Page 1: Theory of Constraints TOC in Project Management

THEORY OFCONSTRAINTS

(TOC)

PRESENTED BY:M. JAWAD-UL-HASSAN

Page 2: Theory of Constraints TOC in Project Management

DO YOU WANT TO INCREASE YOUR“PROJECT PERFORMANCE”???

Page 3: Theory of Constraints TOC in Project Management

DO YOU WANT TO INCREASE YOUR“PROJECT PERFORMANCE”???

ÞYes

OrÞNo

Page 4: Theory of Constraints TOC in Project Management

SURELY YES…!!!

Page 5: Theory of Constraints TOC in Project Management

BUT HOW???

Page 6: Theory of Constraints TOC in Project Management

DIFFERENT APPROACHES ARE THERE…

Page 7: Theory of Constraints TOC in Project Management

TOC APPROACH

Page 8: Theory of Constraints TOC in Project Management

WHAT ACTUALLY TOC IS?

• Multi-systems Methodology

• To Assist People & Organization

• To Think about their problems

• Develop Breakthrough Solution

• & Implement those Solutions

Page 9: Theory of Constraints TOC in Project Management

TOC EMPHASIZES…

• Importance of Defining System goals

• Understanding the Global Goal of system

• As a Condition for…???

Page 10: Theory of Constraints TOC in Project Management

TOC EMPHASIZES…

• Importance of Defining goals

• Understanding the Global Goal of system

• As a Condition for…???

Þ SUCCESS

Page 11: Theory of Constraints TOC in Project Management

THE SYSTEM’S GOALS

Page 12: Theory of Constraints TOC in Project Management

THE SYSTEM’S GOALS

• To Achieve a “GOAL”

• A Result or achievement toward which effort is directed

Page 13: Theory of Constraints TOC in Project Management

THE SYSTEM’S GOALS

Page 14: Theory of Constraints TOC in Project Management

THE SYSTEM’S GOALS

• The leader is responsible for the Goal

• Everyone may be considered as a leader of something (Whole Org, or a unit)

Page 15: Theory of Constraints TOC in Project Management

USING THEORY OF CONSTRAINTS IN PROJECT

MANAGEMENT• How we can implement TOC?

• What benefits can we take?

• All this is Coming to your ways…

Page 16: Theory of Constraints TOC in Project Management

LITERATURE• Articles

• Journals

• Websites

• & other Means

• & Finally I concluded

Page 17: Theory of Constraints TOC in Project Management

TOC IS ABOUT MANAGEMENT…

Page 18: Theory of Constraints TOC in Project Management

• The three important Questions for a Manager…

1. What is the Ultimate Goal?

2. Where does He / She Stand in relation to the Goal?

3. The Magnitude and direction of the change needed to move from the status Quo to Where He or She Wants to be (The Goal)?

TOC IS ABOUT MANAGEMENT…

Page 19: Theory of Constraints TOC in Project Management

• Average Managers are concerned with methods, opinion and precedents.

• Good Managers are concerned with solving Problems

TOC IS ABOUT MANAGEMENT…

Page 20: Theory of Constraints TOC in Project Management

CONCEPT OF CONSTRAINTS

• What keeps your system from doing Better?

• Is there something that is constraining your Project from reaching its Goals?

Page 21: Theory of Constraints TOC in Project Management

SYSTEMS AS CHAINS

• Assume a system to be a chain with a goal of transmitting force from end A to B

Page 22: Theory of Constraints TOC in Project Management

SYSTEMS AS CHAINS

• Weakest LinkThe link at which the system fails

Page 23: Theory of Constraints TOC in Project Management

STRENGTHENING THE CHAIN

• Where should we focus our efforts?

Page 24: Theory of Constraints TOC in Project Management

BASIC QUESTIONS FOR MANAGERS

• What’s the desired Standard of performance?• System’s Goal

• What to Change?• Where is the constraint?

• What to Change to?• What should we do for the constraint?

• How to cause the changes?• How do we implement the change?

Page 25: Theory of Constraints TOC in Project Management

TOC FIVE FOCUSING STEPS

“Which will Strengthen the Chain”

Page 26: Theory of Constraints TOC in Project Management

A PRODUCTION EXAMPLE

A Simple Production System

Page 27: Theory of Constraints TOC in Project Management

STEP-1

Identify the Constraint

Page 28: Theory of Constraints TOC in Project Management

STEP-1IDENTIFY THE CONSTRAINT

Page 29: Theory of Constraints TOC in Project Management

STEP-1IDENTIFY THE CONSTRAINT

Step “C” is the Constraint

Page 30: Theory of Constraints TOC in Project Management

STEP-2

Exploit the Constraint

Page 31: Theory of Constraints TOC in Project Management

STEP-2DECIDE HOW TO EXPLOIT THE CONSTRAINT

Page 32: Theory of Constraints TOC in Project Management

STEP-2DECIDE HOW TO EXPLOIT THE CONSTRAINT

What can we do to get the most out of this constraint without committing to potentially expensive charges?

Page 33: Theory of Constraints TOC in Project Management

STEP-3

Subordinate Everything to the Constraint

Page 34: Theory of Constraints TOC in Project Management

STEP-3SUBORDINATE EVERYTHING TO THE CONSTRAINT

18 Units/

Day

23 units/day

17 units/day

Page 35: Theory of Constraints TOC in Project Management

STEP-3SUBORDINATE EVERYTHING TO THE CONSTRAINT

18 Units/

Day

23 units/day

17 units/day

Capacity Increased at Step “C”

Page 36: Theory of Constraints TOC in Project Management

STEP-4

Elevate the Constraint

Page 37: Theory of Constraints TOC in Project Management

STEP-4ELEVATE THE CONSTRAINT

You are hereBut

Why?

Page 38: Theory of Constraints TOC in Project Management

STEP-4ELEVATE THE CONSTRAINT

• We are at Stage 4…

Means

• Step 2 & 3 weren’t Sufficient to eliminate the constraint

Page 39: Theory of Constraints TOC in Project Management

STEP-4ELEVATE THE CONSTRAINT

• Elevating the constraint

Means

• We take whatever action is required to eliminate the constraint

Page 40: Theory of Constraints TOC in Project Management

STEP-5

Repeat for the NEW Constraint

Page 41: Theory of Constraints TOC in Project Management

STEP-5REPEAT FOR THE NEW CONSTRAINT

• Go Back to Step 1 but Beware of Inertia

18 Units/

Day

23 units/day

17 units/day

Page 42: Theory of Constraints TOC in Project Management

STEP-5REPEAT FOR THE NEW CONSTRAINT

• Go Back to Step 1 but Beware of Inertia

23 units/day

17 units/day

• Constraint Shifted to another place - Market

Page 43: Theory of Constraints TOC in Project Management

BE WARE OF INERTIA

• Completed Process???

• In Real No…!!!!

• Constraints on Next Step…

Page 44: Theory of Constraints TOC in Project Management

TOC FIVE FOCUSING STEPS

“Which will Strengthen the Chain”

Page 45: Theory of Constraints TOC in Project Management

THEORY OF CONSTRAINTS “A SUMMARY”

• Understanding the system is mandatory to improving it

• Any System has a Goal

• The Leader is responsible for the Goal

• Theory of Constraint is about Leadership & Management

• Every System has at least one constraint

• If you don’t impact the constraint then there is no effect on the system’s improvement

• Improvement is a Long Term and Continuous Process

Page 46: Theory of Constraints TOC in Project Management