  • 8/15/2019 thsis(1)

    1/64

    Cost effective co

    Addis Ababa University Department of

    Berhanu Adane & Mesfin T/giorgis

    Cost Effective Condo

    A Thesis Submitted in

    Degree in Co

    ndominium construction project in Addis Abab

      Construction Technology and Management

    inium Construction Project in A

    Partial Fulfillment of Bachelor of Scie

    struction Technology and Manageme

     

    BY: Berhanu Adane

    Mesfin T/ Giorgis 

    a

    dis Ababa 

    ce (B.Sc.)

    t

    Addis Ababa

    February 2012

  • 8/15/2019 thsis(1)

    2/64

    Cost effective condominium construction project in Addis Ababa

    Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Addis Ababa University

    Ethiopian Institute of Architecture, Building Construction and City Development

    Department of Construction Technology and Management

    A BSc. THESIS ON 

    COST EFFECTIVE CONDOMINIUM CONSTRUCTION

    PROJECTS IN ADDIS ABABA:

    APPROVED BY BOARD OF EXAMINERS: 

    ADVISOR: Ato Tadesse Ayalew (MSc) 

    EXAMINER

    ________________________________ ____________________________________________

    EXAMINER

    _________________________________ ___________________________________________

    CHAIR PERSON

    _______________________________________________________________

    PREPARED BY: -

    Berhanu AdaneMesfin T/Giorgis

    Addis AbabaFebruary 2012, 

  • 8/15/2019 thsis(1)

    3/64

    Cost effective condominium construction project in Addis Ababa

    Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    ABSTRACTHousing is a basic need for civilized living. In many developing countries, housing inadequacies and

     backlog have been increasing mainly due galloping increase in population; fast pace of urbanization and

    other social and economic factors which include breaking up of the joint family system, and steep rise in

    the prices of land, building materials and labour.

    Housing has become one of the complex problems of our times and unless urgent measures are taken

     both at the national and international levels to mitigate the housing problem, it will assume crisis

     proportion with grave adverse consequences on the survival and well-being of the people, as well as the

     process of economic and social development.

    Developing countries need to accord high priority to housing and despite the severe constraints of

    resources; ways and means have to be devised to tackle the housing problem.

    As a matter of fact, cost effective housing means housing at low cost for all sections of the population in

    a better quality standard. Thus the accent is on housing at effective cost as compared to the prevailing

    cost levels.

    It is sometimes felt that what is really intended by cost effective construction is cost reduction in

    housing. Others view it as a low cost housing.

    However, cost effective housing construction, generally implies housing for the low-income families

    housing at affordable cost to them it can even be projected to high income group also.

    The perspective should be clear to all. Surely by low-cost housing it is meant to achieve cost-effective

    housing for all, particularly for the low-income families so that to the extent possible, housing is brought

    within their reach.

    Cost effective construction should not mean low quality housing although the quality and cost go

    together. The total cost of housing, called life-cycle cost of housing taking in to consideration the initial

    capital cost of housing construction and also the recurring cost of maintenance and repair of housing,

    over a period of its economic service life, should be determined and the most cost-effective housing

    should be adopted

    Since 2005 Ethiopia has been implementing an ambitious government-led low- and middle-income

    housing program The Integrated Housing Development Program (IHDP). The initial goal of the program

    was to construct 400,000 condominium units, create 200,000 jobs, promote the development of 10,000

    micro - and small - enterprises, enhance the capacity of the construction sector, regenerate inner city

    slum areas, and promote homeownership for low income households.

  • 8/15/2019 thsis(1)

    4/64

    Cost effective condominium construction project in Addis Ababa

    iAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    In order to avoid these problems and upgrade the systems, it is essential to get a well organized

    construction management team works as well as quality control techniques at construction sites.

    It is obvious that construction quality management is necessary to ensure that the construction is always

    underway and operating smoothly by addressing problems caused by:

      Supply of insufficient skilled construction labors

      Inadequate supply of construction materials

      Lack of proper control of production process, etc.

    The research is focusing the projects of cost effective housing study conducted through questioners,

    interviews and site observations. The findings of the investigation have shown that; on a specific project

    sub-contractors and the main contractor has weak communication between each other .This is because

    the contract agreement is only with the client. This results non-uniform quality of end product .It is

    found out from the respondents that the majorities of labors does not have sufficient skills for the jobs

    they have given, and the contractors are not supplying appropriate manpower required. Among the

    respondents, most of them are not satisfied with the quality of materials brought either from different

    quarry sites or from production areas .It is observed from  sites of those cost efficient hosing projects

    that, negligence of the quality of works is highly developed in most of the people there. Furthermore, the

    site engineers follow traditional way of controlling techniques and among the observed sites most of

    them have poor quality of control mechanisms and production techniques.

  • 8/15/2019 thsis(1)

    5/64

    Cost effective condominium construction project in Addis Ababa

    iiAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    ACKNOWLEDGMENTWe would like to express our gratitude and deep appreciation to our advisor, Ato Tadesse Ayalew, for

    his valuable comments, suggestions and advice during preparing the thesis paper.

    We want to acknowledge Ato Tibebu Asefa and Mr. Ingo from EIABC for their great support in

    material and successful accomplishment of our research work.

    And we would like to thank professionals working in housing development office, site engineers

    supervisors and house hold who have been providing us the necessary information and data required for

    the thesis.

    Last but not least, we would like to thank our families who have been with us for their continuous

    encouragement and assistance.

  • 8/15/2019 thsis(1)

    6/64

    Cost effective condominium construction project in Addis Ababa

    ivAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Table of Contents

    ABSTRACT ........................................................................................................................................... i

    ACKNOWLEDGMENT ....................................................................................................................... iiiList of figures and charts ....................................................................................................................... v

    List of tables ......................................................................................................................................... vi

    Acronyms ............................................................................................................................................ viChapter 1 ............................................................................................................................................... 11. Introduction ........................................................................................................................................ 1

    1.1 Background .................................................................................................................................. 11.2 Statement of the problem .............................................................................................................. 1

    1.3 Objective of the study ................................................................................................................... 21.3.1 The General Objectives .......................................................................................................... 2

    1.3.2 The specific objectives ........................................................................................................... 31.4 Significance of the study............................................................................................................... 3

    1.5 Research limitations ..................................................................................................................... 31.6 Research structure and organization .............................................................................................. 4

    CHAPTER 2.......................................................................................................................................... 52. LITERATURE R EVIEW ....................................................................................................................... 5

    CONTEXTUAL FRAMEWORK  ................................................................................................................. 52.1 I NTRODUCTION .............................................................................................................................. 5

    2.1.1. Historical background ........................................................................................................... 52.1.2 Housing Problems, Housing needs and effective demand ....................................................... 6

    2.1.3 Condominium Housing in Ethiopia Context ........................................................................... 72.1.4 Policy and legal frameworks and the actors in shelter delivery ............................................... 8

    2.2 Housing in Addis Ababa ............................................................................................................. 112.2.1 Access to Shelter and Housing Stock ................................................................................... 11

    2.2.2 Housing Standard, Affordability and Tenure ........................................................................ 12

    2.2.3Design consideration, site selection ....................................................................................... 14CONCEPTUAL REVIEW ................................................................................................................... 17

    2.3 Cost-Effective Constructions ...................................................................................................... 172.3.1 Cost-Effective building economic concepts .......................................................................... 17

    2.3.2 Construction Management ................................................................................................... 172.3.3 Construction industry and building materials ....................................................................... 18

    2.3.4 Building elements ................................................................................................................ 192.3.5 Technological concept and new technologies ....................................................................... 23

