ssm lil 0204 nrr

62
SIEMENS Nhon Trach 2 CCPP, Hamlet3, Phuoc Khanh Commune, Nhon Trach District. Dong Nai Province, Metnam LILAMA CORPORATION Nhon Trach 2 Power Project Nhon Trach District, Dong Nai Province Phuoc Khanh Village Viet Nam Attn.: Mr. Nguyen Van Hung Project Director NHON TRACH 2 CCPP Transportation of Condenser Dear Sir, CC: NT2 - PM SSM-M SLT SPO Siemens AG Energy Sector; Management Wolfgang Dehen Fossil Power Generation Division; Management Michael Suess Energy Solutions; Management: Rainer Hauenschild Energy Name lngo Richter Department E F ES EC 1 Telephone Fax E-mail Your reference Our reference Date MailNhonTrach-Site-Ll [email protected] vN 1 003/0301 //ssM-Lt L- 0204 NRR 2010-10-05 LILAMA-NT2-PMB RECEIVED t to:........1f. J.3.......... Date:....a5..4.9.119 As already announced, please find now the following documentation for the off-loading, transport, and installation of the condensor, for your information. - Method Statement: 8972 - MS - LT - 004, rev 0 Roll - off at the jetty and transport to site - Method Statement: 8972 - MS - | - 004. rev A On-carriage and set down - Method Statement: 8972 - MS - | - 003, rev B Installation of Condenser, incl. Risk Assessments - Time Schedule With best regards Siemens Aktiengesellschaft: Chairman of the Supervisory Board: Gerhard Cromme; Managing Board: Peter Loescher, Chairman, President and Chief Executive Officer; Wolfgang Dehen, Heinrich Hiesinger, Joe Kaeser, Barbara Kux, Hermann Requardt, Siegfried Russwurm, peter y. Solmssen Registered offices: Berlin and Munich, Germany; Commercial registries: Berlin Charlottenburg, HRB 12300, Munich, HRB 6684 WEEE-Reg.-No. DE 23691 322 scF 1212008 V08.12 Postial address: SiemensAG E E.NHT P.O. Box 10 10 63 63010 Offenbach am Main Office address: Kaiserleistr. 10 63067 Ofienbach am Main Tel: +49 (69) 807-0 Fax +49 (9131) 18 796913 e- art irhilr Pago I of I

Upload: huynhthanhtamptsc

Post on 25-Apr-2017

237 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ssm Lil 0204 Nrr

SIEMENS

Nhon Trach 2 CCPP, Hamlet3, Phuoc Khanh Commune, Nhon Trach District.Dong Nai Province, Metnam

LILAMA CORPORATIONNhon Trach 2 Power ProjectNhon Trach District, Dong Nai Province

Phuoc Khanh Village

Viet Nam

Attn.: Mr. Nguyen Van HungProject Director

NHON TRACH 2 CCPPTransportation of Condenser

Dear Sir,

CC: NT2 - PMSSM-MSLTSPO

Siemens AGEnergy Sector; Management Wolfgang DehenFossil Power Generation Division; Management Michael SuessEnergy Solutions; Management: Rainer Hauenschild

Energy

Name lngo RichterDepartment E F ES EC 1

TelephoneFaxE-mail

Your referenceOur referenceDate

MailNhonTrach-Site-Ll [email protected]

vN 1 003/0301 //ssM-Lt L- 0204 NRR2010-10-05

LILAMA-NT2-PMBRECEIVED

t to:........1f. J.3..........Date:....a5..4.9.119

As already announced, please find now the following documentation for the off-loading, transport, andinstallation of the condensor, for your information.

- Method Statement: 8972 - MS - LT - 004, rev 0Roll - off at the jetty and transport to site

- Method Statement: 8972 - MS - | - 004. rev AOn-carriage and set down

- Method Statement: 8972 - MS - | - 003, rev BInstallation of Condenser, incl. Risk Assessments

- Time Schedule

With best regards

Siemens Aktiengesellschaft: Chairman of the Supervisory Board: Gerhard Cromme;Managing Board: Peter Loescher, Chairman, President and Chief Executive Officer; Wolfgang Dehen, Heinrich Hiesinger,Joe Kaeser, Barbara Kux, Hermann Requardt, Siegfried Russwurm, peter y. SolmssenRegistered offices: Berlin and Munich, Germany; Commercial registries: Berlin Charlottenburg, HRB 12300, Munich, HRB 6684

WEEE-Reg.-No. DE 23691 322

scF 1212008 V08.12

Postial address:SiemensAGE E.NHTP.O. Box 10 10 6363010 Offenbach am Main

Office address:Kaiserleistr. 1063067 Ofienbach am MainTel: +49 (69) 807-0Fax +49 (9131) 18 796913

e- art

irhilr

Pago I of I

Page 2: Ssm Lil 0204 Nrr

SIEMENSTechnlcal Cont?act Conditlon ON CARRIAGE

Siemens

MS{ t(D.|

rrrffa- 4oaff E\ (Gttfu dqr udd od.g d r ffi I s wer - ununilon or 6 Mbns ail @actthid b tu vht .8'6 nJ'Buihn do tdibrH dl...|€ d !a nr! ht|. ls DiYdanl ol drnqos I r(hG

Documenl No.:

zEN000{63G&BEC01 9{0fl)O3Appendix 3 Rev.04

lndex / Date: 04 201G01-19

Contractor: FRACHT FI,VO AG, FKslsteltach/Germany

Proiect: Nhon Tach 2 CCPP, Vlotnam Customcr: SIEMENSPKI: NTlfll3(Ploigcl Codo)

MethodStatemcntNo.iE9T2-MS-LT-,004 lHev':0 Date: 24.00.10 Page: 1 ol 4

Prepared by Service Provlder'):ALE

Rcvbwed by Scrvlcs Provldor' ):ALE

R€letsed by scrvlce ProuoerAI F

Nams / ual€Salheesh Kumat

24 09 10

signalure

AName / uat€Er ttri.rn lr{itnlu;uz

14 09 lo

Signah,.c wan€/ IJale

Bcrrtard [tlr,ngt

1-l.r)9 l(J

shnatur€

Rcleasc<l by ContEctol: Released by Independent ExPort-r: ,9h^.

Ltr6ffi,p9524.09.10 t-;r

Name / Oale Signature

Rdcatcd rtwE99r'cyfu/ Rel?a!+PlfrEMEr{s: 2ndilqPdAgrs:!;"€fi2,,1% za YYT //r,// YTSTLL(A ffi2@r1,x Neme/oal€ -r4 ffit" rlt

rrade: // '/ //'/r/ Y c Component: Condenser Lower & Upper panHhwett t&2-Shipmenrf4

Scope ot work 9!gg!ggg trom Roll'off Jotty to conalructlon sltc by Trallcr

Lower & Upper part) & Hotwell 1&2 lron

Roll-rrfl .lett\ (sirrron rrver-Jctty) l(r Nlruu Trleh ll C(-PP \ite oftl(rlt!!19,1r9. !iclnartt

Sequencc of opcratlons:

1 Llrrve lhe trarler on the bafge into the requ[edoosition

6 The t(atlers slowly matleuver away lrom the barge lhe

desagnated roule

2 Ihe lrailer bed raised till contact the understde ol

tlre item arrd clear from its support7 Al oltloading area stool sLrpporls are posttioned and

trailer iack down

3 T ransoorl ;shtnq-s lre secuted I Remove all lashrngs lhen drrve the trallel out

4 Tire barge rs ballasted as requlred duflng lhe toll-oll 9 Dernobihi. ALE transportallon equlpments tlorn slle

5 Slowl5' dnve llre trailc.r ovet lhe litlk spart bndqe 10

Menagomant slructu|!;

Prolecl administrator / transportali0ncoordinalor

llr.r I laiar)! Lor

Slte superuisorlJq ri';,1 \,/ir, T.iln0

H&S oflicet l.-lLrr

Oul-of-hours conlact name

Oul-ol-hours phone no. i-|8'1 .llir )()-'-lR-

Who checks lhe uork?tt SeMce Povider and Conlractor may be same company-

o{bd bt tshl gEd d ag|alasd ol f, unt mo(H q d€j(F F rnl Ne tcEN4

Page 3: Ssm Lil 0204 Nrr

SIEMENSTechnical Contract Condition ON CARRIAGE

Document No.:

ZEN00(H)630-&BEG019 3

Ap dir 3 Rev.04

lndex / Date: 04 I 201GO1 -19

zl Contracting at SiemEns SPR TL discr€tion

Contractor: FRACHT FWO AG, D.Kelsterbach/Germany #Project: Nhon Trach 2 CCPP, Vlstnam Gustomer: SIEMENS

PKZ: NT 1003

(Proiec'l Code)

MethodStat€mentl.lo.:8972-MS-LT-004 lRev.:0 Ilate: 24.09.10 Page:2ot 4

(mark wlth a cross / add as necessary)

tr crane A Barge n Skidding system

! Floating crane tr Ocean-going vessel !E Heavy-load vehicle, road tr Ship lilting gear trD Heavy-load vehicle, rail A Lashings Dtr Ro-Ro operations tr Mobile lifting equipment

Must consideration be giv€n to third-party installations? (power / 9s / water i communications egulpment)

lf yes, state neoessary prccaulions:

Transfer in port of arrival

lnformation/data onfloating crane

Maximum load capacity': IModel': I NA

Name ol contractor': )' Cryies of: certilicate of last inspeclion / license / drawing ol lifting arrargement

Onto road vehlcles

Heavy-load vehicle Manuf acture/s descriptions:

Manufacture/s drawings:

Manufacturer's load lables: )NA

Drawings lor specificlransporlation operationwith information/data on:

arrx r:'neil B9r2-trl'SS-LT- OO4 Rei

SelFpropelled vehicle wilh power pack:

Lashing Positioning of Lashings (drawing): 8972-T01 , T03, T05, T07, T09,T10, T11,T13-Tl5

Load balance calculation acc. to VDI 2700, Dll,l/Euro-slandards or similar:

Siemens

MS.LT@I

Transmihat, reqodElion. Gsotrtrflt;m ildq edling ol Uis documol as well as ulilizRtitr d ils cmlenls andcmunicaiionlh€reol lo dhss $frNl eDras aulhffraaliil are prorilbled o|londds wi! bs Mld liable ld peyrenl ol dafrq€s Al tighiscreahcl by galdl granl d retFlalid o, a uilIty FEdel d dsiJn paldil are re*rtd

Page 4: Ssm Lil 0204 Nrr

SIEMENSTechnical Contract Condltion ON SITE TRANSPORT

Siemens

MS{T'0O4 pag€ 3

TEnsmllal. r€productio, dis*frnalioo and/o. €ditnlg ol lhis dcumeol as w€l as utilEalbn ol its Colents ildcomrunicalio lherel lo othcE wilhoul erpt6s illhona0on ole prohrbiled Ollsdcrs wil b€ hgld bbl€ lqpayrmt ol damages, Al dghts cGEtad bry Palcil 96nl d rcgislEtion ol a ulilty tDdd ot d6ign pglan afo

r6sryed

Document No.:zEN 069>'&BECO1g-fiXXX)3Appendix 4 Rev. (Xlndex / Date: 04 / 2010{1-19

Contractor: FRACHT FWO AG, D-Kelsterbach/Germany

Profect: Nhon Trach 2CCPP, Vletnam Customer: SIEMENSPKZ: NT 1003

(Projecl Code)

Method Statement No.:8972-MS-LT-004 Rev.: Date: 24.09.10 Page: 3 of 4

Indication on all necessary loadbearing parls, like loaddistribution devices. etc:

Drawings:

Statical calculations:

Certificates:

Mobile lifting equipmentManufacturer's descriptions, drawings and operating instruclions'

Loads imposed by lifting equipment in outdoor areas as wellas in or on

building structures.

