1. Site Survey – TSS conducts a site survey, assessing the facility and recommending improvements to increase capabilities and extend the lifespan of the Data Center
2. IT Programming & Planning -- Analyzing the client’s future IT system demands, using industry best practices and con-verting them into expected space, pow-er & cooling needs
3. Evaluation & Assessment – Establishing a programmatic Design Criteria that clari-fies critical expectations for the Data Center infrastructure to support IT opera-tions
TSS conducts each Facility Assessment using this structured approach in order to effectively analyze options and pro-
vide balanced recommendations.
A TSS Data Center Facilities Assessment provides clients with a roadmap, by conducting a thor-
ough assessment and leveraging options that ultimately result in a world class facility. Client deci-
sion-makers can select from insightful, budgeted choices that are based on best practice princi-
ples for Data Center design and operation.
The TSS Facilities Assessment allows clients to:
Address concerns about facility space, power
and cooling capacity, as well as issues of relia-bility and maintainability
Anticipate and correct potential short-term sys-
tem limitations as well as long-term facility defi-ciencies
Demonstrate how varying IT growth scenarios
will affect facility resources Predict future expenditures based on realistic
budget plans Employ best practices that improve operating
efficiencies Analyze strategic facility options to determine
organizational best values
Bridging the Gap Between IT and Facilities℠
TSS analyzes each client’s Data Center requirements, founded on Best Practices for IT Growth Modeling
Incorporating Future Trends Starts with Customer-Based IT Projections & Capacity Planning
Considering Business Drivers and Trends
Anticipates Technology Developments
Evaluating the Impact of Alternatives and Options
Conversion to Facility Infrastructure Requirements Equipment Space Projections
Electrical & Mechanical Demand Loads
System Reliability & Operational Requirements
Visualizing Phased Techniques That Sync with Budget Cycles Matches Infrastructure Needs With IT Growth
Supports a scalable, modular approach to procurement and
implementation
A documented Design Criteria specifies the short and long-term program expectations needed to support the client’s Data Cen-ter operations.
Targeting improvements to Data Center capacities Flexibility to support increasing densities
Implementing modularity for smart-growth
Responding to today’s escalating reliability demands
Definition of Reliability/Tier Level
Integrating maintainability into the infrastructure
Specifying Guidelines for the Infrastructure Electrical & Monitoring Capabilities
Mechanical & Fire Protection Capabilities
Racking and Cabling Concepts
Improving Energy Efficiency
Analysis of Options and Recommendations Consideration for maximizing existing systems
Recommendations recognizing current constraints
Real World cost-conscious recommendations
Constructability Programmatic Phased Approach
Minimize Impact on Data Center Operations
TSS assesses the client’s specific Data Center facility. Briefing on overall client objectives
Gain understanding of planning objectives related to IT and
infrastructure
Review of existing drawings and design documentation
Identification of previous design objectives
Gain understanding of existing infrastructure
Survey of the current environment and infrastructure
Architectural
Mechanical
Electrical
Fire Protection
Assessment of Existing Conditions
Capabilities and Limitations
Identification of Single Points of Failure
Current Utilization and Excess Capacity
1. A Gap Analysis that outlines current capaci-
ties and compares them against expected
future requirements
2. Roadmap for recommended facility modifi-
cations needed to address the gap
3. Project budgets based on real-world experi-
ence
4. Concise decision criteria to use in executive
briefings to help gain management commit-
ment
IT Operations
Security
Structured Cabling
Leadership in Mission Critical Environments