    2.3.6 Low-cost housing in construction......................................................................................... 232.3.7 Water, sanitation, Electrical systems and Vertical circulation ............................................... 25

    2.3.8 Impact of science and technology ........................................................................................ 26

    2.3.9 Significance of Building Materials ....................................................................................... 27CHAPTER -3- ..................................................................................................................................... 33

    3. Research methodology ................................................................................................................. 33

    3.1. Research Methods materials and procedures .............................................................................. 343.1.1 Research Approach .............................................................................................................. 34

    3.1.2 Research Area ...................................................................................................................... 343.1.3 Research Design .................................................................................................................. 34

    3.1.4 Population, Sample and Sampling Techniques ..................................................................... 343.1.5 Data gathering instrument .................................................................................................... 34

  • 8/15/2019 thsis(1)

    7/64

    Cost effective condominium construction project in Addis Ababa

    vAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    CHAPTER -4- ..................................................................................................................................... 374 Analysis and discussions ................................................................................................................... 37

    4.1. Introduction ............................................................................................................................... 374.2 Policy implementation ................................................................................................................ 37

    4.3 Material delivery and quality standard ........................................................................................ 38

    4.4 Small scale enterprises ................................................................................................................ 394.5 Schedule, quality and cost .......................................................................................................... 394.6 Affordability and cost effectiveness ............................................................................................ 40

    4.7 Indigenous materials ................................................................................................................... 414.8 Households problem ................................................................................................................... 42

    CHAPTER -5- ..................................................................................................................................... 435. Conclusions and Recommendations.................................................................................................. 43

    5.1. Conclusions ............................................................................................................................... 435.2. Recommendation ....................................................................................................................... 45

    APPENDIX:-A .................................................................................................................................... 47APPENDIX:-B..................................................................................................................................... 52

  • 8/15/2019 thsis(1)

    8/64

    Cost effective condominium construction project in Addis Ababa

    vAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    List of figures and charts

    Figure 1:- Dilapidated Houses

    Figure 2:- Institutional Frame work of HDPO

    Figure 3:- Slum areas in parts of the cityFigure 4:- Concrete in its – visibly – finest form

    Figure 5:- Power Trowel Finishing Techniques

    Figure 6:- Faire faced pigmented concrete wall

    Figure 7:- External finishing stage Block Type E1 at Jemo3 site

    Figure 8:- Terrazzo Riser ready to use

    Figure 9: Flow Chart Representation of the Thesis

    List of tables

    Table 1:- Table 1: Houses constructed in Addis Ababa, 1996-2003

    Table 2:- Financial structure for beneficiaries according to unit type 

  • 8/15/2019 thsis(1)

    9/64

    Cost effective condominium construction project in Addis Ababa

    viAddis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Acronyms

    HDPO: - Housing development project office

    MoWUD: - Ministry of Works and Urban Development

    MSE:-medium to small enterprises

    CEH: - Cost Effective Housing

    (NGO):-Non Governmental Organizations

    AARH Addis Ababa Rental Housing

    USD: - United States Dollar

    AACA:-Addis Ababa City Administration

    CSA: - Central Statistics Agency

    AAHDPO: - Addis Ababa Housing development Office

    RC: - Reinforced concrete

    CSIR:-Central Research institutes under the council of scientific and industrial research

    CBRI:-Central building research institute

    CGCRI:-Roorkee, Central Glass and Central Building Research Institute

    CFRI Central Fuel Research InstituteSERC: - Structural Engineering Research Centre

    IHDP: - Integrated Housing Development Program

    ETB: - Ethiopian Birr

  • 8/15/2019 thsis(1)

    10/64

    Cost effective condominium construction project in Addis Ababa

    1Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Chapter 1

    1. Introduction

    1.1 Background 

    Housing Practices is an ongoing series that documents the experiences of countries who are

    implementing large-scale affordable housing program which provides authoritative and independent

    documentation of innovative affordable housing program in countries of the developing world.

    Rather than drawing from theory or abstract models, Housing Practices addresses the demand for

     practical guidance on housing program based on experience. Each volume holistically documents one

    ‘best-practice’ housing program that has achieved significant results.

    The stagnant nature of economic development and rapid population growth of most of the developingcountries makes effective and efficient service delivery difficult for governments, to satisfy the need of

    their residents. Housing is one of the basic necessities for human survival; despite it remains for long

     period as a critical problem of most of the cities of developing countries. This is the main situation in

    Ethiopia as well.

    The paper deals with analyzing the existing condominium construction situation of the city to identify

    different factors that affect the strategy originally planned make it low cost.

    1.2 Statement of the problem

    This study outlines the state-of-the-practice about cost effective construction in terms of construction

    management, material and work methodology within condominium projects of Addis Ababa. In the use

    of construction materials and discusses the applications of indigenous materials. An evaluation based on

    technical, environmental, and economic factors indicated that have significant potential to replace

    conventional materials for various applications in construction, and should be projected for future

    construction. Specific applications of the products and potential problems associated with their usage in

    the operations are also the rationale for the study.

    Civil engineering has made a vast progress with the development of new materials and sophisticated

    techniques of construction. Quality control, time saving and reliability have become the motto of civil

    engineering. But, the construction of low-cost residential buildings in Ethiopia is dominated by the use

  • 8/15/2019 thsis(1)

    11/64

    Cost effective condominium construction project in Addis Ababa

    2Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    of labour-intensive technique of construction. There is not much improvement in the management and

    quality of construction due to the following reasons.

    old traditional techniques of construction are still on-going as they are thought that they are assumed

    cheaper and facilitate the contractors:

      cheap labour attracts the local contractors as advanced machines are costly

      old techniques of construction involve more labour than machines

      Most of contractors have not undergone civil engineering education

    Also the housing standard of the city is incompatible with the affordability of the majority residents to

     build their shelter. In other words the majority of the residents have no financial capacity to build their

    dwelling to fulfill the standard of the regulation, provided that the estimation of construction cost of the

    units increasing day to day. However this is beyond the current reality since the price of construction

    materials is rising rapidly.

    Measures taken to alleviate the problem by public and private sectors could not bring about a solution

    especially from the need of the poor. The city administration had difficulties to supply standard housing,

    in quantity as well as in quality terms, and basic services.

    There are, however, a number of unanticipated challenges facing the program The most pressing is

    the affordability of the units for low-income households, with the cost increases in the price of

    condominium houses deeming them no longer an option for many low-income households. Furthermore,

    the inability to pay the monthly mortgage and service payments forces many households to move out of

    their unit and rent it.

    The issue of successful housing construction of the city there for rests mainly on strategies applied to

    increase cost effective construction. So the question is what are the possible strategies that can enable

    cost effective construction of the city to build decent dwelling?

    1.3 Objective of the study

    1.3.1 The General Objectives

    The general objective of this research is to show better alternative ways of plan preparation and

    implementation that suits the socio-economic and political (policy) environment of the country at large

    and the city in particular. This paper deals with the cost effective construction in terms of construction

    management, material and work methodology within condominium projects. Analysis and the current

  • 8/15/2019 thsis(1)

    12/64

    Cost effective condominium construction project in Addis Ababa

    3Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    quality control management practice in cost effective housing projects. The research is based on case

    study conducted on respective projects; focuses will be made on condominium house project sites in

    Addis Ababa. 

    1.3.2 The specifi c objectives

      To assess the ongoing condominium housing construction projects in Addis Ababa particularly

    in one of the selected site with respect to the strategic policy, plan and its goal achievement.

      To study cost effective housing construction in terms of construction management, material and

    work methodology on the basis of past and ongoing experience.

      To assess the affordability of condominium housing.

