Page 1: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Test Project–Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 1

Page 2: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

DAFTAR ISI Dokumen-dokumen dalam lembar soal berikut meliputi beberapa bagian diantaranya adalah : 1. LKS2015_TPRA.doc Bagian A : Kisi-Kisi Lomba 2. LKS2015_TPRA.doc Bagian B : Petunjuk Lomba 3. LKS2015_TPRA.doc Bagian C : Soal – Soal Lomba 4. LKS2015_TPRA.doc Bagian D : Gambar / Drawing 5. LKS2015_TPRA.doc Bagian E : Peralatanan Perlengkapan6. LKS2015_TPRA.doc Bagian F : Skematik Penilaian

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 2

Page 3: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2015_TPRA.doc Bagian A

BAGIAN A KISI-KISI LOMBA

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 3

Page 4: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

INFORMASI LOMBA

DESKRIPSI TEKNIK

A. Nama dan Deskripsi Kompetensi 1. Nama kompetensi adalah Teknik Pendingin dan Tata Udara 2. Jenis yang dikompetensikan pada Teknik Pendingin dan Tata Udara adalah perakitan dan

pengelasan, sistem pemipaan refrigerasi dan pemasangan sisten AC split3. Peserta Lomba dipilih oleh propinsinya masing-masing. 4. Syarat peserta adalah siswa SMK yang sesuai dengan jurusan Teknik Pendingin dan Tata

Udara 5. Kompetisi dilakukan secara individual. Jumlah peserta dalam 1 team mewakili 1 SMK dan 1

team terdiri dari 1 orang.

B. Ruang Lingkup Kompetensi : 1. Peserta harus mampu :

a. Membaca gambar kerja pemipaan dan kelistrikan sistem refrigerasi dan tata udara b. Membentuk berbagai macam pola sambungan pemipaan dan penggunaan peralatan

mekanik guna mendukung sistem refrigerasi dan tata udara. c. Memasang AC split pada papan panel dan menguji coba hasil rakitannya, d. Memasang sistem pemipaan refrigerasi pada display case dan menguji coba hasil

rakitannya e. Menemukan dan menganalisa kesalahan sistem kelistrikan dan sistem refrigerasi.

2. Proyek dilaksanakan dalam 3 hari dimulai pukul 08.30 sampai pukul 17.00

C. Kerja Praktik : 1. Desain : proyek akan didesain dengan menggunakan komponen industri sesungguhnya yaitu

AC split, kompresor,evaporator, kondenser, dan alat ekspansi 2. Pemasangan : refrigerasi dan tata udara dipasang pada papan panel peraga sesuai dengan

gambar rancangan, 3. Komisioning : rancangan harus dapat difungsikan sesuai dengan instruksi/dokumentasi. 4. Tidak ada kesalahan yang disengaja dilakukan oleh peserta. 5. Troubleshooting : mencari kesalahan pada rangkaian yang kesalahannya dibuat oleh juri.

D. Pengetahuan Teori : 1. Desain rangkaian : peserta harus mengetahui fungsi komponen-komponen utama sistem tata

udara dan refrigerasi, elektrik dan aksesories lainya serta dapat menjelaskan fungsi rangkaian,

2. Analisa teknik : peserta harus mampu menganalisa rangkaian untuk menemukan kesalahan-kesalahan yang terjadi pada rangkaian kontrol.

E. Material : Disediakan oleh panitia lomba : 1. AC Split 2. Condensing Unit3. Recovery unit 4. Sumber listrik 220 VAC 5. Bahan Utama sistem pendingin

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 4

Page 5: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Disediakan oleh peserta : 1. Diperbolehkan membawa multi meter sendiri 2. Diperbolehkan membawa manifold gauge sendiri 3. Membawa peralatan tulis. 4. Peralatan yang diperlukan untuk perakitan dan pengelasan pipa, pemasangan air

conditioner, dan pemasangan sistem refrigerasi pada refrigerator dan display case.

