SPECIAL PLAN ASSISTANCE (SPA) 2008-09 PROJECTS ARUNACHAL PRADESH CONSOLIDATED MONITORING REPORT 1 ST REPORT DISTRICT: EAST SIANG MONITORING PERIOD: PERIOD ENDING DECEMBER 2009 PREPARED BY H.O.-NORTH EASTERN DEVELOPMENT FINANCE CORPORATION LTD. (NEDFi) BASUNDHARA ENCLAVE, B.K. KAKATI ROAD, ULUBARI, GUWAHATI 781007 Phone: + 91 361 2529202 206 / Fax + 91 361 2529178 B.O.-NORTH EASTERN DEVELOPMENT FINANCE CORPORATION LTD. (NEDFi) NH-52(A) MAIN ROAD, E-SECTOR, ITANAGAR - 791111 Phone/Fax: +91 360 2217694

Upload: ngohanh

Post on 22-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  

SSPPEECCIIAALL  PPLLAANN  AASSSSIISSTTAANNCCEE  ((SSPPAA))  22000088­­0099  PPRROOJJEECCTTSS  

AARRUUNNAACCHHAALL  PPRRAADDEESSHH  

CONSOLIDATED MONITORING REPORT � 1ST REPORT 

DISTRICT: EAST SIANG 

MONITORING PERIOD: PERIOD ENDING DECEMBER 2009 PPRREEPPAARREEDD  BBYY  

  

 

 

 

H.O.­NORTH EASTERN DEVELOPMENT FINANCE CORPORATION LTD. (NEDFi) BASUNDHARA ENCLAVE, B.K. KAKATI ROAD, 

ULUBARI, GUWAHATI � 781007 Phone: + 91 361 2529202 � 206 / Fax + 91 361 2529178 

 

B.O.­NORTH EASTERN DEVELOPMENT FINANCE CORPORATION LTD. (NEDFi) NH­52(A) MAIN ROAD, 

E­SECTOR, ITANAGAR ­ 791111 Phone/Fax: +91 360 2217694 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

  

Acknowledgement   We  record  our  sincere  thanks  to  the  Department  of  Planning,  Government  of 

Arunachal Pradesh, for appreciating the need for independent third party monitoring of 

Special Plan Assistance (SPA) (2008‐09) projects  in the state of Arunachal Pradesh and 

reposing their confidence in NEDFi by entrusting with the assignment. 

 

We are indeed grateful to Shri Ankur Garg, IAS, Secretary (Planning), for providing his 

invaluable suggestions to the Monitoring Team. 

 

We are also thankful to Shri C. L. Tungkhang, Director (State Plan) and his colleagues 

at  the  Planning Department  for  facilitating,  coordinating  and  providing  all  support  to 

NEDFi officials in the course of the field visits to the projects. 

 

In  particular,  the  field  support  provided  by  the  Chief  Engineers  of  the  concerned 

Departments  and  their  Executive  Engineers,  Assistant  Engineers  and  other 

Technical/General staff in the course of the field visits as also in submission of the field 

data is thankfully acknowledged. 

     Chairman & Managing Director North Eastern Development Finance Company Ltd. (NEDFi) Guwahati 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

  

CONTENTS   

Page Nos. Sl. No. 

PARTICULARS From  To 

1.  INDEX OF PROJECTS  3  3 

2.  EXECUTIVE SUMMARY OF RECOMMENDATIONS  4  7 

3.  SUMMARY OF PROJECT SPECIFIC OBSERVATIONS  8  10 

4.  INTRODUCTION  11  11 

5.  METHODOLOGY & SAMPLING  12  12 

6.  RECOMMENDATIONS  13  14 

7.  PROJECT SPECIFIC OBSERVATIONS  15  23 

8.  SUBMISSION OF REPORTS  24  24 

9.  DISCLAIMER  25  25 

  ENCLOSURES   

  MONITORING REPORTS  As per Index of 

Projects at 1 above

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

 1. INDEX OF PROJECTS 

 

LIST OF SPA (2008­09) PROJECTS IN EAST SIANG DISTRICT MONITORED 

Sl. No. 

Project Name  Cost of Project (Rs. lakh) 

Department  Executing Department 

Page Nos. 

Status 

1.  C/o Cluster of Minor Irrigation projects under Boleng Sub‐Division 

250.00  Water Resources Department (WRD) 

 WRD 

 27 – 37 

 Complete

2.  Flood control work on Sibo Korong, Maye, Rottong, Poklek & Besong rivers to protect village area & agricultural land area at Boying, Yagrung, Sibut & Takilalung village 

250.00  Water Resources Department (WRD) 

 WRD 

 38 – 47 

 Complete

3.  C/o of rural link roads under Rural Works Sub‐Division, Pangin 

100.00  Rural Works Department (RWD) 

 RWD 

 48 – 54 

 Complete

4.  Improvement of various roads and bridges under Ruksin Sub‐Division 

90.00  Public Works Department (PWD) 

 PWD 

 55 – 62 

 Complete

5,  Improvement & extension of Mebo Township Road 

85.00  Public Works Department (PWD) 

PWD  63 – 69  Complete

6.  Building Infrastructure schemes for Education & Health Departments under Nari‐Koyu Sub‐Division 

400.00  School Education & Health 

 WRD 

 70 – 81 

 On‐going 

7.  Improvement & infrastructure development in Sports at Mebo Town 

200.00  Rural Department (RD) 

 RD 

 82 – 88 

 On‐going 

8.  Improvement & infrastructure development in Education & Health at Mebo Town 

115.00  Rural Department (RD) 

 RD 

 89 – 96 

 On‐going 

9.  Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township 

50.00  Public Health Engineering Department (PHED) 

 PHED 

 97 – 103

 Complete

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

2. EXECUTIVE SUMMARY OF RECOMMENDATIONS    �Short­Term Recommendations� Observations  Recommendations 1.  Design & locational changes: 

The  project  �Building  infrastructure  for  Education  & Health Departments under Nari­Koyu subdivision� at Sl. No. 6 of Index of Projects: (a) Construction of single storied girl’s hostel  for 100 boarders at Telam H.S. School – this has been changed to double storey; (b)  Construction  of  SP  Type‐II  (double  unit)  5  nos. quarters  for  teachers of Koyu Secondary School –  this has been changed to 4 double units and 2 single units; (c)  Construction  of  SP  Type‐III  (2  nos.)  quarters  for Medical officers of Telam PHC  – 1 no.  shifted  to Nari and  the one at Telam has been built  inside  the Telam H.S. School campus; (d)  Construction  of  SP  Type  II  (double  unit)  2  nos. quarters for Medical Staff of Telam PHC – 1 no. double unit  proposed  to  be  converted  into  two  single  units with one unit shifted to Nari; (e)  No  approvals  for  design  and  locational  changes could be provided to the Third Party Monitors.  

1.  Any  major  design  changes and  proposals  for  location changes  should  be  done only  after  obtaining  proper official written approvals. Executing  Departments should  strictly  comply  and adhere to this requirement.   

2.  Need for re­execution of works: The  project  �Improvement  &  infrastructure development  in  Sports  at Mebo  Town�  at  Sl.  No.  7  of Index  of  Projects  had  a  component  of  leveling  of playground  at  a  cost  of  Rs.  41.36  lakh  which  is reportedly  complete  and  amount  spent.  However, during  the  visit  of  the  Third  Party Monitors,  it  was found  that  the  playground  is  full  of  boulders/stones with visible slope and unfit for any sporting activity.  

2.  This playground will have to be  redeveloped  to  make  it fit for sporting activities. 

3.  Variations in actual execution: The  project  �Improvement  &  extension  of  Mebo Township  Road�  at  Sl. No.  5  of  Index  of  Projects  had also  in  its  original  estimates WBM‐II  of  amount  Rs. 17.18 lakh, which was not executed. Instead, additional work  executed  outside  of  original  estimates  includes construction of 2 nos. RCC Box culvert – 2mtr. span, 3 nos. RCC Box  culvert  – 1 mtr.  span, 2 nos. wing wall and construction of CC drain of 210 mtr. length within the overall project cost. 

3.  While  the  works  executed are  necessary,  proper planning  should  have  been done during the preparation of the DPR and estimates.  For  better  implementation, Executing  Departments should  prepare  estimates after  detailed  studies  and visits to project sites.  

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

 4.  Poor project conceptualization/formulation: 

The  project  �Improvement  &  infrastructure development in Education &Health at Mebo Town � at Sl. No.  8  of  Index  of  Projects  had  a  component  of  RCC fencing &  gate  for Mebo HS  School  costing Rs.  25.16 lakh.  However,  the  condition  of  the  Boys  Hostel  for which  this  RCC  fencing was  done  is  in  a  dilapidated condition as can be seen from the pictures below. 

4.  Better  project  formulation could have suggested repair and  renovation  works  for the  boys  and  girls  hostel prior  to  or  along  with  the construction  of  the  RCC fence/wall. 

 

*Dilapidated condition of boys Hostel at Mebo HS School.  

*R.C.C. wall constructed at hostel campus Mebo H.S. School.  

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

�Medium­Term Recommendations� Observations  Recommendations 1.  Multiple  contractors  executing  works  on  Work 

Order Basis: The number of contractors engaged in the 9 projects at East  Siang  district  as  reported  by  the  Executing Departments is as under: 

Name of project  No. of contractors 

(i) C/o Cluster of Minor Irrigation projects under Boleng Sub‐Division 

154 

(ii) Flood control work on Sibo Korong, Maye, Rottong, Poklek & Besong rivers to protect village area & agricultural land area at Boying, Yagrung, Sibut & Takilalung village 

350 

(iii) C/o of rural link roads under Rural Works Sub‐Division, Pangin 

127 

(iv) Improvement of various roads and bridges under Ruksin Sub‐Division 

31 

(v)  Improvement  &  extension  of  Mebo Township Road 

18 

(vi) Building Infrastructure schemes for Education & Health Departments under Nari‐Koyu Sub‐Division 

68 

(vii) Improvement & infrastructure development in Sports at Mebo Town 

(viii) Improvement & infrastructure development in Education & Health at Mebo Town 

(ix) Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township 

17 

1.  A  policy  decision may  be considered  by  the  State Government  to  make tendering  process mandatory  in  award  of work under SPA along the lines  of  centrally sponsored  schemes  like PMGSY.  Well‐established procedure  for  tendering, through  competitive bidding,  should  be followed for all projects to ensure quality works  and timely completion. 

2.  Projects executed by non­technical Departments: Two  large  projects  at  Sl.  No.  1  (vii)  &  (viii)  above with total project cost of Rs. 315 lakh at Mebo Town is  being  executed  by  the  BDO  who  has  only  one technical person in the rank of EO(RE). 

2.  Such  large  &  important construction  and  civil works should be executed by  technical  executing departments  like  PWD etc. 

3.  Projects  complete  before  Third  Party  Monitors visits: In  this  instance,  it was  observed  that many  of  the projects have been completed before the Third Party Monitors appointment and visits.  

3.  The  State  Govt.  may consider  appointing  third party monitors at the time of  sanction  of  projects. This  will  enable  the monitors  to  visit  the projects prior  to or at  the start  of  works  enabling the monitoring to be more objective  and  concurrent in nature. 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

  �Long­Term Recommendations� Observations  Recommendations 1.  Quality Testing and Quality Control Measures: 

 Presently  no  testing  facilities  are  available  close  to sites/District HQs. All  the  construction  observed was being done without any testing. Moreover, no quality control measures are being taken at present. 

1.  The  State  Govt.  may consider  arrangements for  Quality  Testing facilities  close  to  the sites/District  HQs.  The Executing  Depts.  may introduce  Quality Control Register  to keep record of Test Reports of materials used as also Site Order Book for recording observations  made  by JE/AE/Executive Engineer during their visits. Technical  assistance  and collaborations  may  be sought  from  IIT, Guwahati, NERIST etc.  

2.  Detailed studies prior to executing projects:  Many  of  the  projects  especially  the  Minor  Irrigation and Flood Control works have been executed without undertaking detailed scientific studies. The  flood  control  works  have  been  done  on  an emergency  and  adhoc  basis which may  result  in  the works  having  to  be  repeated  again  in  the  next  rainy season. 