      To observe problems of end products ready for use by the households and those already being

    used by the household and come up with alternative solutions.

    1.4 Significance of the study

    The study is expected to give new insight on the current status of condominium housing construction

    and also give information to researchers in housing construction.

    The overall focus of this study is to assess the status of condominium housing construction practices and

    identify factors that challenge housing construction and give alternative ways. So, it is the researchers

    that this study may:

    - Give some information related to condominium housing construction

    - To assist responsible bodies to assess the strength and weakness of the condominium housing

    construction

    - Inspire researchers for further study in the area. Moreover, this study will attempt to give light on

    the urgent need for integrated condominium housing construction

    1.5 Research limitations

    This Study conducted through site-visits, interviews with key stakeholders and household surveys on

    condominium sites.

  • 8/15/2019 thsis(1)

    13/64

    Cost effective condominium construction project in Addis Ababa

    4Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    We acknowledge the contribution of all individuals and organizations. In addition appreciation is given

    to the households who participated in the household surveys undertaken in Jemo and Gofa.

    During the research work, we have been facing a number of constraints .Some of the major limitations

    are mentioned as follows:

    ►  Time limitations►  Shortage of data collecting instruments►  Unwillingness of the construction companies and professionals to give informations

    To overcome the limitations, we have been spending all the time given, all of our resources we have got

    with maximum possible efforts.

    1.6 Research structure and organization

    The report contains the following five main chapters

    Introduction: In this chapter, the general summary of the research is presented. It includes the background, aims and objectives, limitations, and structure and organization of the research.

    Literature review: This chapter presents the basic concepts, principles and implementations of QCM

    .Investigations of the present quality control systems, causes of quality faults and improvementmechanisms are discussed in detail.

    Research methodology: this chapter deals with the methods chosen for the research together with the

    reasons for selection. It also describes the sources of data, and how questionnaires, interviews and

    discussions are conducted.

    Results and discussions: In this chapter, the analysis of the data collected through questionnaires

    interviews and literature review is presented .The different quality control techniques and managementsystems are discussed to measure the efficiency applied upon cost efficient housing projects.

    Conclusions and recommendations: This chapter presents a summary of the findings of the above

    chapters of the thesis. In addition, it includes the conclusions and recommendations of the research.

  • 8/15/2019 thsis(1)

    14/64

    Cost effective condominium construction project in Addis Ababa

    5Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    CHAPTER 2

    2. LITERATURE REVIEW

    CONTEXTUAL FRAMEWORK

    2.1 INTRODUCTION 

    Regardless of the economic condition of the developing country attempting to meet its national housing

    needs, it is evident that in the selection of housing schemes, the questions of economy remain the

     primary consideration because construction of houses requires considerable investment of capital. As a

    result, there is a great need to reduce building cost with the help of optimum utilization of building

    materials that are scarce and costly. Speed in construction is also to be brought about so that

    construction is completed in a short time as possible and the houses are ready for early occupation with

    relatively less cost. [1].

    The conceptual review with respect to cost saving mechanisms is addressed from two aspects, namely

     construction technology aspect and  construction management aspect. Besides these two construction

    aspects are interrelated, a good management skill helps not only to retain the cost saving mechanisms

    considered during the design phase but also to attain additional cost saving and quality techniques.

    However, if the project is not well managed it may cost additional amount and may become more

    expensive than the conventional construction method. What we want to say is that though the cost

    reduction techniques are interrelated, greater attention should be given to the construction management

    that encompasses the inception till completion of the project.

    2.1.1. Histor ical background

    According to many scholars, the concept of condominium is quite old. Albert Ferrer states that “there is

    at least one record of the sale of part of a building, in ancient Babylon (modern Iraq), during the First

    Dynasty, nearly two centuries before the birth of Christ”, and that there is evidence of the use of the

    system among the Greeks, Egyptians, and others. It was during the Middle Ages, when walls were

    constructed to enclose cities in order to provide security, that building space became even scarcer in

    many European cities. This lack of space led to individual ownership of parts of a building, sometimes

    even individual ownership of single rooms, in cities such as Orleans and Paris. Leyser states that this

  • 8/15/2019 thsis(1)

    15/64

  • 8/15/2019 thsis(1)

    16/64

    Cost effective condominium construction project in Addis Ababa

    7Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    meet the Millennium Development Goals (MDGs) in 2015 requires a total of 2,250,831 units, which

    equates to a considerable 225,000 houses per annum. There is massive demand for serviced, healthy

    affordable housing. This demand stems from both the current housing deficit and the poor quality of the

    existing kebele housing stock that is beyond repair. However, there is low effective demand . Effective

    demand is based on the ability and willingness to pay for housing, affected by income and what

    households are prepared to pay. Although effective demand is difficult to determine because it requires

    reliable data on income levels and expenditure patterns of households, their savings capacity and

     prioritization of housing vis-à-vis other forms of investment, it is the case that the majority of Ethiopians

    cannot pay for formal housing supplied by the private market. Therefore, the greatest need is for

    affordable housing. [11]

    Figure 1 Dilapidated Houses

    2.1.3 Condominium Housing in Ethiopia Context

    The idea of condominium housing is a new phenomenon in Ethiopia. It is just as old as the IHDP. It

    emerged as a strategic response to rapid urban population growth, high prevalence of urban poverty, and

    urban unemployment in major Ethiopian cities; because only 30% of the urban house stock was

    regarded to be in fair condition; and the housing shortage is being estimated to be between 900 000 and

    1 000 000 (MWUD, 2006, IHDP 2008). The condominium housing project thus aims at meeting the

    elements of Millennium Goal 7 on Environmental Sustainability, target 11 which seeks to achieve a

    significant “improvement in the lives of at least 1 million slum dwellers“In Addis Ababa city more than

  • 8/15/2019 thsis(1)

    17/64

    Cost effective condominium construction project in Addis Ababa

    8Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    70% of the population lives in slums and the houses are made predominantly from mud and straw

    (IHDP 2008). [4]

    2.1.4 Policy and legal frameworks and the actors in shelter delivery

    Currently though housing policy is not yet formulated at national and city level, the city’s housing

     principle is following the free market economic policy adopted in 1991that create conducive atmosphere

    for private sector particularly the real estate developers to participate in housing development. The

    federal government enacted proclamation on urban development policy that gives high attention for

    alleviating housing problems of urban areas. The city administration has also prepared five years

    housing development program in 2004 to reduce housing problem of the city by 50%. The program

    gives prior attention for alleviating housing problem of low income households. It promotes high raise

    (up to G+4) condominium buildings with a minimum built up area of 22 m2 to minimize theconstruction cost so as to benefit low income families. Government, Private sector (Real estate

    developer, Cooperatives, and Individuals) and Non Governmental Organizations (NGO) are considered

    as the major actors in housing construction and marketing activities. [5]

    The central government represented by AARH was involved in constructing and renting houses for

    residential and other purposes before 1991 none the less the outcome was not as it was required. “Over

    the period 1974-1991, the AARH constructed 8623 dwelling units throughout urban Ethiopia.” (PADCO

    1996:29) At present it is only renting the constructed and nationalized houses with a monthly rent of

    above USD 11.11.The city administration is renting about 150,000 nationalized units rented below USD

    11.11 per month and known as Kebele houses. Besides even though it was responsible for supplying low

    cost residential houses it built 7409 units only during 1996-2004. Now days it is involving in building

    32000 units for residential and commercial purposes with a high emphasis of supplying housing for the

    low income households. The process is however hindered by shortage of financial and material

    resources.

