941,500,000.00Jarak 46 - 701,479,091.39164Papan Kayu kelas 2M31,037,571.94237,571.94800,000.00Jarak 46 - 70829,091.39165Papan Kayu MerantiM31,187,571.94237,571.94950,000.00Jarak 46 - 701,079,091.39166Papan Nama ProyekBh350,000.000.0350,000.00350,000.00167Papan Reuter BengkiraiM'26,900.000.026,900.0026,900.00168Pas. Lampu Baret + InstalasiUnit375,000.000.0375,000.00375,000.00169Pas. Lampu GantungUnit450,000.000.0450,000.00450,000.00170Pasir BetonM3324,567.03149,567.03175,000.00Jarak 46 - 70172,608.93Jarak 46 - 70171Pasir Pasang sungaiM3324,567.03149,567.03175,000.00Jarak 46 - 70127,213.47Jarak 46 - 70172Pasir pasang putihM3249,567.03149,567.03100,000.00Jarak 46 - 7058,541.85149,074.25Jarak 46 - 70173Pasir UrugM3199,567.03149,567.0350,000.00Jarak 46 - 7073,541.85Jarak 46 - 70174Paving blok biasabh2,000.000.02,000.0045,750.000.04175Paving block K - 127m275,000.000.075,000.0051,000.0025176Penangkal Petir + Instalasiunit5,500,000.000.05,500,000.005,000,000.0030000177Pintu Panel Double ky BangkiraiBh700,000.000.0700,000.00660,000.003000178Pintu Double PlywoodBh250,000.000.0250,000.00225,000.00179Pintu Panel ky Bangkirai Uk. Besar L 80 cmBh425,000.000.0425,000.00341,000.00180Pintu Panel ky Bangkirai Uk. Kecil L 70 cmBh350,000.000.0350,000.00330,000.00181Pintu Panel kayu Ulin Ukuran Besar L 80 cmBh350,000.000.0350,000.00341,000.00182Pintu Panel kayu Ulin Ukuran Kecil L 70 cmBh300,000.000.0300,000.00330,000.00183Pintu Panel Lapis Formika (Fabrikasi)Bh335,000.000.0335,000.00250,000.00184Pintu SkatBh200,000.000.0200,000.00200,000.00185Pipa Galvanis AW Dia 1 "M'15,000.000.015,000.0013,500.00186Pipa Galvanis AW Dia 2 "M'30,000.000.030,000.0027,000.00187Pipa Galvanis AW Dia 3 "M'93,000.000.093,000.0090,000.00188Pipa Galvanis AW Dia 4 "M'110,000.000.0110,000.00107,250.00189Pipa PVC AW Dia 1 "Btg25,000.000.025,000.004 m' / btg18,500.00190Pipa PVC AW Dia 1/2 "Btg12,500.000.012,500.004 m' / btg13,000.00191Pipa PVC AW Dia 2 "Btg45,000.000.045,000.004 m' / btg25,000.00T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN192Pipa PVC AW Dia 3/4 "Btg15,000.000.015,000.004 m' / btg16,000.00193Pipa PVC AW Dia 4 "Btg85,000.000.085,000.004 m' / btg98,000.00194Pipa stainless steel 2 "M'30,250.000.030,250.0030,250.00195Pipa stainless steel 3 "M'37,812.000.037,812.0037,812.00196PittingBh6,000.000.06,000.005,000.00197PlamirKg28,000.000.028,000.0013,200.00198PliturKg8,500.000.08,500.007,300.00199Plint / list lantai keramikBh3,500.000.03,500.001,450.00200Plint marmer 10 x 40 cmBh12,500.000.012,500.0012,500.00201Plywood 3 mmLbr46,000.000.046,000.0015,333.3335,750.00202Plywood 4 mmLbr61,500.000.061,500.0061,333.3342,900.00203Plywood 6 mmLbr92,000.000.092,000.0092,000.0049,500.00204Plywood 12 mmLbr184,000.000.0184,000.00184,000.00110,000.00205Plywood 15 mmLbr230,000.000.0230,000.00230,000.00145,000.00206Plywood 18 mmLbr276,000.000.0276,000.00276,000.00160,000.00207Porselen 20 x 20 cmBh2,500.000.02,500.001,700.00208Polycarbonat0.00.00.0209Rangka besi hollowM'60,000.000.060,000.0060,000.0017210Rol Cat TembokBh20,000.000.020,000.0012,000.004000211Rolling door0.00.00.068000212Roster beton 20 x 20 cmBh3,000.000.03,000.002,200.00213Roster beton 20 x 30 cmBh4,000.000.04,000.003,300.00214Roster kayu bangkirai 20 x 20 cmBh60,000.000.060,000.0082,500.00215Rumput HiasM225,000.000.025,000.0012,000.00216Saklar GandaBh19,250.000.019,250.0019,250.00217Saklar TunggalBh16,500.000.016,500.0016,500.00218Sekering Kas 3 Group + InstalasiUnit100,000.000.0100,000.00100,000.0043000219Semen Abu - Abu / PC ( 50 kg/Zak )Zak43,000.000.043,000.0038,500.00860220Semen WarnaKg1,600.000.01,600.004,850.00221Semen putihKg1,200.000.01,200.004,400.00222Seng gelombang Besar / kecilLbr30,000.000.030,000.0034,000.00223Seng Plat BJLS 30M'12,500.000.012,500.0024,000.00223Seng PlatLbr35,000.000.035,000.0028,500.00224Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 )Unit4,550,000.000.04,550,000.002,500,000.00225Septictank KayuUnit1,650,000.000.01,650,000.001,500,000.00T. A 2006NOURAIANSATJUMLAH HARGA SATUANBIAYA ANGKUTHARGA DASAR TANPA PAJAKKETERANGAN226SirlakKg27,000.000.027,000.0027,000.00227Sirtum3209,567.03149,567.0360,000.00Jarak 46 - 70142,608.93(6,958.10)228SolarLtr6,321.000.06,321.002,750.00229SpritusLtr5,000.000.05,000.005,000.00230Stop KontakBh18,000.000.018,000.0016,500.00231Talang Air PVC MaspionM'25,000.000.025,000.00Perbatang 4 m'25,000.00232Tambah daya ListrikWt2,500.000.02,500.002,500.00233Tanah UrugM3162,261.35148,761.3513,500.00Jarak 46 - 7032,789.98234Tandon Air 2 x 1200 ltr + Menara + AtapUnit3,950,000.000.03,950,000.003,700,000.00235Tandon Air 1 x 1200 ltr + Menara + AtapUnit1,975,000.000.01,975,000.001,850,000.00236Tangga Naik Tinggi 1 mBh210,000.000.0210,000.00210,000.00237Tanki Air Viberglass 1200 LtrBh850,000.000.0850,000.00750,000.00238Tanki Air Viberglass 2500 LtrBh1,850,000.000.01,850,000.00825,000.00239Tanki Air Viberglass 550 LtrBh650,000.000.0650,000.00650,000.00240Teakwood 3 mmLbr85,000.000.085,000.0028,333.3365,000.00241Teakwood 4 mmLbr113,500.000.0113,500.00113,333.3372,600.00242Teakwood 6 mmLbr170,000.000.0170,000.00170,000.0093,500.00243Ter / ResiduKg5,000.000.05,000.005,000.00244TerpentinLtr2,500.000.02,500.002,500.00245Tiang Lampu Tunggal 11 m'Bt1,950,000.000.01,950,000.001,950,000.00246Tiang Lampu Tunggal 9 m'Bt1,280,000.000.01,280,000.001,280,000.00247Tiang Lampu Ganda 11 m'Bt2,300,000.000.02,300,000.002,300,000.00248Tiang Lampu ganda 9 m'Bt1,510,000.000.01,510,000.001,510,000.00249Tinner ALtr12,000.000.012,000.0012,000.00250Titik Mata LampuTtk130,000.000.0130,000.00120,000.00251Trap Depan Papan Tulis Bak Lapis KeramikBh130,000.000.0130,000.00130,000.00252Ukiran jamang pada puncakBh312,500.000.0312,500.00312,500.00253Ukiran jamang pada listplankBh250,000.000.0250,000.00250,000.00254UrinoirBh1,500,000.000.01,500,000.001,500,000.00255Washtafel + CerminBh450,000.000.0450,000.00450,000.00256Washtafel Type S5 ex TOTOUnit500,000.000.0500,000.00500,000.00T. A 2006Catatan :1.Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal2.Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran3.Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut4.Ongkos angkut tergantung jarak lokasi pekerjaan ke Quary ( sampel jarak angkut 46 - 70 )5.Harga belum termasuk PPn

Penajam, Januari 2005

Dibuat Oleh : Konsultan PerencanaCV. ALFREDO JAYA KONSULTAN

Ir. A. FARHANI Direktur

SNI REVISIANALISA HARGA SATUAN SNI 2006KODE ANALISAINDEKSATUANU R A I A NHARGA SATUAN ( Rp )HARGAJUMLAH HARGA ( Rp )BAHANUPAH( Rp )( Rp )A. PEKERJAAN PERSIAPANA. 6.6.11 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M1.2500btgDolken kayu dia 8-10/4 m'@9,500.0011,875.002.5000kgSemen [email protected],150.000.0050m3Pasir beton@324,567.031,622.840.0090m3Koral beton@314,567.032,831.100.0720m3Kayu 5/7@650,000.0046,800.000.0600kgPaku biasa 2'-5'@11,825.00709.500.4000ltResidu@5,000.002,000.000.2000ohTukang kayu@55,000.0011,000.000.4000ohPekerja@45,000.0018,000.000.0200ohKepala tukang@60,000.001,200.000.0200ohMandor@60,000.001,200.00JUMLAH67,988.4431,400.0099,388.44A. 6.6.21 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M1.2500btgDolken kayu dia 8-10/4 m'@9,500.0011,875.002.5000kgSemen [email protected],150.001.2000LbrSeng gelombang 3" - 5 "@30,000.0036,000.000.0050m3Pasir Beton@324,567.031,622.840.0090m3Koral beton@314,567.032,831.100.0720kgKayu 5/7@650,000.0046,800.000.0600kgPaku biasa 2'-5'@11,825.00709.500.4500KgMeni besi@25,000.0011,250.000.2000ohTukang kayu@55,000.0011,000.000.4000ohPekerja@45,000.0018,000.000.0200ohKepala tukang@60,000.001,200.000.0200ohMandor@60,000.001,200.00JUMLAH113,238.4431,400.00144,638.44A. 6.6.31 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M1.2500btgDolken kayu dia 8-10/4 m'@9,500.0011,875.002.5000kgSemen [email protected],150.0025.0000kgKawat Duri@11,000.00275,000.000.0050m3Pasir Beton@324,567.031,622.840.0090m3Koral beton@314,567.032,831.100.0720kgPaku biasa 2'-5'@11,825.00851.400.2000ohTukang kayu@55,000.0011,000.000.3000ohPekerja@45,000.0013,500.000.0200ohKepala tukang@60,000.001,200.000.0200ohMandor@60,000.001,200.00JUMLAH294,330.3426,900.00321,230.34Hal : 393A. 6.6.41 M' MENGUKUR DAN MEMASANG BOUWPLANK0.0120m3kayu meranti, balok@1,037,571.9412,450.860.0200kgPaku