"tajikistan’s hydro energy – basis of a potential power corridor between central asia &...
TRANSCRIPT
"Tajikistan’s Hydro Energy – basis of a Potential Power Corridor be-
tween Central Asia & South Asia
"
Ambassador Sherali Jononov
Embassy of the Republic of Tajikistan to the Islamic Republic of Pakistan
1.Energy Profile2.Power Projects3.Prospective -
Hydro4.Prospective-
Thermal5.Regional Initia-
tives - OHL
3
Tajikistan Energy ProfilePotential for gen-erate 527 billion.
KW. hours per yearThe installed ca-pacity of power
plants of 5400 MWOf these, 95% hy-dro and 5% ther-
mal power stations The annual gener-ation more than 17
billion. KW. hourExcess of hy-
dropower in the summer months
(from 3 to 5 billion.
KW. hour)
Winter energy shortages more
than 2,5 billion. KW.
hour
4
Power Projects Implementation
Completed Projects
1.7 billion. USD
Ongoing Projects
268 million. USD
Projectson design and
preparation stage938,3 million. USD
5
Power Projects Implementation
• EMERGENCY BAYPAZA HPP LANDSLIDE STABILIZATION • RECONSTRUCTION OF DUSHANBE CITY ELECTRICAL NET-
WORKS• CONSTRUCTION OF MHPP IN RURAL AREAS OF THE REPUBLIC
OF TAJIKISTAN• CONSTRUCTION OHL-500kV SOUTH-NORTH• CONSTRUCTION OHL-220kV • ADDITIONAL WORKS OF CONSTRUCTION OHL-500/220kV
SOUTH-NORTH & LOLAZOR-KHATLON• REHABILITATION OF ENERGY SECTOR OF THE REPUBLIC OF
TAJIKISTAN• REGIONAL POWER INTERCONNETION TRASMISSION PROJECT• RECONSTRUCTION OF 220kV SWITCHYARD AT NUREK HPP• CONSTRUCTION OF 220KV OHL HUJAND-AYNI• ESTABLISHMENT OF UNIFIED POWER SYSTEM OF THE NORTH
OF TAJIKISTAN• REGIONAL POWER TRANSMISSION PROJECT• ENERGY LOSS REDUCTION PROJECT IN DUSHANBE CITY• CONSTRUCTION OF SANGTUDA HPP-1 • CONSTRUCTION OF SANGTUDA HPP-2
Completed Projects
1.7 billion. USD
6
Power Projects Implementation
• Reconstruction of 500kV Switchyard at Nurek HPP
• Regional power transmission project • Rehabilitation of 500kV Regar substation • Energy loss reduction project• Energy loss reduction project in Sughd
Region
Ongoing Projects
268 mil-lion. USD
7
Power Projects Implementation
• Golovnaya 240 MW HPP rehabilitation project
• Rehabilitation of 220kV Ravshan substa-tion
• Construction of 2x50 MW second phase of Dushanbe TPP 2
• Rehabilitation of Kayrakum HPPP• Wholesale Metering and Transmission Re-
inforcement Project• CASA-1000
Projects on design and prepara-
tion stage938,3
million. USD
8
Our Development Partners
ADB63,27 mln. USD – loan366, 77 mln. USD –grant
WB63 mln. USD – loan17,2 mln. USD - grant
IDB52,73 mln. USD – loans
KfW18,0 mln. Euro–loan7,0 mln. Euro-grant
KFAED 3, 600 mln. KD–loan
SECO15,2 mln. USD– grant
China Eximbank801,43 mln. USD –loan
BT co-financ-ing63,63 mln. USD
EBRD70 mln. USD – loan11,7 mln. USD - grantSangtuda HPP-1174,6 mln. USD – Taj. Gov.524 mln. USD – Rus. Gov
Sangtuda HPP-240 mln. USD – Taj. Gov.318,8 mln.USD – Iran Gov.
OPEC8,5 mln. USD – loan
9
Prospective Projects HydroROGUN HPP (3600 MW)
SHUROB HPP (850 MW)
NUROBOD HPP– 1 (460 MW)
NUROBOD HPP– 2 (400 MW)
FONDARYO HPP (300 MW)
AYNI HPP (160 MW)
SANOBOD HPP (125 MW)
ZARAFSHON HPP (150 MW)
10
Prospective Projects -ThermalDUSHANBE-2
TPP 2х150 MW – SECOND PHASE
(300 MW)
SHUROB TPP(300 MW)
FON YAGNOB TPP (600 MW)
11
Regional Initiatives - OHL
CASA-1000 PROJECT
500kV OHL TAJIKISTAN-
AFGHANISTAN-TURKMENISTAN
500kV OHLTAJIKISTAN-
AFGHANISTAN-IRAN
500kV OHL TAJIKISTAN - PAKISTAN
(through Vakhan corri-dor)
TUTAP PROJECT
12
12
Project CASA-1000500kV line that will con-
nectKyrgyzstan-Tajikistan-Afghanistan-Pakistan
(1200 km)
Construction of 500kV OHLTajikistan-Afghanistan-
Turkmenistan(length -650 km)
Construction of 500kV OHL
Tajikistan-Afghanistan-Iran(length-715 km)
Construction of 500kV OHLTajikistan-Pakistan
through Vakhan corridor(length – 750 km)