Provisions for load distribution in outdoor areas as well as in or on building

structures, il necessary-

Description of setup and removal ol mobile lifting equipment and auxiliaries

such as: truck crane, buibing crane, rope hoists' etc.

Detalled Level 3 time schedule lor entlre operation (dellvery ol heavylifts and moblle lifting equlpment, setup of lifting equlpment,transportatlon off slte, etc,).

Static analysis of mobile lifling equipment wilh test certificate issued by

independent third party (TUV, Lloyds, etc.).

Gommercially available conveyor syslems shall be certified by means olmanufacturers' certificates and/or in-service inspections.

For special designs of conveyor systems the Service Provider shallverifytheir safety by means of static analyses'

Information on allowable assembly tolerances (parallelism ol tracks, edge

offset, differences in elevation, angular misalignment, etc.). Compliancewith tolerances shallbe recorded during assembly of mobile lifting

equipment.

Information on allowable tolerances under load (sagging/deflection, angularmisalignment, etc.). Compliance with allowable tolerances shall be

continuously monitored and recorded during entire loundation setdown

operation (lilting, trave rsing, lowering/setting down).

Information on deployed monitoring equipment (camera, theodolite, spirit

level, etc.) with which compliance with allowable tolerances is checked and

registered during foundation setdown operation.

certificates lor lifting equipment (lifting system, ropes, shackles, connectingpieces, etc.).

Organization chart stating names of persons responsible lor individual

activities.

Qualilication records/certificates for all personnel deployed for the varioustasks (incl. managers and H&S officerdrepresentatives).

Page 5: Ssm Lil 0204 Nrr

SIEMENS Document No.:

zE -063)-&BEC019-000(n3

Appendix 3 Rev.04

lndex / Date: 04 ' 2O1G01-19Technical Contract Condltlon ON CARRIAGE

ls a more detailed Method Statement required? Yes I / No I I yes, specily

List of applicable documentsTltle: Document No.: Bev.:

Land Transptnattr:n rtl Heav\, Po\t/ef Pianl f ,rr.'r:lnenl: 8972-MS-tr-001 n

It{etlrod Sialenient Sr;,rrna:v lor lhe l-and Trarrsr '"dalion c{

\ttt1'11111i1 -i ( (rrrii! ri'ii8972-M-SS-t r 0C4 A

Siemens

MS,LT(n4

Trng$nal. reprodEfon. dissemrmlbn flnd/or ediling ot thi'. dc|,|tsl c wel c ulifaalbn d ls colsE andwuncatidlhseol lo glhe6 wih\ol elpro$ aulhdbhlbn are Fohibned Oilo(b6 Yil bo heH iiabl€ lq gFrGnl ol dats965 Al tights

c.6bd by palcnt 9r6nl q regislr6td ol a ultlily modolq dsign palol as rFNed

Conlraclor: FRAC HT F1,VO AG, D-Kelsterbach/Germany

Project: Nhon Trach 2 CCPP, Vletnam Cuslomer: SIEMENSPKZ: NT 1003

(Proi€ct Code)

Method Slatement No.: 8972-MSLT-OOI Rev.:0 Dato:2.1.09.10 Page: 4 of 4

How will the follorrinq risks/hazards be minimized?Hazardous substances Hefer to Risk Assessments withirr Do<;umenl 8972-MS-LT-001

High-voftage power lines Beler to Risk Assessments within Docttntetrl 8972-MS-LT-001

Falling objects Reler lo Risk Assessments within Documenl 8972-MS-LT-001

Use of machinery Reler to Risk Assessments vrrithin Dr:cument 8972-MS't T 0O1

Loads weighing more than 1O tons each Refer to Risk Assessments within llocumenl 8972-MS-LT-001

Suspended Loads Reter to Risk Assessments within Documenl 8972-MS-LT 001

Otherc Reler to Risk Assessrtrents within Docurnent 8972-MS-LT-001

What temporary servlces are required?

- Power NA

Provision

by NA

Lighting NA by NA

Water NA by NA

Other NA by NA

Are actions relaled to tratfic control equipment requlred?

lf yes, give details:

Use ol lights and sirerrs crr gr-rods vehrcfes & persorrnel io wear high visibilrty clothrng and salety loolwear Gerlerat public

to be kept clear ivith assislance from Police where necessary Banksmen io be prr:vided necessary- Any use ol mobilephones whrle driving/operating any vehicle ts prohiflted

Page 6: Ssm Lil 0204 Nrr

SIEMENSMETHOD STATEM ENT-Su mmary

for the

LAND TRANSPORTATION

of

SHIPMENT UCONDENSER'S

for

NHON TRACH II CCPPDONGNAI PROVINCE, S.R.V

VIETNAM

Iiroler l ltlulrrirer 8972

f 'r{ijt-.Cl NHON TRACH II CCPP

{,l!f,r} SIEM ENs

8972-MSS-LT-004

A 23-09-10 For approval SK EM

0 19-09-10 For approval SK EM

Revision Date Desoiption Prepared Ghecked Approved Approved

ALE Heavy LiftVietnam Co. Ltd- Client

, -,re 01/10 i;&t 1 ,,r 3

Page 7: Ssm Lil 0204 Nrr

1. INTRODUCTIONThis document provides the summary of Land Transportation method using for the transportationof Condensers from Saigon River Jetty to Nhon Trach ll Project Site.

The initial characteristics of the ltems are as follows:

Quantity Item Description Lengthlm)

widrh(m)

Height(m)

Weight(r)

TrailerConfiouralion

2Gondenser

DSPPG-Lower Part9.110 3.650 3.550 43.0

lxABConventional

2Condenser

DSPPG-Upper Part9.110 3.650 3.550 43.0

1x2xBConventional

2 Hot well 7.330 6.510 3.200 23.63lx2x8

Conventional

Transportation Operational Llmltlng Parameters

Llmlts Go No ooWind speed < 9m/s > gm/s

24hr weather forecast (wind) Droppinq lncreasinqVisibility > 30m < 30mSurface Good Traction Available Poor Traction

2. OPERATIONAL PROCEDURE - IAND TRANSPORTATION FROM SAIGON RIVERJETTY TO NHON TRACH II CCPP SITE

2.1 Prior to anival of the Cargo Barge carrying the condensers, the hydraulic modular trallerare mobilised to Saigon River Jetty, Nhon Trach ll CCPP, aniving on 40'low bed trailer.

2.2 The trailer is then manoeuvred beneath the hot well on the barge into the required positionand aligned.

Once the trailer is in position and aligned, the trailer bed is raised using integral hydraulicsuntil the trailer bed is in firm contact wiilr the underside of the ltem.

A final check is made on all hydraulic and electrical connections and the bed further raised,lifting the ltem clear of the temporary supports.

Transport lashings are secured between the trailer and the condenser.

The barge is ballasted as required during the roll-off procedure to ensure that the bargedeck remains levelwith the quayside.

The trailer slowly manoeuvres over the load-out plates and roll-off the barge.

2.4

2.7

2.5

2.6

ALE @stExtENs

NHON TRACH II CCPP

SWF14

1.1

8972.ftlSS-LT{04 RaY 0

For Approval

01/10

23

Page 8: Ssm Lil 0204 Nrr

3.

4.

2.8 The trailers slowly manoeuvre away from barge through the designated route from theSaigon River Jetty towards the Nhon Trach ll CCPP site.

2,9 A bridging arangement at the site entrance to be provided for the aocess of hydraulictrailerJbided with item. Structural integrity of brldge arrangement to be verified by others.

2.10 On arrival at the Nhon Trach ll CCPP site offloading area, support stools are positioned

and hot well is jacked down by the trailer. Transport lashings are removed. The ltem islowered onto the temporary support steelwo* using the traller hydraulics. The trailer is

withdrawn from underneath the Condenser.

Note: Condenser lower & upper part will be delivered under crane hook for assembly byothers.

2.11 The other condensers will be transported to site following the above procedure.

DEMOBILISATION OF ALE EQUIPMENT3.1 After all the condensers are offloaded at Nhon Trach 11 CCPP site, the ALE transportation

equipments are removed from site.

