1 | Page State Project Management Unit, West Bengal Integrated Coastal Zone Management Project Institute of Environmental Studies and Wetland management Dept. of Environment, Govt. of West Bengal DD-24, Sector – 1, Salt Lake City, Kolkata – 700064 TERMS OF REFERENCE FOR ENGAGEMENT OF CONSULTANCY SERVICES FOR IMPACT ASSESSMENT OF THE PILOT INVESTMENTS UNDER ICZM PROJECT – WEST BENGAL A. Background : The Government of India, along with the State Governments of Gujarat, Odisha and West Bengal, is implementing a World Bank financed project called the Integrated Coastal Zone Management Project (ICZM Project). The Project aims to support the long-term vision of the Government by (a) building national capacity for implementation of a comprehensive coastal management approach in the country, and (b) piloting the integrated coastal zone management approach in the states of Gujarat, Odisha and West Bengal. The Project focuses on expanding the institutional capacity and knowledge base needed for integrated management of coastal zones, capacity building at the state level, preparation of integrated coastal zone management plans, and a range of complementary local pilot investments. The pilot activities in West Bengal are located mainly on the coastal stretches of Digha- Sankarpur and Sagar Island of Sundarban. SPMU – West Bengal, ICZM Project now intends to assess the impact of the pilot investments that are either completed or nearing completion for which ICZM Project intends to engage consultancy services from eligible firms and universities. The intended consultancy will involve extensive data collection and research using both qualitative and quantitative methods. B. Objectives of the Assignment 1. To provide an appropriate framework of evaluation which takes into account baseline conditions, institutional and knowledge benchmarks, dynamic nature of ICZM processes with suggestion to improve project design and implementation. 2. To provide investigative and diagnostic information through project evaluation and provide documentation of lessons learnt to the SPMU due to the implementation of

Upload: danglien

Post on 22-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

1 | P a g e

State Project Management Unit, West Bengal

Integrated Coastal Zone Management Project Institute of Environmental Studies and Wetland management

Dept. of Environment, Govt. of West Bengal

DD-24, Sector – 1, Salt Lake City, Kolkata – 700064

TERMS OF REFERENCE FOR ENGAGEMENT OF CONSULTANCY SERVICES FOR

IMPACT ASSESSMENT OF THE PILOT INVESTMENTS UNDER ICZM PROJECT –

WEST BENGAL

A. Background :

The Government of India, along with the State Governments of Gujarat, Odisha and West

Bengal, is implementing a World Bank financed project called the Integrated Coastal Zone

Management Project (ICZM Project). The Project aims to support the long-term vision of

the Government by (a) building national capacity for implementation of a comprehensive

coastal management approach in the country, and (b) piloting the integrated coastal zone

management approach in the states of Gujarat, Odisha and West Bengal. The Project

focuses on expanding the institutional capacity and knowledge base needed for integrated

management of coastal zones, capacity building at the state level, preparation of integrated

coastal zone management plans, and a range of complementary local pilot investments. The

pilot activities in West Bengal are located mainly on the coastal stretches of Digha-

Sankarpur and Sagar Island of Sundarban.

SPMU – West Bengal, ICZM Project now intends to assess the impact of the pilot

investments that are either completed or nearing completion for which ICZM Project

intends to engage consultancy services from eligible firms and universities. The intended

consultancy will involve extensive data collection and research using both qualitative and

quantitative methods.

B. Objectives of the Assignment

1. To provide an appropriate framework of evaluation which takes into account

baseline conditions, institutional and knowledge benchmarks, dynamic nature of

ICZM processes with suggestion to improve project design and implementation.

2. To provide investigative and diagnostic information through project evaluation and

provide documentation of lessons learnt to the SPMU due to the implementation of

Page 2: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

2 | P a g e

ICZM approach in select coastal stretches. The findings may be disseminated to

concerned Govt Depts and the PEAs in order to provide them an insight to the

outcomes for planning and executing integrated sustained approaches to the

development and management of coastal zones.

3. To provide a structured assessment of the economic and social costs and benefits

accrued, with practical quantifications, from implementation of the pilot investments

under ICZM Project West Bengal. The results and conclusions of the impact

assessment may contribute to future policy development and action plans including

possible promotion of thematic research programs and capacity building activities.