    Housing cooperatives, individuals and real estate developers are the main actors in shelter delivery for

    owner occupied and rental purposes. Nonetheless the sluggish land supply system and unaffordable

    construction cost and requirements are the main factors that affect private housing supply. The number

    of plots allocated by lottery system between 1995 and 2002 was only 2049 (Esrael 2005:41-46). Better

    result is registered in 2004 and 2005 when about 60,000 members organized under 2000 cooperatives

  • 8/15/2019 thsis(1)

    18/64

  • 8/15/2019 thsis(1)

    19/64

  • 8/15/2019 thsis(1)

    20/64

    Cost effective condominium construction project in Addis Ababa

    11Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    2.2 Housing in Addis Ababa

    2.2.1 Access to Shelter and Housing Stock

    The housing condition of Addis Ababa is by far inadequate in quantity and quality terms to meet the

    need of the residents.

    In 1994 the number of housing units (374,742) was 9.5% less than the number of households (414262)

    which need an equal number of dwellings. (CSA1999:218). Based on the data of planning and policy

    commission the difference has increased to 24.8% within ten years, even if the total housing stock has

    risen to 471429 with 2.5% average annual increment. The unfulfilled demand for residential housing in

    2004 was therefore 116,806. Besides, different studies indicate that 269814 (about 80%) of the houses

    located in the inner part of city (337268) need complete replacement because of dilapidation. Hence, the

    estimated gap between housing supply and demand or housing deficit due to new household formationand dilapidation as of 2004 is estimated to be about 386,620. [5]

    Housing supplier No of houses Percentage share

    Public 7409 8.4

    Cooperative 24820 28.2

    Individuals 22225 25.3

    Real estate developers 3520 4.0

    Informal sectors 30000 34.1

    Total 87976 100

    Table 1: Houses constructed in Addis Ababa, 1996-2003

    Measuring housing quality by major indicators that are availability of adequate space for privacy and

    mobility and Physical condition of the houses, most of the dwellings in the city are termed as low level

    of quality. About 31% of the housing stock had only one room and the average number of households in

  • 8/15/2019 thsis(1)

    21/64

    Cost effective condominium construction project in Addis Ababa

    12Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    one-room house is 1.1 (CSA1999:229-233). Therefore about 24.8% of all Addis Ababa household are

    living in overcrowded dwellings. (UIS 2002:24) With regard to physical condition, the feature of most

    of the units is in need of replacement because, 82.3% of the total housing stocks are built up of mud and

    wood and served for more than 40 years (CSA 1999:224-227). [10]

    Figure 3 Slum areas in parts of the city

    2.2.2 Housing Standard, Affordability and Tenure 

    The housing standard of the city is incompatible with the affordability of the majority residents to build

    their shelter. The city administration has adopted housing standards (G+0 and G+1) in 1994 and 2003

    with respective construction cost of 3889 and 6667 USD, which are only affordable to households who

    earn a monthly income of more than 167 and 222 USD respectively. (Esrael 2005:47-48)

    The term “affordable housing” has a number of connotations and definitions. Some regard it simply as

    housing for low-income people. Others interpret “affordable housing” as any form of directly or

    indirectly subsidized dwelling. The formal definition, however, refers to the share of a household’s

    income that is spent on lodging.  An expenditure of a household’s gross annual income on mortgage

     principle, interest, taxes, and utilities has become a recognized measure of how much people should

  • 8/15/2019 thsis(1)

    22/64

    Cost effective condominium construction project in Addis Ababa

    13Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    spend on rented or owned adequate and safe housing. Housing is, therefore, affordable when households

    with income at or below the city, community, or state median income spend no more than some percent

    of their gross annual income on shelter. Along with societal and economic changes, the growing need to

    house a segment of the population affordably has accelerated in recent decades.[9]

    However according to the assessment result of housing study of ORAAMP 92% of the total population

    of the city earn a monthly income of less than 167 USD (ORAAMP 2002:24-26). In other words the

    majority of the residents have no financial capacity to build their dwelling to fulfill the standard of the

    regulation, provided that the estimation of construction cost of the units remain unchanged. On the other

    hand this is beyond the current reality since the price of construction materials is rising rapidly. The

    respective price change of the main construction materials that have great role in determining

    construction cost of a house, with in the last two years was 61%, 37% and 26% for cement, sand and

    reinforcement bar. So that it is not difficult to understand that the percentage of people who cannot

    afford to build standard unit could go up.

     Affordability involves a relationship between housing cost, which includes mortgage payments, rent

     property taxes, and utilities, and household income. In particular, it refers to the ability of homeowners

    or potential homeowners to make payments on a home.  Access refers to the ability of potential

    homeowners to obtain financing for a home. It is largely determined by lending practices set by the

    lender’s conventions and affected by the availability of financing interest rates, down payment

    requirements, and other borrowing terms and conditions. The  affordability gap is another important

    term that is commonly used. It is defined as the difference between the amounts a household can afford

    to pay as a percentage of income and the actual rent or mortgage payment needed . [9]

    Unit Type Down

     payment

    Interest rate Grace period Repayment

     period

    studio 10% 0% 6 month 20 years

    1-Bed 10% 2% 3 month 10 years

    2-Bed 30% 7.5% - 15 years

    3-Bed 30% 7.5% - 10 years

    Commercial 100% - - -

    Table 2 financial structure for beneficiaries according to unit type

  • 8/15/2019 thsis(1)

    23/64

    Cost effective condominium construction project in Addis Ababa

    14Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    In the light of tenure, Addis Ababa has two forms of housing tenure, government and private, which

    accounted for 40.4% and 50.8% of the total housing units respectively (CSA1999:253). Residents who

    own land formally are secured to obtain tenure certificate irrespective of sex, even though those

    households who built house on illegally obtained land, which proportionate about 25% of the total units,

    (ORAAMP 2002:34) are not secured to legal status and are vulnerable to forced eviction. [5]

    2.2.3Design consideration, site selection 

    Housing design involves the form, dimensions, orientation, natural lighting, ventilation, and spatial

    organization of dwellings. There is no “ready-made” solution for housing design in reconstruction.

    Careful and contextualized integration of many issues determine whether or not a rebuilt house’s

    stakeholders, most importantly, its inhabitants, are satisfied. 

    The Addis Ababa city administration is constructing houses based on master plan and neighborhood

     planning of the city. The existing dominant housing topology is changed from single to multi-storey (up

    to G+4) to maintain the population density of the core area 650-2000 Inh/hect proposed by the master

     plan. For instance 696 units are built on 45191 m2 plot of land or on average 755 persons are settled on

    one hectare. (AAHDPO 2005: 3)

    The other main principle of the design of the condominium houses is that maintaining the existing mixed

    settlement that is constructing units for different income groups and purposes. Based on this units for

    commercial and communal purposes are also constructed with the Studio up to three bed room type of

    residential houses. [5]

    According to the housing development project office of Addis Ababa Ethiopia; 173.8 hectares of land

    was spared and prepared for 34,280 condominium units in the city. This includes land for the erection of

    the condominium houses, land for common space, land for local kitchens, land for common laundry and

    land for septic tanks and drainage laying space. The research established that there were no criteria used

    for site selection. Land belongs to the government; as such the government provides land for

    condominium housing projects in order to cut construction costs. Building sites were randomly selected

    for the project on open spaces in inner city and some on the peripherals of the city. Households that

     benefited from condominium houses in the inner city had an advantage of living and working in the

    inner city without transport costs; and access services. Those households who benefited from

  • 8/15/2019 thsis(1)

    24/64

    Cost effective condominium construction project in Addis Ababa

    15Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    condominium projects outside the city centre are now incurring costs of transport to acquire services to

    and from the city centre. [10]

  • 8/15/2019 thsis(1)