2.  The  Departments  should undertake  detailed studies/scientific studies  and  where required  take  External Experts  for  preparing Detailed Project Reports prior to taking up projects for execution. 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

3. SUMMARY OF PROJECT SPECIFIC OBSERVATIONS  (i) Construction of Minor Irrigation projects under Boleng Sub­Division Cost of project: Rs. 250 lakh  Details of project: Construction of 15 nos. of Minor  Irrigation 

Projects Observations: (a) The clusters of Minor Irrigation Projects are spread over a large area at high altitudes/hill tops with difficult accessibility; (b) The Third Party Monitoring Team could visit only one project at Sine and Boleng village. The source is perennial having head works and one distribution channel. It is reported that the discharge ranges from 0.043 to 0.135 cumecs and the command area is mostly terrace; (c) No  reports were made  available  regarding water  availability  during  different  seasons, crops  raised  (mono/double  cropping),  survey  containing  alignment  and  levels  of  canals, position of outlets in the command area etc. These reports should be prepared in future prior to taking up such important irrigation projects; (d)  It  is  reported  that  around  154  contractors  were  engaged  on  work  order  basis  for executing this project.  (ii) Flood control work on Sibo Korong, Maye, Rottong, Poklek & Besong rivers to protect village area & agricultural land area at Boying, Yagrung, Sibut & Takilalung village Cost of project: Rs. 250 lakh  Details of project: Flood control works on 5 hill rivers Observations: (a) These schemes have been executed on an emergency basis and have no relevance to flood control measures. No proper channelisation/dredging have been done – only some boulders have been removed and  in the process the bed has been depressed  in the  form of pond. So during the next rainy season these depressions will be filled up by boulders again; (b)  It  is  important  that  a  comprehensive  report/master plan be prepared  to  take up  such works for durable remedial measures. While these kinds of works are required for providing the  public  immediate  relief,  long  term  relief  can  only  be  provided  after  proper  scientific studies and planning; (c)  It  is reported  that around 350 contractors were engaged  for  this project  through work order basis. Multiplicity of contractors leads to poor quality and delay of works.  (iii) Construction of rural link roads under Rural Works Sub­Division, Pangin 

Cost of project: Rs. 100 lakh  Details of project: Construction of 14 nos. of rural link roads Observations: (a) About 14 link roads of lengths (5 km to 9 km) have been taken up mainly for earth work in formation cutting; (b) The Third  Party Monitoring  team  could  visit  two  projects  viz.  Construction  of RLR  at Kallek village and Construction of RLR at Radha village. Both  roads alignments have steep gradients which should be avoided and road geometrics should be within permissible limits These roads need further extensions to provide connectivity to more villages; (c) It is also reported that a total of 127 contractors were engaged for executing this project through work orders. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

 (iv) Improvement of various roads and bridges under Ruksin Sub­Division Cost of project: Rs. 90 lakh  Details  of  project:  Repair  works  on  Mirem‐Mikong‐Jonai 

(MMJ)  and  Sika‐Tode‐Sika‐Bamin  (STSB)  roads  and  flood protection  works  on  bridges  at  Peneng  Korong  &  Sille Korong rivers on MMJ road 

Observations: (a) The repair works on roads are satisfactory. However, the protection works particularly on Sille  Korong  has  been  done  on  an  adhoc  basis  and  unscientifically  –  no  HFL  &  other hydrological data  are available. The MMJ and STSB  roads  are very  important  roads which provide  connectivity  between  different  villages.  The  MMJ  road  also  provides  interstate connectivity with Assam at Jonai and is the only road connecting the new Industrial Area at Niglok. The two bailey bridges over Peneng Korong and Sille Korong need to be replaced by RCC  bridges  and  the  entire  length  of  both  the  MMJ  and  STSB  roads  need  widening, improvement and repairs; (b) Work was executed through Works Orders and a total of 31 contractors were engaged for the project. Important works like this should be executed through tendering process.  (v) Improvement & extension of Mebo Township Road Cost of project: Rs. 85 lakh  Details of project: Repair works on different roads  in Mebo 

Town Observations: (a) The original estimate was for repair of roads in patches with WBM I, II & III & carpeting, embankment & boulder crated wall. But the works executed include RCC culverts, CC drains & wing walls by excluding WBM‐II & reduction in other works like embankment, WBM‐III & blacktopping. Additional works executed were construction of 2 nos. of RCC box culvert of 2m span and 3 nos. of RCC box culvert of 3m span, CC drain of 210m length and 2 nos. of wing walls within the overall budget; (b) Approvals  for such deviations  from  the original estimates/sanction of  the actual works executed on ground could not be provided by the Dept. to the Third Party Monitors; (c)  There  is  a  need  for  proper  planning  in  preparation  of  estimates  and  scrutiny  before execution.  (vi) Building  Infrastructure  schemes  for Education & Health Departments under Nari­Koyu Sub­Division Cost of project:  Rs. 400 lakh 

Details  of  project:  Construction  of  school  hostels,  teacher  & medical quarters, development of football ground, extension of PHC building 

Observations: (a) Construction of single storied girl’s hostel for 100 boarders at Telam H.S. School has been changed to double storey; (b) Construction of SP Type‐II (double unit) 5 nos. quarters for teachers of Koyu Secondary School has been changed to 4 double units and 2 single units; (c) Construction of SP Type‐III  (2 nos.) quarters  for Medical officers of Telam PHC  – 1 no. shifted to Nari and the one at Telam has been built inside the Telam H.S. School campus; (d) Construction of SP Type II (double unit) 2 nos. quarters for Medical Staff of Telam PHC – 1 no. double unit converted into two single units with one unit shifted to Nari; (c) No work has been done on the football ground; (d) No approvals for design & locational changes provided to the Third Party Monitors. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

10 

 (vii) Improvement & infrastructure development in Sports at Mebo Town Cost of project: Rs. 200 lakh  Details  of  project:  Construction  of  Sports  Auditorium  & 

Playground with VIP Gallery Observations: (a) Sports Auditorium has been completed satisfactorily; (b) Development of Playground: Totally unsatisfactory work. An amount of Rs. 41.36 lakh has been reportedly spent on leveling the playground. However, the playground still needs to be properly leveled and brought to playing conditions. On the date of the Third Party Monitoring visit  i.e. February 12, 2010,  it was  seen  that  the playground was  filled with boulders  and stones with a visible slope and unfit for any sporting activity. The playground will have to be redeveloped; (c) Work on VIP Gallery was ongoing during the visit; (d) This project is being executed by the Block Development Officer, Mebo who has only one junior  technical person who  is supervising  the works. Large projects of  this nature  should ideally be executed by Technical executing depts. like PWD etc.  (viii)  Improvement &  infrastructure development  in Education & Health at Mebo Town Cost of project: Rs. 115 lakh  Details of project: Construction works at CHC, Mebo, Motum 

ME School, Mebo HS School & Sigar Primary School Observations: (a) The proposal of RCC wall fencing for the hostels at Mebo HS School has been very poorly conceptualized and formulated. The Boys Hostel is in a dilapidated condition while the RCC wall fencing for the same has been built; (b) No work has been done on the development of football ground at Mebo HS School; (c) This project is being executed by the Block Development Officer, Mebo who has only one junior  technical person who  is supervising  the works. Large projects of  this nature  should ideally be executed by Technical executing depts. like PWD etc.  (ix)  Improvement  of  existing  distribution  network  of  water  supply  at  Pasighat Market area within Pasighat Township Cost of project: Rs. 50 lakh  Details of project: Replacement and  relaying existing water 

pipeline, drilling of bore well and erection of overhead water tank 

Observations: (a) The project has been executed satisfactorily; (b) The scheme has been found to be very beneficial for the people and business concerns in Pasighat Market area; (c) Noteworthy observation  is  that user  charges are being  collected. The water  rate being collected is – Household Rs 100/‐ per month and Commercial per point Rs 50/‐ per month; (d) The test report of water quality was within permissible limits.  

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

11 

4. INTRODUCTION  (a) Special Plan Assistance  (SPA) projects approved during Annual Plan 2008­09 for the state of Arunachal Pradesh    During the Annual Plan 2008‐09 for the State of Arunachal Pradesh, the Planning 

Commission approved Rs. 50490.00  lakh as grant under SPA for  implementation of 334 

nos. of State specific projects. The Ministry of Finance, Govt. of India conveyed sanction 

and  payment  of  grant  component  of  Rs.  50490.00  lakh.  In  order  to  complete  all  the 

approved projects, the Govt. of Arunachal Pradesh provided the required loan component 

of Rs. 5610.00 lakh. The required fund was released by the Ministry towards the end of 

the  financial  year  2008‐09.  To  avoid  haphazard  and  slapdash  utilization  of  resources, 

Govt. of Arunachal Pradesh requested the Planning Commission to extend the time frame 

beyond  March  31,  2009  for  implementation  of  projects  up  to  September  30,  2009. 

Accordingly, all concerned Departments were allowed  to  implement  the SPA (2008‐09) 

projects during 2009‐10 within the stipulated deadline. 

  To  ensure  transparency  and  judicious  utilization  of  resources,  the  Govt.  of 

Arunachal  Pradesh,  in  a  path  breaking  measure,  had  decided  to  engage  Third  Party 

Monitors for independent monitoring of the SPA (2008‐09) projects. It was also decided 

that monitoring will be undertaken  for projects whose project costs are Rs. 50.00  lakh 

and above. Thus a total of 257 nos. of SPA (2008‐09) projects were to be monitored by 

NABCONS and NEDFi. 

 (b) Independent Third Party Monitoring of SPA (2008­09) projects by NEDFi    NEDFi has been assigned, on professional basis,  the work of  independent Third 

Party Monitoring  of 16  (sixteen)  nos.  of  infrastructure  projects  (roads,  bridges, minor 

irrigation,  education,  health  etc.)  in  the  three  districts  of  East  Siang  (9  nos.),  Dibang 

Valley  (2  nos.)  and  Lower  Dibang  Valley  (5  nos.)  in  the  State  of  Arunachal  Pradesh, 

underSPA (2008‐09). 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

12 

5. METHODOLOGY & SAMPLING  (a) Methodology 

  Detailed  information  regarding  the projects  to be monitored was collected  from 

the  Executing  Departments  through  an  approved  Government  Format  along  with 

Detailed  Project  Reports/Concept  Papers.  Desk  study  was  done  by  an  Expert  Team 

formed especially for the purpose. 

  Field  visits  were  taken  up  after  coordination  with  the  Planning  Department, 

District  Planning Officers,  Chief  Engineers/Executive  Engineers/Assistant  Engineers  of 

the  implementing Departments. During  the  field  visits  detailed  physical  survey  of  the 

projects were conducted. On‐field discussions with the executing engineers & contractors 

were held and wherever recommendations, corrective measures required were provided 

by  the  Expert  Team.  Scrutiny  of  project  costs  and  expenses,  interaction  wherever 

possible with the beneficiaries, Village Heads, meetings with the Deputy Commissioners 

and Heads of Departments were done and feedback provided. 

 

(b) Sampling of cluster of projects    100%  projects  (all  16  nos.)  have  been  taken  up  for  independent  Third  Party 

Monitoring  by  NEDFi. However,  some  of  the  projects  have  a  number  of  sub‐projects. 

Sampling of sub‐projects was done after carefully giving proportionate representation to 

all the beneficiary villages, size of financial outlays as also to different types/categories of 

the  projects.  In  cases  of  incomplete  projects with  cluster  of  sub‐projects,  subsequent 

monitoring  visits will  also  cover  sub‐projects  not  visited  earlier.  The  projects will  be 

monitored  till  they  have  been  physically  completed.  Equipped  with  the  background 

information  in  respect  of  the  selected  projects  provided  by  the  State  Government,  an 

expert  team  of NEDFi was deployed  in  the  field  to undertake  the physical monitoring 

studies of the  identified projects with the highest  level of objectivity, data  integrity and 

independence.  This methodology  will  be  uniformly  followed  for  all monitoring  visits 

subject, however, to further improvement from time to time based on the felt needs and 

feedback while  keeping  intact  in  sharp  focus  the  core  idea  of making  the monitoring 

exercise absolutely objective and corrective in nature. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

13 

 

6. RECOMMENDATIONS 

 6.1  Design  changes  and  relocation  of  projects  to  be  done  only  after  proper approvals have been obtained from the concerned authorities 

  The  Executing Departments  need  to  strictly  adhere  to  this  requirement.  Please 

refer 7(vi) at page 21. 

 6.2 Poor quality of works and need for re­execution 

  The quality of work at Playground in Mebo Town has been very poor. An amount 

of Rs. 41.36  lakh has been reportedly spent. However, the playground remains unfit for 

any sporting activity. This playground will have to be redeveloped. Please refer 7(vii) at 

page 22. 

 6.3 Variations in actual execution from sanctions 

  Executing Departments should ensure that there are minimum variations during 

execution of projects on ground from original sanctions. While important works outside 

of original sanctions have been executed on ground, these can be easily taken care of by 

improved  planning  and  detailed  studies  during  preparation  of  estimates  and 

DPRs/Concept Papers. Please refer 7(v) at page 20. 

 6.4 Improvement in project conceptualization/formulation 

  Project  conceptualization/formulation  needs  to  be  improved  considerably. 

Please refer 7(viii) at page 23. 

 6.5 Tendering process in place of Work Order system in awarding works 

  A policy decision may be considered by the State Government to make tendering 

process mandatory  in award of work under SPA along  the  lines of centrally sponsored 

schemes  like  PMGSY.  Well‐established  procedure  for  tendering,  through  competitive 

bidding,  should  be  followed  for  all  projects  to  ensure  quality  works  and  timely 

completion. Please refer to page 6. 

6.6 Projects executed by non­technical Departments 

  Large  civil  construction  projects  should  ideally  be  executed  by  Technical 

Executing Departments like PWD etc. Please refer 7(vii) & (viii) at pages 22 & 23. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

14 

6.7 Appointment of Third Party Monitors along with sanction of projects 

  The  State  Govt.  may  consider  appointing  third  party  monitors  at  the  time  of 

sanction of projects. This will enable the monitors to visit the projects prior to or at the 

start of works enabling the monitoring to be more objective and concurrent in nature. In 

this instance, many of the projects were complete before the third party monitors visit. 

 6.8 Quality Testing and Quality Control Measures 

  The State Govt. may consider arrangements for Quality Testing facilities close to 

the sites/District HQs. The Executing Depts. may introduce Quality Control Register to 

keep  record of Test Reports of materials used as also Site Order Book  for  recording 

observations made by JE/AE/Executive Engineer during their visits. Please refer 7(vi) at 

pages 21 & 22. 

