Page 1: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Status of the National Transport Planand its impact on the development of the country

Page 2: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

CHALLENGES ACROSS THE

TRANSPORT SECTOR• 5% the total freight

• Average speed: 14km/hour

FREIGHT RAILWAYSROADS

• 40% of the network in poor conditions

• 95% of freight transported by truck.

• Low domestic connectivity.• Half the number of pax/capita than

in the rest of the region.• Space for improvements in safety

and air traffic control.

AIR SECTOR

• 15M users in MRBA.• Absence of public transport in the

provinces• Low quality infrastructure.

URBAN MOBILITYPORTS AND WATERWAYS

• Limitations on infrastructure don’t allow the operation of large ships.

• Lack of access infrastructure.• Loss of competitiveness.

Page 3: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

VISIONCarrying out the most ambitious Transport Plan in the history ofthe country, with a federal vision; integrated and intermodaltransport that provides conditions of excellence for the mobilityof people and goods; reduces transportation times, costs andnegative externalities; and fundamentally maximizes safety,comfort and sustainability.

Page 4: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

INFRASTRUCTURE

Transforming, developing and modernizing the infrastructure for transport in the country, through a federal strategy, improving the

connectivity and productivity of the regional economies, especially the ones that have been most left behind.

PRIORIZATION

Managing in an efficient and sustainable way the different modes of transport, to contribute to the economic growth and to reduce the logistic costs, defending the interests of users. Prioritizing the sustainable modes of transport and the individual non-motorized mobility.

SAFETY

Positioning security as the center of actions associated with transportation in all its forms and in a transversal way to all the

areas of the Ministry.

EMPLOYMENT AND PEOPLE

Strengthening quality work, favoring the generation of direct and indirect employment in the execution of works; The creation of

new jobs based on the opportunities generated by the development of infrastructure; and ongoing training to professionalizing and prioritizing public and private employment in the field of transportation.

TRANSPARENCY

Eliminating corruption and ensuring transparency in purchases, contracting and control of works, as well as in all acts of

government of the Ministry of Transport.

STRATEGIC GOALS

Page 5: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Public investment (million USD) Private investment 2016-2019 TOTAL

2016 2017 2018 2019

Air sector 250 360 400 450 1,350 2,810

Freight railways 100 500 1,550 1,550 500 4,200

Urban transport 750 2,750 3,000 3,000 9,500

Roads 1,900 2,100 3,000 3,000 2,000 12,000

Ports 10 50 100 100 4,500 4,760

TOTAL 3,010 5,760 8,050 8,100 8,350 33,270

INVESTMENT PLAN2016 - 2019

USD 33,270

Page 6: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

2500 Km

NATIONAL ROAD NETWORKLong term plan for 2027

2,000 km new pavings

825 works

2,800 km new highways

2,500 km safe roads

13,000 km rehabilitated roads

250 new engineering projects

RN 7 - Lujan a Giles

USD 12,000 MINVESTMENT 2015 – 2019

Highways Safe roads

Ro

ads

USD 35,000 MLONG TERM PLAN 2027

JOB GENERATION:100,000

We have already achieved 50%

Page 7: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

INTEGRATION WITH CHILE

BINATIONAL TUNNEL AGUA NEGRA

It will go through the Andes Mountain linking the province of San Juan (Argentina) and Coquimbo Region (Chile).

Two independent tunnels 14 km long at 4.080m above sea level.

Main advantages:

▶ Developing a logistic corridor from Porto Alegre, Brasil, up to Coquimbo in Chile to strengthen regional economies, offering a straight exit to the Pacific Ocean.

▶ Contributing to the diversion of flows in the Cristo Redentor System during seasonal closure due to bad weather conditions.

▶ Generating jobs, developing technology and capacity that will strengthen Argentinean road engineering sector.

Investment USD 1,500 M

CRISTO REDENTOR SYSTEM Investment USD 750 M

Main border crossing between Argentina-Chile, with more than 4,5 M tons/year.

Main mountain chain crossing in Latin America. Daily mean transit of 2.100 vehicles (20% of which are trucks)

Executive project for the first stage is currently being developed together with IADB. R

oad

s

Page 8: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

LARGE INFRASTRUCTURE PROJECTS

SANTA FE – PARANÁ BRIDGE

Currently in pre-project development.

Public tender planned for the fourth quarter 2017.

4.5 km in longitude; 50 m height.

Access lanes from road 168 y connectivity with roads14, 12 and 11.

Investment USD 1,100 M

CORRIENTES – RESISTENCIA BRIDGE Investment USD 750 M

Executive project contracted with UTE Consulbaires-Consular-IATASA.

Public tender planned for the fourth quarter 2017.

3.5 km in longitude and 30 meters in height.

Access lanes from roads RN 11 y RN 12.

Ro

ads

Page 9: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

2,000 M USD investment expected in the next 5 years.► 7,000 km of resurfaced roads and new hard shoulders.► 1,400 km of new highways on high volume corridors.

11 PPP in total: 8 corridors (between 600 and 900 Km extension) & 3 access to ports (Bahía Blanca and Rosario, and South access of Buenos Aires)

Income from toll & fixed fee guaranteed by the National Government in the first 7 years (funded by resources from a fuel fund established by law).

Planned schedule: ► Data room: 7-2017.► Tender: end of 2017.

ROAD CORRIDORS – PUBLIC PRIVATE PARTNERSHIP

6,576 km under the new concession scheme of national roads11 projects to be tendered by 2017

Ro

ads

Page 10: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

IMPACT ON ECONOMY: Road asphalt production

2013/15: average 4 plants per year

2016: 32 plants

1st quarter 2017: 4 plants per month

Selling of asphaltic plants

2017 is projected to be the best year in history (580,000 TN).

March 2017 was the best month in history: 53,466 tn.(The previous record was November 1998)

Ro

ads

555,836

486,547

328,322 352,291

132,137

211,017

329,438

406,280 459,256 480,805

427,537 468,101 460,474

492,029

404,428

472,728 435,056 414,356

357,107

404,834

20122011

201020172015

175.166

580.000

20142013

201620001999 2003

2002 2004 20062001 20092007

20082005

1998

Real consumption 2016 - actualityRoad asphalt 1998 - 2015 Projection 2017

Consumption of road asphalt 1998-2017

Page 11: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

TOTAL INVESTMENTUSD 15,000 M

JOB GENERATION:

25,000 DIRECT

WHERE ARE WE GOING: Freight network completely rehabilitatedand 15% of freight transported by train in 2035

Network fully enabled

Tns transported

Km rehabilitated tracksFrei

ght

trai

ns

Renewed track

Heavy maintenance

Page 12: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

0

14

28

41

55

Córdoba Dean Funes Recreo Frías La Madrid Tucumán

1984

2016

* Primer semestre 2016

Authorized speed on rails: 1984 vs. 2016

WHAT DID WE RECEIVE? Declining freight railways

The average commercial speed of Belgrano Cargas is 14 km/h.45% of the tracks (4,000 km) with caution alert, which led to a significant drop in average speed.

1.5 derailments per day in the Belgrano Cargas network and 1.3 cuts on tracks (1st half 2016)

Frei

ght

trai

ns

Page 13: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

IN A YEAR THE NEW MANAGEMENT REVERTED THE TREND

13

-17%-17%

-24%-20%

Revertimos la tendencia en 2016 con un

crecimiento del 3%

The Belgrano Line had its best December with

121,418 Tn

Operational action groups:

Time reduction of56% in derailing liftings

We reverted the trend in 2016 with an annual growth of 3%

Frei

ght

trai

ns

year

TN

Page 14: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

RENEWAL OF BELGRANO CARGAS LINE

20,600 employments (direct + indirect).

