track works - urban mobility indiaurbanmobilityindia.in/upload/conference/66404d67-1b21-42de-bb30...

19
TRACK WORKS Mr. Preetam Ganguly

Upload: others

Post on 08-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

TRACK WORKSMr. Preetam Ganguly

Page 2: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 2

Alstom Track Offering

> Concrete track> Ballast Track

MAIN LINES METROS TRAMWAYS > Direct fastening concrete

track> Sleepers concrete track> Ballast track

> Rubber wheel concrete track> Direct fixed concrete track> Sleepers concrete tracks> Depot ballast track

> Compliance with every track specifications

> Ballast Track

TW5

> Concrete Track with sleepers for LRT

TW1

> Concrete Track using APPITRACK

TW2

> Concrete track for rubber tyre metro

TW4

> Concrete track for steel wheel metro

TW3

Page 3: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 3

Some track works figures

285 124

406

92

522

1 428

-

200

400

600

800

1 000

1 200

1 400

1 600

Km

of s

ingl

e tr

acks

TW1 TW2 TW3 TW4 TW5 TOTAL

Reference solutions

Kilometers of single tracks

TW120%

TW29%

TW328%

TW46%

TW537%

5 references solutions

Concrete track with sleepers for LRT

Concrete track using APPITRACK

Concrete track for steel wheel metro

Concrete track for rubber

wheel metro

Ballast track

Page 4: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 4

Complete track works capabilities

>Strong for design & procurement support in French Office

> Recruitment of skilled people for local design office

> Minimise expatriates : Project Manager and Construction Manager

HUMAN RESOURCES SOURCING EQUIPMENTS> Local investigations on

heavy plants & tools available for renting

> Accurate availability planning of in house heavy equipments

> Local : Pre-cast concrete sleepers plant, concrete

> Regional : rail, ballast, sleepers> International : clips, turnouts

> Alstom has a local approach to every track project worldwide

Page 5: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 5

Our Key Expertise : Track EngineeringIn‐depth Expertise provides cutting‐edge as contractor

> Conceptual Eng. and global Performance• Environmental (Noise&Vibration, stray current…)• Track alignments definition and optimisation• Interfaces with other subsystems• Reliability, Availability, Maintainability, Security

performance• Safety case

> Detailed design• Technical specification• Components design and type tests• Construction drawings• Constructability of design• Survey methods

Page 6: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 6

Innovative infrastructure solutions

> R&D products and solutions are based on a proven design already implemented on existing projects

HATTHigh attenuation tram track

APPITRACK Track laying technology

High Attenuation SleeperAntivibration solution

GG8

Page 7: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 7

APPITRACK PROJECTS

Page 8: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 8

APPITRACK Modern technology for track laying

Step 1 : Slipformed concrete

Step 2 : Fasteners insertion

Step 3 : Completed slab with fasteners

Step 4 : Completed track

Step 5 : Finished track

Page 9: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 9

APPITRACK - Automatic Pin & Plate Inserter for TRACK

> Accelerates construction => up to 6 times less than the traditional method

> Preserves the environment and reduces carbon emission

> Reduces civil works, concrete volumes and dust> Reduces noise and disturbances> Ensures cost effective & high quality track

construction due to the machine’s high precision> Less painful operations and 3 to 4 times less

accident hazards

Average daily speed in linear meter : 150 lm for tram (maximum 403 lm) 400 lm for metro

> A fully mechanized installation method developped by Alstom

Page 10: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 10

-Average Appitrack output: 95 lm / day-Average Manual teams output: 21 lm / day-19km done as of today in appitrack/completed

-Average Appitrack output: 79 lm / day-Average Manual teams output: 18 lm / day-16km done in appitrack out of 33km

-Average Appitrack output: 128 lm / day-Average Manual teams output: 22 lm / up to 5 teams- 14km done in appitrack/completed

-Average Appitrack output: 130 lm / day-Average Manual teams output: 22 lm / day

APPITRACK Some project data

> JERUSALEM PROJECT – Completed

> ALGIERS PROJECT – As of 28th February 2011

> REIMS PROJECT – Completed

> CLEO PROJECT – As of 28th February 2011

> Installation program can be more aggressive to increase Appitrack usage

Page 11: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 11

APPITRACK Metro – A new solution

> Tests successfully done in Singapore (length of pumping > 400m)

> Control of concrete consistency test successfully done in Singapore for slipforming

Appitrack (optimised) versus typical project (excluding depot) - 12,2 %

> Optimised planning

> Optimised cross section (less concrete)

> No Stray Current Corrosion Control (to be estimated)

> Comparable perimeter as a new typical project

> Insertion tests done with rebars

> Successful Pumping Tests (> 400 m)

> Development of fastening systems with approved suppliers

> Free for tender in November 2010

> 30 potential projects within 4 years

Page 12: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 12

HAS (High Attenuation Sleeper) : An alternative to floating slab track

Page 13: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 13

HAS - High Attenuation Sleeper An alternative to floating slab track

Fastening system according

to customer choice

Concrete sleeper Rigid plastic hull

Holes for conductor rail support

Polyurethane seal

> Use of a rigid hull• Reduction of stiffness (no vertical friction between sleeper and hull)• Friendly maintenance (sleeper easily clipped in the hull)

> Concept of track with sleepers• Friendly construction (standard production rate without discontinuity)• Reduction of tunnels diameter (FST systems being thicker)

> Concept of track with sleepers• Attenuation higher than 20dB at 63Hz

Page 14: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 14

Advantages of HAS over FST

> Less concrete (optimisation of the cross section)

> Less manhours required for installation

> Same method than rest of the line

> No stress on the linear planning of works

> Adjustable to specific Rolling stock data

> Friendly Maintenance

HAS sleeper

Page 15: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 15

HATT : High Attenuation Tram Track

Page 16: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 16

HATT – High Attenuation Tram Track

> Preserve neighbourhood comfort• Attenuation over 10 dB• Urban insertion

> Reduce floating slab track quantity• Reduction of more than 25%

of the trackworks costs• Reduction of worksites costs• Reduction of interfaces (Civil

Works, drainage, APS)

> An existing alternative solution• Proven system: already

installed• « proven use » and « proven

design » system type • Trackworks antivibratil

systems installation • Continuous rail support • Less concrete and no tapis

Page 17: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 17

TRACK WORK REFERENCES

Page 18: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 18

Tram ReimsTram RouenTram La Rochelle LRTTram Strasbourg ElecTram Lyon Tram Montpellier ElecOrly Val Toulouse Tram Bordeaux extGrenoble Tram Paris MRT Meteor

Metro Caracas

Metro Mexico

Tram AlgiersMaroc Fes -MeknesTram Constantine

Metro Santiago

Tram L1 Orléans

Metro Lausanne

Tram Dubai

Metro Istanbul Marmaray

Milan L5 ext. Italy

Tram Firenze L2&3

Athens Suburban

Metro L2 & 3 Athens

Metro Cairo

HSL CTRL 2 - UK

Tram Sao Paulo 3rd

RailTram Brazilia

Metro Taiwan

Metro Singapore MRT ExtSingapore NEL ExtSingapore Downtown Line

Tram Buenos Aires

Bangkok MRT Blue Line

Metro Chennai/India

Tram Jerusalem

Venezuela MRT Los Teques

Track Platform - Main references

Page 19: TRACK WORKS - Urban Mobility Indiaurbanmobilityindia.in/Upload/Conference/66404d67-1b21-42de-bb30 … · Infrastructure - Track Works - Page 3 Some track works figures 285 124 406

Infrastructure - Track Works - Page 19

www.alstom.com