Term project #3Term project #3

I.E 200427140 BJ Song

200527106 EH Kang

200527151 YJ Ann

200527185 HI Choi

Presentation Title

Contents

01 The existing facilities

02

03

Problem and assumption

04

Proposal

05

SLP

Plan

Presentation Title 1

01

원단 부자재창고

storage

cutting

Assistance table lounge

ironhoist

sewing machine obaroque

the existing facilities

Presentation Title 6

01Operation Sequence – open typeOperation Sequence – open type

obarocustorage cutting

Sewing machine (zipper)

Sewing machine (Inter)

Dac-ccu

(rubber-band)

sewing machine (face)

(upper)painting

packing

(laber)Iron

Common process

Upper

pants

the existing facilities

Presentation Title 1

01Operation Sequence – zipper typeOperation Sequence – zipper type

storage cutting

Sewing machine (zipper)

Sewing machine (Inter)

sewing machine (face)

(upper)painting

packing(laber)

Irong

Dacccu(rubber-band)

Common process

Upper

pants

the existing facilities

Presentation Title 6

01Operation Sequence – round typeOperation Sequence – round type

storage cutting

Sewing machine (Inter)

Dac-ccu

(rubber-band)

sewing machine (face)

(upper)painting

packing

(laber)Irong

Common process

Upper

pants

the existing facilities

obarocu

Presentation Title 1

01

storage

cutting

Assistance table

iron

hoist

sewing machine obaroque

lounge

the existing facilities

Presentation Title 1

02

Complicated procedure Simplification of process Mass production – Inappropriateness of process layout

- Movement distance is long Movement distance is straight line and short - Complicated production control Easy to understand the rate of progress - Increment of stock Shortened stock

Problem and assumption

Presentation Title 1

02

Restroom, storage, entrance is fixed

Machine is moved with table

Problem and assumption

Presentation Title 1

03

Q

PProduct layout • Mass production

• Simplification of process

• solution of process layout

problem

Proposal

03

- unused Assistance table.

- Iron, cutting, hoist, packing are fixed.

Presentation Title 1

Sewing machine (face)Dac-cuu (rubber band)

Sewing machine (inter)Sewing machine (zipper)

obaroquestorage

cutting

lounge

iron

hoist

Product layout - straightProduct layout - straight

Proposal

Product layout - groupProduct layout - group

03

- 1 Assistance table.

- Iron, cutting, hoist, packing are fixed.

Presentation Title 1

Sewing machine (face)Dac-cuu (rubber band)

Sewing machine (inter)Sewing machine (zipper)

obaroquestorage

cutting

lounge

iron

hoist

Assistance table

Proposal

StraightStraight

03

- unused Assistance table.

- Iron, cutting, packing are moved.

Presentation Title 1

Sewing machine (face)Dac-cuu (rubber band)

Sewing machine (inter)Sewing machine (zipper)

obaroquestorage

cutting lounge

iron

hoist

Proposal

Presentation Title 1

04

product

set/day

process sequence

1 100

-(storage),cutting,painting(upper),sewing(face),obarocu,sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face),obarocu,Dac-ccu(rubber band),sewing(inter),iron,packing

2 250-(storage),cutting,painting(upper),sewing(face), sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face), Dac-ccu(rubber-band),sewing(inter),iron,packing

3 400-(storage),cutting,painting(upper),sewing(face), ,sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face), Dac-ccu(rubber-band),sewing(inter),iron,packing

Extended part list

SLP

Presentation Title 11

04 SLP

Storage

Cutting

Painting

Sewing (face)

Obaroque

Dac-cuu

Sewing (inter)

Sewing (zipper)

Irong

Packing

AX

UU

EU

UX

X

XA

UU

UU

XX

XX

XX

XX

X

EU

EE

XX

EU

UX

X

EE

XX

EX XEX

E

Activity Relationship Chart

Presentation Title 11

05 plan

New arrangement by using

the SLP method

Cost Analysis

Thank youThank you