► Renewal of 1,593 km

► 38 months

► Investment: USD 2,600 M

► Chinese funding CMEC + CAF + Treasury

Frei

ght

trai

ns

Page 15: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Renewal of1,626 km

39 monthsInvestment

USD 2,800 M

RENEWAL OF SAN MARTÍN LINE

5 Provinces (Buenos Aires, Santa Fe, Córdoba, San Luis and Mendoza)

Solution of a limitation to the competitiveness of the regional economy.

The project will generate 26,000 jobs (direct + indirect)

72% of local input.

EMP

LOY

MEN

T The cost of transport will decrease by 55%, on average for the 12 M Tns that will be derived from truck to train.

+ 200 M USD/year of savings in logistics.

LOG

ISTI

C C

OST

S

Reduction of road accidents and reduction of GHG emission.

EXTE

RN

ALI

TIES

Operational costs will be reduced significantly due to the decrease of rolling material weariness and derailings (in 2016 there were 91)

EFFI

CIE

NC

Y

Frei

ght

trai

ns

Page 16: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Recovery700 km

36 monthsInvestment

+ USD 530 MFunding

PPP

RENEWAL OF ROCA LINE – VACA MUERTA

1

2

3

4

Pto. Bahía Blanca 20 km/ 50 M USD

Improvement/Renewal B. Blanca – Chipolletti 540 km/ 300 M USD

Renewal Chipollelti - C. Cordero 30 km / 30 M USD

New layout C. Cordero – Añelo 85 km / 150 M USD

The 4 stages of the project will generate 3,500 jobs.

EMP

LOY

MEN

T 2019 1.5 M Tn 2023 5 M Tn 2028 7 M Tn

The only viable alternative for transporting this volume.

FREI

GH

T V

OLU

ME

Reduction on logistics costs for the transport of potassium (Project Vale).

Reduction of road accidents and reduction of emission of GHG.

EXTE

RN

ALI

TIES Time optimization on

transport and therefore a reduction on operational costs.Improvement on capacity of standard transport TN/axis.EF

FIC

IEN

CY

Frei

ght

trai

ns

Page 17: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

17

WHAT ARE WE DOING? Recovering the freight network

Never in history there was such an investment on the freight network infrastructure.

USD 6 billions investment on infrastructure

BELGRANO CARGAS

Today we have 800 km of rails being renewed.

In April 2017 we will have:

► 1,593 km of rails being renewed.► USD 2,600 M investment.► 20,600 employment generated (direct + indirect).

SAN MARTÍN

In 2018 we will begin the construction:

► 1,626 km of rails to renew.► USD 2,800 M investment.► 26,000 employment generated (direct + indirect).

ROCA

We began to negotiate:

► 700 km of rails to renew.► USD 530 M investment.► 3,500 employment generated (direct + indirect).

Frei

ght

trai

ns

Page 18: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

IMPACT ON THE ECONOMY: MORE PRODUCTION AND PRIVATE INVESTMENT in stock centers and loading facilities.

17%

Private investment as a complement of public investment :12 companies will add 1.5M Tn of capacity to the network with a USD 113 M investment

Pampa del InfiernoRamal C12

CharataRamal C3

Pampa del InfiernoRamal C12

TucumánRamal C8

USD 12M

USD 3.4 M

USD 8.4M

USD 9M

Four of these companies are already investing USD 33 M

Frei

ght

trai

ns

Page 19: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

IMPACT ON ECONOMY: GROWTH ON PRODUCTION AND TRANSPORT

TRAIN22 M TN

ROAD410 M TN

RIVER/SEA12 M TN

TRAIN103 M TN

CAMIÓN410 M tn

RIVER/SEA22 M TN

ROAD617 M TN

MODAL SHARE

2012435M tn

2030735M tn

Frei

ght

trai

ns

Page 20: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

WHERE ARE WE GOING: MULTIPLY WATER CARGO.Modern ports. Predictable and safe navigation.

Develop our merchant navy and increase domestic use.

Increase dredging through public-private partnerships.

Infrastructure works in ports and waterways (improve navigation safety).

INVESTMENT 2016 - 2019

USD 260 MCURRENT PRIVATEINVESTMENT USD 2,500 M+

Po

rts

and

wat

erw

ays

WORKS

► 2 ports for 30 M USD under construction

► 4 Works to start for 84 M USD

► 3 projected works for 31 M USD

Improve industry competitiveness.

Page 21: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

21

ROSARIO

BAHÍA BLANCA

BUENOS AIRES

Road works and new accesses to Rosario Port (267 km)

Rail accesses to new ports.

Reduction of transport and operational costs in ports.

Highway construction in the intersection of National Roads 3 and 252 and part of the beltway in road 33 (corridor linking Bahia Blanca with Rosario) Three-level distributor over the Cholo Crossing, instead of the current roundabout at ground level.

Construction of “Paseo del Bajo”: access to Buenos Aires Port

Building 11 km of highway between provincial road 11 and Industrial Park (Tecplata).

Investment USD 657 M

Investment USD 557M

9

Toepfer – Pto. de San Martín – Santa Fe

Investment USD 900 M

Puerto de San Martín – Santa Fe

Buenos Aires

IMPROVEMENTS IN PORTS’ ACCESSEliminating bottle necks and improving bypasses

Ro

ads

Page 22: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

BUENOS AIRES PORT EXPANSION

The most important container terminals of Argentina can handle in total 1,5 million TEUs.

Investment in the layout of the terminals in order to increase capacity and receive new generations ships (Post-Panamax).

Current concessions expire in 2019 and we expect the tender process to be launched during 2017.

Investments are estimated in around 2,000 M USD –including access infrastructure in order to increase capacity of the port.

Po

rts

and

wat

erw

ays

Page 23: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Subsecretaría de Planificación de Transporte de Cargas y Logística

ARGENTINA HAS ONE OF THE MOST IMPORTANT GRAINS’ EXPORT NODE

10,5 M of tons of grains and subproducts

74 M TNS OF GRAINS AND SUBPRODUCTS

25 TERMINALS

4,700 TRUCK/DAY

Historic exports record: it grew 45% compared to 2015, 7,7 million of tons

Is one of the biggest grain exporter terminal in the World.

Historic record in 2016 of 12.2 million tons (50% growth versus 2015).