Biasa 2' - 5'@11,825.00236.500.0070m3kayu papan 3/20@1,037,571.947,263.000.1000ohtukang kayu@55,000.005,500.000.1000ohpekerja@45,000.004,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH19,950.3710,900.0030,850.37A. 6.6.51 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN1.2500btgDolken kayu dia 8-10/4 m'@9,500.0011,875.000.1800kgKayu@1,037,571.94186,762.950.8500m3Kayu Biasa@1,037,571.94881,936.151.1000m3Besi Strip@18,000.0019,800.0035.0000kgSemen [email protected],100.000.1500kgPasir Pasang@249,567.0337,435.050.1000m3Pasir Beton@324,567.0332,456.700.1500m3Koral beton@314,567.0347,185.0530.0000BhBata [email protected],500.000.2500LbrSeng Plat@30,000.007,500.002.0000BhJendela Nako@150,000.00300,000.000.0800m2Kaca Polos@80,000.006,400.000.0150BhKunci Tanam@125,000.001,875.000.0600LbrPlywood 4 mm@61,500.003,690.002.0000ohtukang kayu@55,000.00110,000.001.0000ohTukang Batu@55,000.0055,000.002.0000ohpekerja@45,000.0090,000.000.3000ohKepala tukang@60,000.0018,000.000.0500ohMandor@60,000.003,000.00JUMLAH1,583,515.91276,000.001,859,515.91A. 6.6.61 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT1.7000btgDolken kayu dia 8-10/4 m'@9,500.0016,150.000.2100kgKayu@1,037,571.94217,890.110.3000kgPaku biasa 2'-5'@11,825.003,547.5010.5000kgSemen [email protected],030.000.0300m3Pasir Beton@324,567.039,737.010.0500m3Koral beton@314,567.0315,728.351.5000LbrSeng gelombang@30,000.0045,000.002.0000ohTukang kayu@55,000.00110,000.001.0000ohPekerja@45,000.0045,000.000.2000ohKepala tukang@60,000.0012,000.000.0500ohMandor@60,000.003,000.00JUMLAH317,082.97170,000.00487,082.97Hal : 394A. 6.6.71 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU3.0000btgDolken kayu dia 8-10/4 m'@9,500.0028,500.000.2760kgKayu@1,037,571.94286,369.850.7000kgPaku biasa 2'-5'@11,825.008,277.501.5000LbrSeng gelombang bljs 32@30,000.0045,000.001.5000ohTukang kayu@55,000.0082,500.001.0000ohPekerja@45,000.0045,000.000.1500ohKepala tukang@60,000.009,000.000.0500ohMandor@60,000.003,000.00JUMLAH368,147.35139,500.00507,647.35A. 6.6.81 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN0.1000ohpekerja@45,000.004,500.000.0500ohmandor@364,000.0018,200.00JUMLAH0.022,700.0022,700.00A. 6.6.91 M2 PEMBUATAN BEDENG BURUH1.2500btgDolken kayu dia 8-10/4 m'@9,500.0011,875.000.1860kgKayu@1,037,571.94192,988.380.3000KgPaku biasa 2'-5'@11,825.003,547.5018.0000kgSemen [email protected],480.000.0300m3Pasir Beton@324,567.039,737.010.0500m3Koral beton@314,567.0315,728.351.5000LbrSeng gelombang bljs 32@30,000.0045,000.001.3500LbrPlywood 4 mm@61,500.0083,025.002.0000ohTukang kayu@55,000.00110,000.001.0000ohPekerja@45,000.0045,000.000.2000ohKepala tukang@60,000.0012,000.000.0500ohMandor@60,000.003,000.00JUMLAH377,381.24170,000.00547,381.24A. 6.6.101 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM0.0360m3Kayu Terentang@1,037,571.9437,352.590.0800kgPaku biasa 2'-5'@11,825.00946.001.0000btgkaso 5/7@25,000.0025,000.000.3000ohTukang kayu@55,000.0016,500.000.0015ohMandor@60,000.0090.00JUMLAH63,298.5916,590.0079,888.59A. 6.6.111 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM1.0000btgBambu dia. 6 - 8 / 600 cm@10,000.0010,000.000.2500kgTali Ijuk@25,000.006,250.000.0170ohTukang kayu@55,000.00935.000.2500ohPekerja@45,000.0011,250.000.0020ohKepala tukang@60,000.00120.000.0130ohMandor@60,000.00780.00JUMLAH16,250.0013,085.0029,335.00Hal : 395A. 6.6.121 M2 PEMBUATAN JALAN SEMENTARA0.1500m3Batu Belah 15/20@165,000.0024,750.000.0900m3Batu Pecah 5/7@170,000.0015,300.000.0100m3Pasir pasang@1,500,000.0015,000.001.0000ohpekerja@150,000.00150,000.000.0500ohmandor@10,000.00500.00JUMLAH55,050.00150,500.00205,550.00A. 6.6.131 M3 BONGKARAN BETON BERTULANG6.6670ohpekerja@45,000.00300,015.000.3330ohMandor@60,000.0019,980.00JUMLAH0.0319,995.00319,995.00A. 6.6.141 M3 BONGKARAN DINDING TEMBOK BATA MERAH6.6670ohpekerja@45,000.00300,015.000.3330ohMandor@60,000.0019,980.00JUMLAH0.0319,995.00319,995.00A. 6.6.151 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M0.4340m2Pagar Kawat jaring@37,500.0016,275.000.0420ohPekerja@45,000.001,890.000.0040ohKepala tukang@60,000.00240.000.0420ohTukang@55,000.002,310.000.0020ohMandor@60,000.00120.00JUMLAH16,275.004,560.0020,835.00A. 6.6.161 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM0.9860lbrPanel Beton [email protected] Beton [email protected] Beton@324,567.0324,017.96010.1460m3Koral@314,567.0345,926.786245.0000kgSemen Abu- abu@43,000.001,935,000.00000.1250ohTukang batu@55,000.006,875.000.0120ohKepala tukang@60,000.00720.000.3750ohpekerja@45,000.0016,875.000.0190ohmandor@60,000.001,140.00JUMLAH2,004,944.7525,610.002,030,554.75B. PEKERJAAN TANAHB. 6.6.11 M3 GALIAN TANAH BIASA SEDALAM 1 M'36.960.4000ohpekerja92.400045,000.0018,000.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0400ohmandor@60,000.002,400.00JUMLAH20,400.0020,400.00Hal : 396B. 6.6.21 M3 GALIAN TANAH BIASA SEDALAM 2 M'0.5260ohpekerja45,000.0023,670.000.0ohtukang gali55,000.000.00.0ohkepala tukang@60,000.000.00.0520ohmandor@60,000.003,120.00JUMLAH26,790.0026,790.00B. 6.6.31 M3 GALIAN TANAH BIASA SEDALAM 3 M'0.7350ohpekerja@45,000.0033,075.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0730ohmandor@60,000.004,380.00JUMLAH37,455.0037,455.00B. 6.6.41 M3 GALIAN TANAH KERAS SEDALAM 1 M'0.6250ohpekerja@45,000.0028,125.000.0ohtukang gali@55,000.000.0BEKISTING SLOOP 15/20JUMLAH (Kg) BESI SLOOP 15/20 PER M30.0ohkepala tukang@60,000.000.00.4vol.bekisting/m'Dia ( mm )Berat kg/m'PanjangBatangJumlah (kg)0.0620ohmandor@60,000.003,720.000.03vol.beton/m'12.000.891.054.003.74JUMLAH31,845.0031,845.0033.3333333333panjang beton/m310.000.620.607.672.85jarak begel / 15 cm'B. 6.6.51 M3 GALIAN TANAH CADAS SEDALAM 1 M13.333333333313.3336.000.220.00.00.01.2500ohpekerja@45,000.0056,250.00TOTAL KG6.590.0ohtukang gali@55,000.000.0VOLUME BETON / M'0.03219.670.0ohkepala tukang@60,000.000.0PANJANG BETON / M333.33333333330.1250ohmandor@60,000.007,500.00JUMLAH63,750.0063,750.00B. 6.6.61 M3 GALIAN TANAH LUMPUR SEDALAM 1 M'0.8230ohpekerja@45,000.0037,035.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0830ohmandor@60,000.004,980.00JUMLAH42,015.0042,015.00B. 6.6.71 M2 PEKERJAAN STRIPPING SETINGGI 1 M0.0500ohpekerja@45,000.002,250.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0050ohmandor@60,000.00300.00JUMLAH2,550.002,550.00B. 6.6.81 M3 PEMBUANGAN TANAH SEJAUH 150 M0.5160ohpekerja@45,000.0023,220.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0500ohmandor@60,000.003,000.00JUMLAH26,220.0026,220.00Hal : 397B. 6.6.91 M3 URUGAN KEMBALI0.1920ohpekerja@45,000.008,640.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0190ohmandor@60,000.001,140.00JUMLAH9,780.009,780.00B. 6.6.10PEMADATAN TANAH0.5000ohpekerja@45,000.0022,500.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0500ohmandor@60,000.003,000.00JUMLAH25,500.0025,500.00B. 6.6.111 M3 URUGAN TANAH1.2000M3Tanah urug@162,261.35194,713.620.2500ohpekerja@45,000.0011,250.000.0250ohmandor@60,000.001,500.001.0000ohLs biaya pemadatan@25,500.0025,500.00JUMLAH194,713.6238,250.00232,963.62B. 6.6.11.a1 M3 URUGAN PASIR1.2000M3pasir urug@199,567.03239,480.430.3000ohpekerja@45,000.0013,500.000.0100ohmandor@60,000.00600.001.0000ohLs biaya pemadatan@25,500.0025,500.00JUMLAH239,480.4339,600.00279,080.43B. 6.6.121 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL0.3300M3pasir urug@199,567.0365,857.120.1090M3kapur [email protected] [email protected]@45,000.0037,485.000.4160ohtukang batu@55,000.0022,880.000.0400ohkepala tukang@60,000.002,400.000.0830ohmandor@60,000.004,980.00JUMLAH65,857.1267,745.00133,602.12B. 6.6.131 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL0.2000M3kapur [email protected] [email protected]@45,000.0037,485.000.4160ohtukang batu@55,000.0022,880.000.0410ohkepala tukang@60,000.002,460.000.0810ohmandor@60,000.004,860.00JUMLAH0.067,685.0067,685.00Hal : 398B. 6.6.141 M3 PEMASANGAN LAPISAN [email protected]@45,000.006,750.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0150ohmandor@60,000.00900.00JUMLAH0.07,650.007,650.00B. 6.6.151 M3 URUGAN SIRTU1.2000M3Sirtu@209,567.03251,480.430.2500ohpekerja@45,000.0011,250.