  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    1/9

    1500 MW

    Oman

    Rev. B 03.12.2010

    Chapt. DESIGNATION Number Rev.

    Total Weight

    Tonnes

    MECHANICAL EQUIPMENT A 7285.1

    1 GT Foundation Anchors/Baseplates A 26.0

    2 Termal Block and Parts A 1539.8

    3 Air Intake Manifold A 78.8

    4 Exhaust Gas Diffusor A 296.2

    5 Generator A 1495.5

    6 A 39.1

    7 A 190.0

    8 A 103.5

    9 Fuel Gas Equipment A 25.1

    10 Fuel Oil Equipment A 70.4

    11 Wash syst. Equipment, blower skid (GT cooling) A 61.0

    12 GT Purge Block & Nitrogen Block Dual A 18.9

    13 HP and LP Coolers (OTC) A 212.3

    14 1500 m2 A

    15 A 115.5

    16 Air Intake Filter System A 860.0

    17 Fogging System A 28.1

    18 Enclosure & Accessories A 505.6

    19 A 91.2

    20 A 68.6

    21 A 1459.5

    A 327.4

    22 GT Piping MS A 244.4

    23 Supports A 32.2

    24 Varios Parts for Piping System A 18.8

    25 Insulation 4186 m A 32.0

    26 Painting of Piping 1344 m2 A

    A 36.3

    27 Electrical Equipment A 36.3 B

    A7648.8

    PARTICULAR TECHNICAL SPECIFICATIONS - DRAWINGS & BILLS OF QUANTITY

    SUMMARY

    ERECTION TECHNICAL DOCUMENT

    Thermal Systems

    Hangers f. HP & LP OTC

    TOTAL WEIGHT GT- MECH. / PIPING / ELECTRICAL (Tonnes)

    ELECTRICAL EQUIPMENT AND CONTROL CABLES

    Recooler

    PIPING

    Podests and Ladders

    Exhaust Stack

    MECHANICAL EQUIPMENT, PIPING, ELECTRICAL EQUIPMENT

    2 x KA26 - 2 MS DC

    Insulation HP & LP Coolers ( OTC )

    Fire protection system

    Blower skid,lube oil purif., control valve block

    Auxiliary block

    GAS TURBINE ISLAND

    BCD

    SUR

    232992144.xls.ms_office 1/9 6/8/2014

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    2/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height DiameterPossible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents

    in Tab

    m m m m +/- 10% kg kg1100 MB BoQ mechanical equipment (Bill of Quantity) 1 Spreadsheet 2-1 Tab 01

    1101 MB General Arrangement MS Power Train Set Dual Fuel 1 see included documents 2-1 Tab 02

    1101 MB General Instructions 1 see included documents 2-1 Tab 03

    Special tools for Gas Turbine site erection 19,200

    1101/ MBA Special tools for Gas Turbine site erection 1 Set, in tool cabinets 8.5 2.5 2.2 14,900 14,900 2-1 Tab 03

    2101 / 21xx MBA Equipment & parts for flushing of Gas Turbine piping systems 1 Container handling only 6.1 2.5 2.6 2,500 2,500 2-1 Tab 03

    61xx / 71xx MBA Tools & parts for Gas Turbine commissioning 1 Container handling only 6.1 2.5 2.6 1,800 1,800 2-1 Tab 03

    GT Foundation Anchors/Baseplates 26,000

    1111 MPA GT Foundation Anchors/Baseplates 4 Set prefab loose parts 3.1 1.9 1.4 6,500 26,000 2-1 Tab 04

    Thermal Block and parts 1,539,800

    1121 MBA Gas Turbine (Thermal Block delivered in one piece) 4 prefabricated 12.6 4.7 5.4 370,000 1,480,000 2-1 Tab 05

    1121 MBA TB- Insulation Upper half. To be assembled on site. Supplier

    Supervisor required.

    4 prefab part, container or wooden boxes 0 2-1 Tab 05

    1121 MBA Various material for TB delivered in one piece.

    Total 5 crates: div. bolts, nuts, insulation material, coupling bolts,assembly support, etc.