    25/64

    Cost effective condominium construction project in Addis Ababa

    16Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Figure 4 External finishing stage Block Type E1 at Jemo3 site

    Figure 5 Terazo Riser ready to use at Jemo3 site

  • 8/15/2019 thsis(1)

    26/64

  • 8/15/2019 thsis(1)

    27/64

    Cost effective condominium construction project in Addis Ababa

    18Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    accountants, attorneys, insurance and bonding underwriters, design professionals, and the owner, must

     be organized and carefully coordinated. Those who succeed in this complex and difficult business are

    the ones who familiarize themselves thoroughly with the daily operations of their jobs. They understand

    the needs of different clients and design professionals and are able to tailor services to them. [18]

    2.3.3 Construction industry and building materials

    The policy should also promote use of appropriate building materials for mass housing constructions

    Special emphasis in national policy would have to be laid on prevention of environmental degradation,

    energy conservation, and ecological balance.[14]

    As with finance and urban service provision, the government significantly controls the construction

    industry. Before 1991 the government had a monopoly over the production and supply of building

    materials. Even though the government is still active in retailing and some subsidies remain in placematerial production and supply is gradually shifting to a market based approach where prices are by-

    and-large market prices.

    Building materials are high in price and of a low quality relative to neighboring countries. For low-

    income housing the most common building materials used are wattle and daub (‘chikka’) for walls, with

    roof rafters of round tree lengths (usually Eucalyptus) covered with corrugated iron sheeting, and skim

    concrete or compacted earth floor. Larger multistory commercial and residential buildings in urban areas

    are composed of reinforced concrete frame and slab construction with hollow brick or fired brick infill

    walls.

    There is a pressing need for more cost efficient alternative materials, as the current cost of construction

    materials is a high proportion of total construction cost, typically around 70 per cent. The construction

    industry comprises four main sectors: building and residential development sector (construction

    companies), civil engineering sector, professional services, and informal self-building sector.

    The national Ethiopian Building Code, Ethiopian Building Proclamation 624/2009 is a legal document

    that outlines the building regulations and requirements, for use by local authorities to ensure building

    standards are maintained in their jurisdiction. The codes are only used and enforced in buildings

    developed in the formal sector. [6]

    The construction sector is undergoing several changes. The government’s plan for the budget year of

    2008/09 was to enhance “the capacity of the construction industry by making it capable and competitive,

  • 8/15/2019 thsis(1)

    28/64

    Cost effective condominium construction project in Addis Ababa

    19Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    enhancing its contribution to the country’s economy, enabling it to meet the demand for housing

    construction, and enabling it to create ample employment opportunities”. It aimed to achieve this by

    improving construction industry policy; developing a construction industry capacity building

     programme; and ratifying and implementing the national building proclamation.[6]

    2.3.4 Building elements

    2.3.4.1 Indigenous building Materials

    Indigenous building materials have been used extensively for building houses at affordable cost. They

    are easily available locally at little or no cost and local people are conversant with the technology of

    using them for construction of houses largely through self-help.

    The performance of the houses built with indigenous building materials is suited to the geoclimatic

    conditions. However, frequent repairs and reconstruction are required. Moreover, large-scale damage

    and destruction takes place due to natural disasters like heavy rainfall and floods, earthquakes and

    landslides, strong winds and cyclones, and fires.

    It is, therefore, incumbent on builders to achieve economic optimization in the use of indigenous

     building materials by application of modern science and technology, so that more durable and livable

    houses can be constructed at lowest possible cost. This is also necessary to ensure sustainable

    development without causing environmental degradation and ecological imbalance, which have become

    matters of overriding significance.Some notable progress has been made in some developing countries in the improved use of indigenous

     building materials for low-cost housing and is briefly mentioned here, along with its potential for

    tackling the massive problem of shelter for the people at affordable cost. [14]

    2.3.4.2 Fair faced concrete structural and wall elements

    The description of fair-faced concrete is not always entirely clear-cut, and various different definitions

    are given for it in the normative literature. Essentially, fair-faced concrete is a part of the structure that is

    intended to remain on view after completion. When it comes to planning a project, functionality andoptimum space utilization are decisively important – but so too are the surfaces, and the visual impact

    that these surfaces have. The focus is thus on the appearance that the architect wishes to impart to the

    fair-faced concrete surfaces (the "architect's wishes"). [17]

  • 8/15/2019 thsis(1)

    29/64

    Cost effective condominium construction project in Addis Ababa

    20Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Spun concrete is characterized by a nonporous, closed fair-faced concrete surface. With the surface

    design, you can allow your ideas to run free - the individual, uniform color shading in any pattern you

    wish offers you almost boundless leeway for design. Simply select your design wishes from a large

     palette of colors and surface structures.

    You can also chose additional mechanical treatment of the surfaces: e.g., sandblasting, chiseling,

     polishing, or granulating. The great resistance of these surfaces to scratches and impacts and to

    aggressive environmental effects (for example, corrosive salty sea air) minimizes preventive and

    corrective maintenance costs. The noticeably smooth surface of the spun concrete places your poles and

    masts in just the right light - from functional as well as design aspects. [17]

  • 8/15/2019 thsis(1)

    30/64

    Cost effective condominium construction project in Addis Ababa

    21Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Figure 6 Concrete in its – visibly – finest form

    Figure 7 Faire faced pigmented concrete wall Royal Nederland Embassy Chancery building

    in Addis Ababa

  • 8/15/2019 thsis(1)

    31/64

  • 8/15/2019 thsis(1)

    32/64

    Cost effective condominium construction project in Addis Ababa

    23Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    2.3.5 Technological concept and new technologies

    The housing design considers land as scarce commodity and the provision of basic infrastructure as

    relevant cost factor.

    However, the costs for basic infrastructure can only be economized if inbound infill areas are used

    Settlements on the fringe or outside of urban centers are financially not viable because of the high costs

    for the provision of minimum basic infrastructure.[12]

    The housing designs are elaborated according to the Ethiopian Building Code Standard and take into

    consideration the different earthquake zones within Ethiopia

    The following new technologies are introduced by the Low-cost Housing Project:

    • New hollow block size - more economical, easier to handle.

    • U-shaped block, same size as hollow block used for prefabrication of lintels and beams.

    • Reinforcement for columns inside of the hollow blocks - no formwork required for columns.

    • Combined strip- and slab foundation - apt for any kind of soil.

    • Pre - fabricated slab system (beams and hollow blocks) - no formwork required.

    • Modular architectural system – adjusted to varying financial capabilities of beneficiaries.

    • Designs to be adapted to any kind of soil and earthquake regions.

    • Reduction of material wastage of up to 30%.

    • Environmentally friendly approach, as no wood is needed for formwork. [12]

    2.3.6 Low-cost housing in construction

    The term low-cost housing has many conceptions and it would be appropriate to clarify the meaning of

    this popular terminology. Low- cost housing means housing at low cost for all section of the population.

    Others define it as low-cost housing means that from the given physical resources of funds, materials,

    land, and skills one should able to build the maximum number of houses of good quality at affordable

    cost i.e. building houses at lower cost as compared to the prevailing cost level.

    It is sometimes felt that what is really intended by low-cost housing is cost reduction in housing others

    view it as cost-effective housing. Therefore, through the low- cost housing programs it easier to achieve

    cost-effective housing for the existing housing shortage particularly for the low-income families so that

    to the extent possible, housing is brought within their reach. Low-cost housing should not mean low

    quality housing although the quality and cost go together. The total cost of housing taking into

  • 8/15/2019 thsis(1)

    33/64

    Cost effective condominium construction project in Addis Ababa

    24Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    consideration the initial capital cost for the housing construction and also the recurring cost of

    maintenance and repair over a period of its economic service life, should be determined during planning

    and designing and the most cost effective housing should be adopted. If it is so, it is unquestionable that

    cost-efficient housing program is the timely solution for the drastically growing housing demand of the

    society in the city.