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.0250ohmandor@60,000.001,500.00JUMLAH251,480.4312,750.00264,230.43B. 6.6.161 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM0.2750m3batu belah@214,567.0359,005.93290.0300m3kerikil@314,567.039,437.01090.0500m3pasir@249,567.0312,478.35141.0000ohpekerja@45,000.0045,000.000.0ohtukang gali@55,000.000.00.0ohkepala tukang@60,000.000.00.1000ohmandor@60,000.006,000.00JUMLAH80,921.3051,000.00131,921.30C. PEKERJAAN PONDASIC.6.6.11 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.7318392.0000kgsemen [email protected],120.00000.3140m3pasir pasang@249,567.0378,364.04711.5000ohpekerja@45,000.0067500.000.6000ohtukang batu@55,000.0033000.000.0600ohkepala tukang@60,000.003600.000.0750ohmandor@60,000.004500.00JUMLAH651,507.78108,600.00760,107.78C.6.6.21 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.7318267.0000kgsemen [email protected],620.00000.4270m3pasir pasang@249,567.03106,565.12131.5000ohpekerja@45,000.0067500.000.6000ohtukang batu@55,000.0033000.000.0600ohkepala tukang@60,000.003600.000.0750ohmandor@60,000.004500.00JUMLAH572,208.85108,600.00680,808.85Hal : 399C.6.6.31 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73392.0000kgsemen [email protected],120.000.3140m3pasir pasang@249,567.0378,364.051.5000ohpekerja@45,000.0067500.000.6000ohtukang batu@55,000.0033000.000.0600ohkepala tukang@60,000.003600.000.0750ohmandor@60,000.004500.00JUMLAH651,507.78108,600.00760,107.78C.6.6.41 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73202.0000kgsemen [email protected],720.000.4850m3pasir pasang@249,567.03121,040.011.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH530,783.74108,600.00639,383.74C.6.6.51 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73163.0000kgsemen [email protected],180.000.5200m3pasir pasang@249,567.03129,774.861.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH505,978.59108,600.00614,578.59C.6.6.61 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73136.0000kgsemen [email protected],960.000.5440m3pasir pasang@249,567.03135,764.461.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH488,748.20108,600.00597,348.20C.6.6.71 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73117.0000kgsemen [email protected],620.000.5610m3pasir pasang@249,567.03140,007.101.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH476,650.83108,600.00585,250.83Hal : 400C.6.6.81 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.7391.0000kgsemen [email protected],260.000.5610m3pasir pasang@249,567.03140,007.101.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH454,290.83108,600.00562,890.83C.6.6.91 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.730.2290kgkapur pasang@5,000.001,145.000.2290m3semen merah@1,600.00366.400.5440ohpasir pasang@249,567.03135,764.461.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH373,299.60108,600.00481,899.60C.6.6.101 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.730.1700kgkapur pasang@5,000.00850.000.1700m3semen merah@1,600.00272.000.3400ohpasir pasang@249,567.0384,852.791.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH321,998.52108,600.00430,598.52C.6.6.111 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.73156.0000kgsemen [email protected],160.000.0320m3kapur pasang@5,000.00160.000.5480ohpasir pasang@249,567.03136,762.731.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH507,106.46108,600.00615,706.46Hal : 401C.6.6.121 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.7361.0000kgsemen [email protected],460.000.1470m3kapur pasang@5,000.00735.000.4920ohpasir pasang@249,567.03122,786.981.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH412,005.71108,600.00520,605.71C.6.6.131 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps1.1000m3batu belah 15/20 cm@214,567.03236,023.7341.0000kgsemen [email protected],260.000.1310m3kapur pasang@5,000.00655.000.5230ohpasir pasang@249,567.03130,523.561.5000ohpekerja@45,000.0067,500.000.6000ohtukang batu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0750ohmandor@60,000.004,500.00JUMLAH402,462.29108,600.00511,062.29C. 6.6.141 M3 PASANGAN BATU KOSONG (AANSTAMPING)1.2000m3batu gunung@214,567.03257,480.430.3000m3pasir urug@199,567.0359,870.110.7800ohpekerja@45,000.0035,100.000.3900ohtukang batu@55,000.0021,450.000.0390ohkepala tukang@60,000.002,340.000.0390ohmandor@60,000.002,340.00JUMLAH317,350.5461,230.00378,580.54C. 6.6.151 M3 PASANG PONDASI SIKLOP 40 % BATU KALI75.0000kgbesi beton@11,000.00825,000.00202.0000kgsemen [email protected],720.000.3200m3pasir beton@324,567.03103,861.450.4900m3koral beton@314,567.03154,137.840.8000kgkawat beton@10,000.008,000.003.0000ohpekerja@45,000.00135,000.000.8500ohtukang batu@55,000.0046,750.000.0850ohkepala tukang@60,000.005,100.000.1500ohmandor@60,000.009,000.00JUMLAH1,264,719.29195,850.001,460,569.29Hal : 402C. 6.6.161 M3 PASANG PONDASI SUMURAN DIA 100 CM0.4500kgbatu belah 15/20@214,567.0396,555.16280.0000kgsemen [email protected],800.000.4500m3pasir beton@324,567.03146,055.160.6700m3koral beton@314,567.03210,759.912.3800ohpekerja@45,000.00107,100.000.3000ohtukang batu@55,000.0016,500.000.0300ohkepala tukang@60,000.001,800.000.0800ohmandor@60,000.004,800.00JUMLAH694,170.24130,200.00824,370.24C. 6.6.17PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG0.0190m3pasir urug darat@199,567.033,791.770.0940m3pasir beton@324,567.0330,509.300.1500m3koral beton@314,567.0347,185.0560.5000kgsemen [email protected],030.0045.0000kgbesi beton@11,000.00495,000.000.9000kgkawat beton@10,000.009,000.000.0320m3kayu kaso 5/7@1,037,571.9433,202.300.1200kgpaku@11,825.001,419.000.0900ltminyak bekisting@5,000.00450.000.2400kgplamur tembok@28,000.006,720.001.0000ohpekerja@45,000.0045,000.000.6700ohtukang batu@55,000.0036,850.000.0670ohkepala tukang@60,000.004,020.000.0500ohmandor@60,000.003,000.00JUMLAH679,307.4388,870.00768,177.43C. 6.6.18PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG0.0160m3pasir urug darat@199,567.033,193.070.0800m3pasir beton@324,567.0325,965.360.1250m3koral beton@314,567.0339,320.8849.0000kgsemen [email protected],140.0034.5000kgbesi beton@11,000.00379,500.000.7000kgkawat beton@10,000.007,000.000.0270m3kayu kaso 5/7@1,037,571.9428,014.440.1200kgpaku@11,825.001,419.000.0900ltminyak bekisting@5,000.00450.000.2000kgplamur tembok@28,000.005,600.000.8000ohpekerja@45,000.0036,000.000.5000ohtukang batu@55,000.0027,500.000.0500ohkepala tukang@60,000.003,000.000.0400ohmandor@60,000.002,400.00JUMLAH532,602.7668,900.00601,502.76Hal : 403D. PEKERJAAN DINDINGD.6.6.11 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps120.0000bhbata [email protected],000.0064.0300kgsemen [email protected],065.800.0590m3pasir pasang@249,567.0314,724.450.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH135,790.2543,250.00179,040.25D.6.6.21 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps120.0000bhbata [email protected],000.0043.5000kgsemen [email protected],410.000.0800m3pasir pasang@249,567.0319,965.360.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH123,375.3643,250.00166,625.36D.6.6.31 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps120.0000bhbata [email protected],000.0032.9500kgsemen [email protected],337.000.0910m3pasir pasang@249,567.0322,710.600.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH117,047.6043,250.00160,297.60D.6.6.41 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps120.0000bhbata [email protected],000.0026.5500kgsemen [email protected],833.000.0930m3pasir pasang@249,567.0323,209.730.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH112,042.7343,250.00155,292.73D.6.6.51 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps120.0000bhbata [email protected],000.0022.2000kgsemen [email protected],092.000.1020m3pasir pasang@249,567.0325,455.840.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH110,547.8443,250.00153,797.84Hal : 404D.6.6.61 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps120.0000bhbata [email protected],000.0022.2000kgsemen [email protected],092.000.1020m3pasir pasang@249,567.0325,455.840.