 6.9 Detailed studies prior to executing projects 

  The  Departments  should  undertake  detailed  studies/scientific  studies  and 

where required take External Experts for preparing Detailed Project Reports prior to 

taking up projects for execution. Please refer 7(i) & 7(ii) at pages 15 to 18. 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

15 

7. PROJECT SPECIFIC OBSERVATIONS  (i) Construction of Cluster of Minor Irrigation projects under Boleng Sub­Division    The  project  is  for  construction  of  15  (fifteen  nos.)  of Minor  Irrigation  Projects 

under Boleng Sub‐Division, namely: 

Sl. No.  Name of Sub­project 1  C/o MIP at Sine & Boleng village 2  C/o MIP at Pangin & Koreng area at Pangin village 3  C/o MIP at Lokpeng Tarak area at Yeksi village 4  C/o MIP at Sissen Komsing, Pangi, Jorsing at Sissen village 5  C/o MIP at Resing area at Yemsing village 6  C/o MIP at Kebang Babuk, Rottung & Kallak area at Kebang village 7  C/o MIP at Pareng, Supsing & Yingku village 8  C/o MIP at Sitang village 9  C/o MIP at Yibuk, Messing & Lessing village 10  C/o MIP at Dosing Rengo & Lelling village 11  C/o MIP at Begging & Mopit village 12  C/o MIP at Pangkang village 13  C/o MIP at Parong village 14  C/o MIP at Riew village 15  C/o MIP at Riga village 

   The  people  of  the  project  areas  are  all  Scheduled  Tribes  belonging  to  the  Adi 

community  and  almost  90%  of  the  population  are  farmers. To wean  away  the  people 

from  their  traditional  practices  of  shifting  cultivation  (Jhum),  introduction  of  Terrace 

Cultivation  with  irrigation  facilities  is  an  important  intervention  of  the  state.  The 

command area of the project is 255 ha. and 143 families will be benefited. 

  The  clusters of Minor  Irrigation Projects  (MIPs) are  spread over a  large area at 

high altitudes/hill tops with difficult accessibility. The third party monitoring team could 

visit  only  one  project  i.e.  Construction  of MIP  at  Sine &  Boleng  village.  The  source  is 

perennial having head works and one distribution  channel.  It  is  reported  that  the  lean 

discharge ranges from 0.043 to 0.135 cumecs and the command area is mostly terrace. 

  No  reports  were  made  available  regarding  water  availability  during  different 

seasons, crops raised (mono/double cropping), survey containing alignment and levels of 

canals, position of outlets in the command area etc. These reports should be prepared in 

future prior to taking up such important irrigation projects. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

16 

  Since all  the 15  sub‐projects have been  reported  to be  completed and only one 

could be visited, it would be  ideal  if the Third Party Monitors are appointed at the time 

when  the project works  start  so  that monitoring works are of  concurrent nature. This 

would ensure better monitoring, quality of work and judicious utilization of funds. 

  It  is  also  reported  that  around  154  contractors were  engaged  for  this  project 

through work order basis. Multiplicity of contractors would only lead to poor quality and 

delay of works. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Irrigation  facilities  for  command  area  of  255  ha.  benefiting  22  villages with 

about 143 families; 

(ii) Higher productivity through double cropping; 

(iii) Weaning away farmers from Jhum cultivation; 

(iv) Alleviation of socio‐economic status of farmers. 

  (ii) Flood control work on Sibo Korong, Maye, Rottong, Poklek & Besong rivers to protect village area & agricultural land area at Boying, Yagrung, Sibut & Takilalung village    Sibo Korong at Boying village, Maye & Rottong Korong at Yagrung village, Poklek 

Korong  at  Sibut  village  and  Besong  Korong  at  Takilalung  village  are  all  hill  rivers  at 

boulder stages and are flashy rivers. The catchment areas of the rivers lie in the nearby 

hilly areas. The area  is  subject  to very heavy  rainfall during  the monsoon period  from 

June to September. This results in the catchments‐basin swelling of the rivers that causes 

heavy  soil erosion and out  flanking over  its banks. This annual phenomenon  threatens 

the agricultural land area and villages through which these rivers pass. On July 14, 2008, 

the rivers outflanked their banks and caused heavy erosion and damages with the rivers 

tending to migrate towards the eroded stretches. The scheme was reported to have been 

taken up on priority to prevent  further damages to the agricultural  land and villages of 

that area. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

17 

  While  these  schemes  have  been  executed  on  an  emergency  basis,  proper  flood 

control measures need to be taken in future. Flood control refers to the specific process 

of providing and operating structures designed  to eliminate or minimize  the damaging 

effects  of  flood  by  retaining,  constraining  or  diverting  flood  flows  as  per  some 

economically based design limits. 

  The  schemes  of  flood  control  taken up here have no  relevance  to  flood  control 

measures.  No  proper  channelisation/dredging  have  been  done  –  only  some  boulders 

have been removed and in the process the bed has been depressed in the form of pond. 

So during  the next  rainy  season  these depressions will be  filled up by boulders  again. 

Wire  crated  boulder  bunds  to  raise  bank  height  and  earthwork  in  embankment were 

done. As it appeared from visual inspection, the streams being flashy and in boulder stage 

are naturally aggrading type. In some cases no channel section of the streams were seen. 

In order  to assess  the quantity of works done, a report  indicating  levels of  the channel 

section at intervals (10 to 15 mt), High Flood Level (HFL), Rainfall data, Long Section of 

the reach with 100 mt u/s and 100 mt d/s of the affected reach etc. should be prepared. 

  For earth work in embankment, the embankment section required to stop spilling 

of  bank  should  be  prepared  showing  top width,  bottom width,  slope,  HFL,  Hydraulic 

gradient etc. 

  Before starting such works, a report should be prepared containing: 

• Wet profile of the river system – whether flood plain is big, medium or small; 

• Water depth on flood plains; 

• Bottom slope of the river channel; 

• Roughness of flow plane; 

• Water discharge – bank spilling, insufficiency of drainage, high discharge; 

• Water  level/flood  level  –  to  determine  hydraulic  gradient  and  embankment 

height; 

• Rainfall data of at least 10 years of the basin or nearby basin; 

• Duration of flooding in a certain area. 

  Any improvement of river channel or flood embankment may be done after such a 

study. Removal of boulders from river bed can be done in collaboration with R&D Dept. 

under schemes like NREGA. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

18 

  It  is  important that a comprehensive report/master plan be prepared to take up 

such works for durable remedial measures. While these kinds of works are required for 

providing the public immediate relief, long term relief can only be provided after proper 

scientific studies and planning. 

  Moreover, it is reported that around 350 contractors were engaged for this project 

through work order basis. Multiplicity of contractors would only lead to poor quality and 

delay of works. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Temporary relief for the flood affected agricultural land and villages. 

 (iii) Construction of rural link roads under Rural Works Sub­Division, Pangin 

  The project  is  for construction of 14 nos. of rural  link roads (RLR) under Pangin 

Sub‐division, namely: 

Sl. No. 

Name of sub­project 

1.  C/o RLR at Kallek village 2.  C/o RLR at Radha Village 3.  C/o RLR at Begging Village 4.  C/o RLR at Sitang Village 5.  C/o RLR at Pankang (Jorkong) Village 6.  C/o RLR at Pankang (Kumku) Village 7.  C/o RLR at Pangin Village 8.  C/o RLR at Yemsing Village 9.  C/o RLR at Riew Village 10.  C/o RLR at Sub Centre at Parong Village 11.  C/o RLR at Boleng 12.  C/o RLR at Tarak Village 13.  C/o RLR at Sissen Village 14.  C/o RLR at Sanggam Bridge Point to Komsing Village 

  Rural road connectivity particularly in hill areas is a key component for the socio‐

economic development of the area. About 14  link roads of  lengths (5 km to 9 km) have 

been  taken up mainly  for earth work  in  formation cutting. However, some of  the roads 

need  further  extensions  to  provide  connectivity  to more  villages.  These  roads  should 

ideally be brought to WBM standards (all weather). 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

19 

  Of the 14 sub‐projects, the Third Party Monitoring team visited two projects viz. 

Construction of RLR at Kallek village and Construction of RLR at Radha village.  It was 

noticed that the alignment at Kallek & Radha village has steep gradients which should be 

avoided and road geometrics should be within permissible limits. 

  It is also reported that a total of 127 contractors were engaged for executing this 

project through work orders. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Reduction in distances to be traveled for the population of adjoining villages; 

(ii) Better access to education, healthcare and other public services; 

(iii) More assured supplies of food, medicines, life saving drugs etc.; 

(iv) Better access to markets for farmers. 

  (iv) Improvement of various roads and bridges under Ruksin Sub­Division    The work  is mainly repair works  for 1 Km of the 16.19 Km  long Mirem‐Mikong‐

Jonai  (MMJ) road, 2 Km of 10.28 km  long Sika‐Tode‐Sika‐Bamin  (STSB) road and  flood 

protection work on bridges at Peneng Korong and Sille Korong rivers. 

  The works are complete physically. The repair works on two stretches of road are 

satisfactory. However,  the protection works particularly on Sille Korong has been done 

on an adhoc basis. The protection works have been done unscientifically  – no HFL and 

other hydrological data are available. The MMJ and STSB roads are very important roads 

which provide connectivity between different villages. The MMJ road provides interstate 

connectivity with Assam at Jonai and is the only road connecting the new Industrial Area 

at  Niglok.  The  two  bailey  bridges  over  Peneng  Korong  and  Sille  Korong  need  to  be 

replaced  by RCC  bridges  and  the  entire  length  of  both  the MMJ  and  STSB  roads  need 

widening improvement and repairs. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

20 

  Work was  executed  through Works Orders  and  a  total  of  31  contractors were 

engaged for the project. Works of this nature should be executed through the tendering 

process. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: (i) Protection for the two major bridges on MMJ road; (ii) Better ride quality. 

  (v) Improvement & extension of Mebo Township Road 

  The original estimate was  for  repair of  roads  in patches with WBM  I,  II &  III & 

carpeting,  embankment  of  1.59  Km  &  boulder  crated  wall.  But  the  works  executed 

include RCC culverts, CC drains & wing walls by excluding WBM‐II & reduction  in other 

works like embankment, WBM‐III & blacktopping. The original estimates included WBM‐

II of length 3 km and amount of Rs. 17.18 lakh. This was not executed. WBM‐III execution 

was done for 2.30 km down from 3.0 km of original estimates and amount spent was Rs. 

16.46  lakh down from Rs. 17.58  lakh. Earthwork  in embankment was executed for only 

0.30  km  whereas  the  original  estimates  were  made  for  1.59  km.  Additional  works 

executed were construction of 2 nos. of RCC box culvert of 2m span and 3 nos. of RCC box 

culvert of 3m span, CC drain of 210m length and 2 nos. of wing walls.   These works were 

executed within  the  overall  budget  of  Rs.  85  lakh  for  the  project.  Approvals  for  such 

deviations from the original estimates/sanction of the actual works executed on ground 

could not be provided by the Department to the Third Party Monitors. There is a need for 

proper planning in preparation of estimates and scrutiny before execution. 

  The execution of works was on Work Order basis and a  total of 18  contractors 

were  engaged  in  this  project.  There  is  an  urgent  need  for  introduction  of  tendering 

process  in  the  awarding  of  such works. More  frequent  supervision  is  required  during 

surfacing/carpeting and maintenance of proper super elevation of roads. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: (i) Better ride quality; (ii) Improved drainage. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

21 

 

(vi) Building  Infrastructure  schemes  for Education & Health Departments under Nari­Koyu Sub­Division    The  project  of  School  Education  Department  is  being  executed  by  Water 

Resources Department and has the following sub‐projects: 

Sl. No. 

Sub­project  Estimated cost (Rs. in lakh) 

1.  Construction  of  Single  storied  Girl’s  Hostel  for  100 boarders at Telam H.S. School at Telam 

119.38 

2  Development  of  football  ground  of  Telam  Higher Secondary School at Telam 

39.88 

3  Construction  of  SP  Type‐II  (Double  Unit)  5  nos. quarters  for  Teachers  of  Koyu  Secondary  School  at Koyu Circle Hq. 

47.53 

4  Construction  of  Single  storied  Girl’s  Hostel  for  100 boarders at Seren Middle School at Seren 

119.38 

5  Extension  of  PHC  Building  for  50  patients  with Kitchen and Dinning at Telam 

41.83 

6  Construction  of  SP  Type‐III  (2  Nos.)  quarters  for Medical Officers of Telam PHC at Telam 

10.99 

7  Construction  of  SP  Type‐II  (Double  Unit)  2  nos. quarters for Medical Staff of Telam PHC at Telam 

19.01 

  Additional contingencies @ 0.5%  2.00   TOTAL  400.00 

 

  The construction of 5 nos. of SP Type‐II (double unit) at Sl. No. 3 above has been 

changed to 4 double units and 2 single units. One double unit has been completed, while 

about 70% has been achieved on another. During the Third Party Monitoring team visit 

on February 9, 2010; work had just started on one double unit and two single units. Work 

on one more double unit  is yet  to start. The reason attributed  for  the change  in design 

and slow progress is “non‐availability of land” – however, this issue was not referred to 

the Deputy Commissioner or the School Education Department for redressal. 

  One out of 2 Units of SPT‐III quarters for Medical Officer’s of Telam PHC at Sl. No. 6 

above has been completed &  the other  is stated  to be shifted  to Nari. Out of 2 Units of 

SPT‐II (Double Unit) quarters for Medical Staff of Telam PHC at Sl. No. 7 above, one has 

been completed and design change has been proposed to convert the remaining double 

unit to two single units – one at Telam and the other shifted to Nari (work on both yet to  

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

22 

start). No work on the football ground of the Telam H.S. School has been done till the date 

of  visit.  No  authorizations/approvals  were  produced  regarding  design  changes  and 

shifting of quarters for Medical Staff from Telam to Nari. 

  Such  major  design  changes  and  changes  to  the  project  should  have  proper 

approvals and authorizations. No quality  control measures and quality  testing  is being 

done. 

  A total of 68 contractors through work orders have been engaged to execute this 

project. Tendering process should be introduced to ensure quality and timely completion 

of such important projects. 

Likely Benefits of the project  Some of the major benefits likely to accrue out of this project are: 

(i) Better education and health facilities. 

 (vii) Improvement & infrastructure development in Sports at Mebo Town    The project was for construction of Sports Auditorium and Play ground with VIP 

gallery at a cost of Rs. 200 lakh. The Sports Auditorium has been completed and the work 

is satisfactory. 

  An amount of Rs. 41.36 lakh has been reportedly spent on leveling the playground. 

