tugas kombis_proposal penawaran penambangan batu andhesit
TRANSCRIPT
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 1/26
TUGAS PEMBUATAN PROPOSAL
Mata Kuliah : KOMUNIKASI BISNIS
DOSEN PENGAMPUH
FARIDA ELMI, Drs. MM
DISUSUN OLEH :
ARIF NURYONO 41312110001
FIKAR FATKHUL MANAN 41312110006
AGUS PERMADI 41312110084
M. SIDIQ RAMADHAN 41312110097
AJI DEWANTORO 41312110028
UNIVERSITAS MERCU BUANA
FAKULTAS TEKNIK INDUSTRI
JURUSAN TEKNIK MESIN
2013
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 2/26
PROPOSALPENAWARAN KERJA SAMA PENAMBANGAN BATU
ANDHESITDI KAWASAN IUP PT. GUNUNG SALAK
REKHANNUSA
DESA ANTAJAYA – KABUPATEN BOGOR, JAWA
BARAT
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 3/26
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 4/26
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 5/26
KATA PENGANTAR
Proposal ini di buat dalam rangka menindaklanjuti Komitment kami PT
SIGMA setelah Dewan Direksi kami melakukan kunjungan dan diskusidengan Direksi PT. Gunung Salak Rekhhannusa pada tanggal 12 Juli 2012,
mengenai rencana kerja sama untuk pengerjaan tambang Andhesit dan
dimungkinkan juga tambang pasir.
Team kami ( PT Sigma ) juga sudah melakukan tinjauan lapangan, dan
kami menganalisa visibilitas reserve batu dan pasir. Dan team kami
menyatakan bahwa lokasi tambang PT GSR pada IUP Operasi Produksi No.
541.3/051/Kpts/ESDM/2010 sangat prospek dengan cadangan / reserve
kualitas baik.
Oleh sebab itu kami membuat Proposal ini berdasarkan data dan
informasi yang kami terima dari Team PT. GSR. Sehingga dalam
penyajiannya kami upayakan mendekati kaidah-kaidah yang ada di IUP
dan data-data topografi yang kami terima.
Proposal ini kami buat juga berdasarkan analisa teknis team kami, mulai
dari rencana investasi, perhitungan cadangan, perhitungan produktivitas
alat, kebutuhan alat dan biaya operasi alat sampai total cost activity yang
muncul dari penambangan ini.
Kami juga mencoba menghitung gross profit berdasarkan rencana
produksi dan asumsi permintaan market. Termasuk investasi
infrastruktur, SDM dan biaya overhead.
Mengingat data-data yang kami terima terbatas dan sederhana maka
proposal ini pun kami buat sederhana dan bersifat prediksi dan asumsi.
Adapun kedepan ada data-data yang lebih akurat dan detail kami siap
untuk menghitung ulang dan merencana ulang terhadap proses
penambangan ini.
Demikian penawaran proposal kami, semoga proposal ini menjadi bahan
pertimbangan manajemen PT GSR dan besar harapan kami untuk dapat
diterima menjadi bagian dari proses penambangan batu andhesit di
kawasan desa Antajaya ini.