C. Scope of Work:

Impact Assessment of all the pilots investments executed under ICZM Project should cover

following salient points:-

1. Assessing and analysing benefits arising from the pilot investments using Cost

Benefit Analysis or any other similar measures/standards

2. Assessing and analysing extent of involvement of community in planning, execution

and supervision, especially in micro infrastructure development, livelihood and

income generation activities.

3. Assessing and analysing implementation of Environment and Social Management

Plan during implementation and post implementation phase. Impact on flora and

fauna, and livelihoods of the people during the course of the implementation of the

project components of ICZM Project.

4. Assessing and analysing adequacy and appropriateness of the documentation process

followed in general and specifically for livelihood and vendor rehabilitation

components Digha & Sagar Block. Consultant is expect to compare the

documentation with national and international process and suggest best practices.

5. Assessing and analysing key risk factors for longer-term sustainability of the created

assets. Analysis of the resources and capacities (organisational, social, financial,

economic) available with the stakeholders including beneficiaries and communities in

general.

6. Assessment of the achievements in capacity building, knowledge sharing, co-

ordination capabilities and general awareness regarding implementation of ICZM

activities. Assessment and analysis of lessons learnt and identification of gaps

amongst the different stakeholders including the PEAs and other govt. departments.

Page 3: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

3 | P a g e

Assessment of possibilities of convergence and degree of integration with other social

and development schemes.

7. Identification of scope of revenue generation if any, from the usage of the assets

created under this project for long term sustainability of the project components

independently.

The analysis to be carried out in comparison with related baseline values (i.e. at least one year

before the implementation of the respective project components). In case of non-availability

of such data, the analysis should be made in comparison with related values pertaining to the

region sourced from government records or reports of reputed organizations, and

questionnaire survey with the local community/authorities.

The consultant is also required to get familiarized with the project through a desk review of

existing project documents and reports like the Project Appraisal Document (PAD), Detailed

Project Reports of the various pilot investments, CRZ notifications, PEA wise Project

Progress Reports (SPRs), Cost Tables, MOUs, Environment & Social Assessment (E&SA)

and Environment & Social plans, Procurement Plans, Financial records etc. The consultant is

also required to understand various processes, guidelines and reports developed in the project

including Bid documents, Contract documents and TORs.

In addition to above general scope and coverage, individual project components needed to be

covered taking into account specific nature of the investment and intended benefits/objectives

achieved.

Scope of the intended impact assessment consultancy for the different project components

implemented under ICZM Project in the state of West Bengal are detailed below:-

I. Department of Disaster Management - Construction of 25 Multi-Purpose

Cyclone Shelters (located in the coastal blocks of South 24 PGs district e.g Sagar,

Basanti, Namkhana, Gosaba and Patharpratima).

1. Broader assessment of the quality and usefulness of the MPCSs. Assessment of

possible usefulness both at the time of disaster and during normal times.

Assessment and analysis of MPCSs as school extensions/learning centers/social

service delivery centers

Page 4: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

4 | P a g e

2. Perception of the community about MPCSs and awareness of the community

about MPCS, disaster mitigation preparedness of the community and the local

authority. Assessment of achievement in coastal vulnerability reduction.

3. Assessment of development and strengthening of the institutional mechanism for

mitigation of disasters, functioning and sustainability of the “MPCS Maintenance

and Management Committees” and relief distribution network e.g. connectivity to

main roads, mock drills along the possible evacuation routes etc.

4. Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the MPCSs.

II. DSDA - Beachfront Development in Digha

1. Broader assessment and analysis of the quality and usefulness of the assets created

e.g. Hawker rehab centers, beach amenities, watch towers, food courts, open air

theatre etc.

2. Perception and analysis of satisfaction level of the tourists and local community

about the assets created with respect to visual aesthetics and management of the

coast/ beach area. Assessment on improvement of beach cleanliness and sanitation

condition with reference to measures/ standards as deemed appropriate by the

consultant. Assessment of tourist footfall of the tourists in conjunction with hotel

occupancy levels and perception of hotel and restaurant owners.

3. Assessment on development and strengthening of the institutional mechanism for

functioning and sustainability including maintenance and management of the assets

created. Assessment of income enhancement/ generation abilities of the local

community due to capacity building activities under this project component.