PROJECT DRAWINGS AND REFERENCE DOCUMENTS

DRAWINGNUMBER

RE\I DESCRIPTIOI{

8972-T13 A Transportation Anangement of 43.0 t Lower Condenser (DSPPG-

0034167) on a Conventional Hydraulic Trailer

8972-114 A Transportation Arrangement of 43.0 t Upper Condenser (DSPPG'0034167) on a Conventional Hvdraulic Trailer

8972-T23 0 Transoortation ananqement of Hot well on Conventional Trailer

8972-0F08 A Offloading Arrangement of 43.0 t Lower Condenser (DSPPG-0034167) on to Suooort Stillaqes in Laydown Area

8972-0F09 A Offloading Anangement of 43.0 t Upper Condenser (DSPPG-0034167) on to Support Stillages in Laydown Area

8972-RT05 DRequired Area for the Transportation of GT Transformers (10UBF) &

Condenser-l at Delivery Nea lOff-Loading Position

8972-RTo8 ARequired Area for the Transportation of Condenser'2 al DeliveryArea I Off-Loadinq Position

stEltENs

I{HON TRACH II CCPP

SWFl4

1.1

8972.tlSS.l-T-{10{ Rev 0

For Approval

01/10

33

ALE @

Page 9: Ssm Lil 0204 Nrr

5a

;EE

22?o

o

3

3ll!lF]I

3iocIttfxa:cI

tIo(,

===G

2eF

5uo2U

3o22c.3Fz{E

?l(iolgloitlll@lsl6lolEIFIUI

=lolUI0l

u

Etlc5Ul

f;EE,SHEi

EEEEEg

EgEEEEE

EEEBEiE

rqi

tlr1

IE.Dc!3l r:::"l-ooJJeJ2qtfgoICto

d

IIIs:IzUIg

,,to

raifi

oi

Page 10: Ssm Lil 0204 Nrr

!tII,I

t,llfr

oirxlJI(l

G

E

!IIE

Ill

E':t90u9it!fattoet

3go(9z==g

2asgUozU

)

iE'EE

EEe

qJ,E

HE'

igEEIgEEEE1

EEEEEEE

EEEEE:E

tl-5toal3l\

!:i, JEIJ'

rHeI

l

i'#

Page 11: Ssm Lil 0204 Nrr

g l"_f_q -dl

it i'i

lirr

II

tE

x,t

IIt

-aE'F

aufJ(

3lo<lol9l=lIiEi

7

5uozu

H*H29uf,H

EEHg

eEFHi

EfiEFg

HEEHIS

!EsEid

EgEEE;

_t:i

o?5orJoJ2--utroA!JO

ttE0

EoUIIE

6os0

Page 12: Ssm Lil 0204 Nrr

IE

II7I

rI

IIt

iu

ltEIx!|$B

iUB

rgE

EfE

l,;--

t.a

-'6Fa

+d

.l

EIfisfriiEFOFglg:{.a

s{*eF<E?>zSE

;*i76{gE

{1

33U

t,i

-ffi0!r-lo*-F'' nL. -BL*r-

Page 13: Ssm Lil 0204 Nrr

tE

tI

!xx6EF

=fI!

l-ltli;l" E

Itl5,l3 i rIU d I

I

I

I

I

I

I

I

a

I3aIaaJI,,ac2otjgfII;I

l- m -9-00.,-I aii .i.i - -o*:F-

,Il

s

I6

€l

illirrl

I

"l

I

,fI

I,l

i2I

,zotst'U

,U

;,.l

fid

!!+

ii5

I

II7ttItIIItII

IIII

I

itItII2

i;

tt8

a

Ia2gge9

frFE

PEgE

frgsE60HgqF?:

!Eg$

;EEE

EEHSr11t

I

tEl6lJ

TEE

EEfi

3

i.l

a'iFozIa7

- wr '! mzr - !*tf;-- or.f, -tf *r-

Page 14: Ssm Lil 0204 Nrr

EEE!JEi$F; IE; E

gE Hxsfr sHel eil{E E3;-.IllrIlL-i

fHbl3s: E-

fEE

letF

!Er+a9

iI!illr r

tftliiiit tlF* ri

oufJ(

- -- |

I

I

Etll

gET6ItT,I

t^t

aarttra+t'

I.I llL..lgEt{rd;mrS -Or0rtEL

-€Df/t

r

tl

r +IL

it.llit,t' I

t't

ttt

fiTn

'liil'I-f 1:

I

Page 15: Ssm Lil 0204 Nrr

ItI

-tE

E

ff,fitiii r I

OlllJ(

EHEsEEiT

HE5?SE

EEs

iEE

IgEF

I!

IIItI

IaEitE9IaTIPt€ita

E

ilE5

iIi6

-+ -rF-,+It

It

ttttt'tttttttttt

ffittIttt

- G6Ei *"--@i01 - --ni.it' mi

Page 16: Ssm Lil 0204 Nrr

Contractor : FRAC HT FWO AG, O-Kel sterbach/Germany

Prolect Nhon Trach 2 CCPP, Vletnem Customer: SIEMENS PKZ: NT 1008

Method Statement No.: 8972-M$l-fi14 Rev.: A Oate: 26.09.2010 Pagc: 1 of 4

Prepared by Service Provldertl: Revlewed by Servlce Provlderrl: Releassd by Serulce Providerr):

Name /DaleSatheesh kumarALE Mridb East,6 00 2nlo

Signature

*Name /DateBinu K.T

26.0e.?0 t0

uqnarure

,.&rt'/ '-

Name / DaleBinu K T26.09 2010

Stgnarur€

.&:*t 7

Released by Contractor: Beleasad by Independent Erpe#l:.Qi"-

KarlSchmidt27.09.10 Sf E

w/

VlEr

turcrL+

W

flamo/ Dale Shnature

'H--%i'

Slgnature

$ose/scdanReleased ov QS[,F[

TfanrporlRcleasad by SIEMENS PG EP4: 38ffiffiI";?: ;?

rlQ /0, /0 W ffi^oiignat|'t. Vlolo

Nam€ / Oal€ Slgnantra-'t)

Trade: U Component: Condenser (llotwell'Lower &Uoocr Part of Condenserl

Scope of work On-carriaqe at con€truction silc includlng setdown on foundallone

Brlef desorlptlon of work to be performed:

Installallon ol Condensers using sldddlng

Sequence of operatione:As per attached document 8972-MS9l-fit4 Rev A

1 6

2 'l

3 8

4 I5 10

Managemenl structure:

Project administrator / transpoilatbncoordinalor

r! I ifrc I

Site suoervisor Binu K.T.

H&S otficer r",1 t1 ,. i ,.'€ T

Out-oFhours contact name liri\,";f i :.1,,A, rL

Page 17: Ssm Lil 0204 Nrr

t"ffiContractor: FRACHT FWO AG, DKelsterbach/Germany

Prolect Nhon Trach 2 CCPP, Vietnam Gustomen SIEMENS PKZ: NT 1fl13

Method Statement No.: 8972-Ms-l-ql4 Rev.: A Date: 26,09.2010 Page:2 of 4

Out-of-hours phone no. 0084-918-207-087

Who checks lhe work? Binu K.T.

ll Servte Provider and Contractor may be same company.2)Contracting at Sl€mens WSLG's dlsiretlon

Safetv and operational detalls: (mark with a cross I add as neceseary)

A Grane n Barge E Skidding system

tr Floating crane tr Ocean-going vessel A Fork Lift Truck

X Heavy-load vehicle, road D Ship lifting gear trn Heavy-load vehicle, rail A Lashings trn Ro-Ro operations n Litt & Lock System

Must conslderatlon be glven to thlrd-parly Installallons? (power / gas / water / communications equipment)

lf yes, state necessary precautions:

Uaison with Site Management and Siemens HSE, Site Manager/Project Manager on site for coordination.

Operations to proceed onlywith Approved Method Statement

Page 18: Ssm Lil 0204 Nrr

ADoendix 4 to TCC ZENOC0-DDO4-06:|GqR. Rev.l: On€arrlsoe at Slle ('setdown onto foundatlon"l

Contractor: FRACHT FWO AG, D'Kelsterbach/Germany

Profecl: Nhon Trach 2 CCPP, Vletnem Customer: SIEMENS PKZ: NT 1003

Method Statement No.: 8072-MS-l-qX Rev.: A Dats 26.00.2010 Page: 3 of 4

Mobile ltftlng equlpment

As per attacheddocument 8972-MSS-l-004

Man uf acture/s description s, drawings and operating instructions.

Loads imposed by lifting equipment in outdoor areas as wellas in or onbuilding structures.

Provisions for load distribution in outdoor areas as well as in or on buildingstructures, if necessary.

Description of setup and removalof mobile lifting equipment and auxiliariessuch as: truck crane, building crane, rope hoists, Etc.

Detailed Level 3 time schedule for entire operation (delivery ol heavy liftsand mobile lifting equipment, setup of liftlng equipment,lransportatbn offsite, etc.).

Static analysis of mobile.lifting equipment with test certifbate issued by in-dependent third party (TUV, Lloyds, etc.).

Commercially available conveyor systems shall be certilied by means ofm an uf acturers' certif icates and/or in-service inspections.

For special designs of convelor systems the Service Provider shallverffylheir safety by means of static analyses-

Information on allo,'rable assembly tolerances (parallelism of tracks, edgeoffset, diflerences in elevation, angular misalignment, etc.). Compliancewith tolerances shall be recorded during assembly of mobile lifting equip-ment.

Information on allowable tolerances under load (sagging/deflection, angularmisalignment, etc.). Compliance with allowable tolerances shallbe conti-nuously monitored and recorded during entire foundation setdown opera-tion (lifting, lraversing, lowering/setling down).

Information on deployed monitoring equipment (camera, theodolile, spiritlevel, etc.) with which compliance with allowable tolerances is checked dur-ing foundation setdown operation.

Certificates for lifting equipment (tifting system, ropes, shackles, connectingpieces, etc.),

Organization chart stating nam€s of persons responsible lor individual ac-tivities.

Qualilication records/certificates for all personnel deployed lor the varioustasks (incl. managers and H&S officers/representatives).