Jakarta, 17 Juli 2012
Manajemen
PT. SOLUSI GLOBAL MANDIRI
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 6/26
DAFTAR ISI
KATA PENGANTAR
DAFTAR ISI
BAB I PENDAHULUAN
1.1. Latar Belakang
1.2. Maksud dan Tujuan
1.3. Informasi Proses Bisnis
1.4. Permasalahan dan Hipotesa
BAB II GAMBARAN UMUM LOKASI PROYEK
2.1. Gambaran Umum Proyek
2.2. Gambaran Umum Cadangan
BAB III RENCANA KERJA
3.1. Umum
3.2. Ruang Lingkup Kegiatan
3.3 Jenis dan Jumlah Peralatan
3.4 Jadwal Kegiatan
BAB IV TEANAGA KERJA & STRUKTUR ORGANISASI4.1. Tenaga Kerja
4.2. Struktur Organisasi
BAB V KESELAMATAN DAN KESEHATAN KERJA SERTA
LINGKUNGAN HIDUP
5.1. Keselamatan dan Kesehatan Kerja ( K3 )
5.2. Lingkungan Hidup
BAB VI RENCANA BIAYA ( Biaya Operasi dan Kepemilikan )
6.1. Komponen Biaya
6.2. Owning Cost6.3. Operating Cost
6.4. Biaya dasar Operasional
6.5. Biaya Total Investasi dan Market
BAB VII KESIMPULAN DAN PENUTUP
8.1. Kesimpulan
8.2. Penutup
LAMPIRAN-LAMPIRAN
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 7/26
BAB I
PENDAHULUAN
1.1. Latar Belakang
Andhesit adalah suatu jenis batuan beku vulkanik dengan komposisi
antara dan tekstur specifik yang umumnya di temukan pada
lingkungan subduksi tektonik di wilayah perbatasan, atau daerah-daerah dengan aktivitas vulkanik yang tinggi.
Batu alam Andhesit adalah jenis batu alam yang mempunyai tingkat
kekerasan atau density cukup tinggi dan umumnya berwarna gelap /
hitam. Batu andesit dapat digunakan atau di terapkan pada dinding
maupun lantai untuk interior dan exterior.
Batu andesit ini juga di gunakan untuk campuran bahan bangunan
seperti beton dan untuk pondasi jalan. Lebih sering masyarakat
menyebutnya batu gunung.
Berdasarkan informasi mengenai batu andesit ini, yang berlokasi di
Gunung Kandaga, Desa Antajaya Kec. Tanjung Sari Kabupaten Bogor,
PT GSR telah melakukan proses perijinan dengan Perhutani sebagai
pemilik Lahan Gunung Kandaga ini. Sesuai dengan ijin Perhutani
dengan No. PERTEK No. 549/044.3/Agr/Dir maka PT GSR telah
melakukan proses perijinan operasi penambangan ke ESDM yang
sudah diterbitkan berdasarkan IUP No. 541.3/051/Kpts/ESDM/2010.
Berdasar informasi diatas juga PT. SIGMA yang bergerak di bidang jasapenambangan, bermaksud untuk ikut dalam proses eksploitasi batu
andhesit di Desa Antajaya. Dengan skema pekerjaan yang akan
dijelaskan di bab berikutnya.
1.2. Maksud dan Tujuan
Proposal ini kami buat dimaksudkan untuk menindaklanjuti Diskusi
Direksi PT SIGMA dengan PT GSR dalam penambangan batu andesit di
desa Antajaya. Dan berdasarkan beberapa kali pertemuan team kami
dengan Pihak PT GSR, yang salah satunya site visit team geologi kami
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 8/26
pada tanggal 3 Juli 2012 ke lokasi PIT A ( IUP No.
541.3/051/Kpts/ESDM/2010).
Tujuan pembuatan proposal ini adalah gambaran yang jelas tentang
kegiatan penambangan ini, termasuk informasi umum tentang
kegiatan, jumlah, dan jenis alat yang disusulkan untuk mendapatkan
optimum fleet , jumlah dan specifikasi peralatan pendukung, tenaga
kerja, jadwal kegiatan dan rencana produksi. Proposal ini juga
dimaksudkan sebagai memberikan sebagai penawaran kerja sama PT
SIGMA dengan PT GSR dalam bentuk share profit dalam Trading Batu
Andesit ini.
Dalam proposal ini juga akan di informasikan mengenai ruang lingkup
kegiatan persewaan alat berat serta gambaran menyeluruh dari
tahapan kegiatan. Dan yang cukup penting juga adalah biaya rentalrate / hire rate yang diperuntukkan pemindahan tanah atau comodity
expose di lokasi Gunung Kandaga ini. Hire rate ini perlu di informasikan
agar kita mengetahui biaya operasi penambangan yang menggunakan
alat – alat berat ( heavy equipment ).