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH110,547.8443,250.00153,797.84D.6.6.71 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 [email protected] [email protected],000.0010.0800kgsemen [email protected],668.800.0925m3pasir pasang@249,567.0323,084.950.0275m3kapur pasang@5,000.00137.500.6500ohpekerja@45,000.0029,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0300ohmandor@60,000.001,800.00JUMLAH97,891.2543,250.00141,141.25D.6.6.81 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps60.0000bhbata [email protected],000.0027.8000kgsemen [email protected],908.000.0280m3pasir pasang@249,567.036,987.880.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH63,895.8821,400.0085,295.88D. 6.6.91 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.0018.9500kgsemen [email protected],297.000.0380m3pasir pasang@249,567.039,483.550.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH58,780.5521,400.0080,180.55D. 6.6.101 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.0014.3700kgsemen [email protected],358.200.0400m3pasir pasang@249,567.039,982.680.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH55,340.8821,400.0076,740.88Hal : 405D. 6.6.111 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.0011.5000kgsemen [email protected],890.000.0430m3pasir pasang@249,567.0310,731.380.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH53,621.3821,400.0075,021.38D. 6.6.121 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.009.6800kgsemen [email protected],324.800.0450m3pasir pasang@249,567.0311,230.520.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH52,555.3221,400.0073,955.32D. 6.6.131 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.008.3200kgsemen [email protected],155.200.0490m3pasir pasang@249,567.0312,228.780.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH52,383.9821,400.0073,783.98D. 6.6.141 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.006.5000kgsemen [email protected],590.000.0500m3pasir pasang@249,567.0312,478.350.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH51,068.3521,400.0072,468.35Hal : 406D. 6.6.151 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps60.0000bhbata merah 8 x 8 x 15 [email protected],000.004.5000kgsemen [email protected],870.000.0500m3pasir pasang@249,567.0312,478.350.0150m3kapur padam@5,000.0075.000.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH49,348.3521,475.0070,823.35D. 6.6.161 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps60.0000bhbata [email protected],000.000.0180kgsemen merah/bata merah tumbuk@1,600.0028.800.0180m3pasir pasang@249,567.034,492.210.0180m3kapur padam@5,000.0090.000.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH37,611.0121,400.0059,011.01D. 6.6.171 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps60.0000bhbata [email protected],000.000.0140kgsemen merah/bata merah tumbuk@1,600.0022.400.0280m3pasir pasang@249,567.036,987.880.0140m3kapur padam@5,000.0070.000.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH40,080.2821,400.0061,480.28D. 6.6.181 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20)12.5000bhHollow block@6,000.0075,000.0013.5000kgsemen [email protected],610.000.0480m3pasir pasang@249,567.0311,979.221.9500m3besi beton polos@11,000.0021,450.000.3500ohpekerja@45,000.0015,750.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0170ohmandor@60,000.001,020.00JUMLAH120,039.2225,920.00145,959.22Hal : 407D. 6.6.191 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15)12.5000bhHollow block@5,000.0062,500.0010.4500kgsemen [email protected],987.000.0380m3pasir pasang@249,567.039,483.551.9500m3besi beton polos@11,000.0021,450.000.3200ohpekerja@45,000.0014,400.000.1200ohtukang batu@55,000.006,600.000.0120ohkepala tukang@60,000.00720.000.0150ohmandor@60,000.00900.00JUMLAH102,420.5522,620.00125,040.55D. 6.6.201 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10)12.5000bhHollow block@3,000.0037,500.007.5000kgsemen [email protected],450.000.0270m3pasir pasang@249,567.036,738.311.9500m3besi beton polos@11,000.0021,450.000.3200ohpekerja@45,000.0014,400.000.1000ohtukang batu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0150ohmandor@60,000.00900.00JUMLAH72,138.3121,400.0093,538.31D. 6.6.211 M2 PASANGAN DINDING CON BLOCK (HB.20)12.5000bhconcrete block@6,000.0075,000.0014.0500kgsemen [email protected],083.000.0040m3pasir beton@324,567.031,298.270.0420m3pasir pasang@249,567.0310,481.823.8700kgbesi beton polos@11,000.0042,570.000.0060kgpaku biasa 2" - 5"@11,825.0070.950.0010kgkayu terentang@55,000.0055.000.0300kgkawat beton@10,000.00300.000.0050kgkoral beton@314,567.031,572.840.3700ohpekerja@45,000.0016,650.000.1570ohtukang batu@55,000.008,635.000.0070ohtukang besi@55,000.00385.000.0164ohkepala tukang@60,000.00984.000.0185ohmandor@60,000.001,110.00JUMLAH143,431.8727,764.00171,195.87Hal : 408D. 6.6.221 M2 PASANGAN DINDING CON BLOCK (HB.15)12.5000bhconcrete block@5,000.0062,500.0010.4600kgsemen [email protected],995.600.0300m3pasir beton@324,567.039,737.010.0320m3pasir pasang@249,567.037,986.140.8700kgbesi beton polos@11,000.009,570.000.0040kgpaku biasa 2" - 5"@11,825.0047.300.0010kgkayu terentang@55,000.0055.000.0200kgkawat beton@10,000.00200.000.0040kgkoral beton@314,567.031,258.270.3400ohpekerja@45,000.0015,300.000.1300ohtukang batu@55,000.007,150.000.0070ohtukang besi@55,000.00385.000.0137ohkepala tukang@60,000.00822.000.0170ohmandor@60,000.001,020.00JUMLAH100,349.3224,677.00125,026.32D. 6.6.231 M2 PASANGAN DINDING CON BLOCK (HB.10)12.5000bhconcrete block@3,000.0037,500.007.2000kgsemen [email protected],192.000.0020m3pasir beton@324,567.03649.130.0210m3pasir pasang@249,567.035,240.912.5400kgbesi beton polos@11,000.0027,940.000.0030kgpaku biasa 2" - 5"@11,825.0035.480.0010kgkayu terentang@55,000.0055.000.0150kgkawat beton@10,000.00150.000.0030kgkoral beton@314,567.03943.700.3400ohpekerja@45,000.0015,300.000.1070ohtukang batu@55,000.005,885.000.0070ohtukang besi@55,000.00385.000.0114ohkepala tukang@60,000.00684.000.0170ohmandor@60,000.001,020.00JUMLAH78,706.2223,274.00101,980.22D. 6.6.241 M2 PASANGAN DINDING LATAI2.5000bhbondbeam 40x20x20 [email protected] [email protected],386.000.0800m3pasir beton@324,567.0325,965.361.5000kgbesi beton polos@11,000.0016,500.000.1500m3koral beton@314,567.0347,185.050.1000ohpekerja@45,000.004,500.000.0300ohtukang batu@55,000.001,650.000.0300ohtukang besi@55,000.001,650.000.0060ohkepala tukang@60,000.00360.000.005ohmandor@60,000.00300.00JUMLAH94,036.428,460.00102,496.42Hal : 409D. 6.6.251 M2 PASANGAN DINDING ROSTER 20 X 200.0426.0000bhroster / terawang@3,000.0078,000.002512.8000kgsemen [email protected],008.000.0350m3pasir pasang@249,567.038,734.850.3000ohpekerja@45,000.0013,500.000.1000ohtukang batu@55,000.005,500.000.0150ohkepala tukang@60,000.00900.000.0150ohmandor@60,000.00900.00JUMLAH97,742.8520,800.00118,542.85D. 6.6.261 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm0.0480.0000bhbata [email protected],000.002523.6500kgsemen [email protected],339.000.5700m3pasir pasang@249,567.03142,253.210.3200ohpekerja@45,000.0014,400.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0150ohmandor@60,000.00900.00JUMLAH206,592.2124,450.00231,042.21D. 6.6.271 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU0.041.5000m2bilik bambu@2,500.003,750.00250.0140m3kayu@1,037,571.9414,526.010.0120kgpaku@11,825.00141.900.0030m3list kayu 2/4@1,037,571.943,112.720.1000ohpekerja@45,000.004,500.000.0500ohtukang batu@55,000.002,750.000.0050ohkepala tukang@60,000.00300.000.0020ohmandor@60,000.00120.0021,530.627,670.0029,200.62D. 6.6.281 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAPRANGKA KAYU MERANTI0.0195m3balok kayu meranti@1,037,571.9420,232.650.0070m3papan kayu meranti@1,187,571.948,313.000.1000kgpaku biasa 2' - 5'@11,825.001,182.501.0000lbrplywood 4 mm@61,500.0061,500.000.2000ohpekerja@45,000.009,000.000.6000ohtukang kayu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0100ohmandor@60,000.00600.00JUMLAH91,228.1646,200.00137,428.16Hal : 410E. PEKERJAAN PLESTERANE. 6.6.11 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM12.9200kgsemen [email protected],111.200.0130m3pasir pasang@249,567.033,244.370.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.0014,355.5718,750.0033,105.57E. 6.6.21 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM8.5200kgsemen [email protected],327.200.0170m3pasir pasang@249,567.034,242.640.