F. Ruangan : Minimal ruangan adalah 10 x 10 m dan dilengkapi dengan meja dan kursi untuk peserta, meja untuk peralatan komponen, meja untuk juri/panitia, dan dilengkapi dengan sumber listrik 220V

G. Kriteria Penilaian : 1. Ketepatan ukuran dan kerapihan hasil kerja para peserta 2. Peralatan yang dirancang dapat bekerja sesuai dengan lembar kerja yang diberikan , 3. Tidak melebihi waktu yang diberikan dalam merakit, realisasi, dan mencari kesalahan

(troubleshooting), 4. Waktu yang dinilai adalah waktu sebelum waktu maksimum dengan hasil pekerjaan benar. 5. Kebenaran rangkaian setelah proses trouble-shooting.

GAMBARAN UMUM SOAL LOMBA

A. Bentuk Soal Soal yang dikompetensikan adalah perakitan sistem refrigerasi dan tata udara, bentuk detail soal dalam bahasa Inggris.

B. Soal 1. Perakitan sistem refrigerasi

a. Merakit sistem refigerasi dan sistem kelistrikan sesuai gambar dan melakukan pengaturan suhu sesuai menu yang ada pada sistem kontrol alat tersebut.

b. Menjalankan sistem refrigerasi dan control

2. Pemasangan sistem tata udara (unit AC) pada papan peraga : Memasang (instalasi) unit AC sesuai dengan spesifikasi produk yang telah dibuat oleh manufakturing, detail berupa : a. Membangun sistem pemipaan untuk AC Split b. Merakit sistem kelistrikan AC Split pada papan peraga sesuai gambar yang ditentukan.c. Mencari dan menganalisa gangguan sistem kelistrikan dan mekanik yang ada pada Split

Air Conditioner d. Melakukan proses recovery refrigeran pada unit air conditioning

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 5

Page 6: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

5. Kriteria Soal Lomba, Nilai dan Waktu

Soal Lomba Nilai Waktu1. Refrigeration System Installation & Commissioning 60 poin 10 jam2. Air-Conditioning System Installation & Commissioning 40 poin 6 jam

C. Jadual Kegiatan : 1. Hari ke 1 :

· Pembukaan . Familiarisasi peralatan,

2. Hari ke 2 : · Test Project 1: Refrigeration system installation & commisioning

3. Hari ke 3 : · Test Project 2: Air conditioning Installing & Commissioning

4. Hari ke 4 : Penutupan

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 6

Page 7: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2015_TPRA.doc Bagian B

BAGIAN B PETUNJUK LOMBA

PETUNJUK UNTUK PESERTA LOMBA

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 7

Page 8: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Soal LKS ini dibuat untuk menguji peserta Lomba dalam memasang atau merakit peralatan sistem refrigerasi dan Tata Udara (split air conditioner), termasuk melakukan proses perbaikan pada peralatan tersebut.

A. Soal Lomba

Ada dua (2) soal lomba yang akan diujikan dengan total waktu adalah 16 jam.

1. Refrigeration System Installation & Commissioning 60 poin 10 jam2. Air-Conditioning System Installation & Commissioning 40 poin 6 jam

B. Informasi Tambahan Beberapa informasi tambahan berkenaan dengan lomba akan diberikan pada saat kompetisi diantaranya adalah : - Jadwal detail lomba.- Persyaratan yang berhubungan dengan keselamatan dan kesehatan kerja (K3) - Kategori peraturan dan prosedur lomba - Dan beberapa informasi lain yang dianggap perlu untuk disampaikan

C. Alokasi Waktu Penyelesaian Soal Setiap peserta lomba diwajibkan untuk dapat menyelesaikan soal sesuai dengan waktu yang telah ditetapkan dan tidak diberikan penambahan nilai pada saat peserta dapat menyelesaikan soal lebih cepat daripada waktu yang telah ditetapkan. Penambahan waktu tidak akan diberikan kepada seluruh peserta. Pada saat peserta telah menyelesaikan pemipaan peserta harus meminta juri menilai pekerjaannya dengan melakukan test kebocoran kurang lebih 15 menit sebelum melanjutkan pada tahap berikutnya, dan juga 10 menit untuk menilai hasil proses pemvakuman yang dilakukan oleh peserta.