Terminal 6

Po

rts

and

wat

erw

ays

Ports of Bahía Blanca - Rosales

Ports of Quequén

Ports of Rosario - Timbúes

Page 24: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

BUENOS AIRES METROPOLITAN REGIONQ

ual

ity

pu

blic

tra

nsp

ort

PUBLIC TRANSPORT

49 %15 MILLION

INHABITANTS2,590 KM2

22,000,000daily trips

39 % 6 % 4 %

Page 25: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

BUS RAPID TRANSIT SYSTEM IN ARGENTINA

Completed

Under construction

Projected

Buenos Aires Metropolitan Area

Qu

alit

y p

ub

lic t

ran

spo

rt

Juan B. Justo9 de JulioSurNorte

25 de MayoSan MartínLa Matanza

Tres de FebreroDel Bajo (Alem)

Morón)

2,5 million daily users

Page 26: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Powering

Investments in progress Strategic works in progress

New stations and technologiesUSD 731M

100% new rolling stockUSD 3,240M

USD 816MAutomatic Trains Stops

USD 570MRailway renewal

USD 8,537 M

USD 193MWorkshops

USD 100M

USD 3,244MRegional Express Network

Undergrounding

Viaducts and PBN

Electrification

USD 3,000M

USD 1,360M

USD 933M

USD 5,650 M

USD 14,187 M INTEGRAL PLAN FOR METROPOLITAN PASSENGER TRAINS (2016-2025)

Qu

alit

y p

ub

lic t

ran

spo

rt

Page 27: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

REGIONAL EXPRESS NETWORK

10,800,000TOTAL BENEFITED POPULATION

Roca Line4,000,000

SUR

5,500,000

OESTE1,700,000

Belgrano Sur Line

1,500,000

Sarmiento Line

1,700,000

San Martín Line1,300,000

NORTE

3,600,000

Mitre Line1,500,000

Belgrano Norte Line900,000

S A N M A R T I NCASEROS

COLEGIALES

LA PATERNAL

CORREO CENTRAL

CENTRAL SARMIENTO

CENTRAL ROCA

A. DEL VALLE

CONSTITUCION

VILLA SOLDATI

TAPIALES

SAN MARTIN

NUÑEZ

PLAZAMISERERE

RETIRO

Qu

alit

y p

ub

lic t

ran

spo

rt

1 Up to Constitución underground station.Period 2017 – 2019 | Investment: USD 283 M

3 BELGRANO Sur hasta Tapiales.Plazo de la obra: 2021 - 2023

2 MITRE up to San Martín.Period: 2017 - 2021

STAGE 2: MITRE – SARMIENTO (6 kms)

STAGE 3: BELGRANO (7 kms)

STAGE 4: EXTENSIONS RER

1 SAN MARTIN up to Caseros.Period: 2017 - 2021

BELGRANO SOUTH /BELGRANO NORTH.Period: 2020 – 2023 | Investment: USD 760 M

a up to La Paternal.

b up to Colegiales.

c up to Nuñez.Period: 2017 – 2021 | Investment: USD 1262 M

2 Connection Roca Central Station

2 Connection Sarmiento.Period: 2018 - 2023 | Investment: USD 438 M

1 Up to Correo Central.Period: 2018 – 2021 | Investment: USD 484 M

STAGE 1: ROCA (7 kms)

Page 28: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Qu

alit

y p

ub

lic t

ran

spo

rt

RAILWAY VIADUCTS IN BUENOS AIRES

TOTAL INVESTMENT

385 M USD

MITRE TIGRE | 110 M USD21 months – September 2019

BELGRANO SUR| 135 M USD28 months – October 2018

Work in progress

SAN MARTÍN| 140 M USD28 months – July 2019

Work in progress

Page 29: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ELECTRIFICATIONSQ

ual

ity

pu

blic

tra

nsp

ort

ElectrificationRoca

250 M USD

Electrification Roca line

ElectrificationBelgrano Sur

480 M USD

Re-electrificationMitre

783 M USD

ElectrificationBelgrano Norte

602 M USD

ElectrificationSan Martín

520 M USDWORK IN

PROGRESS

Page 30: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Actualizar ambas

imágenes con avance de

obra – mostrar el tunel

SARMIENTO´S UNDERGROUNDINGInvesments in progress

Qu

alit

y p

ub

lic t

ran

spo

rt

TOTAL INVESTMENT

U$S 3,000 M

Elimination of 49 low level crossings

20,000 daily vehicles

180,000 daily passangers

25% travel time reduction

WORK IN PROGRESS

Page 31: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

AUTOMATIC TRAIN STOP (ATS)Investing in safety

Qu

alit

y p

ub

lic t

ran

spo

rt

WORK IN PROGRESS

260 M USD300 million passengers per year

8 railway lines (Urquiza, Belgrano Norte, Belgrano Sur, Roca,

Mitre, San Martín and Sarmiento)

1,462 km of rail

Contract granted to

Page 32: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

FUTURE TENDER OF ROLLING STOCK – URBAN TRAINS

ONE OF THE BIGGEST ROLLING STOCK TENDERS OF THE YEAR

Qu

alit

y p

ub

lic t

ran

spo

rt

Detail Units Total 2017 2018 2019 2020 2021 2022 2023 2024 2025

Broad Gauge Electric Cars(1676/25Kv, 50Hz)

Numbers of Train

USD M 1,806 6,24 6,24 41,6 95,68 166,4 182 310,96 540,8 459,08

Units 174 0 0 4 8 16 16 26 52 52

Electric Train MaintananceUSD M 45,9 1,8 3,6 9 10,8 20,7

Units 51 0 0 0 0 2 4 10 12 23

3 DATA ROOM in January – 12 internacional companies – 485 business inquiries

COMPANY COUNTRY

ALSTOM France

TALGO España

BOMBARDIER Germany

SIEMENS Germany

CRRC China

HYUNDAI ROTEM Korea

COMPANY COUNTRY

MITSUBISHI Japan

KBR USA

STADLER RAIL Switzerland

CAF Spain

TRANSMA HOLDING Russia

MARUBENI Japan

Financing conditions

Lead time

Page 33: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Air

pla

ne

revo

luti

on

AIR MARKETDoubling the number of domestic passengers

Enhanced domestic and international connectivity

More routes and frequencies

Additional safety

Better travel experience

Ezeiza’s new airport

Ezeiza’s airport today

Page 34: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

NORWEGIAN

NEW COMPANIES

LOCAL INVESTMENT PLANS

USD 1.5-1.9 B

40 airplanes (approx. 27 purchase and 13 by leasing)

1,250 direct jobs

AVIANCA

Air

pla

ne

revo

luti

on

USD 220 millions

12 ATR – 600 + Embraer 190

450 direct jobs

LOCAL INVESTMENT PLANS

Page 35: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

MODERNIZING AIRPORT INFRASTRUCTURE, INVESTMENT IN NEW TECHNOLOGY AND EQUIPMENT

19 airports

INVESMENT 2016 – 2019

1,400 M USD3x the investment of the previous 4 years

Air

pla

ne

revo

luti

on

Aeroparque’s airport today

New Aeroparque’s airport

Page 36: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

8 AIRPORTS ALREADY COMPLETEDA

irp

lan

e re

volu

tio

n

Córdoba

Mendoza

Río Gallegos

Salta

Trelew

Iguazú

Chapelco

Tucumán

CórdobaTucumán

Iguazú

Trelew

Mendoza

Page 37: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

9 AIRPORTS WORKS IN PROGRESSA

irp

lan

e re

volu

tio

n

Comodoro Rivadavia

Aeroparque

Ezeiza

Jujuy

Salta

San Fernando

San Juan

San Luis

Bariloche

Comodoro Rivadavia

AeroparqueJujuyEzeiza

Page 38: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

TRANSPARENCY - PROGRESS IN TENDERING PROCESSES

Main actions:

Online (web) publishing of all processes and documents, available openly and for free.

Advance publication of general guidelines + Procedural Manual.

Mechanisms to avoid cartelization.

Opening internal borders and tenders for international companies.

New tendering strategies (lump-sum processes, possibility of improving offers)

Adequacy of HR and internal processes.