    4 Set loose parts 3,200 12,800 2-1 Tab 05

    1121 MBA SEV-FDS Dual fuel 4 prefab part 9.5 1.4 6.9 4,400 17,600 2-1 Tab 05

    1121 MBA EV-FDS Dual fuel 4 prefab part 9.5 1.9 6.5 7,350 29,400 2-1 Tab 05

    1121 MBA GT26: Thermal Bock SEI 1 2-1 Tab 05

    Air Intake Manifold 78,800

    1123 MBL Air Intake Manifold / Lower part 4 prefab 8.7 1.9 3.2 7,530 30,120 2-1 Tab 06

    1123 MBL Air Intake Manifold / upper part 4 prefab 8.7 3.2 4.2 12,020 48,080 2-1 Tab 06

    1123 MBL Loose Parts to Air Intake Manifold 4 Loose parts - - - 150 600 2-1 Tab 06

    Exhaust Gas Diffusor 296,240

    1124 MBR Exhaust Gas Diffusor 1 (delivered in one piece) 4 prefab 6.2 6.1 5.7 30,660 122,640 2-1 Tab 07

    1124 MBR Cigar at front 4 prefab part 2.5 2.3 3.4 3,700 14,800 2-1 Tab 07

    1124 MBR Loose Parts to Exhaust Gas Diffusor 1 4 Set loose parts 3.0 2.4 3.4 2,700 10,800 2-1 Tab 07

    1124 MBR Flow Cross 4 prefab part 1.4 - - 2.2 in above in above 2-1 Tab 07

    1124 MBR Exhaust Gas Diffusor#2 (4 parts) 4 delivered in 4 parts 6.5 6.9 6.9 0 0 2-1 Tab 07

    1124 MBR Exhaust Gas Diffusor#2, Part 1 4 prefab parts 4.1 8.7 3.8 12,500 50,000 2-1 Tab 07

    1124 MBR Exhaust Gas Diffusor#2, Part 2 4 prefab parts 2.6 7.2 3.8 6,700 26,800 2-1 Tab 07

    1124 MBR Exhaust Gas Diffusor#2, Part 3 4 prefab parts 4.1 7.5 3.8 11,000 44,000 2-1 Tab 07

    1124 MBR Exhaust Gas Diffusor#2, Part 4 4 prefab parts 2.6 7.2 3.8 5,500 22,000 2-1 Tab 07

    1124 MBR Diffuser GT26 Supports 4 Set loose parts 3.0 1.2 0.7 1,100 4,400 2-1 Tab 07

    1124 MBR Loose Parts to Exhaust Gas Diffusor 2 4 Set loose parts 4.0 0.8 0.5 200 800 2-1 Tab 07

    1124 MBR NOX measuring cross (Measuring arm) 4 prefab loose parts 4.0 0.5 0.5 in above in above 2-1 Tab 07

    EGD delivered with basic coating. Final coating to be applied on

    site after assembly of the EGD. Paint to be provided by erection

    contractor (according to project specific requirements)

    basic coated surface 2-1 Tab 07

    Equipment Dimensions Bid Instructions

    not included in Total

    Mechanical GT File: 232992144.xls.ms_office Page 2 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    3/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height DiameterPossible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents

    in Tab

    m m m m +/- 10% kg kg

    Equipment Dimensions Bid Instructions

    Generator 1,495,460

    1131

    MK. Generator delivered with basic coating. Final coating to be

    applied on site after assembly of the Generator. Paint to be

    provided by erection contractor (according to project specific

    basic coated surface

    Generator 50WY23Z-124 1,495,460

    1131 Generator (72 Slot) 4 pre-assembled 12.8 4.3 5.4 357,000 1,428,000 2-1 Tab 08

    Stator casing top cover 4 prefabricated 8.6 3.9 1.9 12,100 48,400 2-1 Tab 08

    1131 MKA Lifting Jacks (Blocks) for setting and alignment 1 set of 4 pcs. 2.0 1.2 0.8 1,500 1,500 2-1 Tab 08

    1131 MKA Generator foundation Base Plates 4 set of loose parts 1.1 1.1 0.7 935 3,740 2-1 Tab 08

    MKA Sikadur, Epoxy based grout for Foundation Baseplates 4 2 component 420 1,680 2-1 Tab 08

