tabel sondor dan hand bor

13
Lokasi : Kelompok : 1 No. sondir : Tanggal :2 April 2011 Elevasi : Kedalaman Cw Tw Kw qc fs fsx20cm (m) (Kg/cm) (Kg/cm) 0.00 0 0 0 0 0.0 0.0 0.20 0 0 0 0 0.0 0.0 0.40 24 36 12 48 1.6 32.1 0.60 32 42 10 64 1.3 26.8 0.80 32 42 10 64 1.3 26.8 1.00 8 16 8 16 1.1 21.4 1.20 28 38 10 56 1.3 26.8 1.40 18 28 10 36 1.3 26.8 1.60 8 16 8 16 1.1 21.4 1.80 8 10 2 16 0.3 5.4 2.00 20 38 18 40 2.4 48.2 2.20 50 65 15 100 2.0 40.2 2.40 35 50 15 70 2.0 40.2 2.60 80 100 20 160 2.7 53.5 2.80 65 80 15 130 2.0 40.2 3.00 10 15 5 20 0.7 13.4 3.20 45 60 15 90 2.0 40.2 3.40 60 75 15 120 2.0 40.2 3.60 55 70 15 110 2.0 40.2 3.80 45 60 15 90 2.0 40.2 4.00 25 35 10 50 1.3 26.8 4.20 40 45 5 80 0.7 13.4 4.40 35 55 20 70 2.7 53.5 4.60 30 40 10 60 1.3 26.8 4.80 55 65 10 110 1.3 26.8 5.00 90 110 20 180 2.7 53.5 5.20 45 60 15 90 2.0 40.2 5.40 100 120 20 200 2.7 53.5 5.60 80 90 10 160 1.3 26.8 5.80 160 180 20 320 2.7 53.5 6.00 160 180 20 320 2.7 53.5 (Kg/cm²) (Kg/cm²) (Kg/cm²) 0 25 50 75 100 125 150 175 200 225 2 0.00 1.00 Perlawanan Selimut

Upload: hans-afriyanda

Post on 04-Jul-2015

40 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tabel Sondor Dan Hand Bor

Lokasi : Kelompok : 1No. sondir : Tanggal :2 April 2011Elevasi :

Kedalaman Cw Tw Kw qc fs fsx20cm Tf Rf(m) (Kg/cm) (Kg/cm) (%)0.00 0 0 0 0 0.0 0.0 0.0 0.00.20 0 0 0 0 0.0 0.0 0.0 0.00.40 24 36 12 48 1.6 32.1 32.1 3.30.60 32 42 10 64 1.3 26.8 58.9 2.10.80 32 42 10 64 1.3 26.8 85.7 2.11.00 8 16 8 16 1.1 21.4 107.1 6.71.20 28 38 10 56 1.3 26.8 133.8 2.41.40 18 28 10 36 1.3 26.8 160.6 3.71.60 8 16 8 16 1.1 21.4 182.0 6.71.80 8 10 2 16 0.3 5.4 187.4 1.72.00 20 38 18 40 2.4 48.2 235.6 6.02.20 50 65 15 100 2.0 40.2 275.7 2.02.40 35 50 15 70 2.0 40.2 315.9 2.92.60 80 100 20 160 2.7 53.5 369.4 1.72.80 65 80 15 130 2.0 40.2 409.6 1.53.00 10 15 5 20 0.7 13.4 423.0 3.33.20 45 60 15 90 2.0 40.2 463.1 2.23.40 60 75 15 120 2.0 40.2 503.3 1.73.60 55 70 15 110 2.0 40.2 543.4 1.83.80 45 60 15 90 2.0 40.2 583.6 2.24.00 25 35 10 50 1.3 26.8 610.4 2.74.20 40 45 5 80 0.7 13.4 623.7 0.84.40 35 55 20 70 2.7 53.5 677.3 3.84.60 30 40 10 60 1.3 26.8 704.0 2.24.80 55 65 10 110 1.3 26.8 730.8 1.25.00 90 110 20 180 2.7 53.5 784.4 1.55.20 45 60 15 90 2.0 40.2 824.5 2.25.40 100 120 20 200 2.7 53.5 878.0 1.35.60 80 90 10 160 1.3 26.8 904.8 0.85.80 160 180 20 320 2.7 53.5 958.4 0.86.00 160 180 20 320 2.7 53.5 1,011.9 0.8

(Kg/cm²) (Kg/cm²) (Kg/cm²)

0 25 50 75 100 125 150 175 200 225 250 275 300

0.0 200.0 400.0 600.0 800.0 1,000.0 1,200.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

0.00

0.50

1.00

1.50

2.00

2.50

3.00

qc Rf Tf

Perlawanan Ujung Konus

Keda

lam

an

Perlawanan Selimut

Page 2: Tabel Sondor Dan Hand Bor

0 25 50 75 100 125 150 175 200 225 250 275 300

0.0 200.0 400.0 600.0 800.0 1,000.0 1,200.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