Adequacy of tender documents

Improvement in tendering processes times

Page 39: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

Tenders 2017Expected tender figures 2017

BUDGET (USD)

Highways and roads

# TENDERSSECTOR

Railways

Airports

Ports

Urban Transport

94

27

8

62

5

USD 6,687 M

USD 891 M

USD 2,510 M

USD 750 M

USD 109 M

TOTAL 196 USD 10,947 M

Page 40: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact
Page 41: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Highway NOA corridor RN 9 T-04: Access to Tucumán Tucumán 21 may-17 Treasury

Highway NOA corridor RN 9 T-04: Access to Tucumán Tucumán 13 may-17 Treasury

Repaving Paving RP 126 (Corrientes) RP 126 T-01: Int. RN 14 - Curuzú Cuatiá Corrientes 19 may-17 Treasury - CAF

Repaving Paving RP 126 (Corrientes) RP 126 T-02: Curuzú Cuatiá - Sauce Corrientes 24 may-17 Treasury - BIRF

Paving Paving RP 126 (Corrientes) RP 126 T-03: Sauce - Int. RN 12 Corrientes 48 may-17 Treasury - N/S

Highway AU RN 5 Luján - Carlos Casares RN 5 T03: Mercedes - Suipacha Buenos Aires 58 may-17 Treasury

Paving Paving RP 40 Int. RN 123 - Int. RP 41 RP 40 Int. RN 123 - Int. RP 41 Corrientes 27 may-17 Treasury - BID

HighwayRehabilitation and access to

BarranquerasRN 16 Distribuidor Acceso a Barranqueras

Corrientes -

Chaco9 may-17 Treasury

RepavingRehabilitation and access a

BarranquerasRN 16 Rehabilitation of road accesso to Barranqueras. Chaco 5 may-17 CAF

OthersRehabilitation and access a

BarranquerasMany Parking for trucks Chaco 4 may-17 CAF

Repaving Corridor NOA RN 66 Int. RN 9 - Int. RN 34 Jujuy 23 may-17 Treasury

Recovery and

maintenanceCrema MALLA 104

RN 152 / RN

143 Int. RN35 - Chacharramendi La Pampa 24 may-17 Treasury

Page 42: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Recovery and

maintenanceCrema MALLA 408a RN 60 / RN 157

T-01: Lte. Cordoba -Emp.Rn157 ; T-02: Int. RN60 -

FriasCatamarca 24 may-17 Treasury

Recovery and

maintenanceCrema MALLA 408d RN 157 Acc. Frías - Int. RP329 Tucumán 24 may-17 Treasury

Highway Highway Cañuelas - Olavarría RN 3 T-03: Variante a S. M. Monte Buenos Aires 49 may-17 Treasury

Recovery and

maintenanceCrema MALLA 131 RN 237/RN 234

T-01: Int. RP 27 - Pte A° Limay Chico ; T-02: Int.

RN 40 - Int. RN 237Neuquén 27 may-17 Treasury

Highway AU RN 95 urban road Saenz Peña RN 95 Calle 251 (km 1109,4) - Calle 351 (km 1115,7) Chaco 12 may-17 CAF

Highway AU RN 40 Mendoza - San Juan RN 40 T01: Acc. Aeropuerto El Plumerillo - Lte. Me/SJ Mendoza 178 may-17 Treasury

Highway AU RN 33 Rufino - Rosario RN 33 T-04: Cnia. Las Flores - Pérez Santa Fé 153 may-17 Treasury

Safe Roads AU RN 158 San Francisco - Río Cuarto RN 58 San Francisco - Río Cuarto Córdoba 86 may-17 Treasury

Safe Roads AU RN 158 San Francisco - Río Cuarto RN 158 San Francisco - Río Cuarto Córdoba 90 may-17 Treasury

Highway AU RN 20 Caucete - San Juan RN 20 Caucete - San Juan San Juan 50 may-17 Treasury

RepavingReconstruction RN 152 Gral. Acha -

PuelchesRN 152 Gral. Acha – Puelches La Pampa 33 jun-17 Treasury

Safe Roads Corredor RN 3 Tierra del Fuego RN 3 Corredor Tierra del Fuego Tierra del Fuego 29 jun-17 Treasury

Highway Safe Roads RN 11 Formosa - Clorinda RN 11 T-05: Circunvalación a Formosa Formosa 33 jun-17 Treasury

Page 43: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Highway AU RN 8 Pergamino - Venado RN 8 Variant Venado Tuerto Santa Fé 38 jul-17 Treasury

Paving Road Corridor RN 40 Los Cipreses - Samoré RN 0259 T-01: Futaleufú - Int. RN 40 Chubut 4 jul-17 Treasury

Paving Safe Roads RN 40 San Juan - SJ Jáchal RN 40 T-02: Talacasto - Int. RN 150 San Juan 54 jul-17 Treasury

Paving New RN 151 Neuquén - Dique Ballester RN 151 T-07: Int. RP 7 - Int. RN 1V22 Neuquén 13 jul-17 Treasury

Highway Corridor NOA RN 34 T-06: Rosario de la Frontera - Acc. A Salta Salta 75 jul-17 Treasury

Special Work Corridor NOA RN 34 T-06: Rosario de la Frontera - Acc. A Salta Salta 89 jul-17 Treasury

Special Work Corridor NOA RN 34 T-06: Rosario de la Frontera - Acc. A Salta Salta 89 jul-17 Treasury

Ruta Nueva Reconstruction RN 149 Calingasta - Las Flores RN 149 T-02: Calingasta - Iglesia San Juan 35 ago-17 Treasury

Paving Paving RN 149 Uspallata - Barreal RN 149 T-01: Uspallata - Calingasta Mendoza 21 ago-17 Treasury

Highway NOA Corridor RN 9 T-03: Termas de R° Hondo - Tucumán Tucumán 126 ago-17 Treasury

Highway NOA Corridor RN 9 T-03: Termas de R° Hondo - Tucumán Tucumán 84 ago-17 Treasury

Highway NOA Corridor RN 34 T-07: Acc. A Salta - San Pedro de Jujuy Salta 44 ago-17 Treasury

Highway AU RN 33 Rufino - Rosario RN 33 T-02: San Eduardo - Chovet Santa Fé 204 sep-17 Treasury

Page 44: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget(Milli

on USD)Tender

Source of

funding

Highway AU RN 34 Rosario - Sunchales RN 34 T-03: San Genaro - Cañada Rosquín Santa Fé 122 sep-17 Treasury

Highway AU RN 34 Rosario - Sunchales RN 34 T-04: Cañada Rosquín - Int. RN 19 Santa Fé 134 sep-17 Treasury

PavingPaving National Road N° 78 - Tramo: Chilecito

- Tinogasta - SecciónRN 78 Chilecito - Tinogasta

La Rioja,

Catamarca7 sep-17 Treasury

Recovery and

maintenanceCerma MALLA 204 RN 9 Villa del Totoral - Lte. Santiago del Estero Córdoba 17 sep-17 Treasury

Recovery and

maintenanceCerma MALLA 504 RN 14 Lte. Corrientes - Campo Grande Misiones 23 sep-17 Treasury

Recovery and

maintenanceCerma MALLA 539 RN 14 Campo Grande - Int. RP 20 Misiones 23 sep-17 Treasury

Highway AU RN 5 Carlos Casares - Santa Rosa RN 5 Anguil - Int. RN 35 La Pampa 80 sep-17 Treasury

Special Work Access to Ports of Rosario RM VARIAS Accesos a Terminales de Timbués y San Martín Santa Fe 65 oct-17 Treasury

Safe Roads AU RN 14 Libres - Posadas RN 14 Paso de los Libres - Posadas Corrientes 26 oct-17 Treasury

Safe Roads Safe Roads RN 14 San José - San Vicente RN 14 San José - San Vicente Misiones 30 oct-17 Treasury

Safe Roads Safe Roads RN 14 San José - San Vicente RN 14 San José - San Vicente Misiones 32 oct-17 Treasury