    1131 MKA Seal frame to foundation air chamber 4 prefab, loose parts 950 3,800 2-1 Tab 08

    1131 MKA Generator foundation Bolts, bottom bar layer 4 set 2.7 0.6 1.0 935 3,740 2-1 Tab 08

    1131 MKA Generator Exciter Filter Boxes (2 boxes) 8 set prefab. Filters 2.4 1.2 1.1 250 2,000 2-1 Tab 08

    1131 MKA Partition Walls and accessories for cooling air chamber, Nuts for

    Anchor Bolts, guide blocks and bowl discs for Generatoranchoring

    4 loose parts 2.0 0.5 0.6 280 1,120 2-1 Tab 08

    1131 MKA Generator cooler connecting pieces, gaskets, bolts & nuts 4 loose parts 2.0 0.6 0.4 125 500 2-1 Tab 08

    1131 MKA Instrumentation & Accessories, installation materials, conduits,

    clamps, cables, round air filters, nameplates, bolts & nuts

    4 set prefab loose parts 2.1 1.0 0.7 220 880 2-1 Tab 08

    1131 MKA Paint, primer, varnish for touch up 4 loose parts 0.6 0.6 0.7 25 100 2-1 Tab 08

    1131 / 1101 MKA Generator Rotor removing device, only supports 1 set loose parts 4.8 2.5 2.0 10,500 10,500

    Blower Skid indoor (option generator) 9,200

    1131 Blower Skid indoor 4 Skid 3.5 2.2 2.6 2,300 9,200 2-1 Tab 09

    1131 (Accessoires to Blower Skid ) 4 Loose parts in above in above 2-1 Tab 09

    Recooler 190,000

    1132 Recooler to GT System (4 cooler block) 10 prefab 11.5 3.4 3.7 11,500 115,000 2-1 Tab 09

    1132 Accessories to Recooler - Coolers 10 Set prefab loose parts 6,500 65,000 2-1 Tab 09

    1132 Closed Cooling Water Skid 2 Skid 3.5 1.3 1.9 3,000 6,000 2-1 Tab 09

    1132 Peak cooling system (for 4x4 cooler block) 2 pre-assembled 2,000 4,000 2-1 Tab 09GT Auxiliary Block 103,484

    1141 MBV01 GT Auxiliaries Block (MS) 4 Skid 12.2 3.0 4.2 25,871 103,484 2-1 Tab 09

    1141 MBV01 Pressure accumulator 4 Loose parts in above in above 2-1 Tab 09

    1141 MBV01 Ball Valve G2" 4 Loose parts in above in above 2-1 Tab 09

    Lube Oil Purifier 2,320

    1141 Lube Oil Purifier 4 Mobile Skid 2.0 0.8 2.1 580 2,320 2-1 Tab 09

    GT Control Valve Block (Dual) 27,600

    1142 MBX01 GT Control Valve Block (Dual) 4 Skid 8.3 2.1 3.1 6,900 27,600 2-1 Tab 09

    1142 MBX01 Measuring Equipment to Control Valve Assembly to CV-block 4 Loose parts in above in above 2-1 Tab 09

    1142 MBX01 Air Pressure Device with Case to CV-block 4 Loose parts in above in above 2-1 Tab 09

    not included in Total

    Mechanical GT File: 232992144.xls.ms_office Page 3 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    4/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height DiameterPossible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents

    in Tab

    m m m m +/- 10% kg kg

    Equipment Dimensions Bid Instructions

    Fuel Gas System Equipment 25,120

    1143 MBP10 Fuel Gas Block 4 Skid 1.8 1.7 1.7 980 3,920 2-1 Tab 09

    1143 MBP Fuel Gas Dust Filter Block 4 Skid 4.5 2.0 3.3 5,300 21,200 2-1 Tab 09

    Fuel Oil System Equipment 70,400

    1144/45 MBN/U Combined Pump Block 4 Skid 6.1 2.5 3.2 15,300 61,200 2-1 Tab 09

    1144/45 MBN/U (Accessories to Combined Pump Block) 4 Loose parts in above in above 2-1 Tab 09

    1145 Drain Tank 4 Skid 2.7 2.5 2.0 2,300 9,200 2-1 Tab 09

    1145 Installation of Drain Tank 4 prefab loose parts in above in above 2-1 Tab 09

    GT Wash System Equipment 2,960

    1146/1101 MBA06 Wash Cart 4 Skid on wheels 2.2 1.4 1.9 740 2,960 2-1 Tab 09

    Blower Skid (GT cooling, CMAS) 58,000

    1147 MBH Blower Skid (Base frame with ventilators EGH and EBV-

    tubes and fixing parts) redundant fans

    4 Skid 6.8 2.9 3.4 9,200 36,800 2-1 Tab 09

    1147 MBH Twin channel (Air duct to Blower Skid) redundant fans 4 prefab loose parts 7.0 2.9 2.9 5,300 21,200 2-1 Tab 09

    GT Purge Block & Nitrogen Block Dual 18,8801148 MBH02 Purging Block Dual 4 Skid 3.1 1.2 1.8 1,200 4,800 2-1 Tab 09