    Civil engineering has made a vast progress with the development of new materials and sophisticated

    techniques of construction. Quality control, time saving and reliability have become the motto of civil

    engineering. But, the construction of low-cost residential buildings is dominated by the use of labor-

    intensive technique of construction.  

    There is not much improvement in the quality of construction due to the following reasons:

    - Old traditional techniques of construction are on-going as they are cheaper

    and facilitate the contractors

    - Cheap labor attracts the local contractors as advanced machines are costly

    - Old techniques of construction involve more labor than machines

    - About 50 percent of contractors have not undergone civil engineering

    The following construction mistakes are observed and overlooked during the construction phase of

    residential buildings.

    - The cement-sand mix in the mortar and brick masonry is made quite early, prior

    to its use and in larger quantities than required

    - The construction materials like sand, bricks, aggregates, etc, are not washed

    and are full of deleterious material and dust

    - Compaction of bottom strata in foundation work is not carried out

    - During concreting of footings, the concrete is poured at a height greater

    than 1 m. Generally, trapezoidal footings are resorted to, where concrete is never vibrated

    - Reinforced concrete (RC) columns, being an important part of the structure, are neither

    mechanically vibrated nor machine mixed. They are cast in short lifts with increased

    number of joints

    - Cover to reinforcement in columns, beams and slabs is insufficient

    - Misalignment of columns at foundation level and rectification at higher level, leading to eccentric

    loading

    - RC coping at plinth level being an important barrier to dampness is never densely cast

  • 8/15/2019 thsis(1)

    34/64

    Cost effective condominium construction project in Addis Ababa

    25Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    - The plinth filling is never carried out in layers nor compacted

    - At the joints of RC and brick masonry, either the RC surface is not roughened or filling of mortar at the

     joint is not evident

    - The joints of brick masonry at larger heights are improperly racked

    - Mixing ratio in plaster and brick masonry is not maintained

    - In the cases where beams are cast prior to slab:

    (i) In large slabs, the concrete in beams starts setting before casting of RC slab

    (ii) The concrete spilled on the sides of beams while casting is never removed which gets set

    subsequently

    - Reinforcement of RC columns is kept exposed above RC slabs

    - Hacking to concrete surface is poorly done prior to plastering

    - Bearing to lintel on both ends is not sufficient

    - In load-bearing structures, secondary beams are resting directly on the walls giving point loading

    - Corner reinforcement is not provided in two-way slabs leading to upliftment of corners

    - Proper care for uplift pressure in black cotton soil is not taken in:

    (a) Ground beam

    (b) combined footing. [13]

    2.3.7 Water, sanitation, Electrical systems and Vertical circulationThis section treats the major subsystems for conveyance of water and removal of wastes in pipes in

     pipes within a building. The pipes generally extend beyond the building walls to a supply source or a

    disposal means, such as a sewer. To prevent illness and death from unsanitary or unsafe conditions in

    supply of water in buildings and removal of wastes in pipes plumbing and fire prevention codes were

    created.

    There are two commonly recognized model plumbing and fire prevention codes: ‘‘International

    Plumbing Code’’ and ‘‘International Fire Code,’’ These codes are generally revised on 3-year cycles.

    [18]

    The model of the condominium house project provides all sites with drainage and sewer pipes. However

    due to the ever increasing population in Addis Ababa in search of better opportunities and services the

    drainage and sewer pipes are frequently busting and blocked because they are failing to cope with

  • 8/15/2019 thsis(1)

    35/64

    Cost effective condominium construction project in Addis Ababa

    26Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    increasing pressure. Designers did not consider the size of the pipes in anticipation of the proportion of

    the number of condominium housing units built with an average of.5-8 person per household. [10]

    Electrical systems:  Design of the electrical installations in a building used to be simple and

    straightforward. Such installations generally included electrical service from a utility company; power

    distribution within the building for receptacles, air conditioning, and other electrical loads; lighting; and

    a few specialty systems, such as fire alarm and telephone. Though highly sophisticated and capable,

    these systems can easily be disrupted or damaged by power system anomalies such as sags, surges,

    noise, and power outages. Electrical design elements to protect against these disturbances must be

    included and must be designed to be

    appropriate and sensitive, fast, and robust.

    Vertical circulation: Circulation, as usually applied in architecture, is the movement of people and

    goods between interior spaces in buildings and to entrances and exits. Safe, convenient, rapid circulation

    is essential for all buildings under both normal and emergency conditions. Vertical circulation of traffic

    in a multistory building is the key to successful functioning of the design, both in normal use and in

    emergencies. In fact, location of elevators or stairs strongly influences the floor plan. So in the design of

    a building, much thought should be given to the type of vertical circulation to be provided, number of

    units needed, and their location, arrangement, and design.

    Traffic may pass from level to level in a multistory building by ramps, stairs, elevators, or escalators.

    The powered equipment is always supplemented by stairs for use when power is shut off, or there is a

    mechanical failure, or maintenance work is in progress, or in emergencies. [18]

    2.3.8 Impact of science and technology

    As a result of advances in building science and technology, greater attention is being given to quality,

     performance, and durability of houses, provision of fittings and fixtures in the house, and installation of

    more efficient and reliable services offering modern conveniences, such as in kitchen, bathroom, and

    living rooms. Greater attention is also being given to planning and design of houses and buildings to

    ensure constructional, structural, health, and fire safety.An industrial approach to building and housing is being developed to increase the efficiency and

     productivity of the building and housing industry, especially for reducing the cost of construction

    increasing the speed in building, and enhancing the capacity of the industry to undertake large-scale

    housing and building projects.

  • 8/15/2019 thsis(1)

    36/64

    Cost effective condominium construction project in Addis Ababa

    27Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Proper layout of housing colonies and town sectors for rational use of land and its development,

    economical and efficient planning of building and dwelling spaces, and the aesthetics of architecture are

     being given due attention. [14]

    2.3.9 Significance of Building MaterialsBuilding materials account for up to two-thirds of the total cost of house construction. Moreover, the

    speed of construction, safety, durability, and performance of houses greatly depend on the type of

     building materials used and appropriate technology of construction.

     Policy Imperatives

    The production and availability, supply and distribution, Cost and quality of different types of building

    materials, particularly indigenous and traditional building materials, need to be given due attention for

    low-cost housing. For successful implementation of mass housing programs, a national policy for

     building materials is warranted. [14]

    National Plan

    Hitherto, the production and supply of building materials for housing has been almost entirely left to the

     private sector particularly in respect of indigenous materials like mud, bamboos, reeds, and local timbers

    and traditional materials like burnt clay bricks, lime and stone.

    Due to several constraints it has not been possible for the building materials industry in the private

    sector to augment its production to meet the demand. As a result there is a great demand for indigenous

    and traditional building materials and some materials are in short supply and their prices have risen

    considerably. [14]

    Advance planning

    To meet the requirements of construction program, the availability and production of building materials

    of different kinds from indigenous resources would have to be considerably stepped up. Emphasis has to

     be laid on increasing the production of new building materials which can be used as alternative materials

    effecting saving in consumption of costly and scarce materials like cement, steel, and timber. New

     production units have to be installed in different parts of the country based on the latest advances in

    technology.

  • 8/15/2019 thsis(1)

    37/64

    Cost effective condominium construction project in Addis Ababa

    28Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    As a matter of fact the augmentation of production of building materials required for mass housing

     program should be undertaken well in advance so that the required types of building materials are easily

    available reasonable cost.