Safe Roads Safe Roads RN 14 San José - San Vicente RN 14 San José - San Vicente Misiones 31 oct-17 Treasury

Safe Roads AU RN 34 Sunchales - Taboada RN 34 Sunchales - TaboadaSantiago del

Estero32 oct-17 Treasury

Safe Roads AU RN 34 Sunchales - Taboada RN 34 Sunchales - TaboadaSantiago del

Estero21 oct-17 Treasury

Page 45: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads AU RN 34 Sunchales - Taboada RN 34 Sunchales - Taboada Santiago del Estero 30 oct-17 Tresuary

Highway Access to Ports of Rosario RN A12 Int. RN 9 (a Bue) - Int. RN 11 Santa Fé 120 sep-17 Treasury

Highway Access to Ports of Rosario RN A12 Int. RN 9 (a Bue) - Int. RN 11 Santa Fé 75 sep-17 Treasury

Highway Access to Ports of Bahía Blanca RN 3 T-01: Paso Urbano por Bahía Blanca Buenos Aires 49 oct-17 PPP

Highway AU RN 205 Cañuelas - Saladillo RN 205 T-01: Cañuelas - Lobos Buenos Aires 108 oct-17 PPP

Highway AU Cañuelas - Olavarría RN 3 T-05: Las Flores - Azul Buenos Aires 110 oct-17 PPP

Highway AU Cañuelas - Olavarría RN 3 T-05: Las Flores - Azul Buenos Aires 140 oct-17 PPP

Special WorkNational Road N° 9 - Acceso Parque

industrial y puertos de ZárateRN 9 Access to industrial park and Zarate ports Buenos Aires 7 oct-17 PPP

Highway AU RN 5 Luján - Carlos Casares RN 5 T04: Suipacha - Chivilcoy Buenos Aires 70 oct-17 PPP

Highway AU Cañuelas - Olavarría RN 3 T-04: S. M. Monte - Las Flores Buenos Aires 65 oct-17 PPP

Highway AU Cañuelas - Olavarría RN 3 T-04: S. M. Monte - Las Flores Buenos Aires 99 oct-17 PPP

Highway AU RN 33 Bahía Blanca - Pigüé RN 33 T-02: Bahía Blanca - Pigüé Buenos Aires 90 oct-17 PPP

Page 46: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Special Work Cristo Redentor System RN 7 T03: Potrerillos - Uspallata Mendoza 60 oct-17 PPP

Special Work Cristo Redentor System RN 7 T05: Uspallata - Acc. Tunel Libertadores Mendoza 100 oct-17 PPP

Highway AU RN 3 Azul - Bahía Blanca RN 3 T-03: Dorrego - Bahía Blanca Buenos Aires 103 oct-17 PPP

Highway AU RN 3 Azul - Bahía Blanca RN 3 T-03: Dorrego - Bahía Blanca Buenos Aires 90 oct-17 PPP

Safe RoadsAU RN 34 La Banda - Rosario de la

FronteraRN 34 La Banda - Rosario de la Frontera Santiago del Estero 32 oct-17 Treasury

Safe RoadsAU RN 34 La Banda - Rosario de la

FronteraRN 34 La Banda - Rosario de la Frontera Salta 22 oct-17 Treasury

Special Work AU RN 22 Cipoletti - Zapala RN 22 T-02: Cipoletti - Neuquén Neuquén 100 oct-17 Treasury

Highway NOA Corridor RN 34 T-01: Taboada - La Banda Santiago del Estero 181 oct-17 Treasury

Special Work AU Cañuelas - Olavarría RN 226 T-06: Azul - Olavarría Buenos Aires 29 oct-17 PPP

Safe Roads AU RN 3 Azul - Bahía Blanca RN 3 Azul - Bahía Blanca Buenos Aires 12 oct-17 PPP

Safe RoadsAU RN 5 Carlos Casares - Santa

RosaRN 5 Carlos Casares - Santa Rosa Buenos Aires 9 oct-17 PPP

Safe RoadsAU RN 5 Carlos Casares - Santa

RosaRN 5 Carlos Casares - Santa Rosa La Pampa 14 oct-17 Treasury

Page 47: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads Safe Roads RN 38 La Rioja - Alberdi RN 38 La Rioja - Alberdi Tucumán 34 oct-17 Treasury

Highway AU RN 11 Resistencia - Formosa RN 11 T-02: Resistencia - Int. RP 90 Chaco 36 nov-17 Treasury

Highway AU RN 33 Rufino - Rosario RN 33 T-05: Pérez - Int. RN A008 Santa Fé 27 nov-17 Treasury

Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 5 Carlos Casares - Santa Rosa Buenos Aires 24 nov-17 PPP

Safe Roads Corridor Iberá RN 12 Corredor del Iberá Corrientes 24 nov-17 Treasury

Highway AU RN 12 Corrientes - Posadas RN 12 Corrientes - Posadas Corrientes 72 dic-17 Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Córdoba 22 dic-17 Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Santiago del Estero 23 dic-17 Treasury

Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Santiago del Estero 29 dic-17 Treasury

Repaving RePaving RN 16 RSP - Salta RN 16 T-02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero 22 dic-17 Treasury

Special workRoad connection to Resistencia bridge and Corrientes capital

Many New bridge Resistencia - Corrientes Corrientes - Chaco 900 dic-17 PPP

Page 48: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Special Wok Bridge Santo Tomé - Santa Fe RN 11 Conexión Vial Santa Fe - Santo Tomé Santa Fé 140,0 01/01/2018 TBC

Special Wok Access to Ports of Rosario RN 1V11 Int. RN A012 - Int. AP 01 Santa Fé 117,0 01/01/2018 Treasury

Highway Access to Ports of Bahía Blanca RN 3 T-01: Paso Urbano por Bahía Blanca Buenos Aires 71,5 01/01/2018 PPP

Special Wok Access to Ports of Bahía Blanca RN 0252 T-01: Paso Urbano por Bahía Blanca Buenos Aires 84 01/01/2018 PPP

Highway AU RN A005 Circunvalación Río Cuarto RN A005 Int. RN 8 - Int. RN 36 Córdoba 51,6 01/01/2018 Treasury

Safe Roads AU RN 12 Corrientes - Posadas RN 12 Corrientes - Posadas Corrientes 21,3 01/01/2018 Treasury

Repaving Repaving RP 1 Jujuy RP 1 T-08: San Pedro - Pichanal Jujuy 31,2 01/01/2018 Tresury - BID

Special Wok Cristo Redentor System RN 7T06: Adecuación de Túnel Libertador y

CaracolesMendoza 200 01/01/2018 PPP

Safe Roads AU RN 11 Santa Fe - Reconquista RN 11 Santa Fé - Reconquista Chaco 21,1 31/01/2018 Treasury

Safe Roads AU RN 14 Libres - Posadas RN 14 Paso de los Libres - Posadas Corrientes 30,6 31/01/2018 Treasury

Safe Roads AU RN 35 Realicó - Río Cuarto RN 35 Realicó - Río Cuarto Córdoba 37,5 31/01/2018 Treasury

Safe Roads Road Corridor Resistencia - Corrientes RN A030 Road Corridor Resistencia - Corrientes Chaco 20 31/01/2018 Treasury

Page 49: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

49

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads AU RN 3 Azul - Bahía BlancaRN 3 Azul - Bahía Blanca Buenos Aires 20,7 31/01/2018 PPP

Safe Roads AU RN 9 Córdoba - Santiago del EsteroRN 9 Córdoba - Santiago del Estero Córdoba 21 31/01/2018 Treasury

