    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND,C)N! O)L S+STE

    SLNO

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

     8.0

    9.0

    10.0

    PLANT DETAILS

    OBJECTIVE

    PROPOSAL

    SERVICES REQUIRED

    SAFETY PRECAUTIONS

    EER!ENCY PROCEDURE

    STATE OF T"E PLANT

    ET"OD

    COPLETION CRITERIA

    APPENDICES

    #$ TEC"NICAL SPECIFICATION

    %$ DRA&IN!.

    '$ LO! S"EETS.

  • 8/18/2019 Tg Lub Oil Flushing

    2/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet 2 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    1.

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1.7

    1.8

    1.9

    PLANT DETAILS

    500 MW unit is provided with lub oil and Ja!in" oil s#ste$swhih onsistin" o% the %ollowin" e&uip$ents to ater to thelubriation and sha%t li%tin" re&uire$ent o% entire 'urbine and(enerator bearin"s and 'urin" "ear s#ste$.

    2 )os. *+ driven *u,iliar# oil pu$ps and 1 )o -+ drivene$er"en# oil pu$p are $eant to suppl# oil to the bearin"s andturnin" "ear at re&uired pressures.

    2 )os. o% *+ driven and 1 )o -+ driven Ja!in" il pu$ps are$eant %or suppl#in" hi"h pressure oil to the bearin"s in order toli%t the sha%t while the $ahine is on barrin" "ear.

    1 )o Main oil pu$p to suppl# oil to the bearin"s while the unit isin operation.

    2)os. o% in/etors to boost the sution pressure to M.

    2 )os o% oolers one in servie the other as standb# to re$ovethe heat %ro$ the oil o$in" %ro$ the bearin"s.

    il te$perature ontrol valve. 'his in on/untion with oil oolers$aintains the oil te$perature at inlet to bearin"s.

    -uple, %ilters in oil line to 'hrust bearin" 'his is to re$ove the$ehanial i$purities %ro$ the oil so that the da$a"e to thustbearin" is avoided. ne is nor$all# in servie and the other is!ept as standb#.

    'hrottles at the inlet to the bearin"s. 'hese are $eant %or re"ulatin" the %low o% oil enterin" the bearin"s so that the bearin"$etal te$peratures are $aintained within operatin" li$its.

    ST,T(S

    Signatu'e

      NTPC BHEL

  • 8/18/2019 Tg Lub Oil Flushing

    3/25

    Station: NTPC-

    Ramagundam

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$S%eet $ of #/

    P&ant a'ea: T(RB)NEPROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    1.10

    1.11

    1.12

    2.0

    2.1

    3.0

    3.1

    3.2

    3.3

    3.4

    #drauli 'urnin" "ear shut o%% valve is $eant %or ad$ittin" thepower oil %or turnin" "ear devie durin" shutdown o% the unit.

    Main il 'an! serves as reservoir o% il. 'he *u,iliar# il u$pand Ja!in" oil pu$ps are $ounted inside the Main oiltan!. 'he tan! ontains two o$part$ents )a$el# dirt#

    and lean o$part$ents separated b# a partition %ilter ele$ent.

    2)os. apour ,hauster %ans are $eant %or re$ovin" oil vapour %ro$ the oil s#ste$ and to $aintain a little a$ount o% vau$.)or$all# one %an is in servie and the other is !ept as standb#.

    OBJECTIVE(

    'o %lush o$plete '( il Ja!in" oil s#ste$s with 'urbine oilto re$ove $ehanial i$purties.

    PROPOSAL

    he$e o% oil %lushin" %or lub oil and Ja!in" oil s#ste$s shall beas per the enlosed s!eth.

    'her$al sho!s shall be "iven to the s#ste$ b# sudden han"esin oil te$perature to $a!e the %lushin" e%%etive. appin" o% theoil lines shall be arried out durin" ther$al sho!s espeiall# atweld /oints.

    il %lushin" shall be arried out usin" the nor$al operatin"'urbine oil as per *nne,ure. 'he &uantit# o% oil re&uired %or %lushin" will be appro,. 40 :;.