However,  the  playground  still  needs  to  be  properly  leveled  and  brought  to  playing 

conditions. On the date of the Third Party Monitoring visit i.e. February 12, 2010, it was 

seen  that  the  playground was  full with  boulders  and  stones with  a  visible  slope  and 

totally unfit for any sporting activity. The playground will have to be redeveloped. 

 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Development of sports; 

(ii) Better quality of life for the youth. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

23 

 

(viii)  Improvement &  infrastructure development  in Education & Health at Mebo 

Town 

  The  project  has  different works  at  CHC, Mebo; ME  School, Motum;  HS  School, 

Mebo  and  Primary  School,  Sigar.  While  all  works  have  been  completed,  only  the 

development of football ground at Mebo H.S. School is remaining. 

  Project conceptualization/formulation has been very poor  in the works taken up 

at Mebo Higher Secondary School. The hostels are  in a dilapidated condition while  the 

boundary walls have been repaired. The hostels need urgent repairs. 

  Moreover, Technical Departments  like PWD  should be entrusted with  such  civil 

works instead of the Block Development Officer who has only one technical staff. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Better education and health facilities. 

 

(ix)  Improvement  of  existing  distribution  network  of  water  supply  at  Pasighat 

Market area within Pasighat Township 

  The project was for replacing and relaying existing water pipeline, drilling of bore 

well and erection of overhead tank for water supply at Pasighat Market area. The project 

was executed satisfactorily. 

Likely Benefits of the project 

Some of the major benefits likely to accrue out of this project are: 

(i) Improved water supply – to facilitate more coverage. 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

24 

 8. SUBMISSION OF REPORTS    10 hard  copies  – 3  in  colour  and 7  in black  and white  –  of  the Comprehensive 

Monitoring Reports  in  respect  of  each  of  the  projects  visited  in  the District  of Dibang 

Valley  are  submitted  herewith  for  kind  perusal  and  record  of  the  Government  of 

Arunachal Pradesh. 

 

 CONSOLIDATED MONITORING REPORT ‐ 1st REPORT 

EAST SIANG � SPA (2008‐09) 

25 

 9. DISCLAIMER   

 THIS  REPORT/DOCUMENT  HAS  BEEN  PREPARED  BY  NORTH  EASTERN DEVELOPMENT  FINANCE  CORPORATION  LTD.  (NEDFi)  ON  BEHALF  OF  THE GOVERNMENT OF ARUNACHAL PRADESH BASED ON THE INFORMATION AND DATA PROVIDED BY THEM AS ALSO THE OBSERVATIONS RECORDED IN THE COURSE OF THE FIELD VISITS.   THE  VIEWS  EXPRESSED  IN  THIS  REPORT/DOCUMENT  ARE  ONLY  ADVISORY  IN NATURE AND THEY DO NOT REPRESENT OR REFLECT, IN ANY WAY, THE POLICY OR VIEWS OF NEDFi.   NEDFi ACCEPTS NO FINANCIAL LIABILITY OR RESPONSIBLITY FOR THE ACCURACY, COMPLETENESS OR USEFULNESS OF  ANY  INFORMATION,  PRODUCT OR  PROCESS DISCLOSED  IN  THIS  REPORT/DOCUMENT  TO  ANYONE  USING  THIS REPORT/DOCUMENT  OR  ACTIONS  IN  ANY  MANNER  ON  ANY  VIEW  OR OBSERVATIONS EXPRESSED HEREIN.     

    

26 

               

MMOONNIITTOORRIINNGG  RREEPPOORRTTSS   

  

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

27 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Project � Minor Irrigation / District � East Siang 

Name of the Project: Construction of cluster of Minor Irrigation projects under Boleng Sub­ Division. 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > 

Name of the District:  East Siang  No. of villages to be benefited:  22 nos. (Cultivable command area–255 ha.) 

Executing Department:  Water Resources Department (WRD)  Total combined population to be benefited  143 families 

Executing Circle:  Water Resources Circle, Itanagar  Names of the benefiting villages: Pangin, Yeksi, Sissen, Yemsing, Kebang, Pareng, Supsing & Yingku, Sitang, Sine & Boleng, Yibuk, Messing & Lessing, Dosing Rengo & Lelling, Begging & Mopit, Pangkang, Parong, Riew and Riga.  

Executing Division:  Water Resources Division, Pasighat  4. Project Status as observed during Field Visit > 

Executing Sub Division:  Water Resources Sub Division, Pasighat  Date of the Field Visit  February 10, 2010 

2. Project Particulars >  Financial Achievement as on December, 2009  (Rs in Lakh)  250.00 

Date of Sanction:  March 13, 2009  % of Financial Progress  100% (Annexure­I) 

Cost of the Project (Rs in Lakh):  250.00 (15 schemes) 

Physical Progress  As per Annexure­II 

Means of Finance :(Rs in Lakh):  Field Observations  As per Annexure­III 

Central Share (90%):  225.00  5. GPS Readings/LatLong:  As per Annexure­IV 

State Share – Loan (10%):  25.00  6. Current Project Status: Completed 

Date of Commencement of work:  March 16, 2009  7.  Number of attached Visuals/Photographs: 28 Date of Completion of work:  June 18, 2009 Date of submission of utilization certificate:  June 25, 2009 

8. Special Comments/Observations/Suggestions/recommendations, if any: ­Under this project,  there  are  fifteen  schemes  spread  over  different  far  flung  locations  at  high altitude. Tendering system should be introduced for execution of such works instead of the present system of awarding works through work orders. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

28 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

 Name of Project: Construction of cluster of Minor Irrigation projects under Boleng Sub­ Division. Job Scheme Number:  

Sr. No.  Items  Amount  (Rs. in lakh) 

 

1  Cost of Project  

250.00 

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

225.0025.00

3  Financial Achievement as on December, 2009  

250.00

4  % of progress (Item 3 / Item 2x100)  

100 %

 Comments on Progress: The project is complete. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

29 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Construction of cluster of Minor Irrigation projects under Boleng Sub­ Division.                      (Rupees in Lakh) 

Details of Sanction  Work planned during the period up to December, 2009 

Work carried out up to the end of 

December, 2009 

Work planned during the period ending March, 2010 (Project is complete) 

Sr. No. 

Particulars of Major Items of Work  Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount (1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 1  C/o MIP at Sine & Boleng village       a  Construction of CC channel  Mtr.  286 15.00 286  15.00 286 15.00  2  C/o MIP at Pangin & Koreng area at 

Pangin village          

a  Jungle clearance  Sq.m  24,024 0.26 24,024  0.26 24,024 0.26  b  C/o of earthen channel  cum  18,113 11.74 18,113  11.74 18,113 11.74  3  C/o MIP at Lokpeng Tarak area at 

Yeksi village.          

a  Jungle clearance  Sq.m  17,940 0.19 17,940  0.19 17,940 0.19  b  C/o of earthen channel  cum  18,765.40 14.81 18,765.40  14.81 18,765.40 14.81  4  C/o MIP at Sissen Komsing, Pangi, 

Jorsing at Sissen village.      

a  C/O Earthen Channel  Cum  8,613 7.87 8,613  7.87 8,613 7.87  b  C/O C.C. Channel  Mtr  200 15.88 200  15.88 200 15.88  5  C/o MIP at Resing area at Yemsing 

village      

a  Jungle clearance  Sq.m  80,104 0.87 80,104  0.87 80,104 0.87  b  C/o of earthen channel  Cum  34,801 29.13 34,801  29.13 34,801 29.13  6  C/o MIP at Kebang Babuk, Rottung & 

Kallak area at Kebang village.      

a  Jungle clearance  Sq.m  27,541.80 0.30 27,541.80  0.30 27,541.80 0.30  b  C/o of earthen channel  Cum  18,758.37 14.70 18,758.37  14.70 18,758.37 14.70  7  C/o MIP at Pareng, Supsing & Yingku       

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

30 

village. a  Jungle clearance  Sq.m  11,625 0.12 11,625  0.12 11,625 0.12  b  C/o of earthen channel  Cum  14,576.40 14.88 14,576.40  14.88 14,576.40 14.88  8  C/o MIP at Sitang village       a  Jungle clearance  Sq.m  13,635 0.15 13,635  0.15 13,635 0.15  b  C/o of earthen channel  Cum  8,617.12 6.85 8,617.12  6.85 8,617.12 6.85  9  C/o MIP at Yibuk, Messing & Lessing 

village      

a  Jungle clearance  Sq.m  7,650 0.08 7,650  0.08 7,650 0.08  b  C/o of earthen channel  Cum  8,912.62 9.92 8,912.62  9.92 8,912.62 9.92  10  C/o MIP at Dosing Rengo & Lelling 

village      

a  Jungle clearance  Sq.m  6,740 0.07 6,740  0.07 6,740 0.07  b  C/o of earthen channel  Cum  10,757.87 10.93 10,757.87  10.93 10,757.87 10.93  11  C/o MIP at Begging & Mopit village       a  Jungle clearance  Sq.m  11,625 0.12 11,625  0.12 11,625 0.12  b  C/o of earthen channel  Cum  14,576.40 14.88 14,576.40  14.88 14,576.40 14.88  12  C/o MIP at Pangkang village       a  Jungle clearance  Sq.m  17,940 0.19 17,940  0.19 17,940 0.19  b  C/o of earthen channel  Cum  18,765.40 14.81 18,765.40  14.81 18,765.40 14.81  13  C/o MIP at Parong village       a  Jungle clearance  Sq.m  9,255 0.10 9,255  0.10 9,255 0.10  b  C/o of earthen channel  Cum  19,017.08 14.90 19,017.08  14.90 19,017.08 14.90  14  C/o MIP at Riew village       a  Jungle clearance  Sq.m  34,825 0.37 34,825  0.37 34,825 0.37  b  C/o of earthen channel  Cum  24,619.69 19.63 24,619.69  19.63 24,619.69 19.63  15  C/o MIP at Riga village       a  Jungle clearance  Sq.m  32,520 0.36 32,520  0.36 32,520 0.36  b  C/o of earthen channel  Cum  37,160.29 29.64 37,160.29  29.64 37,160.29 29.64  16  Add contingencies @ 0.5%      1.25   1.25 1.25    

TOTAL >    250.00    250.00  250.00     

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

31 

Annexure ­ III 

FIELD VISIT OBSERVATIONS 

Name of Project:  Construction of cluster of Minor Irrigation projects under Boleng Sub­ Division. Type/Category of the Project:   

Sr. No.  Particulars  Observations / Comments 

1  Comments on physical progress as observed on the date of the visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

Under  this  project,  there  are  15  nos.  of  sub  projects  of  Minor irrigation  schemes  under  Boleng  Sub Division  in  East  Siang Dist. The third party monitoring team visited one project viz. C/o MIP at Sine and Boleng village. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

No Q.C. Register was maintained. 

3  Special Observations / Comments,  if  any, with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

The  sources  have  stated  that  the  source  is  perennial,  cropping pattern � double, irrigation coverage 45 Ha, discharge 0.135 cum. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

It is reported that a total of 22 villages with 143 families will benefit from this project.  

5  Difficulties, if any, being experienced in completing the Project  No difficulties. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

Detailed  studies  covering  water  availability,  H/W  distribution system, cropping pattern, irrigation coverage should be undertaken before taking up such projects. 

 

Minor Irrigation 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

32 

Annexure ­ IV GPS READINGS/LATLONG � GPS SITE MAPS 

 

MIP at Sine and Boleng village 

Latitude ‐ N 280 19’ 01.5”

Longitude ‐ E 940 56’ 53.1”

Elevation 492 m 

  

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

33 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

  

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

34 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

35 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

36 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                      C/o cluster of Minor Irrigation Projects under Boleng Sub‐Division, SPA (2008‐09) 

37 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

38 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Project � Flood Control Works / District � East Siang 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 Name of the Project: Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong rivers to protect village area and agriculture land at Boying, Yagrung, Sibut and Takilalung villages. 

3. Social Benefits from the project > 

1. Project Details >  No. of villages to be benefited:  4 Villages 

Name of the District:  East Siang  Total combined population to be benefited  6200 Nos. 

Department  Water Resources Department (WRD)  Names of the benefiting villages: Boying, Sibut, Takilalung & Yagrung 

Executing Department:  Water Resources Circle, Itanagar  4. Project Status as observed during Field Visit > 

Executing Division:  Water Resources Division, Pasighat  Date of the Field Visit  February 12, 2010 

Executing Sub Division:  Water Resources Sub‐ Division, Pasighat  Financial Achievement as on December, 2009  (Rupees in lakh)  250.00 

2. Project Particulars >  % of Financial Progress  100% (Annexure­I) 

Date of Sanction:  March 25, 2009  Physical Progress  As per Annexure­II 

Cost of the Project (Rs in Lakh):  250.00 (5 schemes)  Field Observations  As per Annexure­III 

Means of Finance :(Rs in Lakh):  5. GPS Readings/LatLong:  As per Annexure­IV 

Central Share (90%):  225.00  6. Current Project Status: Complete 

State Share – Loan (10%):  25.00  7.  Number of attached Visuals/Photographs: 16 

Date of Commencement of work:  March 28, 2009 

Date of Completion:  June 12, 2009 

Date of submission of utilization certificate  June 25, 2009 

8.  Special  Comments/Observations/Suggestions/recommendations,  if  any:  ­The project  is  for  taking  up works  on  small  stretches  of  five  flashy  hill  streams  at boulder stage. The works include removing of boulders from river bed which has been termed as channelisation, boulder bund to raise bank height and earthwork in  embankment.  The  rivers  are  flashy  and  in  boulder  stage  and  are  naturally aggrading type � in some cases no channel section of the rivers were seen. Detailed studies should be  taken up prior  to  taking up such works which appear  to have been taken up on adhoc basis. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

39 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

 Name of Project: Flood control works on Sibo Korong, Maye, Rottong, Poklek and Besong rivers to protect village area and agriculture land area at Boying, Yagrung, Sibut and Takilalung village.  

