    MODEL 1 2 3 4

    Simulation Time (Day) 20.83 20.83 20.83 20.83

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    2/12

    MODEL 1 2 3 4

    BAHAN MENTAH

    Schedulle Time (Day) 20.83 20.83 20.83 20.83

    Capacity 150 150 150 150

    Total Entries 130 119 124 128

    Avg. Time Per Entry (HR) 162.06 153.27 67.89 112.19Avg. Contents 42.14 36.48 16.84 28.72

    Maximum Contents 89 76 42 58

    Current Contents 88 76 40 57

    % Utilization 28.09 24.32 11.22 19.15

    MESIN POTONG (TOTAL)

    Schedulle Time (Day) 20.83 41.67 41.67 20.83

    Capacity 1 2 2 1

    Total Entries 42 43 84 71

    Avg. Time Per Entry (HR) 11.82 23.04 11.79 6.99

    Avg. Contents 0.99 0.99 0.99 0.99

    Maximum Contents 1 2 2 1

    Current Contents 1 2 2 1

    % Utilization 99.27 99.07 99.07 99.27

    PEMESINAN (TOTAL)

    Schedulle Time (Day) 20.83 20.83 41.67 41

    Capacity 1 1 2 2

    Total Entries 41 41 82 70

    Avg. Time Per Entry (HR) 11.94 11.94 11.91 11.93

    Avg. Contents 0.98 0.98 0.98 0.83

    Maximum Contents 1 1 2 2

    Current Contents 1 1 2 2% Utilization 97.89 97.89 97.68 83.48

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    3/12

    MODEL 1 2 3 4

    Bahan Mentah:

    Schedulled Time (Day) 20.83 20.83 20.83 20.83

    % Empty 1.12 1.95 2.37 1.12

    % Part Occupied 98.88 98.05 97.63 98.88

    % Full 0 0 0 0

    % Down 0 0 0 0

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    4/12

    MODEL 1 2 3 4

    Mesin Potong

    Schedulled Time (Day) 20.83 41.67 41.67 20.83

    % Operation 58.25 30.25 58.17 98.7

    % Setup 0 0 0 0

    % Idle 0.73 0.93 0.92 0.73% Waiting 0 0 0 0

    % Blocked 41.02 68.82 40.91 0.57

    % Down 0 0 0 0

    Perakitan

    Schedulled Time (Day) 28.83 20 41.67 41.67

    % Operation 97.89 97.89 97.68 83.48

    % Setup 0 0 0 0

    % Idle 2.11 2.11 2.32 16.52

    % Waiting 0 0 0 0

    % Blocked 41.02 0 0 0

    % Down 0 0 0 0

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    5/12

    The total amount of time the location was scheduled to be available. This value is now in decimal format, not truncated

    The percentage of time the location was actually processing an entity.

    The percentage of time no entities were at the location, but the location was not down.

    The percentage of time entities spent waiting for a freed destination.

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    6/12

    . (Excludes off-shift time, break time, and scheduled downtimes.)

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    7/12

    MODEL 1 2 3 4

    Arrival

    Bahan Mentah 0 0 0 0

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    8/12

    Bahan Mentah 1 2 3 4

    Total Exit 40 40 80 68

    Current Qty In System 90 79 44 60

    Avg Time In System (HR) 187.19 169.15 88 137

    Avg Time in Move Logic (HR) 0 0 0 0

    Avg Time Waiting (HR) 151.17 122.21 58.93 110.87Avg Time In Operation (HR) 19.24 19.17 19.18 19.17

    Avg Time Blocked (HR) 16.78 27.77 10.79 6.99

    MODEL

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    9/12

    The percentage of time the entity spent waiting for a resource, a WAIT UNTIL condition, another entity to join or combine,The percentage of time the entity spent in processing at a location or traveling on a conveyor/queue. If an entity is on a conv

    The percentage of time the entity spent waiting for a the next location to become available.

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    10/12

    or behind other entities. (100% - Sum of %s for all other states.)eyor behind another entity which is blocked because the next location is unavailable, the time the entity spent behind

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    11/12

    the other entity is considered % in Operation.

  • 7/28/2019 TUGAS 4 SIMULASI.xlsx

    12/12

    Raw Material 1 2 3 4

    % In Move Logic 0 0 0 0

    % Waiting 80.76 72.25 66.28 80.91

    % In Operartion 10.28 11.33 21.58 13.99

    % Blocked 8.96 16.42 12.14 5.1

    MODEL