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH11,569.8418,750.0030,319.84E. 6.6.31 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM6.4800kgsemen [email protected],572.800.0190m3pasir pasang@249,567.034,741.770.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH10,314.5718,750.0029,064.57E. 6.6.41 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM5.2000kgsemen [email protected],472.000.0200m3pasir pasang@249,567.034,991.340.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH9,463.3418,750.0028,213.34E. 6.6.51 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM4.3200kgsemen [email protected],715.200.0220m3pasir pasang putih@249,567.035,490.470.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH9,205.6718,750.0027,955.67Hal : 411E. 6.6.61 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM3.6800kgsemen [email protected],164.800.0230m3pasir pasang putih@249,567.035,740.040.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH8,904.8418,750.0027,654.84E. 6.6.71 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM2.8800kgsemen [email protected],476.800.0240m3pasir pasang@249,567.035,989.610.2000ohpekerja@45,000.009,000.00000.1500ohtukang batu@55,000.008,250.00000.0150ohkepala tukang@60,000.00900.00000.0100ohmandor@60,000.00600.0000JUMLAH8,466.4118,750.0027,216.41E. 6.6.81 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM5.7600kgsemen [email protected],953.600.0030m3Kapur padam@5,000.0015.000.0130m3pasir pasang@249,567.033,244.370.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH8,212.9718,750.0026,962.97E. 6.6.91 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM1.8400kgsemen [email protected],582.400.0060m3Kapur padam@5,000.0030.000.0140m3pasir pasang@249,567.033,493.940.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH5,106.3418,750.0023,856.34E. 6.6.101 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM3.0000kgsemen [email protected],580.000.0050m3Kapur padam@5,000.0025.000.0190m3pasir pasang@249,567.034,741.770.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH7,346.7718,750.0026,096.77Hal : 412E. 6.6.111 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM0.0090kgsemen [email protected] padam@5,000.0045.000.0090m3pasir pasang@249,567.032,246.100.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH2,298.8418,750.0021,048.84E. 6.6.121 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM0.0070kgsemen [email protected] padam@5,000.0035.000.0150m3pasir pasang@249,567.033,743.510.2000ohpekerja@45,000.009,000.000.1500ohtukang batu@55,000.008,250.000.0150ohkepala tukang@60,000.00900.000.0100ohmandor@60,000.00600.00JUMLAH3,784.5318,750.0022,534.53E. 6.6.131 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM14.2800kgsemen [email protected],280.800.0230m3pasir pasang@249,567.035,740.040.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH18,020.8424,200.0042,220.84E. 6.6.141 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM10.8000kgsemen [email protected],288.000.0260m3pasir pasang@249,567.036,488.740.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH15,776.7424,200.0039,976.74E. 6.6.151 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM8.6800kgsemen [email protected],464.800.0280m3pasir pasang@249,567.036,987.880.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH14,452.6824,200.0038,652.68Hal : 413E. 6.6.161 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM7.2900kgsemen [email protected],269.400.0280m3pasir pasang@249,567.036,987.880.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH13,257.2824,200.0037,457.28E. 6.6.171 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM6.2400kgsemen [email protected],366.400.0300m3pasir pasang putih@249,567.037,487.010.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH12,853.4124,200.0037,053.41E. 6.6.181 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM0.0090kgsemen [email protected] padam@5,000.0045.000.0180m3pasir pasang@249,567.034,492.210.2500ohpekerja@45,000.0011,250.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0125ohmandor@60,000.00750.00JUMLAH4,544.9524,200.0028,744.95E. 6.6.191 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM15.5000kgsemen [email protected],330.000.0130m3pasir pasang@249,567.033,244.370.3000ohpekerja@45,000.0013,500.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH16,574.3726,480.0043,054.37E. 6.6.201 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM11.7500kgsemen [email protected],105.000.0350m3pasir pasang@249,567.038,734.850.3000ohpekerja@45,000.0013,500.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH18,839.8526,480.0045,319.85Hal : 414E. 6.6.211 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM9.4800kgsemen [email protected],152.800.0380m3pasir pasang@249,567.039,483.550.3000ohpekerja@45,000.0013,500.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH17,636.3526,480.0044,116.35E. 6.6.221 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM7.9400kgsemen [email protected],828.400.0390m3pasir pasang@249,567.039,733.110.3000ohpekerja@45,000.0013,500.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH16,561.5126,480.0043,041.51E. 6.6.231 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM18.6500kgsemen [email protected],039.000.0350m3pasir pasang@249,567.038,734.850.3200ohpekerja@45,000.0014,400.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0150ohmandor@60,000.00900.00JUMLAH24,773.8530,550.0055,323.85E. 6.6.241 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM14.1500kgsemen [email protected],169.000.0390m3pasir pasang@249,567.039,733.110.3200ohpekerja@45,000.0014,400.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0150ohmandor@60,000.00900.0021,902.1130,550.0052,452.11E. 6.6.251 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM11.3800kgsemen [email protected],786.800.0420m3pasir pasang@249,567.0310,481.820.3200ohpekerja@45,000.0014,400.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0150ohmandor@60,000.00900.00JUMLAH20,268.6230,550.0050,818.62Hal : 415E. 6.6.261 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM8.1900kgsemen [email protected],043.400.0450m3pasir pasang@249,567.0311,230.520.3200ohpekerja@45,000.0014,400.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0150ohmandor@60,000.00900.00JUMLAH18,273.9230,550.0048,823.92E. 6.6.271 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM7.0700kgsemen [email protected],080.200.0210m3pasir pasang@249,567.035,240.910.1500ohpekerja@45,000.006,750.000.0700ohtukang batu@55,000.003,850.000.0070ohkepala tukang@60,000.00420.000.0080ohmandor@60,000.00480.00JUMLAH11,321.1111,500.0022,821.11E. 6.6.281 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM5.6700kgsemen [email protected],876.200.0230m3pasir pasang@249,567.035,740.040.1500ohpekerja@45,000.006,750.000.0700ohtukang batu@55,000.003,850.000.0070ohkepala tukang@60,000.00420.000.0080ohmandor@60,000.00480.00JUMLAH10,616.2411,500.0022,116.24E. 6.6.291 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM9.3000kgsemen [email protected],998.000.0180m3pasir pasang@249,567.034,492.210.0260ohpekerja@45,000.001,170.