    1148 MBH01 Nitrogen Block (N2 blocks) Dual 2-1 Tab 09

    1148 MBH01 Lower sect. 4 prefab 1.9 2.1 1.6 2,000 8,000 2-1 Tab 09

    1148 MBH01 Upper sect. 4 prefab 1.9 2.1 1.2 1,520 6,080 2-1 Tab 09

    HP and LP Coolers 212,300

    1152 MBH40 HP Cooler (OTC) 4 prefab 3.6 2.0 9.9 1.9 22,000 88,000 2-1 Tab 09

    1152 MBH40 Insulation Material to HP OTC 4 Set loose parts 4.8 2.4 2.3 1,600 6,400 2-1 Tab 09

    1152 MBH40 HP OTC insulated surface (total of 3 layers, 55m2 each) 12 loose parts appr. Total Thickness 200mm 55 m 660 m 2-1 Tab 09

    1152 MBH40 Insulation mats/matresses to HP OTC 4 Set loose parts 800 in above 2-1 Tab 09

    1152 MBH40 Insulation accessories to HP OTC (flat steel bar, bolts&nuts, fixati 4 Set loose parts 200 in above 2-1 Tab 09

    1152 MBH40 Insulation accessories to HP OTC (metal sheets) 55m2 4 Set prefab & loose parts 450 in above 2-1 Tab 09

    1152 MBH40 Insulation erection material to HP OTC (rivets, steel wire, silicone 4 Set loose parts 50 in above 2-1 Tab 09

    1152 MBH30 LP Cooler (OTC) 4 prefab 3.6 2.7 9.7 3.0 27,700 110,800 2-1 Tab 09

    1152 MBH30 Insulation Material to LP OTC 4 Set loose parts 5.2 2.4 2.3 1,775 7,100 2-1 Tab 09

    1152 MBH30 LP OTC insulated surface (total of 3 layers, 70m2 each) 12 loose parts appr. Total Thickness 200mm 70 m 840 m 2-1 Tab 09

    1152 MBH30 Insulation mats/matresses to LP OTC 4 Set loose parts 1,000 in above 2-1 Tab 09

    1152 MBH30 Insulation accessories to LP OTC (flat steel bar, bolts&nuts, fixati 4 Set loose parts 250 in above 2-1 Tab 09

    1152 MBH30 Insulation accessories to LP OTC (metal sheets) 70m2 4 Set prefab & loose parts 500 in above 2-1 Tab 09

    1152 MBH30 Insulation erection material to LP OTC (rivets, steel wire, silicone) 4 Set loose parts 50 in above 2-1 Tab 09

    1152 MBH30 Various inst. Material for HP & LP OTC 1 Set loose parts 700 700 2-1 Tab 09

    Hangers and various inst. Material for HP & LP OTC 115,504

    1152 MBH30 Hangers, pipe supports, shock absorber for HP & LP OTC 4 Set loose parts 1,320 5,280 2-1 Tab 09

    1211 MBH30 Heating system for Once Trough Cooler (OTC) 4 Set loose parts 0.5 0.5 0.6 56 224 2-1 Tab 09

    1152 (1101) MBH30 Lifting device for HP & LP OTC 4 prefab 2.9 0.4 0.8 1,000 4,000 2-1 Tab 09

    1152 MBH30 Steel Structure and Loose Parts for HP & LP OTC 4 Set prefab loose parts 26,500 106,000 2-1 Tab 09

    Mechanical GT File: 232992144.xls.ms_office Page 4 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    5/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height DiameterPossible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents

    in Tab

    m m m m +/- 10% kg kg

    Equipment Dimensions Bid Instructions

    Air Intake System 860,000

    1211 MBL Air Intake Arrangement MS Typical 1 Document 2-1 Tab10

    1211 MBL GT Air Intake System "pulse" with air compr. skid (800Kg)

    (Pulse Filter Manufacturer R&M)

