THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT

MARCH 2015

CONTACT: Sean Thomas, CEO +27 (0) 79 496 6725 +27 (0) 11 067 4747 [email protected]

Page 2: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

PROJECT SUMMARY • Bio2Watt, is a Waste to Energy Project Development Company which develops, owns

and builds the projects it is involved in.

Bronkhorstspruit Biogas Project (Pty) Ltd (“BBP”) is a Renewable Energy IPP:

• 4.4MW installed electrical capacity and further 3MW of heat available for beneficiation

• Electricity will be sold to BMW in Pretoria, roughly 60kms from the site.

• Total project costs amount to R150m, broken down as follows: R36m equity, R16m dti (SA govt) grant, R98m loan from the Industrial Development Corporation

• The project is structured as a limited recourse finance transaction. Equity investors include Norfund, the EPC contractor, two impact funds and Bio2Watt.

• Project will officially start evacuating power in May 2015

Page 3: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

THE BRONKHORSTSPRUIT BIOGAS PROJECT

WASTE REDUCTION JOB CREATION

MORE RENEWABLE

ENERGY

DEVELOPING LOCAL EXPERTISE

FLARE

MIXER

FOOD PRODUCERS

DIGESTOR FERTILISER

OFF-TAKER

3MW

GAS ENGINES

POWER PURCHASING AGREEMENT

BIOGAS

ORGANIC WASTE

BENEFITS

AVOID WATER POLLUTION

BYPASS LANDFILLS

AVOID GHG EMMISSIONS

Page 4: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

SOME INTERESTING FACTOIDS

1,500 R8M

7 years From when project was started to Financial Closure March 2014

Pages of Legal documents – Typically agreements would lapse

… spent in legal fees

10 jobs per MW

Page 5: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

BBP – PROJECT TIMELINE

PPA negotiations

Environmental Impact Assessment

Supply Agreements

Pre-feasibility study

Jan 2007 Jan 2008 Jan 2009 Jan 2010 Jan 2011 Aug 2012 Mar 2013 Feb 2014 Apr 2015

Connection and Wheeling Agreements

Licenses & Permits

Debt/Loan Agreement - IDC

EPC Agreement

O&M Agreement

Equity Investors

Construction

Page 6: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

How was this possible? Farm/Landowner:

-  Buy-in & support from Farm is critical

-  Extensive amount of input required e.g. banks even request access to books

to ensure Farm’s sustainability

Municipality & Eskom:

-  Wheeling & Connection Agreement

-  Revenue Management & Billing

Funding

-  Patient investors

-  Development Finance Institution providing attractive loan

Off-taker

- Willing to pay a premium for Green Electricity

Page 7: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

17/03/15 Confidential

Main Challenges

-  License approval process

-  High project development costs

-  Wheeling of power

-  Off the shelf EU technology would not have worked

-  Currency movement

-  Price of electricity

-  Feedstock availability

-  Returns are low and drawn out - requires patient investors

-  Intricacies of Project Finance requirements

Page 8: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

17/03/15 Confidential

Licenses required for biogas project

LICENSES: - EIA

- WULA

- Waste License

- Air Emission License

- SALA

MUNICIPALITIES: - Building Plan approval

- By Laws

- Consent of Use

DOE, NERSA & ESKOM: - Generation License

- Letter from DOE

- Access to grid

Page 9: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

Regulatory Challenges for IPPs

LICENSES: Shorten process Environmental Impact

Assessment. All other licenses should have clear

time frames within which they need to be

processed – Currently Water Use License is

dependent on good will of the official

MUNICIPALITIES: Provide them with clear directives for waste

management and a protocol for wheeling.

DOE, NERSA & ESKOM: Industry is best supported through a strong policy

framework – Removal of access to the grid to an

independent broker

Page 10: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise

17/03/15 Confidential

BRONKHORSTSPRUIT BIOGAS PROJECT

Page 11: THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT … - SAIPPA... · the bronkhorstspruit biogas project waste reduction job creation more renewable energy developing local expertise