D. Poin Pengecekan Hal penting dalam lomba ini adalah adanya prosedur yang menghendaki setiap peserta untuk meminta kepada juri untuk mengobservasi setiap langkah kerja yang dilakukannya. Sebagai contoh pada saat peserta telah menyelesaikan proses pemvakuman unit, maka peserta meminta salah seorang juri untuk melakukan observasi hasil pekerjaannya dan meminta juri untuk menandatangani kotak proses vakum yang tersedia dalam soal. Silahkan lihat pada contoh berikut :

Proses Pemvakuman Sistem Juri:

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 8

Page 9: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Informasi Keselamatan (Safety)

Selama Lomba, seluruh peserta diwajibkan mengikuti dan melaksanakan aturan keselamatan yang telah ditetapkan, yaitu :

1. Sepatu Kerja : Diwajibkan untuk menggunakan sepatu keselamatan (Safety Shoes).

2. Pakaian Kerja : • Menggunakan baju kerja dengan bagian tangan dan kaki sepenuhnya terlindungi (trousers or

overalls).

• Tubuh bagian atas selalu tertutup.

• Lengan harus tertutup dengan menggunakan pakaian lengan panjang pada saat pengelasan dan penanganan Refrigerant.

3. Pelindung Mata • Wajib mengenakan pelindung mata (Kaca Mata) putih atau Clear Glasses. • Terutama untuk pekerjaan brazing, soldering, filing, reaming, hack-sawing, drilling, grinding dan

penanganan refrigerant, dry nitrogent dan udara bertekanan., termasuk ketika sedang mengerjakan pekerjaan kelistrikan.

4. Sarung Tangan • Harus digunakan pada saat Brazing dan penanganan refrigerants • Wajib digunakan pada saat melakukan pekerjaan kelistrikan termasuk pengujian kelistrikan.

5. Kelistrikan Seluruh peserta wajib untuk meminta izin dari Juri pada saat ingin mengoperasikan semua peralatan listrik kecuali peralatan kerja seperti Bor dan hand power tools lainnya.

Setiap peserta yang terindikasi tidak menggunakan peralatan keselamatan yang telah ditentukan dapat diberhentikan aktivitasnya oleh Juri sampai peserta tersebut memenuhi persyaratan keselamatan yang dimaksud.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 9

Page 10: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2015_TPRA.doc Bagian C

BAGIAN C SOAL – SOAL LOMBA

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 10

Page 11: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Competition Details - Module 1

Refrigeration System Installation and Commissioning

Maximum Time Allowed – 10 hours 60 Marks

The competitor is required to position and install the supplied refrigeration equipment according to the schematic pipe work diagram that will be supplied.

Drawing Rthat relate to this module are as follows:R.001 (Flow Diagram) included in Test Project Section 1: Test Project DrawingsR.002 (Wiring Diagram) included in Test Project Section 1: Test Project DrawingsR.003 (Equipment Layout) included in Test Project Section 1: Test Project DrawingsR.004 (Letters “COOL” Layout Front) included in Test Project Section 1: Test Project DrawingsR.005 (Letters “COOL” Layout Rear) included in Test Project Section 1: Test Project DrawingsR.006 (Letters “COOL” flow direction) included in Test Project Section 1: Test Project Drawings

Components will include the following :

Major system components Condensing unit Evaporator koil Refrigeration quality pipe work Electrical components

Refrigeration system flow control and valves including Liquid line filter drier Sight glass Thermostatic expansion valve with ext. equilizer Low pressure and high pressure gauges Pressure access valves Refrigerant R134a Refrigeration quality copper pipework

Electrical system component including: Safety pressure controls Temperature controller Relays, contactors and associated switch gear

