Throttle Energy Inc.

Virtual Pipeline Technology for Energy Solution

Page 2: Throttle Energy Business PPT

Introduction of CompanyThrottle Energy is a fully integrated Oil and Gas Company

consisting of 4 partners with expertise in Oil and Gas

Production Operation Including core expertise in;

Natural Gas Processing and Transportation

Gas to Power Plant conversion

Front End Project Development and Concept selection

Downstream Operations and Manufacturing

Subsurface Data Interpretation

International Business

Process Safety.

Page 3: Throttle Energy Business PPT

Core Business Target Faster return on investment on Gas to Power projects Lowest delivery fuel cost to end users

Deliver Natural Gas to end users at requested conditions Save operating company’s overhead cost (40-70%)

Stop Gas Flaring Capture Produced Hydrocarbon gas

Efficient Logistics and reliable service delivery Mobile unit Gas Compression systems

Provide Gas storage for remote locations and Users Provide High pressure gas for;

Enhanced Oil Recovery(Gas Lift) for low pressure wells Well Completions Relevant drilling operations (pumps, power generation in

remote locations)

Page 4: Throttle Energy Business PPT

• Lowest delivered fuel cost to end users

• Faster return on investment

• Safer, reliable source of Natural Gas

• Proven (IP Protected) technology

• Efficient logistics and service delivery

• Strategically placed infrastructure

• Industry focus

• Environmentally friendly

Value Proposition to Customers

Page 5: Throttle Energy Business PPT

Virtual Pipeline Process

Flare Gas Capture and Recovery Process Flow Illustration out in the Field

TEI PATENTED

TECHNOLOGY

Page 6: Throttle Energy Business PPT

Results of Patented Technology

Existing/Conventional Filling

ending temperature >180F 65% full

Patented Chill Fill* Technology Applied to CNG Trailers

ending temperature @ 59F 100% full

Page 7: Throttle Energy Business PPT

CNG Virtual Pipeline Process

Page 8: Throttle Energy Business PPT

Confidential and Proprietary to Throttle Energy Inc.

CNG Virtual Pipeline Process

6

TEI Virtual Pipeline Process

Page 9: Throttle Energy Business PPT

End to End Technology High Efficiency Compression Optimized High Density Gas Storage

Compact Unload Heating and

Pressure Regulation

Storage Nano-Materials for

High Density at Lower Pressures

Page 10: Throttle Energy Business PPT

Compression and Dehydration Wellhead Capture Station in a Box

Page 11: Throttle Energy Business PPT

Gas Transportation AlternativesToday, there are 3 alternatives for the large-scale transportation of natural gas:

Generally there are three(3) Alternative means of transportation of gas

• LNG• Pipeline• CNG

We are proposing CNG Virtual Pipeline ProcessCNG

Pipe-LineLNG

11

Page 12: Throttle Energy Business PPT

Evolution of CNG since 2005

>200% Capacity growth due to materials innovations

>50% roadable density of LNG

Cost dynamics improving due to carbon fiber economics

220mscf (II)

165mscf (I)

510mscf+ (III/IV)

Composites = Reduced Heat Transfer

Working Pressures Higher

= Higher Heat of Compression

CNG Requires Fast Trailer Turnaround

Page 13: Throttle Energy Business PPT

CNG Trailer Stations in Oilfield Basins

Anadarko Basin (September 2013)

Eagle Ford (February 2014)

Alberta (April 2014)

Marcellus (June 2014)

Permian (October 2014)

Page 14: Throttle Energy Business PPT

Power Plant Capacity

(MW)

Gas Requirement

(MMCF/D)Cost of Gas ($)

Diesel Rquired

(Gallon/D)Diesel ($)

5 1 $3,000 7,367 $29,468

10 2 $6,000 14734 $58,936

50 10 $40,000 73670 $294,680

100 20 $60,000 147340 $589,360

200 40 $120,000 294680 $1,178,720

Page 15: Throttle Energy Business PPT

Footprint of EquipmentFully mobile equipment

Containerized designs Can be moved from field to field as needed Easily deployed in the Swamp or any other Location

Can be placed on a Barge in swampy areas (small draft needed compared to competing technology with heavy equipment)

Easily be attached to a Truck Head for transport Small enough to fit close to existing