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH12,490.2114,150.0026,640.21E. 6.6.301 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM7.0700kgsemen [email protected],080.200.0210m3pasir pasang@249,567.035,240.910.0260ohpekerja@45,000.001,170.000.2000ohtukang batu@55,000.0011,000.000.0200ohkepala tukang@60,000.001,200.000.0130ohmandor@60,000.00780.00JUMLAH11,321.1114,150.0025,471.11Hal : 416E. 6.6.311 M2 PLESTERAN SKONING 1 pc ; 2ps0.5000kgsemen [email protected] pasang@249,567.03499.130.0570ohpekerja@45,000.002,565.000.0380ohtukang batu@55,000.002,090.000.0380ohkepala tukang@60,000.002,280.000.0020ohmandor@60,000.00120.00JUMLAH929.137,055.007,984.13E. 6.6.321 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM0.1440kgPc Warna1,600.00230.4015.0000kgBatu Granito10,000.00150,000.000.0500ohpekerja45,000.002,250.000.0200ohtukang batu55,000.001,100.000.0020ohkepala tukang60,000.00120.000.0050ohmandor60,000.00300.00JUMLAH150,230.403,770.00154,000.40E. 6.6.331 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM0.4400kgPc Warna1,600.00704.0011.5000kgBatu teraso7,500.0086,250.000.4500ohpekerja45,000.0020,250.000.2000ohtukang batu55,000.0011,000.000.0200ohkepala tukang60,000.001,200.000.0250ohmandor60,000.001,500.00JUMLAH86,954.0033,950.00120,904.00E. 6.6.341 M2 PLESTERAN CIPRAT 1 pc ; 2ps4.3200kgsemen portland860.003,715.200.0160m3pasir pasang249,567.033,993.070.2500ohpekerja45,000.0011,250.000.1000ohtukang batu55,000.005,500.000.0100ohkepala tukang60,000.00600.000.0150ohmandor60,000.00900.00JUMLAH7,708.2718,250.0025,958.27E. 6.6.351 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps4.3200kgsemen portland860.003,715.200.0160m3pasir pasang249,567.033,993.070.0150ohpekerja45,000.00675.000.0700ohtukang batu55,000.003,850.000.0070ohkepala tukang60,000.00420.000.0080ohmandor60,000.00480.00JUMLAH7,708.275,425.0013,133.27Hal : 417E. 6.6.361 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS0.5000kgsemen portland860.00430.002.9000kgBatacote1,500.004,350.000.0060m3pasir pasang249,567.031,497.400.3000ohpekerja45,000.0013,500.000.2000ohtukang batu55,000.0011,000.000.0200ohkepala tukang60,000.001,200.000.0150ohmandor60,000.00900.00JUMLAH6,277.4026,600.0032,877.40F. PEKERJAAN KAYUF.6.6.11 M PASANG KUSEN PINTU DAN JENDELA KAYU JATI1.1000m3kayu jati, balok@5,000,000.005,500,000.006.0000ohpekerja@45,000.00270,000.0020.0000ohtukang kayu@55,000.001,100,000.002.0000ohkepala tukang@60,000.00120,000.000.3000ohmandor@60,000.0018,000.00JUMLAH5,500,000.001,508,000.007,008,000.00F.6.6.21 M PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI1.2000m3kayu bengkirai, balok@1,937,571.942,325,086.336.0000ohpekerja@45,000.00270,000.0018.0000ohtukang kayu@55,000.00990,000.002.0000ohkepala tukang@60,000.00120,000.000.3000ohmandor@60,000.0018,000.00JUMLAH2,325,086.331,398,000.003,723,086.3326,806.22F.6.6.31 M PASANG KUSEN PINTU DAN JENDELA KAYU ULIN1.2000m3kayu ulin, balok@1,537,571.941,845,086.330.060.120.00726.0000ohpekerja@45,000.00270,000.0018.0000ohtukang kayu@55,000.00990,000.00138.88888888892.0000ohkepala tukang@60,000.00120,000.000.3000ohmandor@60,000.0018,000.00138.9JUMLAH1,845,086.331,398,000.003,243,086.33F.6.6.41 M PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH1.21.000081.2000m3kayu meranti, balok@1,037,571.941,245,086.330.00863930896.0000ohpekerja@45,000.00270,000.0018.0000ohtukang kayu@55,000.00990,000.002.0000ohkepala tukang@60,000.00120,000.000.3000ohmandor@60,000.0018,000.00JUMLAH1,245,086.331,398,000.002,643,086.33F.6.6.51 M2 PASANG PINTU KLAMP KAYU BENGKIRAI0.0360m3Kayu bengkirai, papan@2,137,571.9476,952.590.0500kgPaku Biasa 2" - 5"@11,825.00591.25000.3500ohpekerja@45,000.0015,750.001.0500ohtukang kayu@55,000.0057,750.000.1050ohkepala tukang@60,000.006,300.000.0180ohmandor@60,000.001,080.00JUMLAH77,543.8480,880.00158,423.84Hal : 418F.6.6.61 M2 PASANG PINTU KLAMP KAYU ULIN0.0360m3Kayu ulin, papan@1,737,571.9462,552.590.0500kgPaku ulin@13,750.00687.50.3500ohpekerja@45,000.0015,750.001.0500ohtukang kayu@55,000.0057,750.000.1050ohkepala tukang@60,000.006,300.000.0180ohmandor@60,000.001,080.00JUMLAH63,240.0980,880.00144,120.09F.6.6.71 M2 PASANG PINTU PANEL KAYU JATI0.0400m3Kayu Jati, papan@7,000,000.00280,000.001.0000ohpekerja@45,000.0045,000.002.5000ohtukang kayu@55,000.00137,500.000.2500ohkepala tukang@60,000.0015,000.000.0500ohmandor@60,000.003,000.00JUMLAH280,000.00200,500.00480,500.00F.6.6.81 M2 PASANG PINTU PANEL KAYU BENGKIRAI0.0400m3Kayu bengkirai, papan@2,137,571.9485,502.881.0000ohpekerja@45,000.0045,000.002.5000ohtukang kayu@55,000.00137,500.000.2500ohkepala tukang@60,000.0015,000.000.0500ohmandor@60,000.003,000.00JUMLAH85,502.88200,500.00286,002.88F.6.6.91 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI0.0350m3Kayu Jati, papan@7,000,000.00245,000.000.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0400ohmandor@60,000.002,400.00JUMLAH245,000.00160,400.00405,400.00F.6.6.101 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI0.0350m3Kayu Bengkirai, papan@2,137,571.9474,815.020.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0400ohmandor@60,000.002,400.00JUMLAH74,815.02160,400.00235,215.02F.6.6.111 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN0.0350m3Kayu Ulin, papan@1,737,571.9460,815.020.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0400ohmandor@60,000.002,400.00JUMLAH60,815.02160,400.00221,215.02Hal : 419F.6.6.121 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI0.0640m3Kayu Jati, papan@7,000,000.00448,000.001.0000ohpekerja@45,000.0045,000.003.0000ohtukang kayu@55,000.00165,000.000.3000ohkepala tukang@60,000.0018,000.000.3000ohmandor@60,000.0018,000.00JUMLAH448,000.00246,000.00694,000.00F.6.6.131 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI0.0640m3Kayu bengkirai, papan@2,137,571.94136,804.601.0000ohpekerja@45,000.0045,000.003.0000ohtukang kayu@55,000.00165,000.000.3000ohkepala tukang@60,000.0018,000.000.0250ohmandor@60,000.0018,000.00JUMLAH136,804.60246,000.00382,804.60F.6.6.141 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI0.0196m3Kayu jati, papan@7,000,000.00137,200.000.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.3000ltrlem kayu@9,500.002,850.001.0000lbrplywood 4' x 3' x 4 mm@61,500.0061,500.000.6000ohpekerja@45,000.0027,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0300ohmandor@60,000.001,800.00JUMLAH201,904.75150,800.00352,704.75F.6.6.151 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI0.0196m3Kayu bangkirai, papan@2,137,571.9441,896.410.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.3000ltrlem kayu@9,500.002,850.001.0000lbrplywood 4' x 3' x 4 mm@61,500.0061,500.000.6000ohpekerja@45,000.0027,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0300ohmandor@60,000.001,800.00JUMLAH106,601.16150,800.00257,401.16F.6.6.161 M2 PASANG JALUSI MATI KUSEN KAYU JATI0.0600m3Kayu jati, papan@7,000,000.00420,000.000.1500Kgpaku biasa 1/2" - 1"@11,825.001,773.750.5000ohpekerja@45,000.0022,500.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0250ohmandor@60,000.001,500.00JUMLAH421,773.75146,000.00567,773.75Hal : 420F.6.6.171 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI0.0600m3Kayu bengkirai, papan@2,137,571.94128,254.320.1500Kgpaku biasa 1/2" - 1"@11,825.001,773.750.5000ohpekerja@45,000.0022,500.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0250ohmandor@60,000.001,500.00JUMLAH130,028.07146,000.00276,028.07F.6.6.181 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN0.0196m3Kayu ulin, papan@1,737,571.9434,056.410.0300Kgpaku ulin@13,750.00412.500.3000ltrlem kayu@9,500.002,850.001.0000lbrplywood 4' x 3' x 4 mm@61,500.0061,500.000.6000ohpekerja@45,000.0027,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0300ohmandor@60,000.001,800.00JUMLAH98,818.91150,800.00249,618.91F.6.6.191 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI0.0196m3Kayu jati, papan@7,000,000.00137,200.000.3000Kgpaku biasa 1/2" - 1"@11,825.003,547.500.3000ltrlem kayu@9,500.002,850.001.0000lbrteakwood 4 mm@113,500.00113,500.000.6000ohpekerja@45,000.0027,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0300ohmandor@60,000.001,800.00JUMLAH257,097.50150,800.00407,897.50F.6.6.201 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI0.0196m3kayu Bengkirai, papan@2,137,571.9441,896.410.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.3000ltrlem kayu@9,500.002,850.001.0000lbrteakwood 4 mm@113,500.00113,500.000.6000ohpekerja@45,000.0027,000.002.0000ohtukang kayu@55,000.00110,000.000.2000ohkepala tukang@60,000.0012,000.000.0300ohmandor@60,000.001,800.00JUMLAH158,601.16150,800.00309,401.16Hal : 421F.6.6.211 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI0.0196m3kayu jati, papan@7,000,000.00137,200.000.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.8000ltrlem kayu@9,500.007,600.001.0000lbrplywood 4' x 3' x 4 mm@61,500.0061,500.000.5000lbrFormika@75,000.0037,500.000.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2500ohkepala tukang@60,000.0015,000.000.0400ohmandor@60,000.002,400.00JUMLAH244,154.75163,400.00407,554.75F.6.6.221 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI0.0196m3kayu bengkirai, papan@2,137,571.9441,896.410.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.8000ltrlem kayu@9,500.007,600.001.0000lbrplywood 4' x 3' x 4 mm@61,500.0061,500.000.5000lbrFormika@75,000.0037,500.000.