The competitors required to commission the system within the time limit. When you have finished commissioning the system you are required to record the operational settings on a System Data Sheet that will be provided to each competitor. The competitor must ask Jury to check their own commissioning records and obtain Jury signature in the space provided in the commissioning sheet.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 11

Page 12: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

System Design Specifications

The following system design specifications for the installation should be used for commissioning and control setting and are as follows:

SYSTEM SPECIFICATIONS- Refrigerant = R134a- Maximum ambient temperature = 33°C Db, 28°C Wb- Design saturated suction temperature = -15 °C- Suction line pressure drop = 1 K

CONTROL AND SAFETY SETTING- Low Pressure Controller cut off 5K lower than design saturated suction temperature (SST).- Low Pressure Controller cut in at -10 °C.- High Pressure cut out the system when the Condensing temperature reaches 55 °C.

Install and Commission Refrigeration System

All competitors will be required to perform the following tasks to complete this module, all tasks except task 1 and 2 have an expert sign off sheet which needs to be filled in and signed prior to moving ahead on each task

1. Install Refrigeration System

All competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and Worldskills International Standard for Refrigeration & Air Conditioning.

2. Install Electrical System

All competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and National skills Standard for Refrigeration & Air Conditioning.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 12

Page 13: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

3. Pressure Test System

Under the supervision of jury, carry out a staged pressure test of the refrigeration system inaccordance to manufacturer’s equipment instructions and National skills standards. The pressure test point should not drop from the starting point in the fifteen (15) minutes after the pressure test is isolated from the Nitrogen cylinder. If the pressure test has not been achieved, the competitor can continue to fix the leak and achieve the pressure test, however the full mark for Pressure Test will be lost.

PLEASE FILL IN THE JURY CHECK POINT SHEET BELOW BEFORE PROCEEDING ANY FURTHER

To be filled in by Competitor

Pressure Test Value □ Bar, □ kPa, □ psi =

To be filled in by JURY ONLY

Competitor Name:

Competitor province:

Pressure at Start of Test: □ kPa, □ psi =

Starting Time:

Pressure at End of Test: □ kPa, □ psi =

Finishing Time:

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 13

Page 14: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

4. Evacuation

Under the supervision of Jury, evacuate the refrigeration system in accordance withmanufacturer’s instructions and National standards using the Deep Vacuum Method to hold a vacuumof at least 1000 microns (130 Pa absolute) of mercury. The evacuation point should not rise more than 20% of the starting point in the Ten (10) minutes after the vacuum pump is isolated from the system under test. If the evacuation below 1000 micron has not been reached within 1 Hour, the competitor can continue to achieve the evacuation; however the full mark for Evacuation will be lost.

PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE PROCEEDING ANY FURTHER

To be filled in by JURY ONLY

Competitor Name:

Competitor Province:

Evacuation Level at Start of Test: □ Micron =

Starting Time:

Evacuation Level at End of Test: □ Micron =

Finishing Time:

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 14

Page 15: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

5. Charging With Refrigerant

Under the supervision of Jury, charge the refrigeration system with the requiredweight of refrigerant to ensure operation according to cold box specification above, andin accordance with acceptable trade & environmental practices.

PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE PROCEEDING ANY FURTHER

To be filled in by JURY ONLY

Competitor Name:

Competitor Province:

Refrigerant Bottle Gross weight prior to charging system: □ grams □ pounds =

Refrigerant Bottle Gross weight at conclusion of competition: □ grams □ pounds =

Mass of Refrigerant added: □ grams □ pounds

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 15

Page 16: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

6. Electrical testing

Under the supervision of Jury, perform all necessary safety checks to ensure the test project is safe to energise.

PLEASE FILL IN THE JURY CHECK POINT SHEET AT THE BACK OF THIS DOCUMENT BEFORE PROCEEDING ANY FURTHER

To be filled in by JURY ONLY

Competitor Name:

Competitor Province:

All wiring inspected by jury prior to energising: □ Yes

Electrical safety checks performed prior to energising: □ Yes

Comments:

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

7. Commission the System

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 16

Page 17: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Competitors are to commission the system for operation in accordance with the design specifications supplied. Please fill out the following commissioning document with the system fully operational.