4. Assessment regarding awareness and handling of participation of vendors, weaker

sections, differently abled community members/ tourists, gender sensitivity issues

(particularly at Toilet Blocks, Food Courts and Vendor Kiosks allotments)etc. during

implementation, maintenance and operation of the assets. Analysis of livelihood

status/ income level, social status and aspirations level of the rehabilitated hawkers.

III. DSDA - Storm Water Drainage System & Phytoremediation in Digha

1. Assessment and analysis of the quality and usefulness of the drainage network and

phytoremediation and its impact on surroundings during summer and monsoon

Page 5: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

5 | P a g e

season. Assessment of drainage network vis a vis structural changes that occurred due

to the work component by way of extension of road/lanes /pathways (if any) coupled

with likely impact through alteration of alignments/ patterns of public utilities e.g.

water supply, power supply, etc. Impact on flooding and waterlogging if any in the

project area especially during peak monsoon or due to tidal surges.

2. Perception of the stakeholders especially tourists, coastal community, etc about the

pilot investment with respect to area development and management of the coast/

beach area. Assessment of improvement in beach cleanliness and sanitation condition

with reference to measures/ standards as deemed appropriate by the consultant.

3. Assessment on development and strengthening of the institutional mechanism for

functioning and sustainability including maintenance and management of the drainage

network and phytoremediation work.

4. Assessment regarding awareness and handling of participation of weaker sections and

gender sensitivity issues etc. during implementation, maintenance and operation of the

drainage network and phytoremediation work.

5. Comparative analysis of seasonal health issues of the locality (local inhabitants and

tourists) after implementation of the drainage system at Digha area - data to be

considered from hospital/health centers, etc. Improvement registered with respect to

aesthetics and landscape including impact on land prices / real estate value of the

project area with reference to value of land as determined by local authorities e.g.

L&LR dept, land auction prices of DSDA, property registration rates of Directorate of

Registration and Stamp Revenue, property tax paid to Panchayats etc.

IV. Strengthening of the Marine Aquarium - MARC-ZSI in Digha

1. Assessment of the quality and usefulness of the improved pumping and filtration

system installed in the marine aquarium along with the development of museum cum

interpretation center.

2. Perception of the local community and tourists about the upgradation of the marine

aquarium and development of museum cum interpretation center along with its impact

on visitors flow. Analysis of the feedback provided in the visitors’ register to

understand the level of appreciation and gaps if any.

3. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the assets created under this pilot investment.

Page 6: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

6 | P a g e

4. Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the facilities/assets created along with

the capacity building programmes under this pilot investment.

5. Analysis/Outcome of the research facility improvement of MARC, ZSI with the usage

of modern scientific instruments procured under ICZMP

6. Assessment of the capacity building/training programmes for the State Govt. officials

and the coastal community on issues pertaining to coastal and marine ecosystem.

V. Eco-tourism in Sagar Island – SIDCL

1) Broader assessment of the quality and usefulness of the assets created under this

project component. Assessment of possible usefulness of the assets at the normal /

peak seasons. The analysis should include the impact of various infrastructures

created on. traffic and pollution management; tourist information coupled with

accommodation, restaurant and allied facilities; impact on the livelihood of the

rehabilitated hawkers and local community; improvement registered in qualitative and

quantitative terms with respect to environmental condition in the project area with the

introduction of better drainage network, sanitation facilities along with solid waste

management.

2) Perception of the community about facilities / assets created along with the awareness

of the communities and local authorities. Assessment of achievement in coastal

vulnerability reduction.

3) Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the Dala Arcade, Naat Mandir, Eco-camp complex,

Toilet Blocks, Beach Shelters and Solid Waste Management units.

4) Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the assets created under this pilot

investment.

5) Assessment of the capacity building/ training programmes.

VI. Renovation of Sanitary Sewerage Scheme in Digha – PHED

1. Assessment of the quality and usefulness of the Sanitary Sewerage Network

including Sewage Lifting and Pumping Stations, Sewage Treatment Plant (STP)

Page 7: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

7 | P a g e

and Laboratory. Assessment of capacity utilisation of STP and other assets/

facilities that have been created.

2. Perception of the community about Sewerage Network and STP and awareness

level of the stakeholders for proper usage of the sewerage system and drainage

systems. Assessment of achievement in coastal vulnerability reduction with

respect to pollution containment, sanitation and hygienic conditions.

3. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the assets created under the Sanitary Sewerage

Scheme. Improvement in institutional knowledge base of PHED and its engineers.

4. Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the Sewerage system.

5. Improvement registered with respect to:-

a) Incidences of water borne and gastro-intestinal diseases related ailments in

Digha.

b) Incidents of contamination of ground water and water supply lines

c) Suspended solids and faecal coliform concentration in sea-water

6. Assessment of disruption of services including existing sewer lines, water supply

pipelines, underground power and communication cables that may have led to

social inconveniences and handling over the same by implementing agencies.

VII. Livelihood Development in Sagar Block - SPMU/WBSRLM

1. Assessment of the socio-economic impact on the coastal community, as a result of

enhanced connectivity and drinking water facilities created through Entry Point

Activities.

2. Assessment of the changes with reference to household income, ownership of net

assets, formation of human and social capital along with women empowerment; food

and nutritional security; farm and non-farm productivity and revenue yield;

improvement and diversification registered in agriculture, animal husbandry, fisheries

and aquaculture based activities; natural resource management as a result of

livelihood development interventions.

3. Assessment of implementation of any climate resilient livelihood options along with

convergence of the livelihood programme with other govt. schemes.

Page 8: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

8 | P a g e

4. Assessment of expansion of small scale productive infrastructure coupled with

formation and functioning of Producer Companies/ Cooperatives, market access and

local value chain development.

5. Assessment of inclusion of vulnerable sections like differently abled community

members, scheduled castes, scheduled tribes, particularly single women and women

headed households, climate refugees.

6. Performance of the “Sanghas” (Cooperative of SHGs/CBOs) to be assessed in line

with the Key Performance Indicators of Micro Finance Institutions.

7. Extent of bank linkages of the member SHGs along with access to loans from the

banks along with development and functioning of producer collectives.

8. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the assets created under this pilot investment.

VIII. Forest Directorate – Plantation, JFM & Biodiversity Conservation Activities

(located in the coastal blocks of Purba Medinipore district e.g Ramnagar- I Contai I

Deshapran Khajuri - II Nandigram- I and Mahisadal).

1. Assessment of the quality and usefulness of the activities e.g. Plantation, JFM and

Biodiversity Conservation. Assessment of the project component will include the

following:

a) Plantation activities vis a vis shoreline and river bank stabilization

b) Broader assessment of mitigation of natural hazards like cyclones, tidal surges etc.

due to plantation activities.

c) Assessment of Survival of plantations created.

d) Broader assessment of ecological and biodiversity conservation benefits.

2. Augmentation of drinking water facilities and its impact in the area inhabited by the

members of Forest Protection Committees.

3. Perception of the community about the activities and awareness of the community and

local authorities about the relevance and importance of the activities for conservation of

the coastal ecosystem and economy. Assessment of achievement in coastal vulnerability

reduction.

4. Assessment of development and strengthening of the institutional mechanism for

sustainability of the plantations as well as assets/facilities created under JFM and

Biodiversity Conservation activities.

Page 9: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

9 | P a g e

5. Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the Plantations as well as assets/facilities.

6. Assessment of income enhancement through alternative livelihood opportunities and

wage employment of FPCs members coupled with Social, Financial and Physical capital

accumulation at the community level in relation to the contracted FPCs/ EDCs.

IX. WBSEDCL - 100% Household Electrification in Sagar Island

1. Assessment of the quality and usefulness of the work related to 100% Household

Electrification. Impact of Electrification in improvement of the health, education

and SME sector in Sagar Island

2. Perception of the community about Electrification work and awareness of the

community about on the possible benefits such as increased security, business

hours, study and allied domestic chores. Assessment of achievement in coastal

vulnerability reduction.

3. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the assets created along with the performance/

serviceability of grid electricity during the contingencies e.g. cyclonic storms,

tidal surge etc. and the restoration mechanisms.

4. Assessment regarding awareness and handling of participation of weaker sections,

differently abled community members, gender sensitivity issues etc. during

implementation, maintenance and operation of the Grid.

5. Assessment of increase in alternative livelihood options and income

enhancements due to introduction of grid electricity. Assessment of electrical

appliance ownership.