Safe Roads AU RN 22 Bahía Blanca - ChichinalesRN 22 Bahía Blanca - Chichinales Río Negro 21 31/01/2018 Treasury

Safe Roads AU RN 22 Bahía Blanca - ChichinalesRN 22 Bahía Blanca - Chichinales Río Negro 11,4 31/01/2018 Treasury

Safe Roads AU RN 34 Sunchales - TaboadaRN 34 Sunchales - Taboada Santa Fé 18 31/01/2018 Treasury

Safe Roads AU RN 34 Sunchales - TaboadaRN 34 Sunchales - Taboada Santa Fé 21 31/01/2018 Treasury

Safe Roads Safe Roads RN 127 Paraná - RN 14RN 0127 Paraná - RN 14 Entre Ríos 22,5 31/01/2018 Treasury

Safe Roads Safe Roads RN 127 Paraná - RN 14RN 0127 Paraná - RN 14 Entre Ríos 19,2 31/01/2018 Treasury

Safe Roads Safe Roads RN 127 Paraná - RN 14RN 0127 Paraná - RN 14 Entre Ríos 24,9 31/01/2018 Treasury

Safe Roads Safe Roads RN 127 Paraná - RN 14RN 0127 Paraná - RN 14 Corrientes 12 31/01/2018 Treasury

Highway AU RN 117 Santa Tomé - LibresRN 0117 Int. RN 14 - Paso Intl. Libres Corrientes 6,7 01/02/2018 Toll

Safe Roads AU RN 8 Río Cuarto - Villa MercedesRN 8 Río Cuarto - Villa Mercedes Córdoba 22,5 03/03/2018 Treasury

Safe Roads AU RN 8 Río Cuarto - Villa MercedesRN 8 Río Cuarto - Villa Mercedes San Luis 9,0 03/03/2018 Treasury

Safe Roads AU RN 22 Bahía Blanca - ChichinalesRN 22 Bahía Blanca - Chichinales Buenos Aires 21,9 03/03/2018 PPP

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Page 50: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales La Pampa 18,6 03/03/2018 Treasury

Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 9,6 03/03/2018 Treasury

Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 3,3 03/03/2018 Treasury

Highway AU RN 34 Rosario - Sunchales RN 0034 T-02: Int. RN A012 - San Genaro Santa Fé 57,0 01/04/2018 Treasury

Safe Roads Corridor Iberá RN 0123 Corridor Iberá Corrientes 16,6 02/04/2018 Treasury

Safe Roads Safe Roads RN 174 Rosario - Villaguay RN 0174 Rosario - Villaguay Entre Ríos 17,4 02/04/2018 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 64,5 02/04/2018 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 60,0 02/04/2018 Treasury

Safe Roads Safe Roads RN 14 San José - San Vicente RN 0014 San José - San Vicente Misiones 18,0 02/04/2018 Treasury

Safe Roads Corridor NOA RN 0065 Corridor NOA Santiago del Estero 49,0 02/04/2018 Treasury

Safe RoadsSafe Roads RN 237 R° Collón Curá -

BarilocheRN 0237 R° Collón Curá - Bariloche Neuquén 13,3 02/04/2018 Treasury

Safe RoadsSafe Roads RN 237 R° Collón Curá -

BarilocheRN 0237 R° Collón Curá - Bariloche Neuquén 13,3 02/04/2018 Treasury

Special Wok Access to Ports of Rosario RP 0010 Int. RN A012 - Int. AP 01 Santa Fé 7,5 02/04/2018 Treasury

Repaving Repaving RN 16 RSP - Salta RN 0016 T-02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero 17,3 01/05/2018 Treasury

Page 51: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Repaving Repaving RN 16 RSP - Salta RN 0016 T-02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero 13,8 01/05/2018 Treasury

Safe Roads AU RN 33 Bahía Blanca - Pigüé RN 0033 Bahía Blanca - Pigüé Buenos Aires 18,6 03/05/2018 PPP

Safe Roads AU RN 32 Pergamino - Rosario RN 0032 Pergamino - Rosario Buenos Aires 14,4 03/05/2018 PPP

Safe Roads AU RN 32 Pergamino - Rosario RN 0032 Pergamino - Rosario Santa Fé 17,4 03/05/2018 Treasury

Highway Repav Au 7 San Luis RN 0007 Variante Desaguadero Mendoza 30,0 01/06/2018 Treasury

Highway AU RN 229 Bahía Blanca - Punta Alta RN 0229 T-03: Dorrego - Bahía Blanca Buenos Aires 25,9 03/06/2018 PPP

Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 15,9 03/06/2018 PPP

Special Wok Cristo Redentor System RN 0007 T04: Variante Uspallata Mendoza 25,0 01/07/2018 PPP

Special Wok Road Corridor Resistencia - Corrientes RN A030 T-02: Segundo Bridge Resistencia - Corrientes Chaco - Corrientes 600,0 01/07/2018 Treasury

Special Wok Access to Ports of Rosario RP 0091 Int. RN A012 - Int. AP 01 Santa Fé 17,5 01/07/2018 Treasury

Special Wok Vial Integration Santa Fe - Paraná RN A007 T-02: Bridge SF-Paraná Santa Fé-Entre Ríos 500,0 01/07/2018 Treasury

Page 52: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads Vial Integration Santa Fe - Paraná RN A007 Vial Integration Santa Fe - Paraná Entre Ríos 14,0 01/07/2018 Treasury

Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 15,0 03/07/2018 PPP

Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 0005 Carlos Casares - Santa Rosa Buenos Aires 15,3 03/07/2018 PPP

Safe Roads Corridor NOA RN 0009 Corridor NOA Tucumán 13,8 03/07/2018 Toll

Safe Roads Corridor NOA RN 0009 Corridor NOA Tucumán 15,0 03/07/2018 Toll

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 18,3 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 18,0 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 19,2 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 19,5 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,0 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,6 03/07/2018 PPP

Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,0 03/07/2018 PPP

Safe Roads AU RN 188 San Nicolás - Junín RN 0188 San Nicolás - Junín Buenos Aires 11,4 03/07/2018 PPP

Page 53: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads AU RN 188 San Nicolás - Junín RN 0188 San Nicolás - Junín Buenos Aires 16,8 03/07/2018 PPP

Paving Paving RP 0008 Int. RN 12 - Int. RN 14 RP 0008T-02: Int. RN 14 (Campo Grande) - Int. RN 12

(Jardín de América)Misiones 26,7 01/08/2018 Treasury

Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 0005 Carlos Casares - Santa Rosa Buenos Aires 14,1 03/08/2018 PPP

Highway AU RN 16 Resistencia - RSP RN 0016 T-03: Peaje Makallé - Int. RP 9 Chaco 32,0 03/10/2018 Tresuary

Safe Roads Corridor NOA RN 0009 Corridor NOA Salta 8,4 03/10/2018 Toll

Safe Roads Corridor NOA RN 0009 Corridor NOA Salta 7,2 03/10/2018 Toll

Safe Roads AU RN 20 Caucete - San Juan RN 0020 Acceso Este San Juan San Juan 9,1 01/01/2019 Treasury

Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 11,1 01/01/2019 PPP

Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 0009 Córdoba - Santiago del EsteroSantiago del

Estero7,5 01/01/2019 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 15,0 01/01/2019 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 18,9 01/01/2019 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 15,0 01/01/2019 Treasury

Page 54: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

ROADS182 future tenders 2017 - 2019 : 10,082 M USD

Contact: Javier Iguacel (Presidente, DNV) [email protected]