1.3. Informasi Proses Bisnis
Skema untuk bisnis penambangan secara umum sama dan dapat di
lihat pada alur diagram di bawah ini :
Pada diagram alur diatas dapat di jelaskan sbb :
1. Land Clearing adalah kegiatan pembersihan lahan yang meliputi :
Land
Overburden
Removal
LOADIN DUMPIN
Andesit
CRUSHE STOCK BUYER /
USER
PIT MARKETCRUSHING
PLANT
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 9/26
- Underbrushing : Pembabatan semak dan pohon, yang
berdiameter kurang dari 30 cm
- Felling / Cutting : pemotongan / penebangan pohon lebih dari 30
cm
- Pilling : Penumpukan pohon dan semak
2. Overburden removal
Aktifitas ini adalah pengupasan tanah penutup batuan atau
comodity, kegiatan ini terdiri dari Loading ( penggalian –
pemuatan ), Hauling ( trasportasi ) dan dumping ( pembuangan
material OB )
3. Andesit removal ( comodity expose )
Kegiatan ini adalah pengambilan comodity atau batuan andesit
dengan melalui proses :
- Drilling dan Blasting ( pengeboran batu dan peledakan batu )
- Loading ( pemuatan )
- Hauling ( transportasi )
- Dumping ( pembuangan )
4. Crushing Plant
Kegiatan ini merupakan proses pemecahan batu andesit dengan
alat sejenis crusher dan kemudian di stock di lokasi stock pile dan
untuk selanjutnya akan di pasarkan ke pembeli atau user.
1.4. Permasalahan dan Hipotesa
Undang-undang no. 4 tahun 2009, yang berintikan adanya larangan
terlibat dalam pekerjaan pada bagian inti kegiatan penambangankepada perusahaan yang terafiliasi, dengan pemahaman perusahaan
afiliasi yang tidak tegas dalam penafsiran UU tersebut diatas. Kondisi
ini jelas sangat mempersempit ruang lingkup kegiatan anak
perusahaan apalagi jika jenis aktivitasnya juga sangat di butuhkan oleh
operasi induknya. Atau dengan kata lain bahwa UU No 4 tahun 2009
sangat membatasi anak perusahaan dalam akselerasi kontribusi
kepada perusahaan atau afiliasi lainnya.
Untuk itu, melihat dan mendalami UU no 4 th 2009 ini maka pendirian
perusahaan menjadi solusi ideal untuk pemecahan masalah tersbeut.Namun perlu di antisipasi seluruh dampak yang timbul terkait
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 10/26
pembentukan anak perusahaan tersebut terutama masalah pajak dan
account receiveable dan aturan lainnya.
Dengan kompleksnya aktivitas perusahaan induk dalam hal ini PT GSR,
maka di yakini bahwa pembentukan anak perusahaan menjadi cara
yang tepat untuk peningkatan akselerasi kontribusi perusahaan owner.
BAB II
GAMBARAN UMUM LOKASI PROYEK
2.1. Gambaran Umum Proyek
Lokasi proyek terletak di Lahan Perhutani Gunung Kandaga dengan
PERTEK No. 549/044.3/Agr/Dir yang termasuk wilayah Desa Antajaya,
Kecamatan Tanjung Sari Kabupaten Bogor Jawa Barat.