6. Reduction in air pollution due to phasing out of DG sets and kerosene fed lighting

equipment.

X. Capacity Building – IESWM

1. Assessment of the quality and usefulness of the Capacity Building Programme in

remote sensing, GIS and oceanographic modelling for–

a) Studying the coastal and near shore processes.

b) Coastal Zone Management Plans preparation

c) Aiding in the coastal zone management planning

Page 10: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

10 | P a g e

2. Perception of the scientific community and local authorities about the Capacity

Building Programme. Assessment of achievement in coastal vulnerability

reduction.

3. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the assets created along with knowledge sharing

with the stakeholders.

XI. Capacity Building – University of Calcutta

1. Assessment of the quality and usefulness of the assets procured under this project

component.

2. Assessment and analysis of the research programmes

a. Cataloguing and dissemination of microbial diversity in Sundarban

b. Assessing the amount of carbon sequestration through mangrove forest of

Sundarban towards controlling global warming.

3. Assessment of potential usage of research outputs in industrial/pharma sector along

with product & process patent achieved if any.

4. Assessment of the impact factor and citations of the research publications.

5. Awareness of the coastal and scientific community about the benefits accrued through

this project component. Assessment of possible contribution in coastal vulnerability

reduction.

6. Assessment of development and strengthening of the institutional mechanism for

functioning and sustainability of the research facilities created.

XII. Capacity Building of SPMU, Forest Dept., Environment Dept. and PEAs.

1. Assessment of the quality, usefulness and implementation level of the project

component.

2. Assessment of capacity building on the basis of lessons learnt, knowledge transfer

and institutional development for the following points:-

a. Better conservation and utilisation of coastal resources for sustainable

development of the coastal region.

b. Better project management and monitoring activities.

3. Assessment of development and strengthening of the institutional mechanism

amongst the govt. depts. and offices along with other stakeholders on the

Page 11: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

11 | P a g e

understanding and implementation of ICZM philosophy due to increased knowledge,

capacity and better ways of integrated approach in working.

XIII. ICZM Plan Preparation for West Bengal

1. Assessment of the quality and usefulness of the preparation of an ICZM plan for the

selected stretch of West Bengal coast.

2. Assessment of development and strengthening of the institutional mechanism

amongst the govt. depts. and offices along with other stakeholders on the

understanding and implementation of ICZM philosophy due to increased knowledge,

capacity and better ways of integrated approach in working.

D. Output & deliverables/ Schedule for completion of Assignment.

The deliverables of the Consultant will be the data sets, bar charts, statistics, reports and

related justifications arising out of analysis of the work, in both soft and hard copies. Further,

full documentation of methods, techniques and data analyses will to be submitted in the

reports accompanying each data category. The following reports, along with the time frames,

will be submitted by the Consultant. The client usually takes 15-30 days for review and

acceptance of the report submitted by the consultant.

Name of the Report Time frame

Inception report: stating broadly the research

methodology, sample size, area coverage and the statistical

analysis and tools that may be deployed.

Within two (2) months from

date of award of contract

Draft Report and presentation for the entire assignment. Within six (6) months from

date of award of contract

Submission of final presentation and report in line with

Project Development Objectives/ indicators

At the end of ninth (9th)

month of the consultancy

Page 12: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

12 | P a g e

E. Data Services and Facilities to be provided by the Client:

The SPMU and its PEAs would provide available data and information for taking up

work as stated under scope of work. SPMU and PEAs will facilitate access to physical

location to project sites to the Consultant. SPMU will issue necessary correspondences

and coordinate at the field level for collection of data by the Consultant. The SPMU will

help the Consultant to identify and facilitate consultation with implementation agencies,

line departments operating at the project area, affected groups, potential project

beneficiaries and other stakeholders in the project area. The SPMU will designate an

officer(s) to act as the main liaison officer and participate in the assignment

The Consultant would be responsible for contacting the individuals identified, synthesize

and analyze the information available, drawing inferences from interactive sessions with

the implementing officers of the PEAs and the project beneficiaries.

Consultant is required to fill the gaps by sourcing information from reputed & credible

websites, PEAs’ office records, district gazetteers, annual reports of line depts., census

data, etc. at its own cost. This may also include records available from Zilla Parishads,

Panchayat Samitis, Gram Panchayats and also from block, sub-division and district

collectorate offices.