Page 19: Ssm Lil 0204 Nrr

Contractor: FRACHT FWO AG, DKelsterbach/Germany

Prolect: Nhon Trach 2 CCPP, Vletnam Guetomer: SIEMENS PKZ: NT 1fi)3

Method Statement No.: 8972-MS.F004 Rev,: A Date: 26.09.2010 Page: 4 of 4

How will the following risks/hazards be mlnlmlzed? [See ALE Risk Assessrnent doc 8972-MS-l-0q[- Falling / sinking / burial

Hazardous substances

- High-voltage power lines

Drowning

Confined spaces / tanks

Falling objects

Use ol machinery

Loads weighing more than10 tons each

Suspended Loads

Others

What temporary servicee are rcquired?- Power NA

Provision

by

Lighting NA by

Water NA by

Other NA by

fue actlons related to trafllc control equlpment required?lf ves, oive details: See ALE Risk Assessment Doc 8972-MS-l-003

ls a rnore detalted Method Statement required? Ves E / No I ll yes, speclty

Llst of applicable docurnents

Tltle: Document No.: Rev.:

Summary Method Statement: Installation of,Condenser

8972-MSS-l-00,4 A

Method Statement: Installation of Condenser 8972-MS-l-003 A

Page 20: Ssm Lil 0204 Nrr

o

o

slEMENsffiilMETHOD STATEMENT-Summ ary

for the

INSTALI.ATION

of

SHIPMENT HCONDENSERS

for

NHON TRACH II CCPPDONGNAI PROVINCE, S.R.V

VIETNAM

Prolecl Numher 8972

Pro;ecl NHON TRACH IICCPP

Ctient SIEMENS

L]trt : u n:*nt i'ir,r f"f rl-rii r 8972-MSS-t-004

B 30{9-10 For approval SK RM

A 26-09-10 For approval SK EM

0 19-09.10 For aoDroval SK EM

Revision Date Descriptkrn Prepared Checked Approved 4pprovedALE Heavy Lift Metnam Go. Ltd. Clienl

ll*tt 01/10 P:191 | ui $

Page 21: Ssm Lil 0204 Nrr

t. r{TROt}t6T|ONthis rloo.unent prwides tte nrrunry of lnsilallaliur meftod of Gonden*r at Nhst Trafi llfr{ed $te.

the initid dramctedslics dthe lkrns arc as fdlsrs:

Arufity Itcm De*ripfrqr tength(m)

v\{dsl(m)

Hoidttfm\

wr$r{t)

TrallcrCmfcrutdqr

2Codenser

DSPPGLoveT Part7.350 3.688 3.496 z7.E lr@r8

Con enitiofial

2Condenser

DSPPGupper Part7.450 3.688 3.405 27.15

1)€xBCowen$onal

2 Hotwell 7.283 6.110 2.U5 n.78 IffiCorwentimd

Transprtation Operational Limitirg Parametere

Lknits Go Ho qotMrd soeed < gfii/s > gnlsVlsibilitv > 3On < 3(ln

OPERATIONAL PROCEDURE - INSTALT.ATION AT NHON TRACH II CCPP SITE

The condsrser items are anives at the inSdldlon are6 on hyffadic failerE, cmd€nser Perts(Hotwdl, Modlle lower E t bper Parts) are assernbled and aligned with fte fourdatm b€ilvreslaxis 13i/10 UMAF15/10 UMA by others.

Assembled Condenser module shanld be ptaced m suitable silflages at a nt'nimum helglil oflffinm above gromdlevd, for inser&rg ddd beams & skates bdor modde.

Two no. *id tracks are assembled sr tre cmcrele forndatsr extending torards & beneaththecondenser canple{e wtth skates & hydradic propdling q6tern.

The condenser is jacked dorn onto the dcates on the sldd hacks.

The cmdener is d<abd dang the ddd tradc md orer the frd positm m the pfin&, poweredby the hydnaulic prope$ig q$em-

fice rlirec$y over tlre ffral po*tian, the csrdenser is jad<etl up ofi the skate and d<id beans,rArfricfi are remoled forn betreen lhe cordenser & pfinfi.

The condenser is iadred down wr b the final poc*tlon.

A[ ALE eq.riprcnt ls dsnobbed and rernored from tte area.

2.

2.1

2.2

2.3

2.6

2.4

2.5

2.7

2.8

,ALE(*rqrl1 !$lli

f'' ij; I

silEIEt&t

il{O}'TRACHilGCPP

$rfft{l!

!.,' :1r.:, Slll{SStSlRrvB:j;::r!r:.j: FeaADptDtl

. a:f 0lllottr: 2 -"r3

Page 22: Ssm Lil 0204 Nrr

PROJECT DRAWINGS AND REFERENCE DOCUMENTS

DRAwlNGNIIMBER REI' DESCRIFTION

8972-106(Sheets 1 of 2)

Bffidure for condenser on low level

olinth-Staoes 1 & 28972-106(Sheets 2ot2l B

ffidure for Condenser on low level

olintlr-Staoes 3 & 48972-111(Sheets 1 of 2)

A-FrovisffiAilnstallation Procedure for Condenser on low level

olinth-Staoes 1 & 28972-111(Sheets 2ot2l A

ffi Prmdure forGondenseron low levelolinth-Staoes 3 & 4

8972-110f2 sheets)

BRigging of Condenser parts

.:,'.-i',t SIEIIENS

P:: ': ,i:,( i NHON TRACII ll CCPP

i.lr{ SWFltl

Hr, 1.1

i-:', r,l..jrri'r*' E972{fi}tl.l{04RevBIr**,s ForApptot/d

tl.iit 0l/10't;,;". 3 rt 3

ALE a

Page 23: Ssm Lil 0204 Nrr
Page 24: Ssm Lil 0204 Nrr

ii '

i&!io5r(;

[*[['Eli

IislE[#

i1e+lsED,sf 0.ru.{}lryrc- * ii-

++ta+IIttttttItIt++JI

T

p

1

i:'- i'-g",''l':it-:..rIIIIIItItItIIt

- +-Swil;Prilnilrlff ra' -

-

Page 25: Ssm Lil 0204 Nrr
Page 26: Ssm Lil 0204 Nrr

tIII

|t!t!l

oltfJ,(;

irli url

8l,Tl3:91ia,EI

;

l

|T]

l1

l,

['Elllll

i[flsllil

i 6D::

+tI++t+t+I+I+II

I+ItIttItI

,---llr-:T1

ti

Page 27: Ssm Lil 0204 Nrr

egr,T

H68g f;"g

,irEli

Page 28: Ssm Lil 0204 Nrr

FTrgq {o

E'[!:g HR

igEi!

0o

f;dU

FEIIgc

fJdfE

g

ToEq

aI2q6a6II6

t

II

IIIa

!I

IIIItI

IIt

III

I,

Page 29: Ssm Lil 0204 Nrr

SIEMENSMETHOD STATEMENT

for the

INSTALLATION

oofCONDENSER

for

NHON TRACH II CCPPDONGNAI PROVINCE, S.R.V

VIETNAM

o

Project Number 8972

Project NHON TRACH II CCPP

Client SIEMENS

Document number 8972-MS-t-003

B 30-09-1 0 For aooroval SK RMA 26-09-10 For approval SK BKT0 1 9-09-1 0 For approval SK BCM

Revision Date Description Prepared Checked Approved ApprovedALE Heavy Lift Vietnam Co. Ltd. Client

Doc. SWF14 Date: 01/10 Page 1 of 13

Page 30: Ssm Lil 0204 Nrr

MANAGEMENT OF OPERATIONS

3. PREREQUISITES AND INITIAL CONDITIONS

,A.LE @Client: S|EmENS

Project: NHON TRACH ll CCPP

Doc: SWF14

Rev: 1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/10

2o113SHAFtft. BAfEn, SrRgt{6En

Page 31: Ssm Lil 0204 Nrr

1. INTRODUCTION

1.1. SCOPE OF DOCUMENT

This Method Statement is concemed with the installation of Condensers for Nhon Trach ll CCPP,Dongnai Province, S.R.V, Vieham, and is subjecl to our normal terms and conditions of caniage.

This method slatement represenb the procedure to be followed, drawings, back up engineeringand risk assessnents to ensure the safe and professional installation of the Condensers.

The initial chanacteristics of the ltems are as follo,vs:

Quantity Item DescriptionLen$h

(mlwdthfm)

Height{m)

Weight(t)tunit

2Condenser

DSPPGLoweT Part7.350 3.668 3.495 27.25

2Condenser

DSPPGUppa Part7.450 3.668 3.495 27.15

2 Hotwell 7.283 6.110 2.844 22.78

Included in the preliminary scope of work for the proiect is:

1.1.1 Supply of all installation equipments fry the installation Condensers at Nhon Trach ll CCPPsite, Dongnai ProMnce, S.R.V. Metnam.

1.1.2 Supply of engineering support for all relevant operations and procedures.

It is the aim of this Method $tatement to define and describe the equipment, safe qBtem of workand procedures that will be employed by ALE Heavylift Vietram Co.Ltd to conduct the operationsin compliance with fte fdlouing legislative and guidance doormentation:

APPROVED CODES OF PRACTICEBS code 5950-2000

lift Vidnam Co.Ltd General

ALE a Client: SIEMENS

Project; NHON TRACH ll CCPP

Doc: S\ /F'14

Rev: 1.1

Doc Number:

Status:

Date:

Page:

8972+ls{.01t Rcv B

ForApproval

01/10

3 of 13silAntEn. saF6n. SrnorGEn

Page 32: Ssm Lil 0204 Nrr

1.2. PARTIES

The relevant parties involved with the installation are listed below:

- SIEMENS

- FRACHT

- Client

- Sub contractor Transportation & Installation

- ALE Heavy lift Vietnam Co.Ltd - Service Provider Transportation & Installation

ALe a Client:

Project:

Doc:

Rev:

SIEMENS

NHON TRACH II CCPP

SWF14

1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/10

4o113gl'AN'EN. gAfCF. 9TBOIGEN

Page 33: Ssm Lil 0204 Nrr

2. MANAGEMENT OF OPERATIONS

Outlined below are the responsibilities of ALE personnel. This section also details the procedures tofollow if a deviation from the original operations procedure occurs.

2.1. THE ALE ENGINEER & PROJECT MANAGER

The ALE Engineer will prepare the method statement along with all drawings and calculations, whichwill be checked by the ALE authorised Manager. lt is the responsibility of the ALE Project Manager toensure that the on-site Operations Supervisor is adequately briefed on the content of this methodstatement.

2.2. THE ALE OPERATIONS SUPERVISOR

Prior to the commencement of the works the supervisor must ensure that all site personnel areadequately briefed on the contents of this method statement. This briefing shall take the form of ashort 'toolbox talk'. The supervisor must liaise with the ALE manager should site circumstances requirematerial change to the methods to be employed during the operation and follow the'ALE managementof change procedure' provided within this document. lt is the responsibility of the supervisor to havecompleted all safety checklists and briefings as identified within this scope of works.

2.3. MANAGEMENT OF CHANGE

This procedure has been prepared to categorise and authorise any intended deviation from theintended scope of works outlined within this safe system of work. The ALE Operations Supervisor onsite is responsible for the work being conducted in accordance with the current approved methodstatement. Any deviation from that approved method is categorised as follows:

2.3.1. Category 1 - (Minor) Deviation

The ALE Operations Supervisor on site considers a deviation from the intended scope of work to be asmall adjustment to meet local site conditions. They must bring this matter to the attention of theclients' on-site representative. \A/here the client agrees that the adjustment is minor and would notintroduce any risk to personnel or the integrity and safe operation of the equipment, authorisation toproceed may be approved by both parties concerned by signing of the changes to the methodstatement in the record of changes box provided within the method statement.Any changes must be communicated back to the ALE Engineer / Project Manager and communicatedto the work force by means of a toolbox talk, which must also be recorded. The work may thenproceed.