Luas Lahan Gunung Kandaga adalah 19 Hektar
Dengan komposisi :
1. Lahan milik Perhutani ( Kehutanan ) seluas 12,5 Hektar
2. Lahar tanah milik ( warga ) seluas 6,5 hektar
Koordinat lahan kehutanan adalah 12,5 Hektar adalah sbb :
No.Koordinat
Y Koordinat
XElevasi
Kedalaman
1 107.158083 6.576139 239 139
2 107.158528 6.575278 218 118
3 107.159194 6.575028 223 123
4 107.159972 6.574972 240 140
5 107.160722 6.574667 239 139
6 107.161639 6.574667 243 143
7 107.162361 6.575556 270 170
8 107.163139 6.57625 287 1879 107.162694 6.577556 278 178
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 11/26
10 107.161778 6.577472 248 148
11 107.158674 6.576592 266 166
12 107.159407 6.57596 246 146
13 107.16023 6.575557 246 146
14 107.161209 6.575599 257 157
15 107.16197 6.576255 275 175
16 107.161338 6.576694 245 145
17 107.16037 6.577227 212 112
18 107.158917 6.577113 257 157
19 107.159738 6.57645 237 137
20 107.160572 6.576496 229 129
21 107.159496 6.577129 237 137
Koordinat tanah milik (warga) adalah sbb
No.Koordinat
Y Koordinat
XElevasi
Kedalaman
1 107.156083 6.578222 149 49
2 107.156278 6.577667 160 60
3 107.156778 6.577028 188 88
4 107.159556 6.579528 163 63
5 107.1585 6.579528 161 61
6 107.157694 6.579167 168 68
7 107.156806 6.578833 159 59
8 107.157305 6.577793 201 101
9 107.157783 6.576973 243 143
10 107.160139 6.578444 186 86
11 107.159611 6.578611 188 88
12 107.159277 6.577946 223 123
13 107.158485 6.577908 238 138
14 107.157472 6.576111 215 115
15 107.160778 6.577806 204 104
2.2. Gambaran Umum Cadangan ( Reserve )
Melihat dan mencermati data bahwa luas lahan adalah 19,5 Ha
Dengan deposit yang terukur adalah : 15,2 juta M3 ( batu Andesit /
Split ) dan 24,32 Juta M3 ( batu andesit / split curah )
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 12/26
BAB III
RENCANA KERJA
3.1. UMUM
1. Identitas Proyek :
Pekerjaan Penambangan Batu Andhesit di Wilayah IUP Operasi
Produksi PT Gunung Salak Rekhannusa
2. Lokasi Kegiatan
Gunung Kandaga, Lahan Perhutani
Desa Antajaya, Kecamatan Tanjung Sari, Kabupaten Bogor
3. Target Kegiatan
Tersedia batu andesit / split untuk di pasarkan ke user
4. Waktu Pelaksanaan
Per tahun 360 hari Kalender dengan estimasi durasi waktu 12
tahun kontrak
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 13/26
3.2. RUANG LINGKUP KEGIATAN
Kegiatan yang akan dilaksanakan dengan asumsi sbb :
1. Land Clearing : 19 Hektar
2. OB Removal : 2 Meter ( tebal dari Topo )
3. Andhesit Removal : 19 Hektar
4. Drilling & blasting
5. Crushing Andhesit
6. Stockpiling
7. Supporting ( accses road, drainage, stockpile area dll )
8. Rock Properties
Andesit Insitu Density 2.93 ton/bcm Andesit Loose
Density 1.76 ton/lcm
OB insitu density 1.80 ton/bcm
OB loose density 1.45 ton/lcm
Swell Factor OB 1.66 lcm/bcm
Swell Factor Andesit 1.24 lcm/bcm
9. Andhesit Removal ( Mining PIT ke Crusher / stockpile )
TAHUN TOTALMATERIAL SATUAN REMARK
2012 185.000 BCMInclude
OB
2013 830.000 BCMInclude
OB
2014 1.000.000 BCM
2015 1.000.000 BCM
2016 1.000.000 BCM
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 14/26
2017 1500000 BCM
2018 1500000 BCM
2019 1673000 BCM
2020 1673000 BCM
2021 1673000 BCM
2022 1673000 BCM
2023 1673000 BCM
3.3. Optimum Fleet Proposed
1. Specifikasi Teknis
- Jarak dumping OB 1,000 m1.00 km
- Jarak hauling Andesit(PIT-ROM) 1,000 m1.00 km
- Jarak hauling Andesit(ROM-Public Road) 2,000 m2.00 km
- Grade jalan maksimum 8%
2. Untuk Truck OB ( dari PIT ke waste dump )
Kecepatan rata isi (loaded) 23 km/jam
Kecepatan rata kosong 25 km/jam
Dumping time 1 menit
Positioned time (spot) 1 menit