Competitor Name:

Competitor Province:

Ambient Temperature .... Celsius ...... Fahrenheit :

Refrigerant Type:

Mass of Refrigerant Charge .... grams .... pounds :

Suction Pressure .... kPa ..... psi

Discharge Pressure .... kPa ..... psi :

Condenser Subcooling .... Kelvin .... Fahrenheit Degrees

Evaporator Superheat .... Kelvin .... Fahrenheit Degrees :

Total System Superheat ... Kelvin ... Fahrenheit Degrees :

LP Control Cut In .... kPa .... psi :

LP Control Cut Out .... kPa ... psi :

HP Control Cut Out .... kPa ... psi :

HP Control Cut In .... kPa .... psi :

Compressor Operating Current □ Amps:

To be filled in by JURY ONLY

Competitor Name:Competitor Province:

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 17

Page 18: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Competition Details - Module 2

Air Conditioning System Installation, Fault Finding, Repair and Commissioning

Maximum Time Allowed – 7 hours 40 Marks

The competitor will be issued with a split type inverter air conditioning system that includes R410A refrigerant charge. The competitor will be required to position, install and commission the Indoor unit and Outdoor unit, pipe work and associated wiring onto a supplied frame work. The installation of a Condensate drain is also required.

The test module requires the installed pipe work to be Pressure tested and Evacuation tested according to the World Skills standards within the time limit. You are then to commission the system according to the specifications provided.

Drawing R.006 (Component Layout Drawing) refers.

The competitors required to commission the system within the time limit. When you have finished commissioning the system; you are required to record the operational settings on aSystem Data Sheet that will be supplied to you.

The competitor must ask a Jury to check their own commissioning records and obtain Jury signature in the space provided on the commissioning sheet.

The specifications for the Air Conditioning unit are:

Cooling Mode

Room temperature setting at : +21 oC

Fan speed setting at : High Speed.

Louvre Setting : Fixed open

Evacuation Reached within 30 mins. Jury Initials

Air Conditioning System Set Up Observed Jury Initials

Test Project For Skills Refrigeration and Air ConditioningProvince Vocational Students Skills Competition - 2015 Page 18

Page 19: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

AC SYSTEM COMMISSIONING REPORT

SELECT COOLING MODE AND HIGH SPEED FOR THE INDOOR FAN FOR COMMISSIONING

Competitors to fill out

Competitor Name:

Competitor Province:

What is the Fault?

The Competitor must ask Jury to observe their air conditioning unit operation and set up and obtain a Jury initial in the box provided.

Commissioning Data

Refrigerant Type =

Mass of the Refrigerant Charge □Gram, □Ounces

Ambient Temperature □˚C, □˚F =

Suction Pressure □kPa, □psi □Bar =

Discharge Pressure □kPa, □psi □Bar =

Saturated Suction Temperature ˚C, ˚F=

Saturated Discharge Temperature □˚C, □˚F =

Suction Superheat Value □K, □˚R =

Air Suction Temperature onto Evaporator □˚C, □˚F =

Air Discharge Temperature off Evaporator

□˚C, □˚F =

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 19

Page 20: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Fan speed High Medium Low

Indoor coil air velocity m/se Ft/sec

Compressor operating current Amp

Jury to fill out:

Start Time:Time fault identifeid:

Refrigeration System Pressure Test

Jury 1.

Jury 2.

Jury 3.

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 20

Page 21: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Troubleshooting, Mechanical Component Replacement, and Commissioning Air.Conditioning System

Using specialized and selected refrigeration tools, the competitor is required to remove and replace a component and recommission the system according to National Skill standards.

The component could be on the cold drink equipment system. The system must be returned

to correct operation within the 5 hour time limit.