    Inorganic MaterialsInorganic materials include commonly used materials like soils and literate, burnt clay bricks and tiles

     building lime and clay pozzolana, stones, and sands. As a result of research work done by CBRI

    Roorkee, India and similar research organizations in other developing countries, improved use of these

    materials for construction of low-cost houses has been made for achieving economy. Some of these are

    as given below:

    1.  Techniques of soil stabilization using materials such as lime, cement, and emulsified bitumen to

    make and walls stronger and durable, with better dimensional stability.

    2.  Water-resistant mud plaster using bitumen emulsion for application on soil-based walls and roofs

    to prevent erosion caused by rainfall.

    3.  Good quality late rite and lime bricks for construction of walls.

    4.  Better quality burnt clay bricks and tiles for construction of walls and roof.

    5.  Good quality building lime and clay pozzolana and also ready to-use lime and lime-pozzolana

    mixtures.

    6.  Stone spalls with cement concrete to produce economical stone blocks for masonry work.

    7.  Sand- lime bricks and blocks that is strong and durable. [14]

    Decentralized production

    In view of the locale and for different types of building materials, it is necessary to encourage the

     production of building materials in cottage industries as well as establish small-scale industries for

     production of a variety of building materials using local raw materials and skills.

    It is important to improve the quality of locally produced building materials in conformity with national

    standards and to conserve energy required for their production. Government policies should be devised

    so that technical guidance as well as financial assistance is made available to motivate the manufactures

    to adopt improved production technology. [14]

  • 8/15/2019 thsis(1)

    38/64

    Cost effective condominium construction project in Addis Ababa

    29Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Augmentation of conventional Materials

    In the case of conventional building materials such as cement, cement concrete products, and other

    metallic building components such as roofing sheets, augmentation of production has to be undertaken

    in a planned manner. However, the cost of these materials is generally high on account of high incidence

    of exercise duty, sales tax, and other taxation on raw materials as well as finished products. Most of the

    conventional materials are so costly and sometimes scarce that they are by and large beyond the

    affordability of the common people and so cannot be employed for mass housing.[14]

    Alternative Building materials

    It is important, therefore, to search continuously for alternative building materials that are cheaper and

    durable. Research and development in this field needs to be supported and financed by appropriate

     policy. A number of indigenous and traditional building materials are in short supply. For example, there

    is great scarcity of timber and to prevent deforestation use of timber in construction should be either

    eliminated or reduced to the extent possible by use of alternative materials. Valuable agricultural soils

    are being used for production of burnt clay bricks and tiles as well as sun-dried bricks. These need to be

    conserved by use of alternative materials. Consumption of cement needs to be rationalized by use of

    alterative building materials such as mud, lime and clay pozzolana, gypsum binder, or rice-husk lime

     binders.[14]

    A variety of alterative materials have been evolved, the production of which should be encouraged as a

    national policy by promoting the establishment of:

    1.  Demonstration- cum-training plants;

    2.  Pilot plants for introducing the production of alternative materials

    3.  Captive plants for production of materials by large construction departments, and

    4.  Commercial plants for producing alterative materials for making them available in the open

    market.

    5.  Demonstration- cum-training plants;

    6.  Pilot plants for introducing the production of alternative materials7.  Captive plants for production of materials by large construction departments, and

    8.  Commercial plants for producing alterative materials for making them available in the open market.[14]

  • 8/15/2019 thsis(1)

    39/64

    Cost effective condominium construction project in Addis Ababa

    30Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Use of Industrial and Agricultural Wastes 

    Due to a rapid program of industrialization as well as the green revolution in the countryside, as well as

    growth of cities and towns, a variety of industrial and agricultural wastes and city garbage are available

    in increasing quantities which not only pose the problem of disposal but also create environmental

    hazards.

    As a result of research work done in the developing countries, industrial wastes like fly ash, cinder, red

    mud from aluminum plants and phosphor gypsum from fertilizer plants and be profitably used for

     production of a variety of building products and components. [14]

    A number of agricultural waste products such as rice husk, timber waste, and grass fibers, which are

    available in large quantities, can be similarly used, as can city garbage such as paper waste and sludge

    from sewerage plants.

    The national policy must not only support research to find alternative use of waste materials in

    construction but also support financially and technically, particularly through fiscal policies such as tax

    concession, the establishment of a variety of building materials industries using industrial and

    agricultural waste products.

    Manufacture of New Materials

    With the spectacular advances in science and technology, several new materials and building products

    and components have been developed particularly in advanced countries by the production and use of

    which a revolution can be brought about in the building industry and in mass housing. Financial

    assistance should be provided for setting up new building industries.

    Policy measures

    To augment the cheap production of good quality materials, the following policy measures need to be

    taken:

    1.  Provide financial support and technical guidance for expansion and modernization of the existing

    units and for setting up new production units.

    2.  Arrange timely supply of coal and other types of fuel in adequate quantity.

    3.  Promote adoption of more scientific methods of production, particularly to conserve energy by

     providing financial and other incentives.

    4.  Promote the production and use of alternative materials for doors, windows, rafters, purlin

    roofing, and flooring to avoid or minimize the use of timber in construction.

  • 8/15/2019 thsis(1)

    40/64

  • 8/15/2019 thsis(1)

    41/64

    Cost effective condominium construction project in Addis Ababa

    32Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

     Late rite Blocks

    Laterite soils are available in a number of place in the country especially in the western states of

    Karnataka, Kerala and Maharashtra. A process has been developed for the manufacture of lateritic bricks

    or blocks from laetrile soils using lime stabilization having strength of 70-100 kg/cm.[14] Dry-hydrated Lime

    The use of lime and lime pozzolana binder as a substitute for cement is well known. A modern, efficient

     process for production of dry-hydrated lime of standard quality has been developed. This dry-hydrated

    lime can be used in place of cement for making mortars and plasters directl or in combination with

     pozzolana. It is also cheaper than cement mortar and plaster and can be produced in small-scale

    units.[14]

     Rice- husk Ash Pozzolana

    About 12 million tons of rice husks are obtained from the rice mills in the country. It can be for the

    manufacture of bricks and for pozzolana binder. When rice husk is calcined under controlled conditions,

    the ash formed is highly reactive. In combination with lime it can be used as a binder which can replace

    cement in the preparation of mortars and plasters. A process has been developed for the calcinations of

    rice husk which is economical and can be adopted in a small scale. [14]

    Hollow concrete Blocks

    In places where suitable soils do not occur for manufacture of good quality bricks, cement hollow

    concrete blocks are manufactured and used for 2-3 storied buildings without adopting reinforced cement

    concrete (RCC) frame structures. These are also suitable as filler block wall construction with RCC

    frame for high rise buildings. The machinery for manufacturing hollow concrete blocks as well as the

     process are available indigenously and are being used in several places. [14]

    Secondary Species of Timber

    Several lesser known species of timber can be used in construction after seasoning and preservative

    treatment. By use of seasoned secondary species of timber the primary species can be preserved and

    saving of up to 30 per cent can be achieved in woodwork.[14]

     Asphaltic Roofing Sheets

    Asphaltic roofing sheets consist of primary board or board felt impregnated with asphaltic medium and

     protected with conserving material. The board is manufactured from scrap pear bagasse, jute waste and

    other locally available waster material. The asphaltic roofing sheets are recommended for use in regions

  • 8/15/2019 thsis(1)

    42/64

  • 8/15/2019 thsis(1)

    43/64

    Cost effective condominium construction project in Addis Ababa

    34Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    3.1. Research Methods materials and procedures

    3.1.1 Research Approach 

    The research focuses on assessing the present construction management and material quality and work

    methodology on condominium projects at Addis Ababa to permit cost effective construction system to

     be applied on cost efficient housing projects. In order to meet the aims of the research, a qualitat ive and

    quantitative approach was utilized.