Effisiens factor 80%
3. Untuk Truck Batu
Kecepatan rata isi (loaded) 23 km/jam
Kecepatan rata kosong 25 km/jam
Dumping time 1 menit
Positioned time (spot) 1 menit
Effisiens factor 80%
4. Material Blasting : 100% Blasted
5. Tabel Equiepment
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 15/26
Assumsi Whrs per year 4990
Annual Rate 6%
Resale Value 10%
Depre Periode lihat tabelReplacement alat disesuaikan dengan depreciation periode nya
US$ RATE 9,000 (Rp)Fuel price 10,500 (Rp/lt)
6. Comsumable Goods
Fuel Price1.1
7 usd/lt
Engine Oil2.4
4 usd/lt
Transmission Oil1.6
7 usd/lt
Final Drive Oil1.6
7 usd/lt
Hydraulic Oil1.6
7 usd/lt
Grease3.8
9 usd/kg
7. Equipment
NO EQ. TYPE BRAND MODELDepreciation
PeriodeFuel EQ Price
1 Drilling machine TAMROCK CHA 660 4 15,00 410.000,002 Hydraulic Excavators KOMATSU PC-300SE 4 30,00 122.000,003 Hydraulic Excavators KOMATSU PC-200 4 18,00 200.000,00
4 Bulldozers KOMATSU D-85SS 4 25,00 237.000,00
5 Wheel Loader KOMATSU WA-180 4 20,00 135.000,00
6 Rigid dumptruck HINO FM 960 4 20,00 105.555,00
7 Motor Grader KOMATSU GD 511A 7 16,00 128.000,008 Crusher LOCAL MANUFACTURE PE 90 _ 1200 7 35,00 1.388.889,009 Rock Breaker NPK 4 - 93.333,00
10 Tower Lamp 8 5,00 12.000,00
8. Parameter – Parameter
a. Pekerjaan meliputi Land Clearing, Topsoil Removal, OB Removal, Andesit
Removal, Road Maintenance
b. Ada 5 hari libur setiap tahunnya, project dimulai dari awal tahun 2012,
Calender Day : 360 hari
c. PA alat 90%
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 16/26
3.4. Perhitungan dan Analisis
- Produktivitas
Perhitungan produktivitas alat berat sangat dipengaruhi oleh
performance alat berat tesebut, karakteristik material, dan kondisikerja. Kondisi kerja antara lain time effisiency, operator skill,
mechanical availability, jarak angkut dll. Sedangkan karakter
material meliputi berat jenis material dan swell factor.
Produktivitas masing-masing alat di hitung dengan
mempertimbangkan aspek kondisi medan kerja dan jenis material.
- Jumlah Kebutuhan Alat Berat ( detail terlampir )
Model EGI Req'nt
Excavator PC 200 1Excavator PC 300 3Bulldozer DZ 85 1Dump truck Hino FM 260 9Wheel Loader WA 180 3Drilling CHA 660 2Motor Grader GD 511A-1 1Dump truck WT 1Crusher Crusher 250 Ton 3Breaker R Breaker 1
Lighting TL 1 26
3.5. Jadwal Kegiatan Produksi ( data lengkap terlampir )
TahunUnit Total 2012 2013 2014 2015 2016
Volume OB Removalbcm 380.000
50.000
330.000
Volume Breaker (Andesit)bcm 300.000 2.700
10.000 20.000 20.000 20.000
Volume Blasting Material
(Andesit)
bc
m
14.700.0
00
132.3
00
490.0
00
980.00
0
980.00
0
980.00
0
Total Volumebcm
15.000.000
135.000
500.000
1.000.000
1.000.000
1.000.000
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 17/26
3.6. Efektif Jam Kerja selama 1 tahun ( Data lengkap
terlampir )
BAB IV
TENAGA KERJA DAN STRUKTUR ORGANISASI
9.1. Tenaga Kerja
Tenaga kerja yang dilibatkan dalam kegiatan ini adalah terdiri dari 2
tenaga kerja ;
2017 2018 2019 2020 2021 2022 2023
30.000 30.000 33.460 33.460 33.460 33.460 33.460
1.470.000 1.470.000 1.639.540 1.639.540 1.639.540 1.639.540 1.639.5401.500.0
001.500.0
001.673.0
001.673.0
001.673.0
001.673.0
001.673.00
0
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 18/26
1. Tenaga Kiriman
2. Tenaga Lokal
Untuk tenaga kiriman telah memiliki skill, kualifikasi dan kompetensi
yang memadahi sesuai prasyarat kompetensi pengawas tambang.Untuk tenaga lokal biasanya di ambil dari lokal wilayah
penambangan, dan lebih banyak tenaga non skill, misalnya tenaga
aministrasi atau pekerja harian lepas.