     

  • 8/18/2019 Tg Lub Oil Flushing

    4/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet 4 of #/

    P&ant a'ea: T(RB)NEPROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

  • 8/18/2019 Tg Lub Oil Flushing

    5/25

    SLNO

    4.0

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.7

    5.0

    5.1

    5.2

    5.3

    5.4

    5.5

    5.6

    5.7

    SERVICES REQUIRED

     *vailabilit# o% letrial heatin" arran"e$ent %or heatin" the +W toturbine oil ooler %or "ivin" ther$al sho!s durin" oil %lushin".

     *vailabilit# o% laborator# %ailit# %or anal#sis o% oil sa$ple.

     *vailabilit# o% servie air and thinner=petrol %or %ilter leanin". 

     *vailabilit# o% su%%iient s!illed $anpower %or e,eution and supervisiono% the proess. 

     *vailabilit# o% re&uired &uantit# o% 'urbine oil

     *vailabilit# o% portable %ire e,tin"uisher at oil %lushin" area.

     *vailabilit# o% proper li"htin" and o$$uniation %ailit#.

    SAFETY PRECAUTIONS(

    tairases plat%or$s handrails %or M' and re&uired approahes asdeided at site should be read#.

    a%et# and protetive e&uip$ents li!e hand "loves hel$et et shouldbe available durin" the proess.

    reautions should be ta!en to avoid spilla"e and onta$ination o% oil.

    ervie water soure should be available near the ativit# area.

     *vailabilit# o% %irst aid !it near the proess area should be ensured.

     *vailabilit# o% ortable %ire e,tin"uishers and bu!ets ontainin" sandshould be ensured near the ativit# area.

    ne oil is %illed in M' no weldin" = uttin" /ob should be arried out inlub oil %lushin" area.

    ST,T(S

    Signatu'e

      NTPC BHEL

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet 5 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

  • 8/18/2019 Tg Lub Oil Flushing

    6/25

    ,C)N! O)L S+STE

    SLNO

    5.8

    5.9

    5.10

    5.11

    5.12 

    5.13

    6.0

    6.1

    6.2

    6.3

    6.4

    6.5

    ;oad on * shall not e,eed %ull load urrent o% the $otor.

    rovision %or e$er"en# stoppin" o% oil pu$ps %ro$ loal=>+?has to be $ade.

    rovision %or e$er"en# drainin" o% M' to the tan! o% +entral oiluri%iation >nit should be $ade.

    il %lushin" area should be properl# ordoned o%%.

    -ispla# o% aution si"n boards dan"er ta"s should be $ade atonerned loations.

    ound the lo! $annin" should be $ade %or $onitorin" o% oil%lushin" ativit#.

    EER!ENCY PROCEDURE(

    $er"en# operatin" instrutions to deal with %ire or an# other e$er"en# onditions should be prepared in advane anddispla#ed at the identi%ied loations.

    'he operator posted in the oil %lushin" area should be aware o% %ire e,tin"uisher operatin" proedures.

    'he tea$ $e$bers should be aware o% proedure to be %ollowedin ase o% aident involvin" in/ur#= letrial ho!.

     *n operator should be posted near the pu$p area and instrutedto trip the pu$ps in the event o% e$er"en# bein" noti%ied to hi$b# an# tea$ $e$ber = observers.

    'he tea$ $e$bers should be aware o% restartin" the %lushin"operation in ase o% s#ste$ stoppa"e due to %ailure o% powersuppl#.

    ST,T(S

    Signatu'e

      NTPC BHEL

  • 8/18/2019 Tg Lub Oil Flushing

    7/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet 1 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    7.0

    7.1

    7.2

    7.3

    7.4

    7.5

    7.5.1

    7.5.2

    7.5.3

    7.5.4

    7.5.5

    7.5.6

    STATE OF T"E PLANT

    retion o% the lubeoil s#ste$ is o$plete as per drawin".

     *ll the te$porar# pipin" whih are inluded in the proess areseparatel# leaned be%ore their installation.