Any change from the intended scope of work must comply with the manufacturer's recommendationsfor the use of the equipment and any associated procedural documentation, i.e. ALE and clientprocedures and / or requirements. Where there is any doubt as to the implications changes may haveon the safety and / or integrity of the system/equipment or any conflict from the client's representativeon site, for whatever reason, this change will become a category 2 - Major and the appropriatecategory 2 action will apply.

2.3.2. Category 2 - (Major) Deviation

Category 2 deviations are those that the ALE Operations Supervisor or the client's nominatedrepresentative considers to be significant or deviations from category 1 that become category 2 asidentified in 2.3.1 above. Any proposed deviations / changes to the intended scope of work under thiscategory shall be communicated to the ALE Engineer / Project Manager who will revise the methodstatement and liaise with the client representative to agree any changes for approval prior tocommencement of work.

ALE a Client: SlEtllENS

Project: NHON TRACH ll CCPP

Doc: SWF14

Rev: 1.1

Doc Number: 8972-lllS-l-003 Rev B

Status: ForApproval

Date: 01/10

Page: 5 of 133Henttn, 3AFCt, gTFOitGan

Page 34: Ssm Lil 0204 Nrr

\A/here necessary, engineering deviations / changes will be approved by the client or nominated thirdparty. On approval, any changes in the method statement and / or intended scope of work affecting thesafe system of work will be communicated to the work force by means of a recorded toolbox talk. Alldeviations and / or changes will be recorded and authorised within the record box provided within thismethod statement.A record of authorised changes during scope of work is available within the template of anyMethod Statement devised for the erection and/or operation of any (ALE) equipment. An exampleis provided below:

2.4. SITE SAFETY

When at the site there is a situation or area that is considered unsafe but beyond the abilities ofALE personnel to make safe. All ALE work activities in that area will cease and the unsafesituation or activity will be reported to the site supervisor for action.

The unsafe situation / activities I area will be reported to the client for the client to take measuresto make it safe again for the activities to continue.

No ALE activities will be performed until the situation or area is again made safe for working bythe client or the client's agent. Should the measures taken by the client prove inadequate, theworks can and will be stopped until adequate steps have been taken. ALE cannot be heldresponsible for any delays resulting from works being stopped due to unsafe situations.

ALE IClient: SIEMENS

Project: NHON TRACH ll CCPP

Doc: SWF14

Rev: 1.1

Doc Number: 8972-MS-l-003 Rev B

Status: ForApproval

Date: 01/10

Page: 6 of 13

during the execution of work within an ALE method statement

SHAFtEn. tArFn. gTnOtaGen

Page 35: Ssm Lil 0204 Nrr

2.5. TOOLBOX TALK RECORD

The following toolbox talk record is provided for the purpose of recording the initialtoolbox talk oncommencement of the works under the scope of this method statement. A toolbox talk recordsheet is also provided within the appendix of this document and should be used to record anyfuture toolbox talks conducted on site. A minimum of one daily toolbox talk should be conduitedat the earliest opportunity prior to commencement of works.

The record is to be completed by all ALE and subcontracted labour personnel employed withinthe scope work and working to this Method Statement and associated Risk Assessment.

Prior to commencing the operation all site personnel are to sign below to confirm that a clearbriefing explaining the job has been given and is understood:

'l am satisfied that I understand the work to be canied out. Att known hazards have beenidentified to me and I have been made fully aware of the control measures in place to reduce anyrisk to both myself and others'.

EMPLOYEE NAME: SIGNATURE: DATE:

Content of TBT: Supervisors Signature:

A,LE @Client: SIEMENS

Project: NHON TRACH lt CCPP

Doc: SWF14

Rev: 1.1

Doc Number: 8972-MSl-003 Rev B

Status: ForApproval

Date: 01110

Page: 7 oI 13

FXAnttF, 9APen, 9tnOt{6Ee

Page 36: Ssm Lil 0204 Nrr

3. PREREQUISITES AND INITIAL GONDITIONS

3.1. GENERAL

Method Statement is subject to approval prior to the commencement of work.Method Statement to be read in conjunction with the attached Risk AssessmentDocumentation.SJA (Safe Job Analysis), if necessary, to be carried out prior to work starting.Afier any break in the operational procedure, a walk round and visual inspection will be madeof the equipment in its current set up to check that nothing has changed since leaving thework place.Minimum Personnel Protective Equipment (PPE) to be worn on site is as follows:

a. Overalls,b. Hard Hat,c. Safety Footwear,d. Eye Protection,e. Gloves,f. Full Safety Harnesses (where necessary).

3.2. RESPONSIBILITIES

Clear area for working afforded at all times by client.SJA (Safe Job Analysis), if necessary, to be carried out prior to work starting.Ground preparatory work to be carried out prior to arrival of transport and to be able towithstand the loadings imposed during this operation.Centre of gravity to be clearly marked on the item.

3.3. CONTROL OF OPERATION

Outlined below are the responsibilities of ALE personnel associated with ALE's on-site operations.

The ALE site supervisor is responsible for the performance of the operational disciplines,which can be divided into two main areas, namely on-site operations and equipmentmaintenance.All operations associated with the installations of the Condenser are under the direct controlof the ALE site supervisor.During the installation of the Condenser the ALE supervisor will monitor the installationequipment.After any break in the operational procedure, a walk round and visual inspection will be madeof the equipment in its current set-up to check that nothing has changed since leaving thework place.The ALE technicians are capable of fixing most problems that can occur during theoperations.Other maintenance engineers are available on call to assist in rectifoing any equipmentmalfunction in the shortest possible time.

5.

1.2.

3.4.

1.2.3.

4.

5.

6.

1.

2.

3.

4.

ALE a Client: SIEMENS

Project: NHON TRACH ll CCPP

Doc: SWF14

Rev: 1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/10

8 of 13

rHAFrtL SAFCn. 9rnoflGEn

Page 37: Ssm Lil 0204 Nrr

3.4. ORGANOGRAM

ALE IClient:

Project:

Doc:

Rev:

SIEIUIENS

NHON TRACH II CCPP

SWF14

1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/1 0

9 of13SHARITF, 3A'f,R, STNOXGEN

Page 38: Ssm Lil 0204 Nrr

4. OPERATIONAL PROCEDURE

On the days that preparation of equipment will take place there will be a 'toolbox' meeting prior tothe start of activities that will review the following items:

a) Procedures, requirements and details specified in the work plans and drawings.b) Review of safety items such as weather concerns, plant activity, escape routes,

contingency plans, locations of fire-fighting and personalsafety equipment etc.Note: Weather forecasts will be obtained prior to the movement. lf the forecasts, inconjunction with the actual wind speed readings taken on the site / crane wind speedindicators, do not give a sufficient window a suitable weather then the movement will be re-assessed.

c) Designate key personnel, such as signalmen, tagline handlers etc.d) Complete and sign off all appropriate checklists and safety permits.e) Check the placement of all banners and barricades that define the safety boundaries of the

work areas.Discuss and give due consideration to any additional appropriate steps that any participantfeels is necessary to perform a safe and timely operation.

Note: Weather forecasts will be obtained prior to the operation. lf the forecasts, in conjunction withthe actual wind speed-readings taken, do not give a sufficient window a suitable window asuitable weather then the lift programme will be re-assessed.

Limits Go No qoWind speed < 9m/s > 9m/s24hr weather forecast (wind) Droooino IncreasinoVisibilitv > 30m < 30m

.A.LE a Client:

Project:

Doc:

Rev:

SIEMENS

NHON TRACH II CCPP

SWF14

1.1

Doc Number: 8972-MSJ-003 Rev B

Status: ForApproval

Date: 0'l/10

Page: 10 of 13

SHARtEn. 9AFEn, StnOil6€n

Page 39: Ssm Lil 0204 Nrr

4. 1 . PRE-OPERATION PREPARATORY WORKS

4.1.1 Clear and free access is to be provided for all ALE personnel and equipment during theoperations at the project site.

4.1.2 Structural integrity of the Condenser, the plinth and the ground is the responsibility of others,and must be confirmed that they are capable of withstanding the loadings imposed duringinstallation operations.

4.'1.3 The areas around the relevant plinths,suitably prepared by others, and mustequipment during complete operations.

and between the plinth and the roadway, are to bebe able to withstand the loadings imposed by ALE

4.1.4 Centre of gravity position to be clearly marked on the items.

4.1.5 Centrelines to be clearly marked on the plinths and Condenser sets by others.

4.1.6 Sufficient area to be provided as when required for positioning the crane to setup installationequipment on the foundation.

4.2. OPERATIONAL PROCEDURE -INSTALLATION OF CONDENSER

4.2.1 The condenser items are arrives at the installation area on hydraulic trailers, condenser parts(Hotwell, Module Lower & Upper Parts) are assembled and aligned with the foundation betweenaxis 13/10 UMA-15/10 UMA by others.

4.2.2 Assembled Condenser module should be placed on suitable stillages at a minimum height of1000mm above ground level, for inserting skid beams & skates below module.

4.2.3 Two no. skid tracks are assembled on the concrete foundation extending towards & beneath thecondenser complete with skates & hydraulic propelling system.

4.2.4 The condenser is jacked down onto the skates on the skid tracks.

4.2.5 The condenser is skated along the skid tracks and over the final position on the plinth, poweredby the hydraulic propelling system.

4.2.6 Once directly over the final position, the condenser is jacked up off the skates and skid beams,which are removed from between the condenser & plinth.

4.2.7 The condenser is jacked down on to the final position.

4.3. DEMOBILISATION OF ALE EQUIPMENT

4.3.'l After Condensers are offloaded on to foundation, the ALE equipments are removed from ProjectSite.