Tetapi ada kemungkinan tenaga skill seperti operator dan driver di
recruit dari lokal wilayah tambang. Dengan upah sesuai upah
minimum setempat.
Untuk mendukung kegiatan ini maka berikut formasi tenaga kerja
menurut jabatan dan jumlah personel nya :
Department Position Req'ntOperation Project Manager 1
Sub Total 1
Engineering Engineering Sect Head 1
Mine Plan & Data evaluator 1
Surveyor 1
Sub Total 3
Production Production Sect. Head 1 Production Group Leader 3 Operator A2B 25 Driver DT 25
Production Administration 1Sub Total 55
Plant and Logistic Plant Sect. Head 1 Plant Group Leader 2 Mechanics 8 Logistik Group Leader 1 Driver Fuel & Oil Truck 2
Sub Total 14
General Admin HRGA & FA Group Leader 1 HRGA Administration 1
Sub Total 2
HSE HSE Officer 2
HSE Administration 1Sub Total 3
Grand Total 78
9.2. Struktur Organisasi
Dalam rangka efektifitas organisasi yang akan melakukan kegiatan
di lokasi tambang Antajaya, berikut kami sampaikan struktur
organisasi proyek :
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 19/26
BAB V
KESELAMATAN DAN KESEHATAN KERJA ( K3 )
5.1. Keselamatan dan Kesehatan Kerja
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 20/26
Keselamatan kerja adalah suatu usaha untuk dapat melaksanakan
pekerjaan tanpa adanya kecelakaan, memberikan suasana atau
lingkungan kerja yang aman sehingga dapat dicapai suatu hasil yang
optimal dab bebas dari resiko bahaya. Upaya keselamtan kerja
bertujuan untuk mencegah agar pekerja tidak mendapatkanluka/cidera dan juga tidak terjadi kerusakan ataupun kerugian dari
peralatan yang digunakan selama berlangsungnya kegiatan.
Ada beberapa faktor yang sering mempengaruhi terjadinya
kecelakaan, dan faktor-faktor ini yang akan diawasi secara ketat
selama kegiatan berlangsung di lokasi kegiatan, faktor-faktor tersebut
antara lain; Manusia, Mesin dan Peralatan kerja, serta Metode Kerja.
Dengan pengawasan faktor-faktor tersebut secara efektif diharapkan
akan dapat memberikan suasana kerja yang aman dan nyaman.
Untuk konsistensi tindak lanjut pengelolaan K3, maka akan dilakukan
pembinaan secara terarah terhadap seluruh pekerja yang terlibat
dalam pekerjaan dalam rangka mencapai standart keselamatan kerja
yang diinginkan serta dalam upaya mencegah terjadinya kecelakaan
dilokasi kegiatan. Upaya pembinaan yang akan dilakukan adalah
sebagai berikut:
a. Penyuluhan K3, berupa pemasangan poster, baliho dan lain-lainnya;
b. Safety talk, yang akan dilakukan secara rutin setiap hari sebelum
melakukan kegiatan dan pada saat pergantian shift kerja;
c. Safety training, akan dilakukan sesuai dengan kebutuhan terutamaterkait dengan pelatihan penggunaan Alat Pelindung Diri (APD);
d. Safecty inspection, yang dilakukan secara tidak terencana
dimaksudkan untuk mengetahui kekurangan-kekurangan yang
dapat menyebabkan kejadia berbahaya secara dini.