    4 Set prefab & loose parts 31.4 23.3 13.9 171,800 687,200 2-1 Tab10

    1211 MBL GT Air Intake System "pulse" Additional 3 Droplet Catcher

    integrated installation

    4 Set prefab & loose parts 11,700 46,800 2-1 Tab10

    1211 MBL GT Air Intake System "pulse" Additional 4 Evaporative

    Cooler

    4 Set prefab & loose parts 1.9 31,500 126,000 2-1 Tab10

    Fogging System 28,140

    1211 MBL Fogging system Pump Skid 4 skid 4.7 2.4 2.7 6,000 24,000 2-1 Tab10

    1211 Loose Parts to Fogging pump skid 4 set 2.3 0.8 1.5 410 1,640 2-1 Tab10

    1211 Nozzle frame, piping 1 Set prefab loose parts 8.6 3.2 0.9 2,500 2,500 2-1 Tab10

    Acoustical Enclosure 505,600

    1221 MPB Enclosure (Indoor) MS 4 appr. Outside dimension 40.0 16.0 9.0 505,600 2-1 Tab11

    1221 MPB Accessories to Enclosure - Steel parts, gratings, handrails,

    ladders

    4 Set prefab loose parts 49,750 in above 2-1 Tab11

    1221 MPB Accessories to Enclosure - Wall and Roof panel 4 set prefab loose parts 35,350 in above 2-1 Tab11

    1221 MPB Accessories to Enclosure - Fans, Fan-skids, Ducts & Supports,

    bolts & nuts, various installation material

    4 Set prefab loose parts 41,300 in above 2-1 Tab11

    Leakage Test (Door Fan Test) to be performed 4

    GT Platforms and Ladders 91,200

    1241 MPG Podests and Ladders 4 prefab loose parts 22,800 91,200 2-1 Tab12

    1241 Painting of Handrails on Podests and Ladders, MS, paint to be

    provided by erection contractor(according to project specific

    requirements)

    4 galvanized surface

    1 1/2" diameter

    total length of handrails 900 m 3600 m 2-1 Tab12

    GT Fire Protection System 68,576

    5461 CYE/S Fire detection, CO2 and WTR spray system 4 prefab loose parts, see attached documents 2,700 10,800 2-1 Tab 13

    5461 CYE/S CO2 Tank (skid) for two GT's MS 4 Skid & prefab parts 5.0 2.3 2.8 14,300 57,200 2-1 Tab 13

    5461 CYE/S Manual fire extinguisher (hand held) two GT's MS 48 prefabricated 0.6 0.3 10kg each 576 2-1 Tab 13

    Exhaust Stack 1,459,486

    1231 MBR Stack with Diverter Typical 4 prefab loose parts 18.0 11.0 40.0 292,571 1,170,286 2-1 Tab 141231 MBR Diverter Hydraulic Unit incl. Accessories 4 skid and set of parts 2.8 1.6 2.4 8,500 34,000 2-1 Tab 14

    1231 MBR Transition Piece 4 prefab loose parts 15.7 6.2 32,300 129,200 2-1 Tab 14

    1231 MBR Stack steel structure and platforms 4 prefab loose parts var var var 31,500 126,000 2-1 Tab 14

    1231 MBR Painting of exhaust gas duct, stack, steelstructure (paint is

    provided with stack material)

    4 pre painted 850 m 3400.0 m 2-1 Tab 14

    Returnable Transport steel frame parts (shpping frame) N/A 0

    1121 MBA Gas Turbine (Thermal Block) GT26B2.2 complete 4 removable steel parts

    1131 MKA Generator Stator WT21H-120 with Transport Covers 4 removable steel parts

    1131 MKA Generator Stator WT21H-120 with Protection Covers 4 removable steel parts

    1131 MKA Generator 50WY23Z-124 complete 4 removable steel parts

    1141 MBV01 Auxiliaries Block 4 removable steel parts

    7,285,070Total weight for this project (Kg)

    Mechanical GT File: 232992144.xls.ms_office Page 5 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    6/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height DiameterPossible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents in

    Tab

    m m m m +/- 10% kg kg2100 MB. BoQ Piping (Bill of Quantity) 4 Spreadsheet 2-1 Tab 01

    2100 Piping Arrangement 4 see included documents 2-2 Tab 02

    General Instructions see included documents 2-3 Tab 03

    GT Piping 244,400

    2131/41/61 MBN/P/U Internal Piping, Dual Fuel 4 partially prefab 49,000 196,000 2-4 Tab 04

    2131/41/61 MBN/P/U External Piping, Dual Fuel 4 partially prefab 6,800 27,200 2-4 Tab 04