    3.1.2 Research Area

    Our research area is Gulele sub city Jomo 3 condominium housing project in Addis Ababa.The site is

    chosen because we have better accesses for data and information and also assume there would be other

    factors that contribute to the study.

    3.1.3 Research Design

    Generally there are two major categories of design: observational study and experimental or intervention

    study.For our reaserch we have chosen observational study since the intension of this study is assessing

    and describing the existing situation in condominium projects; hence descriptive design is applicable

    3.1.4 Population, Sample and Sampling Techniques 

    Our population the condominium housing projects of Addis Ababa.From this population we have

    selected Gulele sub city Jomo 3 condominium housing project as our sampling area.For the application

    of the study we have used simple random sampling technique in which this technique helps us to give

    equal probability for our subject.

    3.1.5 Data gathering instrument 

    The instrument used to gather the required information includes questionnaire, interview, observation

    and personal experience.

  • 8/15/2019 thsis(1)

    44/64

    Cost effective condominium construction project in Addis Ababa

    35Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    Questionnaire

    It’s prepared to obtain information from contractors, consultants, employer and households as they are

    the center for the research.

     Interview

    To secure additional information, unstructured interview question were conducted.

    Observation

    In order to make the research stronger actual on site observation technique were carried out.

     Personal experience

    One of the major reasons that we have selected this research topic is because we have many experiences

    in the condominium housing projects as well as other similar type of projects in which we acquire

     professional skill and knowledge. Based on these exposures we have been experiencing different prosand cons attached to the housing construction. These leads us to find alternative solution for those

     problems we come across.

  • 8/15/2019 thsis(1)

    45/64

  • 8/15/2019 thsis(1)

    46/64

    Cost effective condominium construction project in Addis Ababa

    37Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    CHAPTER -4-

    4 Analysis and discussions

    4.1. Introduction 

    The analysis of the research is carried out by from the data collected through questionnaires, interviews,

    formal and informal discussion and observations on condominium housing construction sites.32

    questionnaires are distributed to those who are involved in condominium housing projects, among them

    14 questionnaires are received from professionals with in depth knowledge in the subject. Formal and

    informal discussions are conducted with selected site supervisors and office engineers. More over the

    questionnaires and site observations on quality of works and on workmanship are carried out on two

    condominium housing projects. Analysis of results also deals with the concepts and findings which are

    written in the literature review portion of the research. The names of the contractors and projects are not

    given in order to keep the privacy of companies.

    Stake holders No of

    questionnaires

    distributed

     No of

    questionnaires

    received

     No of

    questionnaires

    not received

    Questionnaire

    received

     percentage

    Employer 5 3 2 60%

    Contractor 10 8 2 80%

    Consultant 5 3 2 60%

    House hold 40 30 3 75%

    The information we gathered through questionnaires from employers, contractors, households and

    consultants are briefly discussed here.

    4.2 Policy implementation

    Our first research question was:

     Is the housing policy being implemented as per the program?

  • 8/15/2019 thsis(1)

    47/64

    Cost effective condominium construction project in Addis Ababa

    38Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

    From the data collected we have found out that 30% of the respondents responded that the housing

     policy being implemented as per the program. But 70% of the respondents were replied that in order to

    achieve the planned implementation:-

      Contractors and sub contractors must improve their performances.

      Design problem and late delivery of construction materials which have considerable effect on project

    delay must be improved.

      Improving proper planning and policy implementation and

      Government has to revise the policy that has been implemented.

    4.3 Material delivery and quality standard

     Do have come across any problem that the material delivery by IHDPO?

    Material delivery and its quality that IHDPO delivered is another major cause of delay in condominium

    housing projects. From the total respondents 85% suggested shortage and late delivery of construction

    materials on site and the remaining 15% responded the major problems are improving through time as

    compared to the early practice. The respondents in addition raise issues like: -

      IHDPO has to allocate the required materials on time contractors in order to overcome delay on

    construction works.

      Construction material demand and supply has to be balanced.

      Massive delivery system has to be deployed and

      Temporary storage at each site must be provided.

    The materials delivered by IHDPO will cause you to excess wastage due to its low quality standard?  

    From the data collected the quality standard is hampered because of the material delivered by IHDPO

    From the respondent’s loss or wastage of cement, coarse aggregate, precast beam, roofing materials,

    metal works and steel structure are listed here under:-

      85% of the respondents have replied that the cement wastage is 0-5% but the remaining 15% of the

    respondents are within the range of 15-20%.

      70% of the respondents suggested that the reinforcement wastage is 5-10% and the other 30% of the

    respondents replied between 15-20%.

  • 8/15/2019 thsis(1)

    48/64

    Cost effective condominium construction project in Addis Ababa

    39Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

      70% of the respondents have responded that wastage from coarse aggregate ranges from 0-5% but the

    remaining 30% of the respondents are within the range of 5-10%.

      70% of the respondents suggested that hollow block wastage is 5-10% and the remaining 30% of therespondents are within the range of 15-20%.

      57% of the respondents have replied that precast beam wastage is 0-5% but the remaining 43% of the

    respondents are within the range of 5-10%

      70% of the respondents suggested that roofing material wastage is 0-5% and the other 30% of the

    respondents replied between 5-10%.

      65% of the respondents have responded that wastage from steel structure ranges from 0-5% but the

    remaining 35% of the respondents are within the range of 5-10%.

      57% of the respondents suggested that sanitary material wastage is 5-10% and the remaining 43% of the

    respondents are within the range of 15-20%.

      57% of the respondents suggested that electrical material wastage is 5-10% and the remaining 43% of the

    respondents are within the range of 20-25%.

    4.4 Small scale enterprises

     Is subcontracting to small scale enterprise being supportive to the implementation of the housing

     program?

    All of the respondents have responded that small scale enterprises are not as such supportive to the

    implementation of the housing project in terms of skill, productivity, performance, work ethics and

    ability to perform on time.

    4.5 Schedule, quality and cost

     Do you think a condominium housing project in Addis Ababa is completed within the proposed work

    schedule?

    All of the respondents of our questionnaires have responded that condominium housing in Addis Ababa

    are not completed as per schedule due to different factors like :-

      Late delivery of materials such as cement, reinforcement, electrical and sanitary materials on site.

  • 8/15/2019 thsis(1)

    49/64

    Cost effective condominium construction project in Addis Ababa

    40Addis Ababa University Department of Construction Technology and Management

    Berhanu Adane & Mesfin T/giorgis

      Lack of close supervision

      Poor quality of materials

      Poor production of construction materials by small scale enterprises

      Design and budget problem

      Poor performance of contractors and

      Government housing construction policy and implementation.

     Does the projects are in cost overrun?

    All of the respondents of our questionnaire have suggested there is cost overrun on condominium

    housing project due to different possible reasons delayed material delivery, design incompleteness,

    contractor’s performance, lack of proper supervision, poor project coordination, corruption and lack of

    interest from the higher officers.

     Do you think the project is being completed according the specified quality standard?

    All of the respondents have responded quality standard on condominium housing project is affected by

    different reasons like:-

      Lack of experience

      Quality of materials from the supplies

      Performance of the contractors and sub contractors

      The material that are used for finishing is highly low quality

      Lack of skilled laborers

      Use of poor construction materials

      Lack of close supervision by consultants

      Poor workmanship and

      Poor quality production of construction materials by unskilled small scale enterprises.