5.2. Lingkungan Hidup
Pengendalian lingkungan hidup terutama akan di arahkan pada proses
pencegahan munculnya efek debu dari batu dan asap dari sumber
manapun. Sehingga debu dan asap tersebut tidak terlepas secara bebas
ke atmosfir yang dapat merugikkan masyarakat dan melanggar hukum
terkait pencemaran lingkungan udara. Sejalan dengan itu juga akan di
lakukan pencegahan kebisingan melalui pemilihan peralatan yang ramah
terhadap polusi. Pengendalian air juga harus diperhatikan, terutama pada
saat curah hujan tinggi, hal ini dapat di lakukan drainage yang layak dan
tempat penampungan air yang memadai.
BAB VI
RENCANA BIAYA ( BIAYA OPERASI DAN KEPEMILIKAN )
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 21/26
6.1. OWNING & OPERATING COST ( BIAYA OPERASI &
KEPEMILIKAN )
NO TYPE TAHUNDELIVERY
PRICE (USD)OOC
(USD/HR)
1 HYDRAULIC EXCAVATOR PC 200 2012 122.000 35,842 HYDRAULIC EXCAVATOR PC 300 2012 230.000 58,353 DZ 85 SS 2012 237.000 56,75
4 WHEEL LOADER 180 2012 135.000 27,695 DUMP TRUCK HINO FM 260 2012 105.555 35,48
6DRILLING MACHINE TAMROCK CHA 660 2012 410.000 53,36
7 MOTOR GRADER GD 511A 2012 128.000 32,798 CRUSHER 2012 1.388.889 130,33
9 ROCK BREAKER 2012 93.333 7,2910 TL 2012 12.000 6,6811 WT HINO FM 260 2012 105.555 35,48
6.2. EQUIPMENT PRODUCTIVITY
NO
EQUIPMENTTYPE
BRANDATTACHM
ENTCAPACIT
Y PRODUCTIV
ITY UNIT
1HYDRAULIC EXCPC 300
KOMATSU
BUCKET1,8 M3
(LCM)133
BCM/HR
2HYDRAULIC EXCPC 200
KOMATSU
BUCKET0,7 M3
(LCM) 64
BCM/HR
3 WHEEL LOADERKOMAT
SUBUCKET 2 M3 (LCM)
115
BCM/HR
4DUMP TRUCK HINO FM 260
HINO VESSEL 20 TON34,6
BCM/HR
5DRILLINGMACHINE CHA660
TAMROCK
BIT 4 INCH25
M/HR
6MOTOR GRADER
GD 511-1KOMAT
SU STD BLADE 3,7 M 7040 M2
/HR
7 WATER TRUCK HINO VESSEL 20 TON 7040 M2/HR
8 ROCK BREAKER NPK 64BCM/H
R
9 CRUSHER LOCAL MANUFACTURE 300 Ton 300 TON/H
R
10 DZ 85 KOMATSUBLADE
250
BCM/HR
6.3. ACTIVITY COST
No Activities Equip Rate Unit Biaya/bcm ($/bcm) Kum Biaya/bcm
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 22/26
($/bcm)
1LandClearing
PC 200 35,84 $/Hr
$
0,009
DZ 85 56,75 $/Hr$0,014 0,023
2 Loading
PC 300 58,35 $/Hr$0,435 0,458
3 Hauling Hino FM
260 35,48 $/Hr$1,018 1,476
4DrillingBlasting
CHA660 53,36 $/Hr
$0,699 2,175
5 Crushing PE 90 -
1200 130,33 $/Hr$1,565 3,740
6 Breaking
PC 200 43,13 $/Hr$0,788 4,528
7
RoadMaintenance
GD511A-1 32,79 $/Hr
$0,066 4,593
WTHino FM
260 35,48 $/Hr$0,076 4,670
8 Supporting TowerLamp 6,68
$0,019 4,688
TotalBiaya
$4,688
OVH 12,5%$0,586
BiayaafterOVH
$5,275
GP 10,0%$5,861
IDR 52745
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 23/26
6.4. TOTAL HARGA PENAWARAN
URAIAN VOLUME UNITTARIF NILAI PEKERJAAN
USD(USD/Unit)
Rp.(Rp./Unit) USD RP
Penggalian / PemindahanTanah:
- Gali 14.995.500 Bcm 0,435 3916,14 6.524.943 58.724.490.102