    2151 MBA Wash Water parts -Internal/ Wash Cart Off-line 4 partially prefab 300 1,200 2-4 Tab 04

    2151 MBA Wash Cart Off-/On-line 4 partially prefab 300 1,200 2-4 Tab 04

    2212 MKF Cooling Water Parts - External 4 partially prefab 2,100 8,400 2-4 Tab 04

    Pipe Line Lists 4 partially prefab 2-4 Tab 04

    MBE Fogging Nozzle Rack 4 prefab 9.0 6.0 0.4 2,200 8,800 2-4 Tab 04

    MBE Fogging System Interconnection pipes 4 partially prefab 400 1,600 2-4 Tab 04

    Supports 32,200

    2131/41/61 MBN/P/U Internal Piping, Dual Fuel 4 prefab loose parts 6,000 24,000 2-4 Tab 05

    2131/41/61 MBN/P/U External Piping, Dual Fuel 4 prefab loose parts 2,0008,000

    2-4 Tab 052151 MBA Wash Water Parts - Internal 4 prefab loose parts 50 200 2-4 Tab 05

    Various Parts for Piping System 18,800

    2100/2212 MB. Various Butterfly / Ball Valves 1"-3", Blow-off valves 4 set of valves 3,500 14,000 2-4 Tab 06

    2100 MB. Miscellaneous items 4 set prefab parts 1,200 4,800 2-4 Tab 06

    Insulation 0

    2131/41/61 MBN/P/U Dual Fuel Piping system - Internal 4 prefab + loose parts see included documents 2-4 Tab 07

    2131/41/61 MBN/P/U Fuel Gas (&Dual) system - External) 4 prefab + loose parts see included documents 2-4 Tab 07

    Painting of Piping & Parts, value = sqm (m2) N/A 1344 m

    2100 MB. Paint to be provided by erection contractor qty for below specified surface in square meters 2-4 Tab 08

    2131/41/62 MBN/P/U Dual Fuel Parts - Internal 4 N/A 224 m 896 m 2-4 Tab 08

    2131/41/63 MBN/P/U Dual Fuel Parts - External 4 N/A 112 m 448 m 2-4 Tab 08

    Field Welds Scope N/A 3724 FW

    2131/41/62 MBN/P/U Internal Piping, Dual Fuel 4 see included documents 730 FW 2920 FW 2-4 Tab 09

    2131/41/62 MBN/P/U External Piping, Dual Fuel 4 see included documents 143 FW 572 FW 2-4 Tab 09

    2131/41/62 MBN/P/U Dual Fuel Vent 4 see included documents 32 FW 128 FW 2-4 Tab 09

    2100 MB. Ignition Gas 4 see included documents 10 FW 40 FW 2-4 Tab 09

    2100 MB. Lube Oil Storage 4 see included documents 8 FW 32 FW 2-4 Tab 09

    2100 MB. Wash Cart Off-/On-line 4 see included documents 8 FW 32 FW 2-4 Tab 09

    Equipment Dimensions Bid Instructions

    Piping GT File: 232992144.xls.ms_office Page 6 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    7/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Accuracy

    tolerance

    Net

    Weight

    Total weight

    SP Number of GT's for this project 4 Length Width Height Diameter Possible

    tolerance

    on weight

    Total for

    Project

    Documents

    in Binder

    Documents in

    Tab

    m m m m +/- 10% kg kg

    Equipment Dimensions Bid Instructions

    NDT Testing N/A N/A N/A

    2131/41/61 MBN/P/U Dual Fuel Parts - Internal 4 see included documents 2-4 Tab 10

    2131/41/61 MBN/P/U Dual Fuel Parts - External 4 see included documents 2-4 Tab 10

    2151 MBA Wash Water Parts - Internal 4 see included documents 2-4 Tab 10

    Pressure Test N/A N/A N/A

    2131/41/61 MBN/P/U Dual Fuel Parts - Internal & External 4 see included documents 2-4 Tab 10

    Flushing of Systems N/A N/A N/A

    2102 MBV Lube oil to be filled in to aux block 4 liquid to fill 26700 liter 106800 liter 2-4 Tab 11

    2102 MBV Flushing Procedure for Lube Oil System 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for Power Oil System 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for Blow-off and Cooling Air Systems 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for NOx-Water, Fuel Oil 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for Fuel Gas System 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for Cooling Water 1 system to flush 2-4 Tab 11