Category Description Road Section ProvinceBudget

(Million USD)Tender

Source of

funding

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 22,4 01/01/2019 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 25,0 01/01/2019 Treasury

Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 18,9 01/01/2019 Treasury

Safe Roads Corridor Iberá RN 0012 Corridor Iberá Corrientes 12,2 01/01/2019 Treasury

Safe Roads AU RN 12 Corrientes - Posadas RN 0012 Corrientes - Posadas Corrientes 9,6 01/01/2019 Treasury

Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 3,6 01/01/2019 Treasury

Safe Roads AU RN 33 Bahía Blanca - Pigüé RN 0033 Bahía Blanca - Pigüé Buenos Aires 9,9 01/01/2019 PPP

Highway AU RN 34 Rosario - Sunchales RN 0034 T-01: Int. RN A08 - Int. RN A012 Santa Fé 25,4 01/01/2019 Treasury

Safe Roads Road Corridor RN 40 Los Cipreses - Samoré RN 0040 Futaleufú - Samoré Río Negro 5,7 01/01/2019 Treasury

Repaving Repaving RN 16 RSP - Salta RN 0016 T-04: Quebrachal - Int. RN 9/34 Salta 12,0 01/04/2019 Treasury

Repaving Repaving RN 16 RSP - Salta RN 0016 T-04: Quebrachal - Int. RN 9/34 Salta 17,4 01/04/2019 Treasury

Safe Roads Road Corridor Resistencia - Corrientes RN A030 Road Corridor Resistencia - Corrientes Corrientes 24,0 01/07/2019 Treasury

TOTAL USD 10,082 M

Page 55: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

RAILWAYS26 future tenders 2017: 891 M USD

Contact: Guillermo Fiad (Presidente, ADIF) [email protected]

Category Description ProvinceBudget

(Million USD)Tender

Source of

funding

Tracks Tracks renewal Suárez - Empalme Bancalari Buenos Aires 23 may-17 Treasury

Tracks Tracks renewal Santa Fe Santa Fe 14 may-17 CMEC

Signal and telecom Adequacy telegraph line Korn - Mar del Plata Buenos Aires 4 may-17 Treasury

Tracks Tracks renewal stage III Belgrano Cargas Many 478 jun-17 CMEC

Tracks Tracks renewal Congreso - Tigre Buenos Aires 32 jun-17 Treasury

Civil Works New station Retiro Buenos Aires 30 jun-17 Treasury

Tracks Trancks renewal Glew - Alejandro Korn Buenos Aires 10 jun-17 Treasury

Tracks Railway crossing Mitre line Buenos Aires 4 jun-17 Treasury

Civil Works Station Castelar - Central Walk Buenos Aires 2 jun-17 Treasury

Signal and telecom Signal and telecom Once station Buenos Aires 73 jul-17 Treasury

Civil Works Workshop San Martín line Many 13 jul-17 Treasury

Civil Works Adequacy José C. Paz station - línea Mitre Buenos Aires 6 jul-17 Treasury

Civil Works Renovation Morón station - Sarmiento line Buenos Aires 5 jul-17 Treasury

Page 56: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

RAILWAYS26 future tenders 2017: 891 M USD

Contact: Guillermo Fiad (Presidente, ADIF) [email protected]

Category Description ProvinceBudget

(Million USD)Tender

Source of

funding

Civil Works Rehabilitation bridge Belgrano Cargas Many 4 jul-17 CAF

Tracks Tracks renewal Caroya section Córdoba 10 ago-17 Treasury

Civil Works Low level crossing - Belgrano Sur line Buenos Aires 29 sep-17 Treasury

Tracks Tracks renewal Fournier section Santa Fe 23 sep-17 Treasury

Tracks Integral adequacy Mar del Plata section Buenos Aires 18 sep-17 Treasury

Electrification Change leads 815 Etapa II Buenos Aires 13 sep-17 Treasury

Signal and telecom Tracks renewal Maldona - J. L Suárez Buenos Aires 2 sep-17 Treasury

Tracks Tracks renewal Rufino - Bouchardo Many 33 oct-17 Treasury

Tracks Tracks renewalTapia - Los Mogotes branch C Belgrano Cargas line Tucumán 5 oct-17 Treasury

Tracks Tracks expansion station Lavallol - Belgrano Cargas line Buenos Aires 1 oct-17 CMEC

Tracks Tracks renewal Tapiales - González Catán - Belgrano Sur line Buenos Aires 15 nov-17 Treasury

Electrification Substitution swichtes 20 kv for 9 subestations Buenos Aires 7 dic-17 Treasury

Civil WorksImprovements in service station : Concordia, Timbues, San Cristobal,

Monte Caseros, Guemes, Paso de los Libres, Garupá y ZarateMany 7 ene-18 Treasury

Tracks Tracks renewal Bouchardo - Huinca Renanco Córdoba 30 feb-18 Treasury

TOTAL USD 891 M

Page 57: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

PORTS6 future tender: USD 109 M + USD 2,000 M

Contact: Manuela López Menéndez [email protected]

Description Province Budget (Million USD) Tender Source of funding

Concession Buenos Aires port Buenos Aires City 2,000 TBC PPP

Structure adaptation and access to the port Entre Rios 1 jun-17 Treasury

Structure adaptation and access to the Quequen port Buenos Aires 30 jul-17 Treasury

Construction of breakswaters to the Mar del Plata port Buenos Aires 13 ago-17 Treasury

Construction of spring to the Bahía Blanca port Buenos Aires 15 ago-17 Treasury

Adequacy spirng to La Plata port Buenos Aires 50 dic-17 Treasury

TOTAL USD 109 M + USD 2,000 M

Page 58: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

AIRPORTS62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected]

Airports Description ProvinceBudget

(Million USD)Tender Source of funding

Catamarca Approximation light system (SALS) Catamarca 0,6 May-17 Direct Investments / trust

Comodoro Rivadavia Renovation on runway and platform Chubut 9,3 May-17 Direct Investments / trust

Ezeiza Electric repowering Buenos Aires 1,3 May-17 Direct Investments / trust

Ezeiza Resurfacing runway Buenos Aires 9,4 May-17 Direct Investments / trust

Aeroparque New post PAMPA - CHARLIE Buenos Aires 1,2 May-17 Direct Investments / trust

Aeroparque Energy and beacon system Buenos Aires 1,6 May-17 Direct Investments / trust

Aeroparque EDIFICIO VI - Upper floor renovation Buenos Aires 0,6 May-17 Direct Investments / trust

Ezeiza New camara parking system Buenos Aires 0,4 May-17 Direct Investments / trust

AeroparqueEDIFICIO VII Y VIII - New passenger terminal (lower

levels) - EquipmentBuenos Aires 9,3 May-17 Direct Investments / trust

Aeroparque New commercial platform (North) Buenos Aires 12,5 May-17 Direct Investments / trust

Bariloche Health Area - National arrivals hall Río Negro 0,3 May-17 Direct Investments / trust

Ezeiza Replacing the BRITE system with AGLAS Buenos Aires 1 May-17 Direct Investments / trust

Río Grande Renovations on runway Tierra del Fuego 3,7 May-17 Direct Investments / trust

Catamarca New passenger terminal Catamarca 12,5 Jun-17 Direct Investments / trust

Comodoro Rivadavia New beacon system (include UPS) Chubut 3,1 Jun-17 Direct Investments / trust

Córdoba Expansion of existing parking Córdoba 1,5 Jun-17 Direct Investments / trust

