tro suncor
TRANSCRIPT
![Page 1: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/1.jpg)
Suncor’s Tailings Future A new tailings management approach
TM Trademark of Suncor Energy Inc.
![Page 2: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/2.jpg)
1
Tailings • Like all mines, oil sands
mines generate tailings • Tailings are
– left over mixture of fine clay, sand, water, residual bitumen
– produced during extraction process that separates bitumen from the oil sand
![Page 3: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/3.jpg)
2
Tailings Handling & Storage • Tailings are pumped into holding ponds to settle
solids from water – Heaviest material – mostly sand – settles to bottom – Water rises to the top – Middle layer – mature fine tailings (MFT) – is made up
of fine clay particles suspended in water
![Page 4: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/4.jpg)
3
The Tailings Challenge • Some MFT particles settle, but much remains
suspended in water • MFT takes many decades to firm up sufficiently for
reclamation • As a result, Suncor has need more and larger tailings
ponds over the years to store MFT
![Page 5: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/5.jpg)
4
Suncor’s Tailings Ponds • Eight ponds
– Covering a total of 26.8 square km
– Containing about 179 million cubic metres of MFT
• Active ponds – Account for nearly 15
percent of the 19,737 hectares of disturbed land Suncor is working to reclaim
![Page 6: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/6.jpg)
5
Wapisiw Lookout Pond 1A
Pond 2/3
Pond 5
Pond 6
Pond 7
Pond 8A
Pond 8B
South Tailings Pond
Suncor’s Tailings Ponds
![Page 7: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/7.jpg)
6
Speeding MFT Consolidation • Consolidating tailings (CT)
technology currently used to speed MFT consolidation
• CT process – Pioneered by Suncor in the
1990s – Adds coarse sand, gypsum to
MFT to accelerate release of water
• Suncor has developed a new and better process to further accelerate MFT consolidation called MFT drying
• MFT drying is a key TROTM process component
TM Trademark of Suncor Energy Inc.
![Page 8: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/8.jpg)
7
CT: Mining Operation Life-Cycle
![Page 9: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/9.jpg)
8
TROTM Process – Overview
• TROTM process a new approach for managing tailings at our oil sands mining operations near Fort McMurray – Expected to result in significant
improvement in the speed of tailings reclamation
– Will help meet new regulatory requirements, changing stakeholder expectations
– More than $1 billion investment planned for implementation
TM Trademark of Suncor Energy Inc.
![Page 10: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/10.jpg)
9
TROTM Process Overview
TM Trademark of Suncor Energy Inc.
![Page 11: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/11.jpg)
10
TROTM Process: Mining Operation Life-Cycle
TM Trademark of Suncor Energy Inc.
![Page 12: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/12.jpg)
11
How the TROTM Process Works • Process involves converting
MFT more rapidly into a solid landscape suitable for reclamation – MFT is mixed with a polymer
flocculent – Mixture is deposited in thin
layers over sand banks with shallow slopes
– Resulting product is a dry material that can be reclaimed in place or moved for final reclamation
– Drying process occurs over a matter of weeks
TM Trademark of Suncor Energy Inc.
![Page 13: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/13.jpg)
12
About The Polymer • Adheres to clay particles in
MFT causing them to bundle together – Clay separates from the
water • A class of chemical used
in municipal water treatment to settle out solids – Safe, as it is inert and
does not react with the environment
![Page 14: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/14.jpg)
13
Expected TROTM Process Benefits
• Use of TROTM process to manage tailings: – Reduces need to build more
tailings ponds • MFT will be consumed more
quickly as it is generated – Accelerates reclamation
• Allows reclamation of mined areas soon after mining
– Reduces existing MFT inventory
• As MFT is consumed independently of plant operations, TROTM process can be used to reduce MFT inventory held in existing ponds
TM Trademark of Suncor Energy Inc.
![Page 15: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/15.jpg)
14
TROTM Process Compared to CT: Time To Reclamation
• Use of TROTM over CT technology is expected to result in a shorter time to reclamation
• TROTM process – A reclaimable surface 10 years after initial
disturbance • CT
– A reclaimable surface 30 years after initial disturbance
TM Trademark of Suncor Energy Inc.
![Page 16: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/16.jpg)
15
TROTM Process Implementation Under Way • More than $1 billion allocated
for full commercial scale implementation
• Heading into the 2011-2012 winter season, Suncor had: – Processed over 5 million tonnes
of tailings fines – Capacity to process 25,000-
30,000 tonnes of tailings fines per day
– Six TROTM process MFT drying systems
TM Trademark of Suncor Energy Inc.
![Page 17: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/17.jpg)
16
TROTM Process Implementation Under Way
• Implementation project – First phase complete Q1
2012 – Second phase complete
Q4 2012 • Suncor on track to meet,
exceed fluid tailings reduction targets – As mandated by ERCB
under Directive 74
TM Trademark of Suncor Energy Inc.
![Page 18: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/18.jpg)
17
TROTM Process Impacts – Now, In The Future • Fundamentally changing
how tailings are managed – 180 million tonnes of oil
sand processed annually – 50,000 tonnes of fine clays
ingested per day • Plans for five additional
tailings ponds cancelled • Expected to reduce tailings
ponds at mine site from eight to one – Total land area covered by
ponds to shrink by 80%
TM Trademark of Suncor Energy Inc.
![Page 19: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/19.jpg)
18
TROTM Process – Tailings Collaboration • Suncor, six oil sands
companies to work together – A unified effort to advance
tailings management • Each company to:
– Share existing tailings research and technology
– Remove barriers to collaborating on future tailings research, development
• Suncor to share TROTM process details – Companies in turn committed
to future tailings research investments
TM Trademark of Suncor Energy Inc.
![Page 20: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/20.jpg)
19
TROTM Process – Recognition
• Emerald Foundation – 2011 Emerald Challenge Award
• Alberta Chamber of Resources – 2011 Major Reclamation Award
• Canadian Association of Petroleum Producers – 2010 Responsible Canadian
Energy Award • ASTech Foundation
– 2010 ASTech Award
TM Trademark of Suncor Energy Inc.
![Page 21: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/21.jpg)
20
For More TROTM Process Information • Visit http://www.suncor.com/tailings • View our TROTM process video • View our Reclamation video
TM Trademark of Suncor Energy Inc.
![Page 22: TRO Suncor](https://reader038.vdocuments.pub/reader038/viewer/2022102623/5880eccd1a28ab0d358b6e07/html5/thumbnails/22.jpg)
21