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2500ohkepala tukang@60,000.0015,000.000.0400ohmandor60,000.002,400.00JUMLAH148,851.16163,400.00312,251.16F.6.6.231 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI0.0196m3kayu jati, papan@7,000,000.00137,200.000.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.8000ltrlem kayu@9,500.007,600.000.5000lbrteakwood 4' x 8' x 4 mm@113,500.0056,750.000.5000lbrFormika 4' x 3'@75,000.0037,500.000.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2500ohkepala tukang@60,000.0015,000.000.0400ohmandor@60,000.002,400.00JUMLAH239,404.75163,400.00402,804.75F.6.6.241 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI0.0196m3kayu bengkirai, papan@2,137,571.9441,896.410.0300Kgpaku biasa 1/2" - 1"@11,825.00354.750.8000ltrlem kayu@9,500.007,600.000.5000lbrteakwood 4' x 8' x 4 mm@113,500.0056,750.000.5000ltrvernis@8,500.004,250.000.5000lbrFormika 4' x 8'@75,000.0037,500.000.8000ohpekerja@45,000.0036,000.002.0000ohtukang kayu@55,000.00110,000.000.2500ohkepala tukang@60,000.0015,000.000.0400ohmandor@60,000.002,400.00JUMLAH148,351.16163,400.00311,751.16Hal : 422F.6.6.251 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI0.0196m3kayu jati, papan@7,000,000.00137,200.000.0300Kgpaku biasa 1/2" - 1"@11,825.00354.751.2000ltrlem kayu@9,500.0011,400.001.0000lbrplywood 4' x 8' x 4 mm@61,500.0061,500.001.0000lbrFormika 4' x 8'@75,000.0075,000.001.0000ohpekerja@45,000.0045,000.002.6000ohtukang kayu@55,000.00143,000.000.2600ohkepala tukang@60,000.0015,600.000.0500ohmandor@60,000.003,000.00JUMLAH285,454.75206,600.00492,054.75F.6.6.261 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI0.0196m3kayu bengkirai, papan@2,137,571.9441,896.410.0300Kgpaku biasa 1/2" - 1"@11,825.00354.751.2000ltrlem kayu@9,500.0011,400.001.0000lbrplywood 4' x 8' x 4 mm@61,500.0061,500.001.0000lbrFormika 4' x 8'@75,000.0075,000.001.0000ohpekerja@45,000.0045,000.002.6000ohtukang kayu@55,000.00143,000.000.2600ohkepala tukang@60,000.0015,600.000.0500ohmandor60,000.003,000.00JUMLAH190,151.16206,600.00396,751.16F.6.6.271M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI1.1000m3kayu jati, balok@5,000,000.005,500,000.0015.0000Kgbesi strip@18,000.00270,000.000.8000KgPaku Biasa 2" - 5"@11,825.009,460.004.0000ohpekerja@45,000.00180,000.0012.0000ohtukang kayu@55,000.00660,000.001.2000ohkepala tukang@60,000.0072,000.000.2000ohmandor@60,000.0012,000.00JUMLAH5,779,460.00924,000.006,703,460.00F.6.6.281M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI1.1000m3kayu bengkirai, balok@1,937,571.942,131,329.1315.0000Kgbesi strip@18,000.00270,000.000.8000KgPaku Biasa 2" - 5"@11,825.009,460.004.0000ohpekerja@45,000.00180,000.0012.0000ohtukang kayu@55,000.00660,000.001.2000ohkepala tukang@60,000.0072,000.000.2000ohmandor@60,000.0012,000.00JUMLAH2,410,789.13924,000.003,334,789.13Hal : 423F.6.6.291M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN1.1000m3kayu ulin, balok@1,537,571.941,691,329.1315.0000Kgbesi strip@18,000.00270,000.000.8000KgPaku ulin@13,750.0011,000.004.0000ohpekerja@45,000.00180,000.0012.0000ohtukang kayu@55,000.00660,000.001.2000ohkepala tukang@60,000.0072,000.000.2000ohmandor@60,000.0012,000.00JUMLAH1,972,329.13924,000.002,896,329.13F.6.6.301M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI1.1000m3kayu meranti, balok@1,037,571.941,141,329.1315.0000Kgbesi strip@18,000.00270,000.000.8000KgPaku Biasa 2" - 5"@11,825.009,460.004.0000ohpekerja@45,000.00180,000.0012.0000ohtukang kayu@55,000.00660,000.001.2000ohkepala tukang@60,000.0072,000.000.2000ohmandor@60,000.0012,000.00JUMLAH1,420,789.13924,000.002,344,789.13F.6.6.311M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI0.0120m3kayu bengkirai, balok@1,937,571.9423,250.860.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH25,024.6110,900.0035,924.61F.6.6.321M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN0.0120m3kayu ulin, balok@1,537,571.9418,450.860.1500KgPaku ulin@13,750.002,062.500.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH20,513.3610,900.0031,413.36F.6.6.331M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI0.0140m3kayu jati, balok@5,000,000.0070,000.000.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH71,773.7510,900.0082,673.75Hal : 424F.6.6.341M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI0.0140m3kayu bengkirai, balok@1,937,571.9427,126.010.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH28,899.7610,900.0039,799.76F.6.6.351M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI0.0140m3kayu bengkirai, balok@1,937,571.9427,126.010.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0050ohmandor@60,000.00300.00JUMLAH28,899.7610,900.0039,799.76F.6.6.361M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI0.1650m3kayu bengkirai, balok@1,937,571.94319,699.370.2000KgPaku Biasa 2" - 5"@11,825.002,365.000.1200ohpekerja@45,000.005,400.000.1200ohtukang kayu@55,000.006,600.000.0120ohkepala tukang@60,000.00720.000.0060ohmandor@60,000.00360.00JUMLAH322,064.3713,080.00335,144.37F.6.6.371M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN0.1650m3kayu ulin, balok@1,537,571.94253,699.370.2000KgPaku ulin@13,750.002,750.000.1200ohpekerja@45,000.005,400.000.1200ohtukang kayu@55,000.006,600.000.0120ohkepala tukang@60,000.00720.000.0060ohmandor@60,000.00360.00JUMLAH256,449.3713,080.00269,529.37F.6.6.381 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI0.0120m3kayu jati, balok@5,000,000.0060,000.000.1000KgPaku Biasa 2" - 5"@11,825.001,182.500.1500ohpekerja@45,000.006,750.000.2500ohtukang kayu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0750ohmandor60,000.004,500.00JUMLAH61,182.5026,500.0087,682.50Hal : 425F.6.6.391 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI0.0120m3kayu bengkirai, balok@1,937,571.9423,250.860.1000KgPaku Biasa 2" - 5"@11,825.001,182.500.1500ohpekerja@45,000.006,750.000.2500ohtukang kayu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0750ohmandor@60,000.004,500.00JUMLAH24,433.3626,500.0050,933.36F.6.6.401 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN0.0120m3kayu ulin, balok@1,537,571.9418,450.860.1000KgPaku ulin@13,750.001,375.000.1500ohpekerja@45,000.006,750.000.2500ohtukang kayu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0750ohmandor@60,000.004,500.00JUMLAH19,825.8626,500.0046,325.86F.6.6.411 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI0.0230m3Kayu jati, balok@5,000,000.00115,000.000.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.2000ohpekerja@45,000.009,000.000.3000ohtukang kayu@55,000.0016,500.000.0300ohkepala tukang@60,000.001,800.000.0100ohmandor@60,000.00600.00JUMLAH116,773.7527,900.00144,673.75F.6.6.421 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI0.0230m3kayu bengkirai, balok@1,937,571.9444,564.150.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.2000ohpekerja@45,000.009,000.000.3000ohtukang kayu@55,000.0016,500.000.0300ohkepala tukang@60,000.001,800.000.0100ohmandor@60,000.00600.00JUMLAH46,337.9027,900.0074,237.90F.6.6.431 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI0.0230m3kayu meranti, balok@1,037,571.9423,864.150.1500KgPaku Biasa 2" - 5"@11,825.001,773.750.2000ohpekerja@45,000.009,000.000.3000ohtukang kayu@55,000.0016,500.000.0300ohkepala tukang@60,000.001,800.000.0100ohmandor60,000.00600.00JUMLAH25,637.9027,900.0053,537.90Hal : 426F.6.6.441 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI0.0270m3kayu jati, balok@5,000,000.00135,000.000.2000KgPaku Biasa 2" - 5"@11,825.002,365.000.2500ohpekerja@45,000.0011,250.000.3500ohtukang kayu@55,000.0019,250.000.0350ohkepala tukang@60,000.002,100.000.0125ohmandor@60,000.00750.00JUMLAH137,365.0033,350.00170,715.00F.6.6.451 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI0.0270m3kayu bengkirai, balok@1,937,571.9452,314.440.2000KgPaku Biasa 2" - 5"@11,825.002,365.000.2500ohpekerja@45,000.0011,250.000.3500ohtukang kayu@55,000.0019,250.000.0350ohkepala tukang@60,000.002,100.000.0125ohmandor@60,000.00750.00JUMLAH54,679.4433,350.0088,029.44F.6.6.461 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI0.0270m3kayu meranti, balok@1,037,571.9428,014.440.2000KgPaku Biasa 2" - 5"@11,825.002,365.000.2500ohpekerja@45,000.0011,250.000.3500ohtukang