Sr. No.  Items  Amount  (Rs. in lakh) 

1  Cost of Project  

250.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

225.0025.00

3  Financial Achievement as on December, 2009  

250.00

4  % of progress (Item 3 / Item 2x100)  

100%

 Comments on Progress:  The project has been completed. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

40 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Flood Control Works on Sibo Korong, Maye, Rottong, Poklek and Besong River to protect village area and agriculture land area at Boying, Yagrung Sibut, Takilalung village. 

 (Rupees in lakh) Details of Sanction  Work planned 

during the period up to 

December, 2009 

Work carried out up to the end of  December, 2009 

Work planned during the period ending March, 2010 

(Project is complete) 

Sr. No. 

Particulars of Major Items of Work  Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount 

(1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 1  Sibo Korong   a  Earthen embankment on Sibokorong  mtr  400 69.70 ‐do‐ 69.70 400 69.70b  Dredging/ channelisation (75m)  m3  25257 25.50 ‐do‐ 25.50 25257 25.50c  Wire crated boulder bund (150 m) near English 

bridge. m3  1483 24.10 ‐do‐ 24.10 1483 24.10

2  Maye Korong   a  Dredging/channelisation   m3  18061 18.24 18061 18.24 18061 18.24b  Wire crated boulder bund (145 m)  m3  610 10.59 610 10.59 610 10.593  Poklek Korong   a  Dredging/channelisation at Poklek Korong (380m)  m3  21265 21.48 21265 21.48 21265 21.48b  Wire crated boulder bund (185 m)  m3  779 13.55 779 13.55 779 13.554  Besong Korong   a  Dredging/channelisation at Poklek Korong (400m)  m3  22614 22.84 22614 22.84 22614 22.84b  Wire crated boulder bund (160 m)  m3  674 11.70 674 11.70 674 11.705  Rottong Korong   a  Dredging/channelisation at Poklek Korong (490m)  m3  23254 23.48 23254 23.48 23254 23.48b  Wire crated boulder bund (103 m)  m3  434 7.57 434 7.57 434 7.576  Add contingencies @ 0.5%      1.25  1.25  1.25 

TOTAL >    250.00  250.00   250.00  

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

41 

Annexure ­ III 

FIELD VISIT OBSERVATIONS 

 Name of Project:  Flood Control Work on Sibo Korong, Maye, Rottong, Poklek & Besong River to protect village area and agriculture land area at Boying, Yagrung, Sibut & Tekilalung village  Type/Category of the Project:   

Sr. No.  Particulars  Observations / Comments 

1  Comments on physical progress as observed on the date of the visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

The project is reported to be complete. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

No Q.C. Register was maintained. 

3  Special Observations / Comments,  if  any, with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

The project was  to  take up works on small stretches of  five  flashy 

hill  streams  at  boulder  stage.  The  work  envisaged  removal  of 

boulders  which  has  been  termed  channelisation,  wire  crated 

boulder bund to raise bank height and earthwork in embankment. 

As it appeared from visual inspection, the streams being flashy and 

in  boulder  stage  are  naturally  aggrading  type.  In  some  cases  no 

channel section of the streams were seen. In some cases it was seen 

that some boulders have been removed and in the process the bed 

has been depressed  in  the  form of pond. So during  the next rainy 

Flood Control 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

42 

season  these  depressions will  be  filled  up  by  boulders  again.  In 

order  to  assess  the  quantity  of  works  done,  a  report  indicating 

levels of the channel section at intervals (10 to 15 mt), High Flood 

Level (HFL), Rainfall data, Long Section of the reach with 100 mt u/s 

and 100 mt d/s of the affected reach etc. should be prepared. 

For earth work in embankment, the embankment section required 

to  stop  spilling  of  bank  should  be  prepared  showing  top  width, 

bottom width, slope, HFL, Hydraulic gradient etc. 

It  is  important  that  a  comprehensive  report/master  plan  be 

prepared to take up such works for durable remedial measures. 

While  these kinds of works are  required  for providing  the public 

immediate relief, long term relief can only be provided after proper 

scientific studies and planning. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

The  project  was  to  provide  immediate  flood  control  relief  to  a 

population of about 6200 of 4 villages. 

5  Difficulties, if any, being experienced in completing the Project  No difficulties. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

43 

Annexure ­ IV GPS READINGS/LATLONG � GPS SITE MAPS 

1) Sibo ­ Korong Latitude ‐ N 280 3’ 17”

Longitude ‐ E 950 17’ 6.4”

Elevation ‐226 m 

Near the culvert 

Latitude ‐ N 280 3’ 35.1”

Longitude ‐ E 950 17’ 24.5”

 2) Poklek � Korong 

Latitude ‐ N 270 59’ 50.2”

Longitude ‐ E 950 17’ 8”

Elevation 154 m above MSL 

 3) Maye � Korong 

Latitude ‐ N 280 0’ 35.3”

Longitude ‐ E 950 14’ 3.8”

Elevation 227 m above MSL 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

44 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

45 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

46 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                   Flood control works on Sibo Korong, Maye, Rottong, Poklek & Besong Rivers, SPA (2008‐09) 

47 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

48 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Project � Construction of Rural Link Roads under RWD ­ Pangin / District � East Siang 

Name of the Project: Construction of rural link roads under Rural Works Sub­Division, Pangin. 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > 

Name of the District:  East Siang  No. of villages to be benefited:  17 Villages 

Executing Department:  Rural Works Department (RWD)  Total combined population to be benefited  8,296 Nos. 

Executing Circle:  Pasighat Circle RWD  Names of the benefiting villages: Kallek & Rotung, Radha, Begging, Sitang, Pankang (Jorkong), Pangkang(Kumku), Pangin, Yemsing, Riew, Parong, Boleng, Tarak, Sissen, Komsing. 

Executing Division:  Pasighat Division RWD  4. Project Status as observed during Field Visit > 

Executing Sub Division:  Pangin Sub Division RWD  Date of the Field Visit   February 10, 2010 

2. Project Particulars >  Financial Achievement as on December, 2009 (Rs in lakh)  100.00 

Date of Sanction:  March 17, 2009  % of Financial Progress  100% (Annexure­I) 

Cost of the Project (Rs in Lakh):  100.00  Physical Progress  As per Annexure­II 

Means of Finance :(Rs in Lakh):  Field Observations  As per Annexure­III 

Central Share (90%):  90.00  5.GPS Readings/LatLong:  As per Annexure­IV 

State Share – Loan (10%):  10.00  6. Current Project Status: Completed 

Date of Commencement of work:  March, 2009  7.Number of attached Visuals/Photographs: 4 

Date of Completion:  December, 2009 

Likely  Date  of  submission  of  Utilization Certificate 

January 23, 2010 

8.  Special  Comments/Observations/Suggestions/recommendations,  if  any:  ­  The project was for earth work in formation cutting. Tendering system for award of works should be introduced in place of the present system of awarding works through work order basis. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

49 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project: Construction of rural link roads under Rural Works Sub­ Division, Pangin  

Sr. No.  Items  Amount  (Rs. in lakh) 

 1  Cost of Project 

 100.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

90.0010.00

3  Financial Achievement as on December, 2009  

100.00

4  % of progress (Item 3 / Item 2x100)  

100%

 Comments on Progress: Formation cutting of hill slope has been done. Project is complete. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

50 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Construction of rural link roads under Rural Works Sub­ Division, Pangin   

                         (Rupees in lakh) 

Details of Sanction  Work planned during the period up to December, 

2009 

Work carried out up to the end of up to December, 2009 

Work planned during the period ending March, 2010 (Not applicable as the project is complete) 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount 

(1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 

1  Radha village       

a  E/w in formation cutting  Km  0.54 9.90 0.54  9.90 0.54 9.90  

2  Begging village           

a  E/w in formation cutting  Km  0.315 9.90 0.315  9.90 0.315 9.90  

3  Sitang village           

a  E/w in formation cutting  Km  0.12 5.00 0.12  5.00 0.12 5.00  

4  Pankang (Jorkong village)             

a  E/w in formation cutting  Km  0.27 5.00 0.27  5.00 0.27 5.00  

5  Pankang (Kumku) village       

a  E/w in formation cutting  Km  0.15 5.00 0.15  5.00 0.15 5.00  

6  Pangin village       

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

51 

a  E/w in formation cutting  Km  0.15 5.00 0.15  5.00 0.15 5.00  

7  Yemsing village       

a  E/w in formation cutting  Km  0.45 14.80 0.45  14.80 0.45 14.80  

8  Riew village       

a  E/w in formation cutting  Km  0.15 5.00 0.15  5.00 0.15 5.00  

9  Parong village       

a  E/w in formation cutting  Km  0.295 10.00 0.295  10.00 0.295 10.00  

10  Boleng village       

a  E/w in formation cutting  Km  0.20 5.00 0.20  5.00 0.20 5.00  

11  Tarak village       

a  E/w in formation cutting  Km  0.24 5.00 0.24  5.00 0.24 5.00  

12  Sissen village       

a  E/w in formation cutting  Km  0.24 5.00 0.24  5.00 0.24 5.00  

13  Komsing village       

a  E/w in formation cutting  Km  0.23 5.00 0.23  5.00 0.23 5.00  

14  Kallek village       

a  E/w in formation cutting  Km  0.54 9.90 0.54  9.90 0.54 9.90  

15  Add contingencies @ 0.5%      0.50   0.50   0.50    

TOTAL >    100.00    100.00    100.00     

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

52 

Annexure ­ III 

FIELD VISIT OBSERVATIONS 

Name of Project:  Construction of rural link roads under Rural Works Sub­ Division, Pangin Type/Category of the Project:   

Sr. No.  Particulars  Observations / Comments 

1  Comments on physical progress as observed on the date of the visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

Out  of  fourteen  (14)  schemes;  work  on  two  schemes  �  PMGSY (Kallek & Rottung  of 3.5 Km)  and  from PP  road  to Radha  village have been inspected. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

Work relates to earth work in formation cutting of hill slope.  

3  Special Observations / Comments,  if  any, with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

At some places formation is not leveled. These link roads should be completed. A  total of 154 contractors were engaged  for executing this project on work order basis. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

This project provides connectivity to 17 villages which will benefit a population of about 8296. 

5  Difficulties, if any, being experienced in completing the Project  No difficulties. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

Funds should be provided to complete these roads to make them all weather.  Tendering  process  for  award  of  works  should  be introduced  instead  of  the  work  order  system  being  followed  at present. 

Roads 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

53 

 

Annexure ­ IV 

GPS READINGS/LATLONG � GPS SITE MAPS 

Readings were taken at 3 positions Kallek Village 

1) Latitude ‐ N 280 8’ 18.8” 

Longitude ‐ E 950 8’ 57.6” 

Elevation 580 m above MSL 

2) Latitude ‐ N 280 7’ 48.1” 

Longitude ‐ E 950 9’ 17.9” 

Elevation 590 m 

 Radha Village 

Latitude ‐ N 280 9’ 24.6”

Longitude ‐ E 950 3’ 4”

Elevation 246 m 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                           C/o Rural Link Roads under Rural Works Sub‐Division � Pangin, SPA (2008‐09) 

54 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

55 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD DECEMBER, 2009 Job/Scheme Number ­ 5054 R&B (SPA) / Project � Roads and Bridges / District � East Siang 

Name of the Project: Improvement of various roads and bridges under Ruksin Sub­Division 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > 

Name of the District:  East Siang  No. of villages to be benefited:  16 Villages. 

Project Job/Scheme Number:  5054 R&B (SPA)  Total combined population to be benefited  10,000 Nos. 

Executing Department:  Public Works Department (PWD)  Names of the benefiting villages: Ruksin, Rayang, Ngorlung, Niglok, Mikong, Mangnang, Bilat, Mirem, Miglung, Remi, Ledum, Sille, Rani, Sika Tode, Sika Bamin, Oyan etc. 

Executing Circle:  Boleng Circle, PWD  4. Project Status as observed during Field Visit > 

Executing Division:  Pasighat Division, PWD  Date of the Field Visit  February 8, 2010 

Executing Sub Division:  Bilat Sub Division, PWD  Financial Achievement as on December, 2009 (Rs in lakh)  90.00 

2. Project Particulars >  % of Financial Progress  100% as per(Annexure­I) Date of Sanction:  March 3, 2009  Physical Progress  As per Annexure­II Cost of the Project (Rs in Lakh):  90.00  Field Observations  As per Annexure­III Means of Finance :(Rs in Lakh):  5. GPS Readings/LatLong:  As per Annexure­IV Central Share (90%):  81.00  6. Current Project Status: Completed 

State Share – Loan (10%):  9.00  7.  Number of attached Visuals/Photographs: 12 Date of Commencement of work:  March 5, 2009 

Date of Completion:  April 27, 2009 

Date of submission of U.C.  May 6, 2009 vide SE/BLG/WG­44/P/2009­10/08­09 

8. Comments/Observations: ­ 1 Km of the 16.19 Km long Mirem­Mikong­Jonai (MMJ) road (Rs. 13.76 lakh) and 2 Km of 10.28 km long Sika­Tode­Sika­Bamin (STSB) road (Rs. 28.49  lakh) has been  repaired and  the  rest amount has been  spent on  flood protection work on bridges at Peneng Korong and Sille Korong rivers on MMJ road. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

56 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

 Name of Project: Improvement of various roads and bridges under Ruksin sub­ division Job Scheme Number: 5054 R&B (SPA)  

Sr. No.  Items  Amount  (Rs. in lakh) 

 

1  Cost of Project  

90.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

81.009.00

3  Financial Achievement as on December, 2009  

90.00

4  % of progress (Item 3 / Item 2x100)  

100 %

 Comments on Progress: The project is complete and the work executed is satisfactory.  