0.00

0.50

1.00

1.50

2.00

2.50

3.00

qc Rf Tf

Perlawanan Ujung Konus

Keda

lam

an

Perlawanan Selimut

Page 3: Tabel Sondor Dan Hand Bor

0 25 50 75 100 125 150 175 200 225 250 275 300

0.0 200.0 400.0 600.0 800.0 1,000.0 1,200.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

0.00

0.50

1.00

1.50

2.00

2.50

3.00

qc Rf Tf

Perlawanan Ujung Konus

Keda

lam

an

Perlawanan Selimut

Page 4: Tabel Sondor Dan Hand Bor

0 25 50 75 100 125 150 175 200 225 250 275 300

0.0 200.0 400.0 600.0 800.0 1,000.0 1,200.0

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

0.00

0.50

1.00

1.50

2.00

2.50

3.00

qc Rf Tf

Perlawanan Ujung Konus

Keda

lam

an

Perlawanan Selimut

Page 5: Tabel Sondor Dan Hand Bor

Lokasi : Dikerjakan Kelompok :No. Titik : Tanggal :Kedalaman :

No. Kedalaman Diagram Jenis Tanah Warna Tanah Keterangan(Meter) (Bor Log)

Page 6: Tabel Sondor Dan Hand Bor

massa tanah basah 7,000.00 7,000.00 7,000.00 7,000.00Kadar air awal 8.50 8.50 8.50 8.50Penambahan air 0.02 0.04 0.06 0.08Penambahan air 140.00 280.00 420.00 560.00Kepadatan :massa tanah basah + cetakan 8,595.00 8,675.00 8,695.00 8,685.00Massa cetakan 5,090.00 5,090.00 5,090.00 5,090.00Massa tanah basah 3,505.00 3,585.00 3,605.00 3,595.00Isi cetakan 2,411.52 2,411.52 2,411.52 2,411.52Kepadatan basah 1.45 1.49 1.49 1.49Kepadatan kering 1.32 1.33 1.31 1.25Kadar air :No. Cawan I II III IVMassa tanah basah + cawan 157.10 160.00 155.90 156.70Massa tanah kering + cawan 143.30 144.30 137.90 133.60Massa air 13.80 15.70 18.00 23.10Massa cawan 11.00 11.10 11.00 11.00Massa tanAh kering 132.30 133.20 126.90 122.60Kadar air 10.43 11.79 14.18 18.84 0.00 5.00 10.00 15.00 20.00 25.00

1.19

1.21

1.23

1.25

1.27

1.29

1.31

1.33

1.35

1.37

Row 15Polynomial (Row 15)Polynomial (Row 15)Polynomial (Row 15)Polynomial (Row 15)Column L

Axis Title

Axis Title

Page 7: Tabel Sondor Dan Hand Bor

1.33 01.33 25

0.00 5.00 10.00 15.00 20.00 25.001.19

1.21

1.23

1.25

1.27

1.29

1.31

1.33

1.35

1.37

Row 15Polynomial (Row 15)Polynomial (Row 15)Polynomial (Row 15)Polynomial (Row 15)Column L

Axis Title

Axis Title

Page 8: Tabel Sondor Dan Hand Bor

Banyak pukulan 54 32 20No. Cawan I II IIIMassa tanah basah + cawan 102.40 103.20 94.40Massa tanah kering + cawan 77.60 79.90 72.60Massa air 24.80 23.30 21.80Massa cawan 11.00 11.10 11.00Massa tanAh kering 66.60 68.80 61.60Kadar air 37.24 33.87 35.39

42.4 0.135

banyak pukulan 54 32 20(%) 35.11 38.08 39.7

Liquid limit

15 20 25 30 35 40 45 50 55 6032

33

34

35

36

37

38

39

40

41

(%)Linear ((%))

Jumlah Pukulan

Kada

r Air

(%)

Page 9: Tabel Sondor Dan Hand Bor

15 20 25 30 35 40 45 50 55 6032

33

34

35

36

37

38

39

40

41

(%)Linear ((%))

Jumlah Pukulan

Kada

r Air

(%)

Page 10: Tabel Sondor Dan Hand Bor

19IV

82.5059.9022.6011.0048.9046.22

5432201925

19 2539.835 39.025

15 20 25 30 35 40 45 50 55 600.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

Banyak pukulanKadar air

Jumlah Pukulan

Kada

r air

(%)

15 20 25 30 35 40 45 50 55 60

1; 35.11

2; 38.08

3; 39.74; 39.835

5; 39.025

(%)(%)

15 20 25 30 35 40 45 50 55 6032

33

34

35

36

37

38

39

40

41

(%)Linear ((%))

Jumlah Pukulan

Kada

r Air

(%)

Page 11: Tabel Sondor Dan Hand Bor

15 20 25 30 35 40 45 50 55 6032

33

34

35

36

37

38

39

40

41

(%)Linear ((%))

Jumlah Pukulan

Kada

r Air

(%)

Page 12: Tabel Sondor Dan Hand Bor

15 20 25 30 35 40 45 50 55 60

1; 35.11

2; 38.08

3; 39.74; 39.835

5; 39.025

(%)(%)