    'her$al sho! she$e is read# as per the details "iven in theenlosed drawin". @e%er dr". )o.4'A014600B

    -irt# lean oil tan!s and the related s#ste$s o% the +entral il

    uri%iation unit @+>B are read# %or drainin" and pu$pin" ba!o% oil to M'

    AIN OIL TAN)

    il in/etor %loat valve are !ept in position. rew plu"s will beprovided in its drain holes.

    M sution and dishar"e are looped with its oil %lushin" deviesupplied %ro$ Wor!s with a CD vent valve.

     *ll + E installations li!e M' level indiators level swithes etare %itted be%ore oil %illin".

    apour e,tration %ans are available %or operation.

     *ll bearin" edestals and M' strainer are $anuall# leanedand inspeted be%ore start o% oil %lushin". Mar!in loth onl# is tobe used %or leanin".

     *s Js and entri%u"e are available with re&uired alar$sinterlo!s and protetions.

    ST,T(S

    Signatu'e

      NTPC BHEL

  • 8/18/2019 Tg Lub Oil Flushing

    8/25

    Station: NTPC-

    Ramagundam

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$S%eet of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO 

    7.6

    7.6.1

    7.6.2

    7.6.3

    7.6.4

    7.6.5

    7.6.6

    7.6.7

    7.6.8

    7.6.9

    7.6.10

    7.6.11

    7.6.12

    7.6.13

    LUB OIL SYSTE(

     *ll %lan"es in the s#ste$ are ti"htened a%ter he!in" %or "as!ets.

    il throttles at * dishar"e %or oil in/etor E and EE are replaedwith suitable adapters=distane piees

    'he turnin" "ear noFFle bo, inside bearin" )o.3 pedestal isre$oved and its %lushin" devie provided be%ore bo,in" up o% pedestal.

    ;ub oil header is onneted to -rain eader with a te$porar#

    loop o% the lub oil header siFe with an isolatin" valve.

    il suppl# return lines %or eah o% (enerator %ront rear ande,iter bearin"s are looped with te$porar# pipes.

  • 8/18/2019 Tg Lub Oil Flushing

    9/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet 3 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    7.6.14

    7.6.15

    7.7

    7.7.1

    7.7.2

    7.7.3

    7.7.4

    7.7.5

    7.8

    7.8.1

    7.8.2

    7.8.3

    il oolers are inspeted throu"h oil line onnetion and i% re&uired areleaned be%ore start o% the oil %lushin".

    'e$perature indiators be%ore and a%ter oil ooler %or oil as well asoolin" water are $ade available.

    JAC)IN! OIL SYSTE(

  • 8/18/2019 Tg Lub Oil Flushing

    10/25

    Station: NTPC-

    Ramagundam

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$S%eet / of #/

    P&ant a'ea: T(RB)NE

    Teting " Commiioning S%edu&e: T(RB)NE O)L *L(SH)N!

    SLNO

    7.8.4

    8.0

    8.1

    8.1.1

    8.1.2

    8.1.3

    8.1.4

    8.1.5

    8.1.6

    8.2

    8.2.1

    8.2.2

    8.2.3

     * he! list is prepared %or all the ite$s re$oved = %ittedte$porail# and is re%erred to at the ti$e o% nor$aliFation.

    ET"OD(

    OIL FILLIN!(

    e&uired &uantit# o% oil is $ade available and the oil is tested %or its &ualit#. 'est erti%iate an also be obtained %ro$ the supplier.

    'urbine oil is %illed into the M' pre%erabl# throu"h the entri%u"e.il %illin" an also be done throu"h bearin" drain header b#$ountin" a te$porar# %illin" %unnel at its e,iter du$$# end.

    +are is to be ta!en that all the drains o% the s#ste$ are losedand no oil lea!a"e our durin" %illin".

    'he operation o% oil tan! level indiator is he!ed durin" oil%illin". ;evel is to be losel# $onitored to avoid an# over%low.

    +entri%u"in" o% M' oil is to be done ontinuousl# with its heaters

    ) +entri%u"e bowl is to be leaned inter$ittentl# to re$oveslud"e olleted.

    M' %ilters is to be leaned as and when re&uired.