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

57 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Improvement of various roads and bridges under Ruksin sub­ division Job Scheme Number: 5054 R&B (SPA)                                           (Rupees in Lakh) 

 

Details of estimates and sanction 

Work planned during the period up to  

December, 2009 

Work carried out up to the end of up to 

December, 2009 

Work planned during the period ending March, 2010(Project complete)  

Sl. No. 

Particulars of Major Items of 

Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount   (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 1  SH: Protection work 

over SILLE KORONG on MMJ road 

cum  a)Boulder apron: 979.13 b)E/work: 1008.10 

14.80 a)Boulder apron: 979.13 b)E/work: 1008.10 

14.80  a)Boulder apron: 979.13 b)E/work: 1008.10 

14.80    

2  SH: Protection work & approach filling  over Peneng Korong on MMJ road 

cum  a)Boulder apron: 726 b)Approach filling:1253.87 c)E/work: 1456 d)CC work:28.90 

30.35 a)Boulder apron: 726 b)Approach filling:1253.87 c)E/work: 1456 d)CC work:28.90 

30.35  a)Boulder apron: 726 b)Approach filling:1253.87 c)E/work: 1456 d)CC work:28.90 

30.35    

3  SH: Re‐WBM, pot holes repair at various location on MMJ road. 

km  (3‐4 Km) =1.00 

13.76 (3‐4 Km) =1.00  13.76  (3‐4 Km) =1.00  13.76    

4  SH: Re‐WBM, pot holes. Repair at various location on Sika Tode‐ Sika Bamin road. 

km  (7.835 – 9.935 Km)=2.1 

28.49 (7.835 – 9.935 Km)=2.1 

28.49  (7.835 – 9.935 Km)=2.1 

28.49    

5.  Add contingency    2.60 2.60  2.60  TOTAL >    90.00    90.00    90.00     

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

58 

 Annexure ­ III 

FIELD VISIT OBSERVATIONS Name of Project: Improvement of various roads and bridges under Ruksin sub­ division Job Scheme Number: 5054 R&B (SPA) Type/Category of the Project:  

Sl. No. 

Particulars  Observations / Comments 

1  Comments on physical progress as observed on the date of the visit (comments may be made here on  such aspects  as overall progress vis‐à‐vis  the  plan,  technical  supervision  by  the  Departmental Engineers, arrangement for machinery, etc.) 

The work is mainly repair works of 1 Km on MMJ road and 2 Km on STSB  road and  flood protection and approach work of  two bailey bridges on rivers Sille Korong and Peneng Korong. The works are complete physically. 

2  Comments on other quality  control measures  such as arrangement for  quality  testing,  maintenance  of  Material  Quality  Control Register at the site, etc. 

No Quality Control register was maintained.  

3  Special  Observations  /  Comments,  if  any,  with  regard  to  the Project’s  background,  its  physical  progress,  quality,  operational issues, etc. not covered above 

The  repair  works  on  two  stretches  of  road  are  satisfactory. However,  the  protection  works  particularly  on  Sille  Korong  has been done on an adhoc basis. The protection works have been done unscientifically � no HFL and other hydrological data are available.  

4  Likely benefits of the Project upon completion (number & names of the  benefiting  villages,  estimated  size  of  the  benefited  population, change in economic status or quality of life, etc. 

The MMJ and STSB roads are very  important roads which provide connectivity  between  different  villages.  The  MMJ  road  provides interstate  connectivity with  Assam  at  Jonai  and  is  the  only  road connecting the new Industrial Area at Niglok. 

5  Difficulties, if any, being experienced in completing the Project  No difficulties faced while executing the work. 6  Suggestion/s  for  Improvement  (for  speeding up  implementation, 

addressing  the  difficulties,  if  any, maximizing  the  project  benefits, etc.) 

1. Work  was  executed  through Works  Orders  and  a  total  of  31 contractors were engaged for the project. 2. Works should be executed through the tendering process. 3.  The  two  bailey  bridges  over  Peneng  Korong  and  Sille  Korong need to be replaced by RCC bridges and the entire length of both the MMJ and STSB roads need widening and repairs. 

Roads and Bridges 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

59 

Annexure ­ IV 

GPS READINGS/LATLONG � GPS SITE MAPS 

 1) 0 point MMJ Road 

Latitude – N 270 57’ 21.8” Longitude – E 950 12’ 15.8”

 2) Bailey bridge on Sille Korong 

Latitude – N 270 54’ 23.4” Longitude – E 950 13’ 57.9”

 3) Bailey bridge on Peneng Korong 

Latitude – N 270 56’ 02.3” Longitude – E 950 13’ 51.4”

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

60 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

61 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                               Job / Scheme Number: 5054 R & B (SPA) Ruksin Sub‐Division, SPA (2008‐09) 

62 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

63 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Job/Scheme Number: 5054 R&B (SPA) / Project � Roads & Bridges / District � East Siang  

Name of the Project: Improvement & Extension of Mebo Township Road. 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > 

Name of the District:  East Siang District.  No. of villages to be benefited:  18 Villages 

Project Job/Scheme Number:  5054 R&B (SPA)  Total combined population to be benefited  20,000 Nos. 

Executing Department:  Public Works Department (PWD)  Names of the benefiting villages: Mebo Township & surrounding villages like Darne, Mebo etc. 

Executing Circle:  Boleng Circle  4. Project Status as observed during Field Visit > 

Executing Division:  Pasighat Division PWD  Date of the Field Visit  February 12, 2010 

Executing Sub Division:  Mebo Sub – Division PWD  Financial Achievement as on December, 2009 (Rs in Lakh)  85.00  

2. Project Particulars >  % of Financial Progress  100% (Annexure­I) Date of Sanction:  March 27, 2009  Physical Progress  As per Annexure­II Cost of the Project (Rs in Lakh):  85.00  Field Observations  As per Annexure­III Means of Finance :(Rs in Lakh):  5. GPS Readings/LatLong:  As per Annexure­IV Central Share (90%):  76.50  6. Current Project Status: Completed 

State Share – Loan (10%):  8.50  7.  Number of attached Visuals/Photographs: 4 Date of Commencement of work:  January 5, 2009 

Date of Completion of work:  April 29, 2009 

Date  of  submission  of  utilization certificate 

May 06, 2009 vide SE/BLG/WG­44/P/2009­10/08­09 

8.  Observations/Suggestions:  ­  The  original  estimate was  for  repair  of  roads  in patches with WBM I, II & III & carpeting, embankment of 1.59 Km & boulder crated wall.  But  the  works  executed  include  RCC  culverts,  CC  drains  &  wing  walls  by excluding  WBM­II  &  reduction  in  other  works  like  embankment,  WBM­III  & blacktopping. There is a need for proper planning in preparation of estimates and scrutiny before execution. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

64 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project:  Improvement and Extension of Mebo Township Road.  Job Scheme Number: 5054 R & B (SPA)  

Sr. No.  Items  Amount  (Rs. in lakh) 

 

1  Cost of Project  

85.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

76.508.50

3  Financial Achievement as on December, 2009  

85.00

4  % of progress (Item 3 / Item 2x100)  

100 %

 Comments on Work/Progress: The project is complete and the works executed is satisfactory. 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

65 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project:  Improvement and Extension of Mebo Township Road. Job Scheme Number: 5054 R&B (SPA) 

                            (Rupees in lakh) 

Details of original estimates & sanction 

Work planned during the period up to  December, 2009 

Work carried out up to the end of  

December, 2009 

Work planned during the period ending March, 2010 (Not applicable as the project is complete) 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount 

(1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 

1  Jungle cutting  Km  1.59 0.86 1.59  0.86 1.59 0.86  2  Earthwork in Embankment  Km  1.59 9.62 0.30  5.30 0.30 5.30  3  WBM I  Km  0.75 6.87 0.75  6.87 0.75 6.87  4  WBM II  Km  3.00 17.18 ‐‐‐‐  ‐‐‐‐ ‐‐‐‐ ‐‐‐‐  5  WBM III  Km  3.00 17.58 2.30  16.46 2.30 16.46  6  Black Topping  Km  3.00 27.18 2.30  27.10 2.30 27.10  7  RCC Box Culvert – 2 mtr span  Nos.  ‐‐‐‐ ‐‐‐‐ 2.00  8.20 2.00 8.20  8  RCC Box Culvert – 1 mtr. span  Nos.  ‐‐‐‐ ‐‐‐‐ 3.00  6.50 3.00 6.50  9  C.C Drain  Mtr  ‐‐‐‐ ‐‐‐‐ 210  5.80 210 5.80  10  Boulder crated wall  Mtr.  65.00 5.29 65.00  6.29 65.00 6.29  11  Wing wall  Nos.  ‐‐‐‐ ‐‐‐‐ 2.00  1.20 2.00 1.20  12  Add. contingencies @ 0.5%      0.42   0.42   0.42    

TOTAL >    85.00    85.00    85.00     

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

66 

Annexure ­ III FIELD VISIT OBSERVATIONS 

Name of Project: Improvement and Extension of Mebo Township Road.  Job Scheme Number: 5054 R&B (SPA) Type/Category of the Project:  

Sl. No. 

Particulars  Observations / Comments 

1  Comments on physical progress as observed on the date  of  the  visit  (comments may  be made  here  on such  aspects  as  overall  progress  vis‐à‐vis  the  plan, technical  supervision  by  the  Departmental Engineers, arrangement for machinery, etc.) 

The  project  has  been  completed  and  the  overall  quality  of  works  is  satisfactory. However, there is deviation from the original estimates/sanction of the actual works executed  on  ground.  Approvals  for  such  deviations  could  not  be  provided  by  the Department  to  the Third Party Monitors. The original estimates  included WBM­II of length 3 km and amount of Rs. 17.18 lakh. This was not executed. WBM­III execution was done for 2.30 km down from 3.0 km of original estimates and amount spent was Rs. 16.46 lakh down from Rs. 17.58 lakh. Earthwork in embankment was executed for only  0.30  km  whereas  the  original  estimates  were made  for  1.59  km.  Additional works executed were construction of 2 nos. RCC box culvert of 2m span and 3 nos. RCC box culvert of 3m span, CC drain of 210m length and 2 nos. wing walls. These works were executed within the overall budget of Rs. 84.58 lakh for the project. 

2  Comments on other quality control measures such as arrangement  for  quality  testing,  maintenance  of Material Quality Control Register at the site, etc. 

No Quality Control Register was maintained.  

3  Special  Observations  /  Comments,  if  any,  with regard  to  the  Project’s  background,  its  physical progress, quality, operational issues, etc. not covered above 

The wing wall constructed  for a culvert on Rake Korong  (Darne village)  is prone  to erosion. 

Roads & Bridges 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

67 

4  Likely  benefits  of  the  Project  upon  completion (number  &  names  of  the  benefiting  villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

Mebo  Town  is  an  Administrative  Sub­Divisional  Headquarter  covering  18  villages with a population of more than 20,000. This project is beneficial for the population of the township and its surrounding villages. 

5  Difficulties, if any, being experienced in completing the Project 

No difficulties were faced. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

(1) The execution of works was on Work Order basis and a  total of 18  contractors were engaged in this project. 

(2) There is an urgent need for introduction of tendering process in the awarding of such works. 

(3)  More  frequent  supervision  is  required  during  surfacing/carpeting  and maintenance of proper super elevation of roads. 

 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

68 

Annexure ­ IV GPS READINGS/LATLONG � GPS SITE MAPS 

Readings were taken at several points during inspection: 1) At Mebo Charali (1.48 Km) 

Latitude ‐ N 280 9’ 59.3” Longitude ‐ E 950 24’ 29.6” Elevation 325 m above MSL 

  At end point of 1.48 Km Latitude ‐ N 280 10’ 7.6” Longitude ‐ E 950 25’ 11.8” Elevation 399m 

2) At Residence of Ex Minister Latitude ‐ N 280 10’ 4.3” Longitude ‐ E 950 25’ 33” Elevation 446 m 

  At End Point Latitude ‐ N 280 10’ 7” Longitude ‐ E 950 25’ 36” Elevation 463 m 

3) Near BDO Office Latitude ‐ N 280 9’ 58.1” Longitude ‐ E 950 15’ 34.3” Elevation 427m 

4) At Education Quarter Road (280 m) Latitude ‐ N 280 9’ 52.6” Longitude ‐ E950 25’ 24.4” Elevation 393 m 

Monitoring Report for the period ending December, 2009 

NEDFi, Itanagar                                                                                            Job / Scheme Number: 5054 R&B (SPA) Mebo Township Road, SPA (2008‐09) 

69 

PICTORIAL/VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 70 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER 2009  Project � Building Infrastructure Schemes for Education & Health Departments � Nari Koyu / District � East Siang 

Name of the Project: Building Infrastructure Schemes for Education & Health Departments under Nari­Koyu Sub Division. 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > Name of the District:  East Siang  No. of villages to be benefited:  30 Villages Executing Department:  Water Resources Department (WRD)  Total combined population to be benefited  9968 Nos. Executing Circle:  Water Resources Circle, Itanagar  Names of the benefiting villages: Koyu, Rina, Sipo, Rotte, Saku, Kadu, Jote, Tabiripo, Lipin, 

Maney, Korang, Tene, Sido, Sipu, Kakki, Depi, Moli, Namey, Nari, Lumpo, Telam, New Telam, Old Deka, New Deka, Pam, Seren, New Seren, Potte, Detak & nearby villages of Assam 

Executing Division:  Water Resources Division, Pasighat  4. Project Status as observed during Field Visit > 

Executing Sub Division:  Water Resources Sub‐Division, Pasighat  Date of the Field Visit  February 9, 2010 2. Project Particulars >  Financial Achievement as on December, 2009 (Rs in lakh)  167.80 Date of Sanction:  March 25, 2009  % of Financial Progress  41.95% (Annexure­I) Cost of the Project (Rs in lakh):  400.00  Physical Progress  As per Annexure­II Means of Finance: (Rs in lakh):  Field Observations  As per Annexure­III Central Share (90%):  360.00  5. GPS Readings/LatLong:  As per Annexure­IV State Share – Loan (10%):  40.00  6. Current Project Status: On­going. 1 unit of SPT­III Medical Officer�s quarter & SPT­II 

Medical Staff quarter of Telam PHC & 1 unit of SPT­II (Double Unit) Teacher�s Quarter of Koyu Secondary School has been completed. 