.A.Le a Client: SIEMENS

Projectr NHON TRACH ll CCPP

Doc: SWF14

Rev: 1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/10

11 of 13

SHAPtfn. SArEn, SItOXOEf,

Page 40: Ssm Lil 0204 Nrr

PROJECT DRAWINGS AND REFERENCE DOCUMENTS

DRAWINGNUMBER REV DESCRIPTION

8972-106(Sheets 1 of 2\ B

Provisional Installation Procedure for Condenser on low levelplinth-Staoes 1 & 2

8972-106(Sheets 2 of 2l B

Provisional Installation Procedure for Condenser on low levelplinth-Staqes 3 & 4

8972-111(Sheets I of 2\ A Provisional Installation Procedure for Condenser on low level

plinth-Staqes 1 & 28972-111(Sheets 2 of 2\ A Provisional Installation Procedure for Condenser on low level

plinth-Staoes 3 & 48972-110(2sheets) B

Rigging of condenser parts

.A.LE a Glient:

Project:

Doc:

Rev:

SIEMENS

NHON TRACH II CCPP

SWF14

1.1

Doc Number:

Status:

Date:

Page:

8972-MS-l-003 Rev B

For Approval

01/1 0

'12 ol 13

9Ftntti. 53f gR, stFoilgan

Page 41: Ssm Lil 0204 Nrr

APPENDICES

5.1 . APPENDIX 'A' - PROJECT DRAWINGS

5.2.

5.3.

APPENDIX 'B' - RISK ASSESSMENTS

APPENDIX 'C' TOOLBOX TALK PROFORMA

.A,LEsFrAnrrn, gaFEn

@Glient:

Project:

Doc:

Rev:

SIEMENS

NHON TRACH II CCPP

SWF14

1.1

Doc Number:

Status:

Date:

Page:

8972-illSl-003 Rev B

For Approval

0'u't0

13 of 13

Page 42: Ssm Lil 0204 Nrr

5.1 APPENDIX'A'- PROJECT DRAWINGS

Page 43: Ssm Lil 0204 Nrr

NlUIoisl6l't3l

-ulr>l'z1lc

E>I-UtrE=: $ = 9^= 6 F' t=

;EEEEH

EiEEsEE!giE ;cE HE

Ffi=rEEEE

EEssEEEE

IE E E'A EE

E;6 Ea5 iE;q 3 ;H E' EE

efis;gf;E EE

cF Eg iE H, En*

;i E; ffi ;; ;Eg

!;)

ll ,;]

It.^F.:l

H t,;r+T

,lrrrr', o,r, [ ./

d*rNs / sNreunl w*rs r c-l-

uru

L oz=v

geez.^ .Eff E E ,;69n E I GP)

H 4 ; ExiH

- g iiH5 i' g g;"6z - - *tz

9 E E 6Hfig.g 3 EtrEqaE p

cnE

l1-Z fr VEEfi

HEE=P {:gE

EEEE*gHfipE

E;ggEEEEHa

riar-9s?6=6n

aifik=on6=U33lB!1dte-)

tag

il?6=E<2,,>

eFliE=piE

|rt|G6i>Ei;6;6

Page 44: Ssm Lil 0204 Nrr

G,iI

I

I

(:).T

I

I

I

II

.Uot<l6

=-Uttlz{ lEEEEE

giEETEEi

iEEEEEEE

Fgisigfi,ggs

,:l

_*'.nl

t.-A

JII''-'T

aoiwlN3e /3N€unt nElsL:]

ItIIItttIIIIlIITII+II

=i+-=IIIItIt

.Ir|_

l+T

=>XP

z': la . l

9 .---l , :=- - f l- :,-:--=:r.:::a-:-rT--f-.' i1..,' ,1 I o

t\^l\('>rl<sl 2llc=4 | e9 e:---36=-f- 5le= '21Ed r1

,:.i-",1iI

I

''-', . _,l

.- - l-:' i

-.. - -.-+u\

EAdi

?2.- .*2E E i ";fis; q g EgiJ

= 4 v-,v)

H E e iiff5 # I s;E2 = - =Y2

FgE6Hfis** e ptrE

qE; p qHS

!I: fi {EHfi

Es;=;=;fas

EHEsFEE{HE

ci2r-Pfeh=

a#eifii+5FFFooFlxafl=vl;<-6fr=a

^ataz6=ts<2,,>

cEl;==U:H<ua2\V

EH*636

IUUJ)- (csl) (csD

,[]. o,r. t'"---=i,iJ;;t-

Page 45: Ssm Lil 0204 Nrr
Page 46: Ssm Lil 0204 Nrr

l/

ilg*-EglE*TEgE

ig=EEEHE

EEHEEEEE

sun;*FslEEE5;ffiE EE

gfEgxaE,gn=

;i Efr ;6 ;= ;EE

-. J-

ttlel?...!.-lli:i'-IIItIItttttIIIt

zF

z

+t+rlt+r+{tt F6

3E6=UE

eiFi -'5FFF@otsu8fr:i{l^sYg<!t.=2:E<2..>

= a'<Etz

i3=v2E

2\Va6i=trui636ljj

ooquld=l<

94. 6-F,^oZB E E o$sa t I Eir,E A ; tg+-.=;;6?6

:F;EEaz < - E=z

9 g E aHfig,E E EfiE

EeE e esE

1i"2 fr afi\fi

ei;=F=teEE

figEEEE;EHg

Page 47: Ssm Lil 0204 Nrr

s2d

==-fiail3d;z

a

E

2o

E

Fg

F

3

zo

:8

=5

z5=>2;0u+=tfiz.}Uiz

o

E E E

c

z

a

3

o 6f

fI

Ee =Hr l

":FOfr244=-did;EA:t s Hsid

= ;*o* o 3:f

i*FEugi

zosuiltrl

E

zUF2Zo4OG&3 I

IEg

E

;.:e93

;EI5

F

{I

rt

5E

IF

t

3

I

nE

iT

p

t

6zgt6P

Page 48: Ssm Lil 0204 Nrr

l"

FOightt.rlg

E

h

j

8z

n

l

d<

I

<E==

tbi0zl>uiz

t-l

e

2

z

Ee =Hn l

bqrhfrAiq"2 o j oJ? E a ?3

i 4 F1t.E1T : ?gRF2 iz6-e33

E,EEEgEEiF96P?"

zz

zosul1

trl

I=F

=N

U

=6

e

zUFz^ *:

(6Hjg.

IEgI

5

IE

P

i

,,

I

*4E

:I5

tI

I6E

il

3

P

6EE

Page 49: Ssm Lil 0204 Nrr

5.2APPENDIX'B' - RISK ASSESSMENTS

Page 50: Ssm Lil 0204 Nrr

N

E9n

5aL

96

ur EH io'=6[,R B€ H

F=O=-.9!0.)6E:, FF;-t=vj:6el-Ei< Lt

-sEo/EZ7O'X

I5

€n P TONA/\(Jrrt

oz

tooor=uJY

.9o-Loao)o

Lf

=3co'^.C-oo

q)

o=o;aE

o.;:lao

o

o

EE:ooc(!

f-o-G)

o-oE

'o

z.c

f

oao

oL

@

ooc.9-

E5cQ

=>=o- _\z

o-=o_ a\

;E-c)^-(J6

f

;.\,

q).=qo

-oE

o3aL

ooC

.Fo

-oE

oLo

c

o!q).=foo)L

c)

E

o

=oLooo

o)v=.= .^-o ;(EsoQoo9pts(J<.c

q)

oJ

.G

Eo()

>o.Y

o-aoJ

=

oo>o.!(E

=I

.>o:cf

Eoo

=o.:<

=

ioicD

I

to tf (Y) o|

>\cGO

=ttaENE

o € (o \f (\

.>ox=I(Yt

o) @ clt

->oI

=Lo

Ir+

€ t

gt!troo

a

ro

o ro

ozYzuYod.

(EooI

ro

L

.=

ooE

I

t

L

.=oE

oo

I

ct

o,

=oo

troEoq)

(E

.9EIo)

=I

N

o.=ocopoo

fc;o.=

=I

Alueneg

Co)-Cc)

c

c)ft\

aoO

EP

rTt

UJ

I

xL

oEtroEoQo)Qo

.Y

.9,u

Page 51: Ssm Lil 0204 Nrr

o6

oo

Nja

Lrl

o

o

oEEooI(gooCLoo-

c.9(J

Eocc-go-

otu

o-o

o0)of,!2

3o!to-Eo.lto0)o3ooo(UooEq)

xo,

o-oTAooo-c)oE=o:!t0)co-o.!()o5EIoEo)o(u

E

.oG0)

cc)Ec.g

c)coct

o-Eo(.)

EEoof(uEx0)

=3Ec)

Eoo..too)F(U

Io-c).scooE

o.E-ooo(u3

o.=Eooo.=oc)ooo-.oEcO

Eo0)o)*o-at,

oT'c)of

E.Uo(E

E

c)-ooo-o(EEc(5U'=l<'aU)

c.9

=oo.O

{t)

oEo.9zc)oE(u

o'6

'6E

sCD

Ec)ooo'6,

UJ

o.q=.2(u

UJJ

o,o-c,

E(l)o)(u

Eo

oltc)o-

,oEc)(lt(!:(u

!t(E(E

ooz

q,0f

;oc0)c!oo

c).coo

ato

:oo

=tsoEoc

oq)o.go.o.oto_qo(I'

E.gf

Ioc0)

;oEc)

.oo,'i=

.9)J

oE.9(Eoc)(5

o=ox

6oat,oc)cE(D

.Eo.Eo

o)Pc)Ellj

oo.oCL

oc)ooo..oEEoo.