Drawing R.007 (Component Layout Drawing) refers

There will be any number of component replacement tasks available and each individual task will be kept secret in its own envelope until the time of this competition module.

The task description will be announced at the start of the module test by the Jury or the delegated representative.

The module is designed to test the Competitors ability to recover refrigerant in an environmentally safe way.

Competitors to fill out

Competitor Name:

Competitor Province:

Jury to fill out:

Start time:Finishing time:

Refrigerant Recovery Observed Jury Initials

Pressure Test Observed Jury Initials

EvacuationTest Observed Jury Initials

Recommissioning Observed Jury Initials

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 21

Page 22: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2014_TPRA.doc Bagian D

BAGIAN D GAMBAR / DRAWING

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 22

Page 23: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.001

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 23

Page 24: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.002

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 24

Page 25: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.003

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 25

Page 26: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.004

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 26

Page 27: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.005

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 27

Page 28: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Drawing R.006

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 28

Page 29: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2014_TPRA.doc Bagian E

BAGIAN E PERALATAN & PERLENGKAPAN PESERTA

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 29

Page 30: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

Peralatan yang disiapkan peserta

Peralatan berikut merupakan peralatan minimum yang dibawa oleh setiap peserta lomba

dan yang akan digunakan selama lomba berlangsung, peserta diperbolehkan membawa

peralatan lain yang dianggap perlu dan membantu dalam proses mengerjakan soal lomba.

Competitor SupplyMeasuring, Preparatory pahse RefrigerationWriting equipment, including, pencils, coloured

Set of gauges R-134a and R410Apens, paper, highlighters Gauge manifold set R134a and R410ATape measure: 5 m Vacuum gauge, down to 50 PascalCentre punch Scale digital balancedPipe reamer Ratchet keyScribe Schrader valve keySet of drills: 1-10 mm Allen keys – imperial and metric

Spirit level Vacuum pump Tong-ammeter Digital Thermometers with at least 2 sensors Metal Rule: 300 mm Electronic Leak Detector Knife Leak detection solution Hammer Small mirror Hacksaw Screw drivers Electrical Work Try-square Wire Strippers Set squares Electrician’s pliers Long nose pliers Multigrips

Electrical Crimping ToolsMechanical tasks MegohmmeterTube cutter, up to 22 mm Multi-meterFiles: flat, half round and roundPipe Bending Machine 6 mm SafetyPipe Bending Machine 10 mm Clothing, long sleeves, long work trousersPipe Bending Machine 12 mm Emergency clothMechanical tube benders, Safety shoesSet of spanners up to 25 mm Clear Safety glassesShifting spanners GlovesSide cutting pliersSteel woolOil can

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 30

Page 31: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

LKS2014_TPRA.doc Bagian F

BAGIAN F SKEMATIK PENILAIAN

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 31

Page 32: Test Project Refrigeration & Air Conditioning -LKS 2015 Provinsi Aceh.docx

SKEMATIK PENILAIAN

Berikut ini adalah Rangkuman skala penilaian untuk bidang Refrigerasi & Air Conditioning yang harus dipersiapkan oleh seluruh peserta sesuai bahasa masing-masing pada bagian Informasi, dilakukan sebelum pelaksanaan lomba.

Gambaran teknis untuk Refrigerasi & Air Conditioning pada bagian F merupakan daftar keterampilan yang harus dipenuhi oleh peserta lomba dan kriteria penilaian akan di berikan untuk semua modul berikut:

Kriteria Keterampilan ( Skill ) Nilai Ma ksi mum

A Component fabrication 12.50

B Component and System Installation 20.00

C Electrical Installation 15.00

D Commissioning and Adjustment 17.50

E Electrical fault find and repair 10.00

F Refrigerant fault find and repair 10.00

G Refrigerant Recovery & Emission Control 10.00

H health and Safety 10.00

Total 100.00

Test Project For Skills Refrigeration and Air ConditioningNational Vocational Students Skills Competition - 2015 Page 32