    LUB OIL SYSTE FLUS"IN!(

    #ste$ is lined up %or %lushin" lub oil lines diretl# %ro$ lub oilheader to drain throu"h the te$porar# valve. il oolers are !eptb#passed. *ll other setions are !ept isolated.

    -iretion o% rotation o% the oil pu$ps is to be he!ed with shortstart = stop o$$and. 'he trial run o% the pu$ps is to be ta!en upalon" with oil %lushin" proess.

  • 8/18/2019 Tg Lub Oil Flushing

    11/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet #0 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STESLNO

    8.2.4

    8.2.5

    8.2.6

    8.2.7

    8.2.8

    8.2.9

    8.2.10

    8.2.11

    8.2.12

    8.2.13

     *s are to be ta!en in to servie. %or %urther oil %lushin" a%ter $a!in" the s#ste$ lea! proo%. +entri%u"e is to be run ontinousl#with its heaters ).

    +are is to be ta!en that * load is li$ited to %ull load urrent o% the * $otor. E% re&uired both *s shall be run.

    Main oil tan! %ilters shall be inspeted and leaned ever# hour 

    durin" initial %lushin" operation. 'herea%ter the %re&uen# is be"raduall# redued to one a da# dependin" upon the %ilter ondition.

    When one a da# M' %ilter leanin" is established lub oiloolers shall be ta!en in servie one b# one %or %urther oil%lushin". )or$all# 23 da#s o% %lushin" with oolers in b#passedondition su%%iient.

    'her$al sho! to the oil s#ste$ is started b# heatin" the oil withther$al sho! arran"e$ent.

    'e$perature o% oil a%ter ooler shall be raised to about 7075de" +. il te$perature should not e,eed 80 de" +.

    'her$al sho! is "iven b# har"in" oolin" water as %ast aspossible and oil te$perature be%ore ooler is brou"ht down b#about 35 I 40 de" +.

  • 8/18/2019 Tg Lub Oil Flushing

    12/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet ## of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STESLNO

      8.2.14

    8.2.15

    8.2.16

    8.3

    8.3.1

    8.3.2

      8.3.3

    8.3.4

    8.3.5

    8.3.6

  • 8/18/2019 Tg Lub Oil Flushing

    13/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet #2 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    8.3.7

    8.4

    8.4.1

    8.4.2

    8.4.3

    8.5

    8.5.1

    8.5.1.1

    :eepin" %ull# released one J is started and dishar"epressure raised to appro,i$atel# 10 !"=$2  %or %urther oil %lushin"o% /a!in" oil lines %or two da#s.

    FINAL STA!E FLUS"IN!(

     *%ter all the iruits have been ta!en %or %lushin" and M'strainer re$ains lean %or 24 rs. -uple, %ilter ele$ents shall beintrodued in the %lushin" iruit

    'he internals o% bearin" oil throttles @ 2 to 3 bearin"s at a ti$e Bare re$oved and line %ilters supplied %ro$ wor!s are introdued.

    +o$plete oil s#ste$ %lushin" is ontinued usin" ther$al sho!s.il sa$ple anal#sis is arried out. -uple, = ;ine %ilters areleaned with leanin" a"ent.

  • 8/18/2019 Tg Lub Oil Flushing

    14/25

    Station: NTPC-

    Ramagundam

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$S%eet #$ of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND,C)N! O)L S+STE

  • 8/18/2019 Tg Lub Oil Flushing

    15/25

    SLNO

    8.5.2

    8.5.2.1

    8.5.2.2

    8.5.2.3

    8.5.2.4

    8.5.2.5

    8.5.2.6

    8.5.2.7

    8.5.2.8

    8.5.2.9

    8.6

    8.6.1

    8.6.1.1

    8.6.1.2

    PREPRATION(

    ?e%ore ondutin" h#drauli test it is to be ensured thatdishar"e pipin" o% Js inludin" its dishar"e ) and have been nor$alised and trial run o% /a!in" oil pu$pso$pleted.

    e&uired te$porar# onnetion shall be $ade between thesubs#ste$s. ?lan! %lan"es shall be installed wherever thesubs#ste$ are onneted to drain as per %lushin" she$e.