Eo(E

-9o.oc.9

=oo.

ui(l'

o-.EEc)

o:(o

oc)o.9E'6o)'='(u

oo:o

L.0)EcoEEc),6

'6E

c,3(t'

;=ooc)

ro.ct).g(o

-gtoo

UJJ

-oEo$.t2

-ooEc)!t(').E

zt

o.9(Eoc)ooo)'6.o0)Ic)ooI

dc)

.9)oEco

;-e

.9,

vo0)EoEc(5

o)'toEo

.9o.D0)l4ooEoE(sEc)Eoou,(u

oo0,(E

E

aCoEEoO(sc.9=T'E

oo=-coL(5

(uzILoo

.Ec')Cula(Jo.6.L(L

co'-ao(L

LoEfYEooo-g(Ea;mEoCc(E(L

rooiiz=.c)

ot

(J(ECL

.E(!coE

o.:cuJ

ogo-U)€o=o

o.aoz

oCD

*o-U)p=LL

oooo(o-cxlJJ

ooE=Lr

GC(5LL

€g-9lL

coEoE'oco

g)oc

uJ

o.q)oc0)PoE[rJ(s

co)Eco.=cuJ

co:oo-ECoJ

Ec=oo-Eooo)

=a

c.9(5LoCL@

G

t[oLo(5

ooN

Iroo

T

NNirt(go

(LrLOO

-co(gLFco-cz

?G-o-o.tq-G{raF-oEF-oLF

IJJ

Page 52: Ssm Lil 0204 Nrr

(o

o

oo,(E(L

jv

€ur g

,;dEEd E.E E E.;: g:; c.E

E *BH F8

ozoU)

c)(Lo

ctzo@

o(Lat

cizoaoLo

I

=loo.Jlto

E

tE

oF.Exo

==oE(!xoEtl

t

roooa)oo;oslo

aeoo

Eoxo'=

=0)Y:tlJ

toooooaiE

E

a

oooE.gx

=3'trootntlo

oG

IA

q)

oooo

3o

JoEtl

E

Erlrl-FooIL

FuIL(ao-((,--.FoJ(,Ffo-o

.I.Frl-Jrl-FIlL(o26gEt9JJ(-orlaa-D

==-

F=tu=utoUoo(x2EUJIF?lUtrE-rt36r lll=(,=ol-rlOAzt?zoozoluo3ltool-

,;ecoE

-E .9€Eo!,OEEoo-o>=5iisccEo>lo9(o_E6.e3g!t(oC'

E secrQ 6E gf;FE,-od)

.-=g=

E3EEEg=+ ots!=o6:i, Elfr'=, €l;I|iDtE:l=t=IllllrE-

+3rtA Aor

II

III

.I;lolol-olol

olol

E't

olflq

r!lEl:l6lElolelcl;lot

E

6lol6l

Elololo,IolulolEIolol

EI5lEl6lxarl>lololol

ctt

OJ

-l>{olol=ltDl

'-lolFlEloultl

I---l..1clol|Ul

GI>lt!lII

got)oDcaET.9,E

J J J J

(f) N C! c')

itEE-

fi -FfiF;E:E5g:rEfiE a+.:fi

igiiggEiiE-

FuE*E€ ruP Ps

iEEgIis

;C)gE?E6(uO6EOI or-or5:E*o_vgs iao.cr o#^(l)

Ea 8F.9 oEr Boof

iss

c)

oo(5

E(,=.=oo-ctoooEoocLo;q)-ootu(L(L

oo-go

n

oG

=!t!,(!Ec,'6q)oo

==o=6)IJtl

J

= = =

(t) (f) (f) N

(v) (f, c! (f)

zi0),=€ctoo

e;0'=98

lFsFEE3€3 u;o -=06p.+E O. (5.=

"E.6

€:3gp!JO

_ att

8,ts

=F'---=€co'69.=oo=

E(o

.c,

3E'o-oaioL

=:trEc(EI

g=ooo.

=Eo

=E'o!

cc

c

;:

g

C

EttCto

E

u

Et-Cutl

tt

ggasFr

ctl

339

€sEI AEG- E

= PggE f

;*;e; P€EEFFEffE

Eooc6coEo'5o

UJ

(\l (') $

Page 53: Ssm Lil 0204 Nrr

(o

oC\loCDo(Lciz

oao(Lo

ctzoaLo(Lo

ctzoU)Lo(Lo

cizoU)

oo-o

cizoU)Lo(Lo

rcizLo@Lo(Lo

= J J J J J

N

(e |f) N (f) lr,

5 E b*te€ ,$ 3+

$FEEgF$: gg IE sE.Hs;E*r*F3

g€FIHEEE

-9-oo=oooo)c-YL(U!t6!t.-og1tf';oo-L;o-.= c)oDllCs.=o

otr3;cc(I)'E-c, E

=g

cc€F>-c(Eg

i9 co oEo- (Er6 beEgEE;ETE

E€Hao=3 A.E- -q)0'6 gz,co

'!our

IEgF$Eg

s#esEtg

.9-o 5.9FEA

€€fiEDa OgEEEE86 E.9gEoge i.9 or6o.EuJ9;EBE +fr?t Be

oo =H* ;E

lSet;bE.9ae3€ o:Ee'E e"E E

gBggE

= = =

ct, (f) c\I (o s (Y)

(t, (r) C\l a/) 0r)

q)Looo/ia;o='E(5lo.E'E

xlro3q,'=

bEfo

EP9Eo5ocr;.oEq(E--c (u >\;E EE:uF=

H:E g

ooo,(U

*o-c>\ CL

ff'=o.= c)

bhEpd.=oF9HC);EE.#F:J=o

b.c,o

Ula

5==ch.o--.4EEE(Eeo-U,cL=.9

EE -iE8:f E

=oric)oEo.oco^c.E.9gi6(E.=O.E

EbFJ>\'-E'-o(h o-fo.g h_

E9Ess,HEE3(E(5crLL !' C'

E(odog).=(5O)a.96oo=0)i:ooo tggggg:gl

otcEIootuc,Eoc

oC.o(E

c)CL

oo.=(s=()-(E(U_c.9()6C,zE

EJ--YOb_el!Ei=u:q)6>L

C)odbE-s 3-ElF(L

5e.F.=aJ h

EE 3HFEE,E€- o,= o o6=6 E=EEgbEEEE€E

Po=P96iEdso .2o)io oC (D=

;EEl9eo (o t- @ o,

o

2o=oooE<

I,IJ

troo.E

o

E!,

ottcoEco(J*l

IC.o_ooatc-l(f)oa

INt-o)@

I

EI

I.IJJ

Page 54: Ssm Lil 0204 Nrr

(0

o(f)

oo)(E(L

oo(EtroEtt

LoocoEcoo*lo

Ic..9.o$oc-l(f)(fo

I6ll-o)o

I

trI

I.IJJ

c;zooLo(Lo

ctzoU)

c)(Lo

cizq)U)Lo(Lo

cizoU)

o)(LU'

ctzLoU)

o(La

F

c;zLoaoLo

CJzo@

o(Lo

F

ctzoU)

o(Lo

J J J J J -J J J

(o c\l

r (t) C'' (o (t, (f)

o-zEci.ts6pEgo9o-RE-'= c)Ul gi

gsE

BE;iY,= E6PiEE5vad,E0s

o-ct8e

;q 5-

E8 ?99 F

E* e

frF s6 ., ci'F

=r*E=!"* fr E;5 eEi g

aoo

=E:-o=o-:oEo

E€E€Eo)d,gED O)c>ooEEooog)-o=cf(5t(J6o<)o(!:b-F<

ts fiaEAtt

i.= gl'EEiE

EH E;EgegE* E€HT;!gE €5 *!,*=H€ P;+E i :

tE;tEEiE:E

o>.9=-

fi mB< 6-oEe:E Ed

8"s1fr

EEI;as:ESpBXo olJJ =

fif c H

Eb g.s

EtetgEE

Eei 3e9#r;o 9E E

iE*"PFE€A

;eg i568-gJoOO-

o.9

EAEit I- rct c,).'o cE9EE HgEE;e=BH$E

elE€14,E S S-.t ooo<rcrcDo

-:E.;Cr-9l 6go-5A.8E

Eeg6.E -99o-ttvt '=C)ts(E-CE'oooEE85 8e

?p-c*(IfcEtE:(E.=

eEqtFot-cEao-o€o:F=JC3a)(UcurFJt-<1.

J J J J J J J

cr) (o (f) c!

(r) (f) or) (f) cr)

efiOE&oEsBboEE5b=o6

-g-Cl r'o-L

s:,5;5EBgE-} EobE9;bogs sE

o

;; qstegE bE.=.=a.='A si E o-o= ..e P*E

!Es5g g

3 sHEFt

--s E

€ sE

sggb !.8Rcg6'b €

ic s

*5

Etrx -Hs€i IEf P EP

iEE*f;s** 8b *s35;8;8

EtgE

^[Ec*;raE# f;

P $e=EEE g

Coo.0969:o=q)c€F>'6ooc)s€oEut=AdJ}

E' -.=+3sodOEoca-E'-

"9E?=FzFS

2ooo

jg(u

coo

=ooF

C.oU'[email protected]

dELAE=>(uI I.L

ofCLf

o.o-oooo-

at

_:a

al,

c.9ocoCLa@

oo:oF

IE

='isY(DJ:F(6NE

ocoo.oCfEEoC)

9oEr.ch=

oE=r.=o!u=f,Y69<(!@t-

(f) s ro (0 t\ @ o,

Page 55: Ssm Lil 0204 Nrr

zo

-!+ocl FtNOD=EQI

o9roO8qg6'oo

ovo-

CLCL

r6'==<!,e'oiio>*oo*-93ioeo|

o

oo

doCLcgno-

m>3oo='GrXoo6

NT$

N)o)

NN

N N)o

6gJO(D6gs=doa

Jq)Nq)

d.o(n

q.oYq,<.3oq,o(olra

a-oGIoc:CL

€9gdo=lo:-o)

CL5'(ooo-o-ef(o

*qa #'aEg

3

3P3 F

sEfisEge4rAYE =iE(oq8.

roo)CL@

olg

o=Eo

€o--a

o)T?os0)O=oJA-9.6'dxit 6ifE='o)an.-o

Jq_

ql!totLf,o-- 9.aoioat=='=.\J.9CJA!!*3o'!

o6of=o

E!'TIooo)=a:9!AC5 ddd 9.q. s.occt

EEoo

f

p@!cq8q=u,o='-9.E

=.o(tt

o

pa(l, (D

89=oo='-9.