    2100 MB. Flushing Procedure for Off-/On-Line cleaning 1 system to flush 2-4 Tab 11

    295,400Total weight for this project (Kg)

    Piping GT File: 232992144.xls.ms_office Page 7 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    8/9

    abcd Sur: 4 x GT26 MS Dual Indoor Standard-BoQ

    SITE

    Package

    KKS Item Description Qty. Degree of

    Pre-assembly

    Net Weight Total weight

    Number of GT's for this project 4Total for

    Project

    Documents

    in Binder

    Documents

    in Tab

    SP kg kg3000/4000 BoQ electrical and instrumentation GT system (Bill of Quanti 1 Spreadsheet 2-1 Tab 01

    3000/4000 Gen. Arrang.Power Train Set Indoor Dual MS 1 see included documents 2-3 Tab 02

    3000/4000 Gen. Arrang.Power Train Set Indoor Gas Only MS 1 see included documents 2-3 Tab 02

    3000/4000 Gen. Arrang. Elect. Consumer and Junction Boxes MS 1 see included documents 2-3 Tab 02

    3000/4000 Gen.Arrang. Embedded Cable Ducts and Pul Pits MS 1 see included documents 2-3 Tab 02

    3000/4000 Gen. Arrang.Earthing Point and Cable Duct Stub MS 1 see included documents 2-3 Tab 02

    Acoustic Enclosure (electrical) 11,600

    1221 MPB Electrical parts to Enclosure - Control panel, Lighting fixtures,

    Cables installation material Indoor MS

    4 Set Mat. 2,900 11,600 2-3 Tab 04

    Instrumentation of GT Block (I&C) 6,340

    4112 MB. Thermal Block Instrumentation ( Thermocouple ) 4 Loose part in box 300 1,200 2-3 Tab 05

    4112 MB. Control Panel MBA01GD010 4 Set Mat. Control Cubicle 650 2,600 2-3 Tab 05

    4112 MB. Thermal Block Instrumentation ( accessories ) 4 Loose part in box 130 520 2-3 Tab 05

    4112 MB. Thermal Block Instrumentation ( Junction Box & Rack) 4 Loose part in box 370 1,480 2-3 Tab 05

    4112 MB. Thermal Block Instrumentation ( Support & Tube ) 4 Loose part in box 70 280 2-3 Tab 05

    4112 MB. OTC Heating system 4 Loose part in box 65 260 2-3 Tab 05

    Gas Detection of GT enclosure 872

    3282 CYQ Gas Detection system Accessories 4 Loose part in box 180 720 2-3 Tab 06

    3282 CYQ Gas Detection system Accessories ( pipe - tangas flow ) 4 Loose part in box 32 128 2-3 Tab 06

    3282 CYQ Gas Detection system Accessories ( Test Equipment ) 4 Loose part in box 6 24 2-3 Tab 06

    Fire Detection system in GT area 7,280

    5461 CYE Control Panel CYE 4 Set Mat. Control Cubicle 316 1,264 2-3 Tab 07

    5461 CYE Testing Tool 4 Loose part in box 12 48 2-3 Tab 07

    5461 CYE Fire Detection Equipments 4 Loose part in box 122 488 2-3 Tab 07

    5461 CYE Fire Detection Equipments Accessories 4 Loose part in box 920 3,680 2-3 Tab 07

    5461 CYE Fire Seal System for 20m2 MS 4 Set Mat. 450 1,800 2-3 Tab 07

    Installation of Generator (Electrical Part) 1,360

    1132 MKA Generator Accessories 4 Loose part in box 340 1,360 2-3 Tab 08

    Air Intake System (Electrical and Instrumentation) 8,000

    1211 MBL Air Intake R&M 4 Loose part in box 2000 8,000 2-3

    Steam Turbine MS Generator Instrumentation 840Generator 50WY23Z-124 840 2-3 Tab 08

    ST1731 MKA Generator Accessories 4 Loose part in box 210 840 2-3 Tab 08

    36,292

    Bid Instructions

    Total weight for this project (kg)

    Electrical and I&C GT File: 232992144.xls.ms_office Page 8 of 9

  • 8/12/2019 Sur_boq 4x Gt26 Ms_b

    9/9

    -

    -

    Contractor: Currency:

    Pipe length

    [m]

    Elbow

    [item]

    Pair of

    Flange

    [item]

    Fittings

    [item]

    Valve

    [item]