kayu@55,000.0019,250.000.0350ohkepala tukang@60,000.002,100.000.0125ohmandor@60,000.00750.00JUMLAH30,379.4433,350.0063,729.44F.6.6.471M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI0.0072m3kayu jati, papan@7,000,000.0050,400.000.0500KgPaku Biasa 2" - 5"@11,825.00591.250.1000ohpekerja@45,000.004,500.000.2000ohtukang kayu@55,000.0011,000.000.0250ohkepala tukang@60,000.001,500.000.0050ohmandor@60,000.00300.00JUMLAH50,991.2517,300.0068,291.25F.6.6.481M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI0.0072m3kayu bengkirai, papan@2,137,571.9415,390.520.0500KgPaku Biasa 2" - 5"@11,825.00591.250.1000ohpekerja@45,000.004,500.000.2000ohtukang kayu@55,000.0011,000.000.0250ohkepala tukang@60,000.001,500.000.0050ohmandor@60,000.00300.00JUMLAH15,981.7717,300.0033,281.77Hal : 427F.6.6.491M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI0.0110m3kayu jati, papan@7,000,000.0077,000.000.0500KgPaku Biasa 2" - 5"@11,825.00591.250.1100ohpekerja@45,000.004,950.000.2200ohtukang kayu@55,000.0012,100.000.0220ohkepala tukang@60,000.001,320.000.0050ohmandor@60,000.00300.00JUMLAH77,591.2518,670.0096,261.25F.6.6.501M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI0.0110m3kayu bengkirai, papan@2,137,571.9423,513.290.0500KgPaku Biasa 2" - 5"@11,825.00591.250.1100ohpekerja@45,000.004,950.000.2200ohtukang kayu@55,000.0012,100.000.0220ohkepala tukang@60,000.001,320.000.0050ohmandor@60,000.0018,370.00JUMLAH24,104.5436,740.0060,844.54F.6.6.511M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI0.0145m3kayu bengkirai, papan@2,137,571.9430,994.790.0600KgPaku Biasa 2" - 5"@11,825.00709.500.1500ohpekerja@45,000.006,750.000.2500ohtukang kayu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0750ohmandor@60,000.004,500.00JUMLAH31,704.2926,500.0058,204.29F.6.6.521M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI0.0086m3kayu bengkirai, papan@2,137,571.9418,383.120.0600KgPaku Biasa 2" - 5"@11,825.00709.500.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0500ohmandor60,000.003,000.00@JUMLAH19,092.6213,600.0032,692.62F. 6.6.53.1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN0.0086m3kayu ulin, papan@1,737,571.9414,943.120.0600kgpaku biasa 2' - 5'@11,825.00709.500.1000ohpekerja@45,000.004,500.000.1000ohtukang kayu@55,000.005,500.000.0100ohkepala tukang@60,000.00600.000.0500ohmandor@60,000.003,000.00JUMLAH15,652.6213,600.0029,252.62Hal : 428F. 6.6.541M2 PASANG RANGKA DINDING PEMISAH KAYU BENGKIRAI0.0195m3kayu bengkirai, balok@1,937,571.9437,782.650.0070m3kayu bengkirai, papan@2,137,571.9414,963.000.1000kgpaku biasa 2' - 5'@11,825.001,182.500.1500ohpekerja@45,000.006,750.000.4500ohtukang kayu@55,000.0024,750.000.0450ohkepala tukang@60,000.002,700.000.0750ohmandor@60,000.004,500.00JUMLAH53,928.1638,700.0092,628.16F. 6.6.551M2 PASANG RANGKA DINDING PEMISAH KAYU ULIN0.0195m3kayu ulin, balok@1,537,571.9429,982.650.0070m3kayu ulin, papan@1,737,571.9412,163.000.1000kgpaku biasa 2' - 5'@11,825.001,182.500.1500ohpekerja@45,000.006,750.000.4500ohtukang kayu@55,000.0024,750.000.0450ohkepala tukang@60,000.002,700.000.0750ohmandor@60,000.004,500.00JUMLAH43,328.1638,700.0082,028.16F. 6.6.561M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI0.0195m3kayu bengkirai, balok@1,937,571.9437,782.650.0070m3kayu bengkirai, papan@2,137,571.9414,963.000.1000kgpaku biasa 2' - 5'@11,825.001,182.500.1500ohpekerja@45,000.006,750.000.4500ohtukang kayu@55,000.0024,750.000.0450ohkepala tukang@60,000.002,700.000.0750ohmandor@60,000.004,500.00JUMLAH53,928.1638,700.0092,628.16F. 6.6.571M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER0.0195m3kayu bengkirai, balok@1,937,571.9437,782.650.0070m3kayu bengkirai, papan@2,137,571.9414,963.000.1000ltpaku biasa 2' - 5'@11,825.001,182.500.5600lbrlem kayu@9,500.005,320.001.0000kgplywood 4' x 8' x 4 mm@61,500.0061,500.000.2000ohpekerja@45,000.009,000.000.6000ohtukang kayu@55,000.0033,000.000.0600ohkepala tukang@60,000.003,600.000.0100ohmandor60,000.00600.00JUMLAH120,748.1646,200.00166,948.16Hal : 429F. 6.6.581M2 PASANG DINDING LAMBRISIRING DARI PAPAN JATI0.0070m3kayu jati, balok@5,000,000.0035,000.000.1000kgpaku biasa 2' - 5'@11,825.001,182.500.1500kgpaku skrup 3,5"@14,300.002,145.000.6000ohpekerja@45,000.0027,000.001.8000ohtukang kayu@55,000.0099,000.000.1800ohkepala tukang@60,000.0010,800.000.0300ohmandor@60,000.001,800.00JUMLAH38,327.50138,600.00176,927.50F. 6.6.591M2 PASANG PLYWOOD TEBAL 3 MM, UNTUK DINDING0.4000lbrplywood 4 mm@61,500.0024,600.000.0500kgpaku biasa 1/2" - 1"@11,825.00591.250.0250ohpekerja@45,000.001,125.000.0750ohtukang kayu@55,000.004,125.000.0075ohkepala tukang@60,000.00450.000.0013ohmandor@60,000.0078.00JUMLAH25,191.255,778.0030,969.25F. 6.6.601M2 PASANG LIST PLAFOND, KAYU PROFIL1.0500m'kayu profil@4,250.004,462.500.0210ohpekerja@45,000.00945.000.0210ohtukang kayu@55,000.001,155.000.0210ohkepala tukang@60,000.001,260.000.0010ohmandor@60,000.0060.00JUMLAH4,462.503,420.007,882.50Hal : 430

lanjutanG. PEKERJAAN BETONG.6.6.11 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr218.0000kgsemen [email protected],480.000.5200m3pasir beton@324,567.03168,774.860.8700m3kerikil beton@314,567.03273,673.321.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00629,928.1794,300.00724,228.17G.6.6.21 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr197.0000kgsemen [email protected],420.000.4700m3pasir beton@324,567.03152,546.500.9400m3kerikil beton@314,567.03295,693.011.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00617,659.5194,300.00711,959.51G.6.6.31 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr173.0000kgsemen [email protected],780.000.5700m3pasir beton@324,567.03185,003.210.8700m3kerikil beton@314,567.03273,673.321.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00607,456.5294,300.00701,756.52G.6.6.41 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr10.0000kgsemen [email protected],600.000.0260m3pasir beton@324,567.038,438.740.0440m3Koral beton@314,567.0313,840.951.1500ohpekerja@45,000.0051,750.000.0200ohtukang batu@55,000.001,100.000.0020ohkepala tukang@60,000.00120.000.0060ohmandor@60,000.00360.0030,879.6953,330.0084,209.69Hal : 431G.6.6.5.1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr)336.0000kgsemen [email protected],960.000.5400m3pasir beton@324,567.03175,266.200.8100m3Koral beton@314,567.03254,799.292.0000ohpekerja@45,000.0090,000.000.3500ohtukang batu@55,000.0019,250.000.0350ohkepala tukang@60,000.002,100.001.0000ohmandor@60,000.0060,000.00JUMLAH719,025.49171,350.00890,375.49G.6.6.61 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)280.0000kgsemen [email protected],800.000.4500m3pasir beton@324,567.03146,055.160.9000m3Koral beton@314,567.03283,110.331.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH669,965.4994,300.00764,265.49G.6.6.71 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr)352.0000kgsemen [email protected],720.000.5600m3pasir beton@324,567.03181,757.540.7000m3Koral beton@314,567.03220,196.921.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH704,674.4694,300.00798,974.46G.6.6.81 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr)357.0000kgsemen [email protected],020.000.4200m3pasir beton@324,567.03136,318.150.5400m3Koral beton@314,567.03169,866.201.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH613,204.3594,300.00707,504.35G.6.6.91 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr)386.0000kgsemen [email protected],960.000.4700m3pasir beton@324,567.03152,546.500.7800m3Koral beton@314,567.03245,362.281.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH729,868.7994,300.00824,168.79Hal : 432G.6.6.101 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr)479.0000kgsemen [email protected],940.000.3700m3pasir beton@324,567.03120,089.800.7400m3Koral beton@314,567.03232,779.601.6500ohpekerja@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH764,809.4094,300.00859,109.40G.6.6.111M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON440.0000kgsemen [email protected],400.000.5000m3pasir beton@324,567.03162,283.510.8000m3Koral beton@314,567.03251,[email protected]@45,000.0074,250.000.2500ohtukang batu@55,000.0013,750.000.0250ohkepala tukang@60,000.001,500.000.0800ohmandor@60,000.004,800.00JUMLAH792,337.1494,