Page 59: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

AIRPORTS62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected]

Felisa Blaquier (Comunicaciones, ORSNA) [email protected]

Airports Description ProvinceBudget

(Million USD)Tender Source of funding

Esquel Passennger terminal remodelations Chubut 7,5 Jun-17 Direct Investments / trust

Ezeiza Beacon provition for taxiway Buenos Aires 1,8 Jun-17 Direct Investments / trust

Ezeiza Updating beacon system on movement area Buenos Aires 9,3 Jun-17 Direct Investments / trust

Ezeiza New medium voltage camara CHIVATOS Buenos Aires 0,09 Jun-17 Direct Investments / trust

FormosaNew beacon system CAT I - high intensity - turning basin,

corrective work and demarcationFormosa 3,1 Jun-17 Direct Investments / trust

Iguazú Resurfacing runway Misiones 9,3 Jun-17 Direct Investments / trust

Jujuy Parking Jujuy 3,1 Jun-17 Direct Investments / trust

Jujuy Expansion of commercial platform Jujuy 2,8 Jun-17 Direct Investments / trust

San Fernando tubing of rainwater Buenos Aires 0,02 Jun-17 Direct Investments / trust

San Fernando New control tower Buenos Aires 2,5 Jun-17 Direct Investments / trust

San Juan Renovations on runway and beacon system San Juan 7,5 Jun-17 Direct Investments / trust

San Rafael Approximation light system (SALS) Mendoza 0,06 Jun-17 Direct Investments / trust

Tucumán New terminal - TWR -Parking - Accesses Tucumán 45 Jun-17 Direct Investments / trust

Tucumán Expansion of commercial platform Tucumán 5 Jun-17 Direct Investments / trust

Tucumán ALS system (900 MTS) Tucumán 1,2 Jun-17 Direct Investments / trust

Ezeiza New hall B - EDIFICIO - Buenos Aires 156 Jul-17 Direct Investments / trust

Page 60: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

AIRPORTS62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected]

Felisa Blaquier (Comunicaciones, ORSNA) [email protected]

Airports Description ProvinceBudget

(Million USD)Tender Source of funding

Ezeiza New parking and outdoor spaces Buenos Aires 25 Jul-17 Direct Investments / trust

Ezeiza Renovation and lighting platform post Zulu (EX CAB. 05) Buenos Aires 3,1 Jul-17 Direct Investments / trust

Ezeiza Readjustment of lighting platform FBO Y Chivatos Buenos Aires 0,07 Jul-17 Direct Investments / trust

Jujuy New passenger terminal Jujuy 28,1 Jul-17 Direct Investments / trust

Río Grande New atmospheric discharges installation Tierra del Fuego 0,02 Jul-17 Direct Investments / trust

San Juan Expansion of commercial platform San Juan 5 Jul-17 Direct Investments / trust

Comodoro Rivadavia New passenger terminal - equipment Chubut 4,6 Ago-17 Direct Investments / trust

Córdoba Airport entrance station Córdoba 2,5 Ago-17 Direct Investments / trust

Ezeiza Renovation in pre-shipment area - Terminal A - Stage 2 Buenos Aires 5 Ago-17 Direct Investments / trust

Ezeiza New passenger terminal - Ex estuche - Buenos Aires 187,5 Ago-17 Direct Investments / trust

Ezeiza Parking post signs in platform Buenos Aires 0,03 Ago-17 Direct Investments / trust

Formosa New passenger terminal Formosa 12,5 Ago-17 Direct Investments / trust

Jujuy New control tower Jujuy 3,1 Ago-17 Direct Investments / trust

La Rioja New passenger terminal La Rioja 9,3 Ago-17 Direct Investments / trust

Page 61: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

AIRPORTS62 future tenders 2017: 750 M USD

Contact: Patricio Di Stéfano (Presidente, ORSNA) [email protected]

Felisa Blaquier (Comunicaciones, ORSNA) [email protected]

Airports Description ProvinceBudget

(Million USD)Tender Source of funding

La Rioja New beacon system category I- high intensity La Rioja 2,8 Ago-17 Direct Investments / trust

Malargüe Main renovation on terminal Mendoza 1,8 Ago-17 Direct Investments / trust

Malargüe Fissures repairing on runway 14-32 and taxiway Mendoza 1,1 Ago-17 Direct Investments / trust

Mendoza New water supply - southern area Mendoza 65,5 Ago-17 Direct Investments / trust

San Juan New passenger terminal San Juan 23,7 Ago-17 Direct Investments / trust

San Juan New parking San Juan 3,1 Ago-17 Direct Investments / trust

Ezeiza Renovation on arrivals area - Terminal A Buenos Aires 9,3 Sept-17 Direct Investments / trust

Ezeiza Renovation on runway 11-29 Buenos Aires 12,5 Sept-17 Direct Investments / trust

Ezeiza New hall B - baggage system Buenos Aires 8,3 Sept-17 Direct Investments / trust

Ezeiza Taxiway to header 35 Buenos Aires 21,8 Sept-17 Direct Investments / trust

PosadasRenovation on passenger terminal + telescoping

walkway provisionMisiones 12,5 Sept-17 Direct Investments / trust

Santa Rosa Frame, perimeter wall and perimeter fence La Pampa 0,02 Sept-17 Direct Investments / trust

Ezeiza Resurfacing taxiway alfa, center line complete Buenos Aires 2,1 Oct-17 Direct Investments / trust

Río Grande Approximation light system (SALS) Tierra del Fuego 1,3 Oct-17 Direct Investments / trust

EzeizaLeading electrical substation (P49) / medium voltage

feedersBuenos Aires 2 Nov-17 Direct Investments / trust

Iguazú Parking Misiones 3,1 Nov-17 Direct Investments / trust

TOTAL USD 750 M

Page 62: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact

URBAN MOBILITY12 future tenders 2017-2019: 5,798 M USD

Contact: Manuela López Menéndez (Secretaria de trabajos de transporte público) [email protected]

Category Description ProvinceBudget

(Million USD)Tender Source of funding

Electrification Electrification San Martín line Metropolitan Area of Buenos Aires 520 jun-17 Treasury

Signal and telecom Signallling Roca line Metropolitan Area of Buenos Aires 170 jun-17 BID

Tracks Track renewal Roca line Metropolitan Area of Buenos Aires 50 may-17 BID

Signal and telecom Adequacy comunication Roca line Metropolitan Area of Buenos Aires 200 jul-17 BID

RER Construction Constitución station Metropolitan Area of Buenos Aires 283 may-17 Treasury

RER Construction Obelisco station Metropolitan Area of Buenos Aires 877 jun-17 Treasury

Additional works Adequacy work of Roca line Metropolitan Area of Buenos Aires 25 ago-17 Treasury

RER Interchanges Metropolitan Area of Buenos Aires 385 2017 Treasury

RER Construcción Correo Central Station Metropolitan Area of Buenos Aires 485 2018 Treasury

RER Connection Sarmiento line Metropolitan Area of Buenos Aires 438 2018 Treasury

RER Overpass San Martín line Metropolitan Area of Buenos Aires 62 2018 Treasury

RERElectrification Belgrano Sur line, Belgrano Norte

line and Mitre lineMetropolitan Area of Buenos Aires 1,865 2018-2019 Treasury

TOTAL USD 5,798 M

Page 63: Status of the National Transport Plan and its impact on ...alabc.s3.amazonaws.com/infrastructureforum2017/14__Guillermo Fiad... · Status of the National Transport Plan and its impact