=.o@

o

IEEif;$E

Fsg*EF6' f6'

E -.{9d@3=A;-q=.oL-

Qq,6'aETooBqfooa

N) (J) $o) (/) o)

N) (]) (r)N) N

r I r

CTESoPfcLo-8ou,?e-o8s(DJ88at(,,?or=.d(,o)GE6fr88a99Ei65'

t€exqF€coqg(',r: -*9 ra gte3 gHsff -i5 do oca=o, o.6'9eg€ g4sE d-B-a+ E-

PdsE3o cLo-

iiFiEg3

aH il*$E *B Ee 3-si8@ (nE (o _ =f

,*ggglg

Egas if fi6'o YX T6otD-

FgHo--o'=oOJ@=s, 6'oo_e6'o-EFaoOJor-fo(cl <.

f(o

ggFflEE

H F#gFE-E

e#ig

ai+gdfr*lsg+=ooa

'5 5gFi

EEggE

a$gE3t6= H.

aa#: lFEs€i€ flgE E;E

;[gi;r;€E+5 idE:sH ad tt a

Elqgg #sH

N (r) 5(l) o) (r)

t- t- t- t- r t-

9c)ci98+3d=oo=qrC)

ooooa

a=CAEIq6<o-qeo<Jaao!Dq

o=c3!=qd<o-q$o<J5e. z.o€

a!oU)oz9

(t,

llo-(tozI

al,o@o-zI

t-mIvI

@(o\lNIoo(t

=@g)

0)

=.o

()r-c)o=o-(D:at,o-

ll0)(cIosoo,

Page 56: Ssm Lil 0204 Nrr

zo

-!+oq-NOtt-sql

oa-ttnoR6qE'oID

=AI

n6*

CLCL

!6'=3<ot='ooio-=>+oo*-9=;?oI'J O'o

oo

vooctggvo-

m>3ooe'tod

N)(o N@

N\t N)o,

l\)(Jl

9=-co.oa)'g

o

!o{o-EA)ox

a g!,:-i=si!Dd

=o(o:.o

o

2mF?eaJAq=-(Dofs-uog

o{oEe 6d=8o-d:JCe

='2da0lo

aaxd€.qs.==(o (o

^n(,)oil i6'a3o=o

ooU)--

o!E8ile.=u36-

CLoq)

o

=o

;C HlHFH

giEFFHs

'E; i*gl=UraaOfo-o o x oo

89=6=o)9a-=

o)

dooCL

o

=.ao

c.alxo0,qfra1.B+a6-0)ofu, a-+Ecooa-aFF

+oo==<J=.

e.9ol 3=ocLf

=q,!9- o.oPEJ=q)oGl(ctoo

tu 5 5 Cr)

l\) (r) (, q)

t- I -

#dEgg aaE&3q ge gfi.g3*aie ia:-E;F3- 9or 9.=

(/):f

1' e Ie oqld €ae Eq= E6d qP.,'d-8-

$EHgi$;

Ha+rlg

iliai;B3 6.gdE,E o €..tEE3ai 9;a

.sQ fc)ii oa9o+gE

€o'a=a4Egoo-Elo0)

Q8JJoo-o6sidgloFa9*OJcLo

nir$Ell;

'tga;F5eilFirE

a

F 5 ds33s

Ell$l:Ei$=$geE iltlFgE=

:?;EIE E

EAo-O'a0t

9.0)ctoo=att

oo-9t_

@coa0):too(t,

l\) 5 $ (Jt

J

r- t- t- r

8 88 il9={€ qH.=a= +'9. R 9H g-t'2*F=llo*=.o F=Xqo'- uraP =." o *3 5 =(o

^ * a31=e; F'rEE ff:',8.3o"€F5g A-

or (,' '- -o + +6^gd='6P 6 gd

o=EIEd<o-qEo<JaU'O!D€

oogr@0)ooocoJ t =go9aH tEte,6 E

e: **ra ,QiaEe

t-mIvI

@(o{NIoo(,

t_=o0)

0)

=oIo()o=o-oat,o-

lltt)(cIo(Jloo,

Page 57: Ssm Lil 0204 Nrr

zo

-!+oqtNOor3cL 6'

o9r60sqQo'oo

ql

vor

CLCL

u6'5=<q,-'oqio-3>+oo19. -9=iou, 0lo

oo

7ooCLggt

v6-

m>3oo-'Gt=oo6

o)(^)(/)N)

(J) G)o

*1OcloEqi+ 0,-

g6dq5€ao

69J-

EIEdE_.YEAE

=.

o

6'ElgE-" €'Y3

o=o0,!t0,o

A'

=o

oI5CL8o!D=

ogooo)oifo

qE r8fgroFor o xllF iAN

EE iqF$<

='8E'-€o

8 3 = qg

a;;E 3

F"6 *-ot

E:€ ; F€E e

o='df6 g

oo=-o0ts=(oo-oE.!t3o=

ilF;d]E+gPEe+oPgF9oor-

$ (rt o) (J)

(l) (rt N l\)

- =dqt; fi[fi€fEgx

c;il

'EgACoE

E ail9B:E

E Irc€ =:**f,83

tF q(cto=.aFdqFqt3--q-P6 Pin d€

o->o-r-.{o =o o5

fr€aI€g9B'E

F3=ti*{ 3BH€$;1ts3 as

gg;ao*o 30

Ed;iO=i 0)

xo+cL(u'CL'{

ottooat,c=.ooCL

oU'

3io3g.

A (t (.) qt

t- t- t- r

_qd =

R I =I di

=.=.R:g

s g *B *ea daE

=;ri E!i+= 6:x < ='g= -.X o s, (ci-f=' o='o -o = =F a" € 8-

3

rmIvI

@(o{NIoo(r)

=o0)q)

=o=Ior-oo5o-o:)oo-

llo)(cIoo)oCD

Page 58: Ssm Lil 0204 Nrr

COSHH ASSESSMENT 004 - Diesel Fuel, Gas Oil

Assessment By: P Gox. Review Date: Jan 2010 | Next Review: As required

Material: Diesel Fuel. Gas Oil Supplier: Any Manufacturcr: Any

Hazardous contents:

Polycyclic aromatic 100ppm, Route: SkinHydrocarbons Smg/m', Route: InhalationOilMist

Description and form of substance: Clear Liquid, Diesel is pale yellowish colour, Gas Oil is red

Normal Use: Fuel for compression-ignition enginesHazards in normal use: Dermatitis due to prolonged/repeated exposu re

Inhalation of misUvapours - aspiration into lungs

{ormal Gontrol Measures:)rotective clothing to be worn where prolonged/repeated contact is likelympermeable gloves to be worn during handling/pumping ( EN 420 )\dequate ventilation, avoid frequenVprolonged skin contact\void prolonged inhalation of misUvapours use HSE approved respiratory when significant vapours occurUoid wearing clothing/footwear soaked in oil\void skin contact, wash thoroughly with plenty of soap and waterUoid splash filling at high flow rates to prevent electrostatic charges being generateditoraqe::uel to be stored in 5 litre approved container and kept inside the box AT ALL TIMES

N\SPECIALI'T

L) utli'f'l$'

:fr

PRoTEcT l{fiilpal I rvi oorous II ousnnus IIIO !AT, DRIXK

ORSHOI(E HY6ItIIEtr.HEAVILY

SOTLED DISPOSAELE

First Aid:Skin:

Eyes:

Inhalation:

Ingestion:

Remove contaminated clothing, Wash skin thoroughly with plenty of soap and water. Seekmedical attention if irritation persistsRinse IMMEDIATELY with plenty of water until irritation subsides (at least 15 minutes) ifirritation persists seek medical advice.Remove immediately from exposure, using safe and proper rescue precautions, administerartificial respiration if necessary, get prompt medical attention.Do not induce vomitinq because of danqers of aspiration. Get medical advice IMMEDIATELY

Fire: Use - Powder - Foam - Carbon Dioxide (CO2).Do not use water.Toxic fumes are produced when substance is involved in a fire.

Spillage: Ventilate area. Vapour heavier than air so particular attention to adjacent pits/basements.Eliminate all sources of ignition.Shut off at source.Absorb in sand or inert absorbent material.Collect into a container. close lid.Suitable hand protection must be worn.Wear respiratory equipment when spillage is in confined space.Wear protective overalls and chemical / safety footwear.Do not allow spillage to enter the drain / sewers / water courses.Dispose of in accordance with LocalAuthoritv Reoulations

Risk Assessment in Normal Use: LOW

Page 59: Ssm Lil 0204 Nrr

COSHH ASSESSMENT 004 - Transmission / Hydraulic Oil

Review Date: Jan 2010 Next Review: As required

Material: Liquimatic Transmission Oils, Hydraulic Oil

Hazardous contents: On Heating.Carbon Monoxide

Carbon DioxideOxides of Nitrogen & Sulphur

Description and form of substance: Mobile Liquid Oil

Normal Use: Hydraulic & Transmission Lubricant

Hazalds in normal use: Dermatitis due to prolonged/repeated exposureInhalation of misUvapours - aspiration into lungs

Normal Gontrol Measures:Protective clothing to be worn where prolonged/repeated contact is likelylmpermeable gloves to be worn during handling/pumping ( EN 420 )Eye protection when handling heated productAdequate ventilation, avoid frequenUprolonged skin contactAvoid prolonged inhalation of misUvapours use HSE approved respiratory when significant vapours occurAvoid wearing clothing/footwear soaked in oilAvoid skin contact, wash thoroughly with plenty of soap and waterAvoid splash filling at high flow rates to prevent electrostatic charges being generatedStoraqe:Fuel to be stored in 5 litre approved container and kept inside the jacking box AT ALL TIMES

NO EAT. DRIXEoR staoKE

First Aid:Skin:

Eyes:

Inhalation:

Get medical advice IMMEDIATELY

Remove contaminated clothing, Wash skin thoroughly with plenty of soap and water. Do not usesolvents or thinners. Seek medical attention if irritation persistsRinse IMMEDIATELY with plenty of water until irritation subsides (at least 15 minutes) if irritationpersists seek medical advice.Remove immediately from exposure, using safe and proper rescue precautions, administer artificialrespiration if necessary, get prompt medical attention.

Use - Powder - Foam - Carbon Dioxide (CO2).Do not use water.Toxic fumes are produced when substance is involved in a fire

Ventilate area.Eliminate all sources of ignition.Shut off at sourceAbsorb in sand or inert absorbent material.Collect into a container, close lid.Suitable hand protection must be worn.Wear respiratory equipment when spillage is in confined space.Wear protective overalls and chemical / safety footwear.Do not allow spillage to enter the drain / sewers / water courses.

of in accordance with Local

Risk Assessment in Normal Use: LOW

Page 60: Ssm Lil 0204 Nrr

5.3 APPENDIX'C'- TOOL BOX TALK PROFORMA

Page 61: Ssm Lil 0204 Nrr

HSQE Briefing and Toolbox Talk Record Sheet

Date: Location:

Name of persondeliveino Talk:

Signature of persondeliverinq Talk:

Content of the toolbox talk: ltnctuoe details of any documents you have made reference to):

No Attendee's Name Signature Date

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Page 62: Ssm Lil 0204 Nrr

oI!aotro-Io0t

zoEzzI!

=gIotuol!oIJJ

lolrJIoo

EiI

_oEooo(o

oo)c

(!;Eoooc,

6ooco

=oo