Date of Commencement of work:  March 30, 2009  7.  Number of attached Visuals/Photographs:26 Planned Date of Completion:  April 15, 2010 Likely Date of submission of U.C.  April, 2010 

8.  Special  Comments/Suggestions  :­  (1) Design  changes  in  teachers  quarters  at  Koyu Secondary School without proper approvals � (5 nos. SP Type­II double unit changed to 4 double units & 2 single units) ­ attributed to non­availability of land; (2) Design change at Telam PHC  ­ one no. SP Type II double unit for Medical staff converted to two single units and one transferred to Nari; (3) Transfer of 1 no. SP Type­III quarter for Medical Officer from Telam to Nari; (4) No work has been done on the playground of Telam H.S. School; (5) Flow of fund to be maintained to expedite completion of Girl�s Hostel�Telam H.S. School. 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 71 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project: Building Infrastructure Schemes for Education & Health Departments � Nari Koyu   

Sr. No.  Items  Amount  (Rs. in lakh) 

1  Cost of Project  400.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

360.0040.00

3  Financial Achievement as on December, 2009  

167.80

4  % of progress (Item 3 / Item 2x100)  

41.95%

 Comments on Progress: Work rate has to be increased substantially to complete the remaining sub­projects by 15.04.2010. (1) The progress of construction of Teachers quarters for Koyu Secondary School is very slow. The approval was for 5 nos. SP Type­II (double unit). But this has been changed to 4 double units and 2 single units. One double unit has been completed, while about 70% has been achieved on another. Work has just started on one double unit and two single units. Work on one more double unit is yet to start. The reason attributed for the change in design and slow progress is �non­availability of land� � however, this issue was not referred to the Deputy Commissioner for redressal; (2) One out of 2 Units of SPT­III quarters for Medical Officer�s of Telam PHC has been completed & the other is stated to be shifted to Nari; (3) Out of 2 Units of SPT­II (Double Unit) quarters for Medical Staff of Telam PHC one has been completed and design change has been proposed to convert the remaining double unit  to  two single units � one at Telam and  the other shifted  to Nari  (work on both yet  to start);  (4) No work on  the football ground of  the Telam H.S. School has been done  till  the date of visit  i.e. 09.02.2010; (5) No authorizations/approvals were produced regarding design changes and shifting of quarters for Medical Staff from Telam to Nari. 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 72 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Building Infrastructure Schemes for Education & Health Departments � Nari Koyu                     (Rupees in lakh) 

Details of Sanction  Work planned during the period up to December, 

2009 

Work carried out up to the end of  

December, 2009 

Work planned during the period up to April, 2010. 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount (1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 1  Telam H.S. School       a)  Development of football ground   Nos.  1 39.88 15%  5.98 15% 5.98 85% 33.90 b)  C/o Girl’s Hostel  Nos.  1 119.38 Procurement of 

materials foundation & 

columns 

42.40 Procurement of materials foundation 

& columns 

42.40 Super Structure (100%)

76.98 

2  C/o SPT‐II Teacher’s Quarter‐Koyu Secondary School 

Nos.  5 47.53 2 qrts. complete & Procurement of materials & C/o foundation for other 3 qrts 

32.00 2 qrts. complete & Procurement of materials & C/o 

foundation for other 3 qrts. 

32.00 Super Structure of 3 qrts (100%)

15.53 

3  Telam P.H.C.       a)  Extension of PHC building with 

Kitchen & Dinning‐  Nos.  1 41.83 64.36%  26.92 64.36% 26.92 35.64% 14.91 

b)  C/o SPT‐III Medical Officer’s Quarter  

Nos.  2 10.99 Complete  10.99 Complete 10.99 Complete (100%)

‐‐‐‐‐‐‐‐ 

c)  C/o SPT‐II Medical Staff’s quarter  

Nos.  2 19.01 Complete  19.01 Complete 19.01 Complete (100%)

‐‐‐‐‐‐‐‐ 

4  C/o Girl’s Hostel – Seren Middle School 

Nos.  1 119.38 Procurement of materials, 

foundation & columns 

28.50 Procurement of materials, foundation 

& columns 

28.50 Super Structure (100%)

90.88 

5  Add. Contingencies @ 0.5%    2.00   2.00 2.00  TOTAL >    400.00    167.80    167.80    232.20 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 73 

Annexure ­ III FIELD VISIT OBSERVATIONS 

Name of Project: Building Infrastructure Schemes for Education & Health Departments � Nari Koyu Type/Category of the Project:  

Sr. No. 

Particulars  Observations / Comments 

1  Comments on physical progress  as observed on  the date of  the visit  (comments may  be made  here  on  such  aspects  as  overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

Physical progress is tardy. No progress was achieved regarding development of the football ground of Telam H.S. School. 1 out of 5 units of SPT­II Teacher's quarters of Koyu Secondary School has been completed; another is 70% complete. 

2  Comments on other quality control measures such as arrangement for  quality  testing,  maintenance  of  Material  Quality  Control Register at the site, etc. 

No Q.C. register was maintained. 

3  Special  Observations  /  Comments,  if  any, with  regard  to  the Project’s  background,  its  physical  progress,  quality,  operational issues, etc. not covered above 

Proper curing is advised regarding building works. 1 out of 2 units of SPT­III Medical Officer's quarter of Telam PHC & half of one unit of SPT­II quarter for Medical Staff ­ Telam PHC were shifted to Nari for which no authorizations could be shown. 

4  Likely benefits of the Project upon completion (number & names of  the  benefiting  villages,  estimated  size  of  the  benefited population, change in economic status or quality of life, etc. 

30  villages  will  be  benefited  from  this  project.  The  works  are mostly social benefit schemes. 

5  Difficulties, if any, being experienced in completing the Project  No difficulty was experienced. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation, addressing the difficulties, if any, maximizing the project benefits, etc.) 

1) The Authority should bring out a blue print for the playground development as per standards. 2) Tendering process should be introduced for good quality of work and early completion. 3) Decisions of shifting parts of the scheme like buildings should be through proper authorizations. 

Building & Earth Work 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 74 

Annexure ­ IV GPS READINGS/LATLONG � GPS SITE MAPS 

1) Football Ground of Telam H.S. School, Telam               Latitude ‐ N 270 46’ 38.4”               Longitude ‐ E 950 0’ 33.8”               Elevation 131 m 

2) Girl�s Hostel of Telam H.S. School, Telam               Latitude – N 270 50’ to 280 5’               Longitude ‐ E 940 54’ to 950 10’ 

3) SPT­II (Double Unit) Teacher�s Quarter of Koyu Secondary School  At Unit­1 

              Latitude ‐ N 270 07’ 34.6”               Longitude ‐ E 940 56’ 52.4”               Elevation 309 m 

At Unit­2               Latitude ‐ N 270 57’ 35.4”               Longitude ‐ E 940 56’ 53.3”

4) SPT­III Medical Officer�s Quarter at Telam P.H.C.               Latitude ‐ N 270 46’ 32.7”               Longitude ‐ E 950 0’ 25.20”               Elevation 122 m 

5) Extension of P.H.C. Building � Telam               Latitude ‐ N 270 46’ 28.7”               Longitude ‐ E 950 0’ 24.3”               Elevation 125 m 

6) SPT­II Medical Staff�s Quarter at Telam P.H.C.               Latitude ‐ N 270 46’ 30”               Longitude ‐ E 950 0’ 24”               Elevation 125 m 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 75 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (Football Ground � Telam H.S. School) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 76 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (Girl�s Hostel � Telam H.S. School) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 77 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (SPT­II {Double Unit} Teacher�s Quarter � Koyu Secondary School) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 78 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (SPT­III Medical Officer�s Quarter � Telam P.H.C.) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 79 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (Extension of P.H.C Building � Telam) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 80 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (SPT­II Medical Staff�s Quarter � Telam P.H.C.) 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                           Building Infrastructure Schemes for Education & Health Departments under Nari Koyu Sub Division 81 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT (Girl�s Hostel � Seren Middle School) 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 82 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Project � Development in Sports at Mebo Town / District � East Siang 

Name of the Project: Improvement & Infrastructure development in Sports at Mebo Town 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > Name of the District:  East Siang  No. of villages to be benefited:  18 villages Executing Department:  Block Development Officer, Mebo 

(Rural Development Department) Total combined population to be benefited  11,000 Nos. 

Executing Circle:    Names of the benefiting villages: Major villages : Mebo, Darne, Ayang, Sillak, Ngopu Executing Division:    4. Project Status as observed during Field Visit > Executing Sub Division:    Date of the Field Visit  February 12, 2010 2. Project Particulars >  Financial Achievement as on December, 2009  (Rs in lakh)  154.18 Date of Sanction:  March 24, 2009  % of Financial Progress  77% (Annexure­I) Cost of the Project (Rs in Lakh):  200.00  Physical Progress  As per Annexure­II Means of Finance :(Rs in Lakh):  Field Observations  As per Annexure­III Central Share (90%):  180.00  5. GPS Readings/LatLong:  As per Annexure­IV State Share – Loan (10%):  20.00  6. Current Project Status: Ongoing Date of Commencement of work:  April 21, 2009  7.  Number of attached Visuals/Photographs: 8 Likely Date of Completion:  March 31, 2010  8. Special Comments/Observations/Suggestions/recommendations, if any  :­ (1) Civil 

works should be executed by Technical Departments like PWD etc. (2) Tender process should be introduced in place of work order system of awarding works  to  multiple  contractors.  In  this  project  8  nos.  of  contractors  have  been engaged. (3) The playground will have to be redeveloped to make it fit for sports activity. 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 83 

 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project: Improvement & Infrastructure development in Sports at Mebo Town. Sr. No.  Items  Amount  

(Rs. in lakh)  

1  Cost of Project  

200.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

180.0020.00

3  Financial Achievement as on December, 2009  

154.18

4  % of progress (Item 3 / Item 2x100)  

77%

 Comments on Progress: Progress is slow. 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 84 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Improvement & Infrastructure development in Sports at Mebo Town.                             (Rupees in lakh) 

Details of Sanction  Work planned during the period up to December, 2009 

Work carried out up to the end of 

December, 2009 

Work planned during the period 

ending  March 31, 2010 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount 

(1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 

1  Sport auditorium at Mebo (completed) 

  45.96 45.96 45.96 Complete ‐‐‐‐‐

2  Retaining wall (completed)    38.39 38.39 38.39 Complete ‐‐‐‐‐3  Leveling of ground 

(completed)   41.36 41.36   41.36 Complete ‐‐‐‐‐

4  VIP gallery (incomplete)    21.37 16.45   16.45 4.925  Open gallery     24.82 ‐‐‐‐‐   ‐‐‐‐‐ 24.826  M.S gate & open gallery    6.23 ‐‐‐‐‐   ‐‐‐‐‐ 6.237  CC approach    3.75 ‐‐‐‐‐   ‐‐‐‐‐ 3.758  Chain link framing    3.68 ‐‐‐‐‐ ‐‐‐‐‐ 3.689  Carriage of sand, boulder    9.99 7.57 7.57 2.4210  Carriage of materials like 

cement, rod from Pasighat to Mebo against above 

  3.18 3.18 3.18 ‐‐‐‐‐

11  Contingency charges    1.27 1.27 1.27 ‐‐‐‐‐TOTAL >    200.00    154.18    154.18    45.82 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 85 

Annexure ­ III FIELD VISIT OBSERVATIONS 

Name of Project: Improvement & Infrastructure development in Sports at Mebo Town. Type/Category of the Project:  

Sl. No.  Particulars  Observations / Comments 1  Comments on physical progress as observed on the date of the 

visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

Progress is satisfactory so far as civil works are concerned. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

No  Q.C.  register  is maintained.  Quality  of  civil  works  is  slightly  affected because of lack of curing. 

3  Special Observations / Comments,  if  any, with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

The principal item of work i.e. development of playground as per standards has not been done. It is reported that an amount of Rs. 41.36 lakh has been spent  on  leveling  the playground. However,  the playground  is  completely unfit for any sports activity as it is full of stones and boulders. The leveling has not been done properly and there is a visible slope. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

18 villages are likely to be benefited. 

5  Difficulties, if any, being experienced in completing the Project  The  project  is  being  executed  by  the Block Development Officer who  has only  one  junior  technical  person  in  EO  (RE)  for  supervision  of  such  an important and costly project. As the EO (RE) has many other assigned tasks, he is not able to dedicate enough time for supervision of works. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

(1) The EO (RE) has been advised to redevelop the playground. (2)  Tendering  process  for  award  of works  should  be  introduced.  In  this project 8 nos. of contractors were engaged through work order basis. 