    MBA 273.1 80 5.8 2 1 1 10.8 14.7273.1 90 3.3 1 1 2 7.8 11.1

    400 406.4 90 1.9 2 1 6.4 11.8

    508 40 4.1 3 4 1 2 20.1 37.1

    508 120 0.9 1 2.9 6.8

    508 170 1.7 2 2 1 10.2 27.2

    700 711.2 40 1.9 2 1 8.9 22.1

    813 100 9.9 2 1 3 19.9 63.3

    813 190 1 3 11.2

    MBH 60.3 90 10.5 6 13.5 10.2

    60.3 100 10.9 12 2 2 20.9 17.1

    65 73 100 0.5 1 1.5 1.3

    100 114.3 60 7.9 8 3 4 21.3 15.7

    135 141.3 60 1.8 6 4 4 14.6 12.0

    168.3 30 5.9 5 3 12.9 9.2

    168.3 60 8.6 12 8 8 34.2 31.0

    168.3 150 0.5 1 2 3.5 5.1

    219.1 40 6.1 4 3 1 16.1 15.1

    219.1 130 21.2 4 27.2 40.9

    219.1 150 11.3 2 4 18.3 29.8

    250 273.1 40 21.6 5 4 2 35.1 38.9

    273.1 60 4.7 1 1 5 12.2 15.1

    273.1 70 6.5 2 1 5 15.5 20.1

    273.1 80 19.7 12 6 8 51.7 70.3

    300 323.9 120 1.4 2 2 6.4 11.3

    350 355.6 70 12.5 3 1 7 26.5 41.2

    355.6 150 11.6 2 2 4 21.6 44.5

    450 457 120 9.7 8 4 4 33.7 73.8

    500 508 130 1.2 1 7 10.2 24.6

    600 610 80 15.8 6 3 6 42.8 103.5

    700 711.2 130 12 2 1 4 23 70.1

    MBP 100 114.3 30 0.5 2 2 4.1 2.2

    150 168.3 30 60.2 24 4 7 90.4 64.8

    168.3 60 6.2 5 2 2 14.2 12.9

    168.3 120 21.4 21 4 5 47.2 60.5

    1,047 m2

    4,186 m2

    32 t

    PosLENGTH

    [cm]

    QUANTITY

    [pcs]

    ESTIMATED

    MANHOURS

    [Hrs]

    INSTALLATION

    UNIT RATE

    [Unit Rate/m2]

    ERECTION PRICE

    1 98 10

    2 98 4

    3 98 3

    4 98 2

    5 98 3

    7 98 2

    7 98 1

    8 98 1

    9 98 4

    10 98 4

    11 98 4

    38 pcs

    152 pcs

    0.664

    1 x KA26-1

    PIPING - GAS TURBINE

    Thermal insulation for 1 UNIT

    Date :

    BCDThermal Systems

    ERECTION OF PIPING THERMAL INSULATION

    GAS TURBINE

    SUR

    INSULATION

    SURFACE for 1

    UNIT

    [m2]

    LINE COMPONENTS

    DN

    [mm]

    INSTALLATION

    UNIT RATE

    [Unit Rate/m2]

    OD

    [mm]

    Author:

    TOTAL EQUIVALENT INSULATION WEIGHT for All UNITS

    ELEMENTARY

    SYSTEM

    200

    250

    EQUIVALENT

    LENGTH for 1

    UNIT

    [m]

    50

    TOTAL INSULATION SURFACE for All UNITS

    INSULATION

    THICKNESS

    [mm]

    500

    800

    SEGMENT

    LENGTH

    [mm]

    BENDING

    RADIUS

    [mm]

    Description

    ESTIMATED

    MANHOURS

    [Hrs]

    TOTAL INSULATION SURFACE for 1 UNIT

    150

    ERECTION PRICE

    PIPING - GAS TURBINE

    INSULATION PROTECTION (ALUMINIUM CHECKERED PLATES) for 3 UNITS

    MBH20BR001 220 350

    MBH30BR010 350 550

    MBH30BR010 490 750

    MBH30BR020 350 550

    MBH30BR020 490 750

    MBH40BR035 145 250

    250

    MBP43BR010 205 300

    MBA81BR010 300 450

    MBA81BR030 300 450

    TOTAL QUANTITY for 1 UNIT

    TOTAL QUANTITY for All UNITS

    TOTAL ESTIMATED WEIGHT for All UNITS

    MBP41BR010 205 300

    MBP42BR010 145