training swmm lid control
TRANSCRIPT
Training of SWMM LID control
2
• Based on the given input data file we will add LID (Low Impact De-velopment) options for subcatchments
3
• EPA’s SWMM 5.1 has been extended to model the hydrologic per-formance of specific types of low impact development (LID) controls.• LID controls that you can choose include 7 green infrastructure practices 1. Permeable pavement 2. Rain gardens 3. Green roofs 4. Street planters 5. Rain barrels 6. Infiltration trenches 7. Vegetative swales (not optional in WMAM)• You will edit 6 types of LID structures by using the LID control option of EPA SWMM5.1 • Follow the instructions (step 1 to step 7) to enter all values • The following tables are information of the LID control you will edit
4
Control name LID type Layer Parameter Value
GR_your initial Green Roof
Surface
Berm Height 3Vegetation Volume Frac-
tion 0.2Surface Roughness 0.1
Surface Slope 1.0
Soil
Thickness 6Porosity 0.5
Field Capacity 0.2Wilting Point 0.1Conductivity 0.5
Conductivity Slope 10Suction Head 3.5
Drainage MatThickness 1
Void Fraction 0.5Roughness 0
<Table 1> Information of green roof
5
<Table 2> Information of permeable pavement
Control name LID type Layer Parameter Value
PP_your initial Permeable Pavement
Surface
Berm Height 1Vegetation Volume Fraction 0.1
Surface Roughness 0.02Surface Slope 2
Pavement
Thickness 8Void Ratio 0.15
Impervious Surface Fraction 0Permeability 100
Clogging Factor 0
Storage
Thickness 12Void Ratio 0.75
Seepage Rate 0.2Clogging Factor 0
Under-drain
Flow Coefficient 0Flow Exponent 0.5Offset Height 0
6
<Table 3> Information of bio-retention cellControl name LID type Layer Parameter Value
BC_your initial Bio-Retention Cell
Surface
Berm Height 6Vegetation Volume Fraction 0.0
Surface Roughness 0.2Surface Slope 0
Soil
Thickness 12Porosity 0.5
Field Capacity 0.2Wilting Point 0.1Conductivity 0.5
Conductivity Slope 10Suction Head 3.5
Storage
Thickness 12Void Ratio 0.5
Seepage Rate 0.5Clogging Factor 0.2
UnderdrainFlow Coefficient 0Flow Exponent 1Offset Height 0.5
7
<Table 4> Information of infiltration trench
Control name LID type Layer Parameter Value
IT_your initial Infiltration Trench
Surface
Berm Height 0.0Vegetation Volume Fraction 0.0
Surface Roughness 0.24Surface Slope 0.4
Storage
Thickness 36Void Ratio 0.4
Seepage Rate 0.2Clogging Factor 0
Under-drain
Flow Coefficient 0Flow Exponent 0.5Offset Height 0
8
<Table 5> Information of rain barrel
Control name LID type Layer Parameter Value
RB_your initial Rain Barrels
Storage Berm Height 48
Underdrain
Flow Coefficient 1
Flow Exponent 0.5
Offset Height 0
Drain Delay 6
9
<Table 6> Information of rain garden
Control name LID type Layer Parameter Value
RG_your initial Rain Garden
Surface
Berm Height 6
Vegetation Volume Fraction 0.0
Surface Roughness 0.0Surface Slope 0.0
Soil
Thickness 12Porosity 0.5
Field Capacity 0.2Wilting Point 0.1Conductivity 0.5
Conductivity Slope 10Suction Head 2.5
10
• Select LID Controls from the project browser (under Hydrology)
Step 1
11
• Left click the add button or select Project -> Add a new LID Control from the main menu
Step 2
12
• Enter the Control Name for the LID structure
Step 3
13
• Choose the type of the LID structure
Step 4
14
• Enter the parameter values of the surface layer
Step 5
15
• To enter the parameter values of the Soil, Storage, and Under-drain layer click the tab of the layer
Step 6
16
• Follow step 1~6 and use the information in table 1~6 to edit the LID control• After you have entered all the values, you can find your designed LID controls
• Now you will plan the subcatchment area with the designed LID struc-tures• Step 7 to step 11 shows how to edit the LID Usage Editor• Follow the instructions from (step 7 ~ 11) and use the following infor-mation to complete the editing process
17
Subcatchment LID Process
S1 Infiltration trench
S1 Rain barrel
S4 Bio-retention cell
S5 Permeable pavement
S5 Green roof
S6 Rain garden
<Table 7> LID controls for subcatchments
18
Subcatchment LID ProcessArea of Each Unit
Numb of Unit
Surface Width
per Unit
% Ini-tially Satu-rated
% of Imperv Area
Treated
Return all
out-flow to perv
S1 Infiltration trench 2320000 4 133 0 40 -
S1 Rain barrel 100 32 0 0 17 Check
S4 Bio-retention cell 47500 500 0 10 50 -
S5 Permeable pave-ment 3828720 1 683 0 0 -
S5 Green roof 1840000 12 136 0 0 -
S6 Rain garden 1650000 1 0 15 5 -
<Table 8> LID planning parameters for each structure
19
• Open the editing window (properties) of one of the subcatchments
Step 7
20
• Left click on the box in LID controls
Step 8
21
• Left click Add to open the LID usage editor
Step 9
22
• Select the LID control name• Enter the planning parameter values for the selected LID structure
Step 10
23
• If you check the LID Occupies Full Subcatchment, the LID struc-ture will automatically calculate the Area of each unit as it is de-signed
Step 11
Thank you~