Consultant will be also responsible for any needed translation of documents and

processing of data.

Consultant will arrange and bear the costs of the services related to transport,

accommodation and other associated logistics at Kolkata and at project sites as required

for carrying out the assignment. Consultant shall include all such costs in its financial

proposal.

F. Composition of Review Committee to Monitor Consultants Work.

Review Committee in consultation with the Dept. of Environment, Govt. of West Bengal

will be constituted which shall monitor the Consultants’ work and would also assist the

Consultant by way of providing available data and information, conveying approvals and

permissions to Consultant for execution of their contractual obligations.

Page 13: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

13 | P a g e

G. Procedure for Review on Inception Reports, Progress Reports, Final draft and Final

report.

The Review Committee will study the reports as stated above and may accept or suggest

changes or even negate the findings of the consultant after due diligence and deliberation

with the concerned PEAs and other stakeholders. The Review Committee will

recommend the release of payment to the consultant upon the acceptance of the

deliverables as stated above and performance appraisal of the consultant in satisfactory

terms. The committee may also seek comments and inputs on the consultants work from

the World Bank staff and other experts as deemed appropriate

H. List of Key Personnel.

Consultant will provide a team of experts with adequate skill sets, qualification, expertise

and commitment necessary to accomplish the objectives of this assignment. Following is

an indicative list of key positions, required qualifications and experience, as well as

indicative input during different stages of the assignment. Consultants are expected to

include in their proposal all additional expertise and support staff that will be needed.

Key

Professionals Experience

No Man /

Month

Team leader

Master’s degree in economics preferably in

developmental/environmental economics. Post-qualification experience

of 10 years in monitoring & evaluating projects is essential. At least 15

years of experience in leading evaluations of implementation of large

scale projects and programs.

1 9

months

Institutional

development

specialist

Masters or higher degree in economics, public finance, rural

development with post-qualification experience of 10 years in

institutional development and design and implementation programs.

Knowledge in micro finance involving SHGs is also required.

1 4

months

Electrical

Engineer

Bachelor’s or Master’s degree in electrical engineering with post-

qualification experience of 10 years in designing and commissioning

the works related to Grid electricity.

1 1

month

Social

Development

Specialist

Postgraduate in Sociology/ Rural Development/ Developmental Studies

or any such relevant field with post-qualification experience of 10 years

in conducting social impact assessments, CBO mobilization, CBO

1 6

months

Page 14: State Project Management Unit, West Bengal Integrated ... · Integrated Coastal Zone Management Project ... Odisha and West Bengal. The Project ... on land prices / real estate value

14 | P a g e

Key

Professionals Experience

No Man /

Month

coordinated livelihood promotion activities, resettlement and

rehabilitation, stakeholder consultations etc.

Environmental

Specialist

Postgraduate in Environmental Science or Engineering. At least having

post-qualification experience of 10 years in the domain of sustainable

development and pollution management projects including at least 2

years in beach management, conducting of environment and social

assessments, audits and EIAs, audits of infrastructure projects;

designing and implementation of sanitation, drainage and sewage

treatment projects.

1 4

months

Civil Engineer Postgraduate in Civil Engineering or equivalent. post-qualification

experience of 8 years in the domain of in civil engineering with

knowledge in of buildings and low cost structures with specific

experience in designing (cyclone, flood, earthquake, fire) safe

structures; hawkers’ rehab centers, etc. The expertise should also

include experience in urban design or landscape architecture.

1 2

months

Eco Tourism

Specialist

Masters or higher degree in tourism with post-qualification experience

of 8 years in relevant sectors e.g. eco-tourism, coastal/ beach tourism

etc.

1 2

months

Disaster

Management

Specialist

Master’s degree in Disaster Management with minimum 8 years of

post-qualification experience in the relevant fields.

1 2

month

Micro

Biologist

Master degree in Microbiology or equivalent fields with 10 years’

research experience in the domain of marine science.

1 1month

Field

Evaluators

Master’s degree in social sciences, environmental sciences, planning or

management with at least 5 years of experience in carrying out

monitoring and evaluation surveys, quality assurance and assessments

at field level for implementation of infrastructure projects essential.

Knowledge of local language essential.

3 8

months