    'est "au"es o% suitable ran"e are provided.

     &uip$ents not sub/eted to test are !ept isolated.

    E$pulse line valves o% all proess pressure "au"es = trans$ittersare to be !ept losed.

    a%et# relie% valves o% Js. are to be he!ed %or their settin".#ste$ pressure durin" #drauli test is to be re"ulated usin"pressure re"ulatin" valve.

    entin" arran"e$ents are provided at blind ends with valve.

    Ja!in" oil dishar"e lines are suitabl# tapped o%% to lub oils#ste$ separatel# with isolatin" valves.

    ;ub oil throttles to all bearin"s are losed.

    PROCEDURE(

    L*% O+, S-/(

    -+ is run and s#ste$ is %illed.

    entin" o% total s#ste$ is arried out.

    ST,T(S

    Signatu'e

      NTPC BHEL

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet #4 of #/

    P&ant a'ea: T(RB)NE

  • 8/18/2019 Tg Lub Oil Flushing

    16/25

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    8.6.1.3

    8.6.1.4

    8.6.1.5

    8.6.1.6

    8.6.2

    8.6.2.1

    8.6.2.2

    8.6.2.3

    8.6.2.4

    8.6.2.5

    8.6.2.6

    8.6.2.7

    8.6.2.8

    8.6.2.9

    8.6.3.0

    -+ is stopped.

    ne J is started with pressure re"ulatin" valve %ull# released.

    ;ines onnetin" /a!in" oil to lub oil s#ste$s are opened.

    ressure is raised to 12 !"=$2 and held %or 10 $inutes. #ste$is he!ed %or lea!a"es.

    J#'+ O+, S-/(

    ressure re"ulatin" valve is !ept %ull# released.

     *%ter o$pletion o% h#drauli test o% lub oil s#ste$ the te$porar#onnetion %ro$ J dishar"e header to lub oil s#ste$ are

    re$oved and /a!in" oil s#ste$ is nor$alised.

    ne J.. is started and pressure is raised to 20 !"=$2 .

    ;ines to eah bearin" are vented and then isolatin" valves tobearin"s losed.

    ;ea!a"es i% an# are attended.

    ressure is "raduall# raised to 180 !"=$2.

    #ste$ is a"ain he!ed %or lea!a"es.

    ressure is held %or 10 $inutes and s#ste$ is then depressurised

    'he is ad/usted to the operatin" value o% /a!in" oil header pressure.

    E% lea!a"es are observed s#ste$ is depressurised and lea!a"esattended and h#drauli test is repeated.

    ST,T(S

    Signatu'e

      NTPC BHEL

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet #5 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

  • 8/18/2019 Tg Lub Oil Flushing

    17/25

    ,C)N! O)L S+STE

    SLNO

    8.7

    8.7.1

    8.7.2

    8.7.3

    8.7.4

    8.7.5

    8.7.6

    8.7.7

    8.7.8

    8.7.9

    8.7.10

    8.7.11

    8.7.12

    8.7.13

    N#,+#/+(

    il is drained %ro$ the total s#ste$ in the dirt# oil tan! o% entraloil puri%iation unit. ualit# o% this oil is tested and i% %oundsuitable the oil $a# be used %or oil %lushin" o% other unit.

    M' and ' are leaned and inspeted.

    il oolers tube nest are leaned and inspeted.

    il in/etor %oot valve are leaned and nor$alised a%ter he!in"the seatin" b# blue $athin". *lso srew plu" provided in drainhole is re$oved.

    ?earin" oil throttles are nor$alised a%ter re$ovin" their srewplu"s and their li%t are ad/usted %or nor$al operation as per %low

    urve. ;o!in" o% throttle is to be done properl#.

     *ll the '( bearin"s and M are nor$alised.

    ah pedestal is leaned o% an# %orei"n $aterial i% an#.

     *ll the provisional arran"e$ents $ade in the s#ste$ %or oil%lushin" are re$oved and s#ste$ nor$alised.

     *ll /a!in" oil onnetions to the bearin"s are nor$alised.

    Ja!in" oil line ) internals re$oved prior to oil %lushin" areinstalled.