-Angkut ( 1 ,0 Km) 14.995.500 Bcm 1,018 9161,54 15.264.660 137.381.938.971
- Sebar 14.995.500 Bcm 0,023 208,68 347.695 3.129.252.714
Drilling Blasting+Breaking 14.995.500 Bcm 1,486 13376,43 22.287.366 200.586.290.012
Crushing 14.995.500 Bcm 1,565 14088,24 23.473.359 211.260.230.876
Road Maintenance 14.995.500 Bcm 0,142 1275,16 2.124.628 19.121.653.205
Supporting 14.995.500 Bcm 0,019 170,21 283.591 2.552.322.938
4,688TOTALTARIF 70.306.242 632.756.178.817
12,50% 0,586 OVH 8.788.280 79.094.522.352
5,275Tot after
OVH 79.094.522 711.850.701.169
10% 5,861PROFITMARGin 87.882.803 790.945.223.522
6.5. KOMPONEN OVERHEAD COST
Dalam komponen overhead cost yang di rencanakan 12,5 % adalah
meliputi :
1. Licences & Tax
2. Non Production Equipment
3. Office Expence
4. Royalty ( Fee Lahan )
5. Mess Expences
6. Insurence
7. Safety device & Training
8. Building & camp maintenance
9. Community development
10. Security & Labour supply
11. Site Expences & Entertaiment
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 24/26
BAB VII
PENUTUP
7.1. KESIMPULAN
A. Proposal ini di buat dalam rangka menindaklanjuti Komitment kami
PT SIGMA setelah Dewan Direksi kami melakukan kunjungan dan
diskusi dengan Direksi PT. Gunung Salak Rekhhannusa pada tanggal
12 Juli 2012, mengenai rencana kerja sama untuk pengerjaan
tambang Andhesit dan dimungkinkan juga tambang pasir.
B. Pelaksanaan kegiatan penambangan ini dengan lebih fokus aktivitas
:
- Drill & blasting
- Loading & dumping
- Crushing & loading
C. Kegiatan awal penambangan akan di mulai dari pekerjaan Land
Clearing seluas 19 Ha sampai pekerjaan Crushing.
D. Tenaga kerja yang terlibat dalam pekerjaan ini adalah 78 orang
termasuk tenaga skill operator dan supporting
E. Keselamatan kerja dan lingkungan menjadi bagian penting yang
terintegrasi dengan kegiatan pengelolaan yang akan di lakukan.
D. Total harga penawaran pekerjaan per Bcm Batu andhesit, termasuk
biaya operasi, overhead dan profit adalah Rp. 52.745 / Bcm
dengan asumsi profit 10%.
7.3. PENUTUP
Pekerjaan penambangan batu Andesit yang terletak di Gunung
Kandaga Desa Antajaya Bogor secara perhitungan cadangan dan
kualitas batuan, sangat prospektif dan visible untuk segera di
tambang.
Oleh sebab itu, hal ini sangat membuka peluang kami dari PT Sigma
untuk terlibat dalam proses penambangan ini. Karena kami punya
tenaga ahli yang cukup kompeten di bidang batu, terutama di quarry.
7/14/2019 Tugas Kombis_Proposal Penawaran Penambangan Batu Andhesit
http://slidepdf.com/reader/full/tugas-kombisproposal-penawaran-penambangan-batu-andhesit 25/26
Dengan demikian kami sangat berharap PT GSR berkenan
mempercayakan PT Sigma untuk bergabung dalam team PT GSR
dalam pekerjaan ini. Dan semoga proposal ini bisa menjadi bahan
pertimbangan PT GSR dalam penerbitan MoU atau SPK.
LAMPIRAN – LAMPIRAN