Sports 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 86 

Annexure ­ IV GPS READINGS/LATLONG � GPS SITE MAPS 

 

Latitude ‐ N 280 10’ 0.6”

Longitude ‐ E 950 25’ 16.7” 

Evaluation 413 m above MSL 

 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 87 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December 2009 

NEDFi, Itanagar                                                                           Improvement & Infrastructure development in Sports, Mebo Town SPA (2008‐09) 88 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 89 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009 Project � Development in Health and Education at Mebo / District � East Siang 

Name of the Project: Improvement and Infrastructure Development in Education and Health � Mebo 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > Name of the District:  East Siang  No. of villages to be benefited:  18 Villages Name of the Department  Rural Development (RD)  Total combined population to be benefited  11,000 Nos. Executing Department:  Block Development Officer, 

Mebo (RD Department) Names of the benefiting villages: Major villages – Mebo, Motum, Sigar, Sillik, Ngopu 

Executing Circle:  ‐  4. Project Status as observed during Field Visit > Executing Division:  ‐  Date of the Field Visit  February 12, 2010 Executing Sub Division:  ‐  Financial Achievement as on  December, 2009 (Rs. in lakh)  108.57 2. Project Particulars >  % of Financial Progress  94.41 % (Annexure­I) Date of Sanction:  March 24, 2009  Physical Progress  As per Annexure­II Cost of the Project (Rs in Lakh):  115.00  Field Observations  As per Annexure­III Means of Finance :(Rs in Lakh):  5. GPS Readings/LatLong:  As per Annexure­IV Central Share (90%):  103.50  6. Current Project Status: Ongoing State Share – Loan (10%):  11.50  7.  Number of attached Visuals/Photographs: 12 Date of Commencement of work:  April 2, 2009 Likely Date of completion of work  March 31, 2010 

8. Comments/suggestions: (i) Tender process of awarding works should be introduced. (ii)  Block  has  many  other  assigned  works.  Civil  works  of  this  nature  should  be executed  by  Technical  Department  like  PWD.  (iii)  Project conceptualization/formulation  has  been  very  poor.  The  hostels  of  Mebo  Higher Secondary School are  in a dilapidated condition while  the boundary walls have been repaired. The hostels need urgent repairs. 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 90 

 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project: Improvement and Infrastructure Development in Education and Health � Mebo. Sr. No.  Items  Amount  

(Rs. in lakh)  

1  Cost of Project  

115.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

103.5011.50

3  Financial Achievement as on December 2009  

108.57

4  % of progress (Item 3 / Item 2x100)  

94.41 %

 Comments on Progress: The project is incomplete. The remaining works is for development of football ground for Mebo H.S. School. 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 91 

Annexure � II PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Improvement and Infrastructure Development in Education and Health � Mebo.                                   (Rupees in lakh) 

Details of Sanction  Work planned during the period up to December, 2009 

Work carried out up to the end of December, 2009 

Work planned during the period ending March 31, 2010 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount (1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) A)  CHC, Mebo                   1  C/o of SPT Morgue    5.2   5.2 5.2 Complete ‐‐‐‐‐ 2  Retaining wall with earth filling     18.02   18.02 18.02 Complete ‐‐‐‐‐ 3  C.C. Step    0.20   0.20   0.20 Complete ‐‐‐‐‐ 4  Drain    0.89   0.89   0.89 Complete ‐‐‐‐‐ 5  Culvert    3.50   3.50   3.50 Complete ‐‐‐‐‐ B)  ME School, Motum         1  Approach gate    5.13   5.13   5.13 Complete ‐‐‐‐‐ 2  RCC fencing    19.69   19.69 19.69 Complete ‐‐‐‐‐ C)  HS School, Mebo       1  Retaining wall & approach    13.69   13.69 13.69 Complete ‐‐‐‐‐ 2  RCC fencing & gate    25.16   25.16 25.16 Complete ‐‐‐‐‐ 3  Development of football ground    6.43   ‐‐‐‐‐‐ ‐‐‐‐‐‐‐ 6.43 4  Internal electrification    4.95   4.95 4.95 Complete ‐‐‐‐‐ D)  Primary School, Sigar       1  Renovation of School building    9.51   9.51 9.51 Complete ‐‐‐‐‐ E)  Others       1  Carrying of materials from Pasighat 

to Mebo against above works.   1.89   1.89 1.89 ‐‐‐‐‐ 

2  Contingency charges    0.74   0.74 0.74 ‐‐‐‐‐ TOTAL >    115.00    108.57    108.57    6.43 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 92 

Annexure ­ III FIELD VISIT OBSERVATIONS 

Name of Project: Improvement and Infrastructure Development in Education and Health � Mebo. Type/Category of the Project:  

Sl. No.  Particulars  Observations / Comments 1  Comments on physical progress as observed on the date of the 

visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

Physical  progress  is  satisfactory.  However,  with  only  one  junior technical  person  in  the  rank  of  EO  (RE)  for  the  entire  Block  � supervision  has  suffered. Better  supervision would  have  ensured better quality. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

No Q.C. register is maintained. 

3  Special Observations / Comments,  if  any, with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

Project  conceptualization/formulation  has  been  very  poor.  The hostels  of  Mebo  Higher  Secondary  School  are  in  a  dilapidated condition while the boundary walls have been repaired. The work is  spread  over  different  places  viz.  CHC  �  Mebo,  ME  School  at Motum, HS School Mebo, Primary school at Sigar. There is only one EO (RE) in the Block. With this manpower strength, the quality will suffer. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

18 villages. The works are important social benefit schemes.  

5  Difficulties, if any, being experienced in completing the Project  One  technical  person  in  the  entire  Block  to  execute  extra  work under special program is quite inadequate. 

6  Suggestion/s  for  Improvement  (for  speeding  up implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

Works of this nature should be executed by Technical Departments. Tendering  system  for  awarding  works  should  be  introduced  in place  of  the  work  order  system  to  multiple  contractors  being followed at present. This project is being executed by 9 contractors. 

Health & Education 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 93 

Annexure ­ IV 

GPS READINGS/LATLONG � GPS SITE MAPS 

(1) CHC, Mebo  

Latitude N 280 10’ 1.9”

Longitude E 950 25’ 21.6” 

Elevation 416 m 

(2) Mebo, H.S. School 

Latitude N 280 9’ 45.7” 

Longitude E 950 25’ 21.4” 

Elevation 366 m  

(3) Motum, M.E. School 

Latitude N 280 4’ 5.6” 

Longitude E 950 25’ 48.2”

Elevation 162 m  

(4) Sigar, Primary School 

Latitude N 280 4’ 31.4”

Longitude E 950 25’ 47.8”

Elevation 140 m  

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 94 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 95 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                              Improvement & Infrastructure Development in Education and Health � Mebo SPA (2008‐09) 96 

PICTORIAL / VISUAL VIGNETTES OF THE PROJECT 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 97 

SUMMARY SHEET PROJECTS UNDER SPECIAL PLAN ASSISTANCE (Normal) for ANNUAL PLAN 2008­09 

MONITORING REPORT FOR THE PERIOD ENDING DECEMBER, 2009  Job/Scheme Number ­ PHE/Sectt­35/2009(Scheme) / Project � Improvement of Water Supply Network / District � East Siang 

Name of the Project: Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township. 

Name of Scheme: SPA (Normal) Annual Plan 2008­09 

1. Project Details >  3. Social Benefits from the project > Name of the District:  East Siang  No. of villages to be benefited:  Pasighat Market area mainly Project Job/Scheme Number: 

PHE/Sectt‐35/2009(Scheme) dated. 30/03/09 

Total combined population to be benefited  8,540 Nos. 

Executing Department:  PHE & WS Department  Names of the benefiting villages: Pasighat Market area Executing Circle:  Not Available  4. Project Status as observed during Field Visit > Executing Division:  PHE and WS Division, Pasighat  Date of the Field Visit  February 11, 2010 Executing Sub Division:  PHE and WS Sub‐ Division, Pasighat  Financial Achievement as on  December, 2009 (Rs in lakh)  50.00 2. Project Particulars >  % of Financial Progress  100% (Annexure­I) Date of Sanction:  March 30, 2009  Physical Progress  As per Annexure­II Cost of the Project (Rs in Lakh):  50.00  Field Observations  As per Annexure­III Means of Finance:(Rs in Lakh):  5. GPS Readings/LatLong:  As per Annexure­IV Central Share (90%):  45.00  6. Current Project Status: Completed State Share – Loan (10%):  5.00  7.  Number of attached Visuals/Photographs: 4 Date of Commencement of work:  March 30, 2009 Date of Completion of work:  June 30, 2009 

Date of submission of utilization certificate  July 23, 2009 

8.  Special  Comments/Observations/Suggestions/recommendations,  if  any:  ­ The project  is  complete. The Department  has  done  commendable work  and  it  is  as good as a new scheme. The scheme has been  found  to be very beneficial  for  the people  and  business  concerns  in  Pasighat  Market  area.  Tendering  system  for awarding works should be introduced in place of the present work order system. 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 98 

Annexure � I 

CONSOLIDATED FINANCIAL PROGRESS 

Name of Project: Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township. Job Scheme Number: PHE/Sectt­35/2009(Scheme) dated 30/03/09  

Sr. No.  Items  Amount  (Rs. in lakh) 

 

1  Cost of Project  

50.00

2  Means of Finance: (a) Central Govt. (90%) (b) State Govt. (10%) 

45.005.00

3  Financial Achievement as on December, 2009  

50.00

4  % of progress (Item 3 / Item 2x100)  

100%

 Comments on Progress: The project has been completed and it is observed that satisfactory work was done. 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 99 

Annexure � II 

PHYSICAL ­ FINANCIAL � CUMULATIVE  

Name of Project: Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township. 

Job Scheme Number: PHE/Sectt­35/2009 dated 30/03/09 

                         (Rupees in lakh) 

Details of Sanction  Work planned during the period up to December, 

2009 

Work carried out up to the end of December, 2009 

Work planned during the period ending March, 2010 (Not applicable as the project is complete) 

Sr. No. 

Particulars of Major Items of Work 

Unit 

Quantity  Amount  Quantity  Amount  Quantity  Amount  Quantity  Amount 

(1)  (2)  (3)  (4)  (5)  (6)  (7)  (8)  (9)  (10)  (11) 

1)  Procurement of G.I. Pipe (M)  Rmt.     

a  80 mm dia  Rmt.  1400 1400  1400  

b  65 mm dia  Rmt.  100 100  100  

c  50 mm dia  Rmt.  400 400  400  

d  40 mm dia  Rmt.  1300 1300  1300  

e  32 mm dia  Rmt.  300 300  300  

f  25 mm dia   

Rmt.  500

11.40

500 

11.40

500

11.40

 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 100 

2)  Dismantling & re­laying of existing G.I. Pipe & laying of new G.I. Pipe. 

Rmt.     

a  80 mm dia.  Rmt.  500 500  500  

b  65 mm dia.  Rmt.  1150 1150  1150  

c  50 mm dia.  Rmt.  650 650  650  

d  40 mm dia.  Rmt.  950 950  950  

e  32 mm dia.  Rmt.  1050 1050  1050  

f  25 mm dia.  Rmt.  550 550  550  

g  20 mm dia.  Rmt.  475

2.65

475 

2.65

475

2.65

 

3)  Erection of P.S. over head tank capacity 62,500 ltrs. 

Job  1 no.  14.13 1 no.  14.13 1 no.  14.13  

4)  C/O Pump house  Job  1 no.  0.88 1 no.  0.88 1 no.  0.88  

5)  C/O RCC foundation for steel staging.  Job  1 job  0.97 1 job  0.97 1 job  0.97  

6)  Provision for G.I fittings   Job  1  job  9.37 1  job  9.37 1  job  9.37  

7)  Provision for Wheel valve  Job  1 job  4.06 1 job  4.06 1 job  4.06  

8)  Provision for T & P items.  Job  1 job  0.98 1 job  0.98 1 job  0.98  

9)  Provision for submersible pump/alternator/engine etc. 

Job  1 job  1.52 1 job  1.52 1 job  1.52  

10)  Exploration ground water (drilling).  Job  1 job  4.00 1 job  4.00 1 job  4.00  

TOTAL>    50.00    50.00    50.00     

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 101 

Annexure ­ III FIELD VISIT OBSERVATIONS 

Name of Project:  Improvement of existing distribution network of water supply at Pasighat Market area within Pasighat Township. Job Scheme Number: PHE/Sectt­35/2009(Scheme) dated 30/03/09 Type/Category of the Project:  

Sr. No.  Particulars  Observations / Comments 1  Comments on physical progress as observed on the date of the 

visit  (comments may be made here on  such  aspects  as overall progress  vis‐à‐vis  the  plan,  technical  supervision  by  the Departmental Engineers, arrangement for machinery, etc.) 

The project is complete. 

2  Comments  on  other  quality  control  measures  such  as arrangement  for  quality  testing,  maintenance  of  Material Quality Control Register at the site, etc. 

Q.C. Control register is not maintained. 

3  Special  Observations/Comments,  if  any,  with  regard  to  the Project’s background,  its physical progress, quality, operational issues, etc. not covered above 

The  noteworthy  observation  is  that  user  charges  are  being collected. The water  rate  being  collected  is  ­ Household Rs.100/­ p.m and Commercial per point Rs. 50 p.m.  No charge from stand. 

4  Likely  benefits  of  the  Project  upon  completion  (number  & names of the benefiting villages, estimated size of the benefited population, change in economic status or quality of life, etc. 

The scheme is a very beneficial scheme for a population of 8540 of mainly Pasighat Market area. 

5  Difficulties, if any, being experienced in completing the Project  No difficulties. 6  Suggestion/s  for  Improvement  (for  speeding  up 

implementation,  addressing  the  difficulties,  if  any, maximizing the project benefits, etc.) 

(1) The Sub Division was asked  for a  test report of water quality. Water quality is good i.e. within permissible limits. (2) Periodical checking of water quality is recommended. (3) Work  was  executed  through  work  orders  and  a  total  of  17 contractors were engaged for this project. (4)  Tendering  process  should  be  introduced  for  executing  such works to maintain quality. 

Water Supply 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 102 

 

Annexure ­ IV 

GPS READINGS/LATLONG � GPS SITE MAPS 

 

Water Tank 

Latitude ‐ N 280 3’ 37.6” Longitude ‐ E 950 19’ 55.3”

 

Monitoring Report for the period ending December 2009

NEDFi, Itanagar                                                                                                           Job/Scheme No. � PHE/Sectt‐35/2009(Scheme) SPA (2008‐09) 103 

PICTORIAL/VISUAL VIGNETTES OF THE PROJECT