Wellheads/producing facilities

Page 16: Throttle Energy Business PPT
Page 17: Throttle Energy Business PPT

CNG vs LNG Delivery Comparison

LNG OTHER CNG TEI OSCOMP

Pipeline +

Compression

Inlet Pressure 800psig uses 25% of Inlet Energy

150psig at a 7% Energy Penalty

$50M for 10MMSCFD

Inlet Pressure 800psig uses 2% of Inlet Energy

150psig at a 3% Energy Penalty

$5M for 10MMSCFD

Liquefaction $20M for 2MMSCFD $1.5M for 2MMSCFD

24/7 Manned Unmanned

740 MSCF (92% Yield) 325 MSCF (65% Yield)500 MSCF (95% Yield)Transport Trucking

$270K $660K $660K

Full Tanker Discharge Requires onsite trailer ModularOnsite Storage

$300K - $ $660K+ $80K - $400K

Gas Heating + Conditioning + Rest

of Systems

280KW - 50MSCFH

800KW - 140MSCFH Peak

$300K+

50KW - 50MSCFH

140KW - 140MSCFH Peak

$150K-$350K

25KW - 50MSCFH

30-70KW - Average Mass

$50K - $350K

*OSCOMP IP present in Compression, Transport and Onsite.

Page 18: Throttle Energy Business PPT

Amount of Power to be generated (MW)

10

Equipment Cost (per Unit) Number of Units Total Cost

Multi Stage Compressor (2MMSCF) $700,000 1 $700,000Transporting Cylinders (500MSCF) $600,000 2 $1,200,000Unloader $600,000 1 $600,000       Total Cost     $2,500,000

AssumptionsInlet gas Pressure 650 psiGas Type Dry GasDistance from Source to User <100 Miles

Transportation MediumHighest Efficient (Truck)

Page 19: Throttle Energy Business PPT

Cost of Gas Per 1MCF

$3

Cost of Diesel per Gallon

$4 1 gal = 4 litres. 1 litre = $1

Power Plant Capacity

(MW)

Gas Requirement (MMCF/D)

Cost of Gas ($/D)

Diesel Rquired

(Gallon/D)

Diesel Cost (Litre/D)

5 1 $3,000 7,367 $29,468 10 2 $6,000 14734 $58,936 50 10 $40,000 73670 $294,680

100 20 $60,000 147340 $589,360 200 40 $120,000 294680 $1,178,720

CONVERSION UNITS1 gal 134CF1000 gal of diesel 139MMBTU1SCF of gas 1025BTU1MCF 7.4 Gal of diesel1 gal of diesel 138690 BTU1MW 3412000BTU

Distance (KM)

Typical Cost of Pipeline($M)

20 30100 150200 300300 450

Page 20: Throttle Energy Business PPT

Completed/on-going projectsAnadarko Basin (September 2013)Eagle Ford (February 2014) Alberta (April 2014) Marcellus (June 2014) Permian (October 2014) Other International Oil Fields

Page 21: Throttle Energy Business PPT

Targeted MarketInternational Oil

CompaniesHeavy Industries

Cement FactoriesNigerian BreweriesIndustriesPipe Mills

State GovernmentsIPPs State HousesSecretariats

Manufacturers• Automobiles• Textile• FertilizersFederal Government

Power generation plants across the country

Federal buildings and offices

Transportation companiesPetrochemical Plants

Page 22: Throttle Energy Business PPT

Team Strength Gas and Condensate recovery Project Management Oil and Gas Exploration and Exploitation including Deepwater

Operations Subsea Development Health, Safety Security and Environment Pressure Transient data analysis (Sapphire & Pansystem) Reservoir Characterization and Simulation (Black oil &

Compositional) Learning/Teaching methodologies (Drilling, Natural Gas

Engineering, Process Engineering, Reservoir Engineering, Production and Well Optimizations)

Experimental Design modeling for probabilistic reservoir  Negotiations and Dispute Resolution Global Manufacturing Operations Global Supply Chain Process Development Global Technologies development and implementation

Page 23: Throttle Energy Business PPT

Throttle Energy - Core ValuesSAFETY, Quality and Timely Delivery of Projects

Addiction to safetyNo harm to workers and AssetsNo impact to EnvironmentSafety is not negotiableNo work is safe without safetyRoutine safety and quality auditsDeliver of PromiseSelect the most robust and cost efficient concept

for each project

Page 24: Throttle Energy Business PPT

SummaryThrottle Energy Inc. has partnered with frontier Technology development company in USA to provide long needed solutions to:

Lack of constant supply of Power Cost associated with building Pipelines across State lines Reduce investment needed for Oil and Gas infrastructure

development Flaring of Produced Hydrocarbon associated Natural Gas currently

resulting in lost revenue Pipeline sabotage/bunkering Completely eliminate environmental risks (Loss of Containment) Capture, process and transport produced hydrocarbon associated

Gas at significantly lower cost compared to LNG.

Technology provides fueling solutions to Pipeline-disconnected customers, substituting expensive liquid fuels with Clean Natural Gas

Page 25: Throttle Energy Business PPT

Throttle Energy Inc.Houston, TX 77095

Email: [email protected]: +1.832.298.8400 or +1.281.415.1238 (USA)Phone: +234.816.668.1997 or +234.809.037.2222