    J is run and all J onnetions to bearin"s are he!ed %orlea!a"es. ;ea!a"es observed i% an# are attended.

    ?earin" pedestal are bo,ed up a%ter ensurin" o$pletion o% all+ E /obs.

    il in/etor and oil ooler throttles are nor$alised = ad/usted %or nor$al operation.

    ST,T(S

    Signatu'e

      NTPC BHEL

  • 8/18/2019 Tg Lub Oil Flushing

    18/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet #1 of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    8.7.14

    9.0

    9.1

    9.2

    9.3

  • 8/18/2019 Tg Lub Oil Flushing

    19/25

    Station: NTPC-

    Ramagunda

    m

    BHEL Ref No.PS-DC-202-500-0004

    NTPC Ref no COS-CO-R!-Comm-PRO"0#$ S%eet # of #/

    P&ant a'ea: T(RB)NE

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N! O* T(RB)NE L(B-O)L ,ND

    ,C)N! O)L S+STE

    SLNO

    10.0 @aBE.

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    14.

    15.

    OIL TEC"NICAL SPECIFICATION

    'he properties o% 'urbine oil are "iven below

     *ppearane +lear 

    :ine$ati isoosit# *t 40 de" + @+'B 41.4

    isosit# Ende, 96

     *'M +olour 2.5

    -ensit# at15 de" + @"$=$lB 0.9

    our oint @de" +B @B 6

  • 8/18/2019 Tg Lub Oil Flushing

    20/25

    SHEET #3 O* #/

    LO! S"EET

    AOP NO 1 2 RUN STATUS

    -*' 'EM *

    +urrent-is. r.

    ;ub oileader 

    r.

    ;ub oil 'e$o. )o. o% 'her$alsho!

  • 8/18/2019 Tg Lub Oil Flushing

    21/25

    S"EET 19 OF 19

    JOP N. 1 N.2 RUN STATUS

    -*' 'EMJ

    +urrent-is. r.

    il 'e$p.)o. o% 'her$al

    ho!?<

    'her$alho!

     *

  • 8/18/2019 Tg Lub Oil Flushing

    22/25

    PROCED(RE *OR H+DR,(L)C TEST ,ND *L(SH)N!

    O* T(RB)NE L(B-O)L ,ND ,C)N! O)L S+STE

    PS(TS(176(00(03

    PROJECT ( RAA!UNDA 500 &

    B"ARAT "EAVY ELECTRICALS LIITEDTEC"NICAL SERVICES DEPARTENT

    PO&ER SECTOR : SOUT"ERN RE!IONC"ENNAI : 600 035.

  • 8/18/2019 Tg Lub Oil Flushing

    23/25

    J+' *M*(>)-*M 500MW >)E'7

    +->N-*>;E+ '' *)- E)( < '>?E) ;>? E;

     *)- J*+:E)( E; N'M

    > <-+>M'

    'E) = E)

  • 8/18/2019 Tg Lub Oil Flushing

    24/25

    RAMAGUNDAM 500 MW UNIT 7

    FLUSHING OF TG LUB-OIL SYSTEM

    DRG.NO.4:PS:TSX:0144: 00

    DRAWN CHECKED APPROED DATED

    K! MKS KB "#.0#.0$

    RAMAGUNDAM 500 MW UNIT 7

    FLUSHING OF TG !ACKING OIL SYSTEM

    DRG.NO.4:PS:TSX:0145: 00

    DRAWN CHECKED APPROED DATED

    K! MKS KB "#.0#.0$

    RAMAGUNDAM 500 MW UNIT 7

    ARRANGEMENT FOR HEATING OF OIL % THERMAL

    SHOCK 

    DRG.NO.4:PS:TSX:014&: 00

    DRAWN CHECKED APPROED DATED

    K! MKS KB "#.0#.0$

    ,RR,N!EENT *OR HE,T)N! O* O)L ,ND THER,L SHOC 

    T+P)C,L6

    T(RB)NE O)L *L(SH)N! R,,!(ND, (N)T 7 500 8

  • 8/18/2019 Tg Lub Oil Flushing

    25/25